A drainage slag pit structure and its implementation method

By designing drainage and slag pit structures in steep slopes and gully areas, and utilizing gravity retaining walls and protective grids to achieve multi-level protection, the shortcomings of traditional protection measures are solved, the protection effect and stability are improved, and the smooth flow of the drainage system is ensured.

CN123109079APending Publication Date: 2026-11-17POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611309094.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-27
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies are ineffective in intercepting falling rocks on steep slopes and in gullies, and are easily damaged by large rocks. Traditional drainage structures are prone to clogging, making it difficult to balance protection effectiveness and stability.

Method used

Design a drainage slag pit structure, including retaining walls, slag collection pits and drainage culverts. Utilize gravity retaining walls and protective grids to achieve multi-level protection, and combine them with protective nets and arc-shaped steel sections for graded interception and screening, forming a deep basin structure to avoid clogging and improve stability.

Benefits of technology

It effectively intercepts falling rocks from steep slopes, prevents them from overturning and blocking, improves protective stability and impact resistance, ensures smooth drainage, and reduces the frequency of dredging.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109079A_ABST
    Figure CN123109079A_ABST
Patent Text Reader

Abstract

This invention relates to the field of geotechnical engineering protection technology, specifically a drainage slag pit structure and its implementation method. The aim is to provide a drainage slag pit structure and its implementation method. This structure is simple in construction, has strong overall impact resistance, effectively separates flowing water from large-diameter stone debris, avoids blockages and the risk of rockfall, and facilitates subsequent slag removal and maintenance. It is suitable for complex protection conditions such as steep slopes and gullies. The technical solution is a drainage slag pit structure, characterized by: a retaining wall located between the protected site and the steep slope, and at least one slag collection pit; the slag collection pit is located between the retaining wall and the steep slope; a wall gallery penetrating the retaining wall is provided at the lower part of the retaining wall, and the slag collection pit is connected to a drainage culvert through the wall gallery. An implementation method for the drainage slag pit structure includes: 1. Foundation excavation; 2. Main structure pouring construction; 3. Erecting protective grids; 4. Ancillary protection construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of geotechnical engineering protection technology, specifically a drainage slag pit structure and its implementation method. Background Technology

[0002] During the construction process, the site is often surrounded by steep slopes with a gradient greater than 45° and natural gully landforms. The protected sites adjacent to these special terrain areas are subject to continuous erosion by the runoff from the gullies. At the same time, the mud and rocks carried by the gully water can easily form impact loads, posing safety hazards to the site and surrounding structures.

[0003] Currently, the industry commonly uses conventional protection and control measures such as passive protective nets and debris collection barriers to address rockfalls and debris flows on steep slopes and in gullies. However, under the special conditions of steep gullies, existing traditional protection technologies have significant shortcomings, and their protective effects are difficult to meet standards. Firstly, in steep gully terrain, falling rocks roll down quickly and bounce high. Conventional passive protective nets are limited by their own installation height and cannot effectively intercept high-jumping rocks, which can easily lead to rocks overturning the protective structure and causing the protection to fail.

[0004] Secondly, traditional passive protective nets have limited structural strength and poor impact resistance. When hit by large rocks or small-scale mudslides, they are prone to deformation, damage, or even complete destruction, resulting in insufficient protective stability.

[0005] Third, conventional slag trap structures have a single function, only having a simple slag trapping effect. When dealing with the frequent slag and water accumulation conditions in steep gullies, they are prone to large stones accumulating and clogging, causing the drainage and slag trapping functions to fail, and failing to meet the protection requirements of efficient drainage and stable slag trapping.

[0006] In conclusion, it is of great significance to develop a drainage slag pit structure and its implementation method to solve the above problems. Summary of the Invention

[0007] The purpose of this invention is to overcome the shortcomings in the above-mentioned background technology and provide a drainage slag pit structure and its implementation method. The drainage slag pit structure has a simple construction and strong overall impact resistance. It can effectively separate flowing water from large-diameter stone slag, avoid blockage and rockfall risks, and facilitate subsequent slag removal and maintenance. It is suitable for complex protection conditions such as steep slopes and gullies.

[0008] The technical solution of this invention is: A drainage slag pit structure is characterized by comprising a retaining wall and at least one slag collection pit located between the protected site and the steep slope; the slag collection pit is located between the retaining wall and the steep slope; a wall corridor penetrating the retaining wall is provided at the lower part of the retaining wall, and the slag collection pit is connected to a drainage culvert through the wall corridor.

[0009] The retaining wall includes a wall body and a protective netting installed on top of the wall body; the lower part of the wall body is buried in the soil layer, and the top elevation of the wall body is higher than the protected site; the wall body is a gravity retaining wall that is wider at the bottom and narrower at the top.

[0010] The slag collection pit includes an upward-opening pit body and a protective grid installed above the pit body; the bottom surface of the pit body is lower than the bottom plate of the water inlet of the wall corridor, so as to form a water cushion or slag cushion to reduce the impact damage of the slag during rainfall; a number of grid insertion holes for fixing the protective grid are provided around the opening of the pit body.

[0011] The drainage culvert is located below the protected site; the inlet of the drainage culvert is connected to the outlet of the wall corridor.

[0012] The protective grid includes several parallel, spaced arc-shaped steel sections and multiple transverse connecting steel sections that connect the arc-shaped steel sections, so as to allow fine debris to fall and intercept large stones; the two ends of the arc-shaped steel sections are inserted into the grid insertion holes.

[0013] The retaining wall has a right-angled trapezoidal cross-section, with its vertical side facing the slag collection pit and its angled side facing the protected site.

[0014] The posts of the protective netting are anchored inside the retaining wall.

[0015] The longitudinal slope of the drainage culvert is greater than or equal to 5%.

[0016] A method for implementing a drainage slag pit structure includes: Step 1, Foundation Excavation: According to the design requirements, locate and lay out the area between the protected site and the steep slope, and complete the earthwork excavation of the slag pit foundation, retaining wall foundation and drainage culvert foundation in sequence. After excavation, level, compact and inspect the foundation. Step 2, Main structure pouring construction: The retaining wall, slag collection pit and drainage culvert are poured and formed respectively. When pouring the retaining wall, the wall corridor is formed at the lower part of the wall at the same time, so that the slag collection pit is connected to the drainage culvert through the wall corridor; when pouring the slag collection pit, several grid insertion holes are reserved around the opening of the slag collection pit. Step 3: Install the protective grid: Prefabricate several parallel and spaced arc-shaped steel sections, and insert the two ends of each arc-shaped steel section into the corresponding grid insertion holes; lay out the transverse connecting steel sections, and connect and fix all the arc-shaped steel sections in a unified manner, and assemble them into a protective grid covering the upper part of the slag collection pit. Step 4, Ancillary Protective Construction: Install protective netting on the top of the retaining wall and drill holes to anchor the protective netting posts inside the retaining wall, thus completing the overall construction of the drainage and slag pit structure.

[0017] In step 3, when the two ends of each arc-shaped steel section are inserted into the corresponding grid insertion holes, fine sand is also filled into the gaps of the grid insertion holes to achieve buffering and limiting.

[0018] The beneficial effects of this invention are: 1. This invention involves setting up a slag collection pit between the steep slope and the retaining wall, forming a deep basin-like structure that effectively inhibits falling rocks from steep slopes from bouncing over the retaining wall. Combined with a gravity retaining wall serving as the rigid main barrier, this forms a secondary barrier protection system. Simultaneously, a protective netting on top of the wall blocks the splashing of small gravel, achieving graded protection for rocks of different sizes and significantly improving the overall protective stability of steep gully areas.

[0019] 2. This invention sets up a protective grid at the top of the slag collection pit, and achieves passive screening by relying on water flow and the weight of the stone slag, intercepting large-diameter stones outside the pit body, thus preventing large stones from entering the slag collection pit and downstream drainage culvert from the source. This solves the problem of easy clogging and failure of traditional slag discharge and drainage structures, and effectively reduces the frequency of manual cleaning.

[0020] 3. This invention employs an arc-shaped arched grid, which boasts high structural rigidity and excellent impact resistance, effectively resisting the impact loads of falling rocks and mudslides from steep gullies. Simultaneously, the arched structure, higher in the middle and lower on both sides, prevents large stones from accumulating and causing overall blockage, ensuring unobstructed drainage and debris flow, further enhancing the reliability of the entire protective structure. Attached Figure Description

[0021] Figure 1 This is a top view of the structure of an embodiment of the present invention.

[0022] Figure 2 This is a schematic diagram of the transverse cross-section of the retaining wall and slag collection pit in an embodiment of the present invention.

[0023] Figure 3 This is a longitudinal cross-sectional schematic diagram of an embodiment of the present invention (the cross-section is located inside the retaining wall).

[0024] Figure 4 yes Figure 2 Enlarged structural diagram of CIMC's slag pit.

[0025] Figure label: Protected site 1, retaining wall 2, slag collection pit 3, drainage culvert 4, protective grid 5, steep slope 6, protective net 7, wall corridor 8, column 9, grid insertion hole 10. Detailed Implementation

[0026] The present invention will be further described in detail below with reference to the accompanying drawings and embodiments.

[0027] like Figure 1As shown, a drainage slag pit structure includes a retaining wall 2, at least one slag collection pit 3, and a drainage culvert 4. The retaining wall is set along the edge of the protected site 1, and the length of the retaining wall is greater than the length of the steep slope (the length direction is perpendicular to the slope). Figure 2 (See figure). The slag collection pit is located between the retaining wall and the steep slope and is arranged along the edge of the retaining wall. A wall corridor 8 is set at the bottom of the retaining wall, and the slag collection pit is connected to the drainage culvert through the wall corridor, forming an integrated gully protection system for slag collection, sedimentation, diversion and drainage.

[0028] like Figures 2-4 As shown, a protective net 7 is installed on the top of the retaining wall. The lower part of the wall is buried inside the soil layer, and the top elevation of the wall is higher than the ground elevation of the protected site. The wall adopts a gravity-type structure that is wider at the bottom and narrower at the top. It has a large overall weight and strong stability, and can effectively resist the lateral impact of mudslides and water flow on the slope, thus playing a main role in retaining and protecting the site. The cross-section of the wall is a right-angled trapezoid, with its vertical side facing the slag pit and the other angled side facing the protected site.

[0029] The protective net (purchased externally) is placed on top of the retaining wall, and the net posts are anchored and fixed inside the retaining wall. The net is securely installed by drilling and anchoring, which can shield and protect against small flying rocks on the slope, forming a multi-level protective structure in conjunction with the lower retaining wall.

[0030] The slag collection pit includes an upward-opening pit body and a protective grid 5 installed above the pit body. The pit body has a recessed deep basin structure, with the bottom elevation lower than the bottom elevation of the wall corridor's water inlet slab. During rainfall, this forms a water cushion or stone slag cushion, reducing the impact damage of stone slag on the pit bottom. Several grid insertion holes 10 are provided around the perimeter of the pit opening and pit wall for positioning, installation, and limiting the fixation of the protective grid. The protective grid is inserted into the corresponding grid insertion holes, and the gaps between the insertion holes are filled with fine sand to buffer and limit the movement, avoiding hard contact that could cause structural damage. The number of slag collection pits, the spacing between adjacent slag collection pits, and the volume of the slag collection pits can be adjusted according to actual project needs.

[0031] The protective grid comprises several parallel, spaced-apart arc-shaped steel sections and multiple transverse connecting steel sections linking the arc-shaped steel sections. Further, the spacing of the arc-shaped steel sections is set within a specific range (e.g., 40cm~60cm) to allow fine slag to fall while intercepting large stones. The arc-shaped steel sections are arranged in an arch shape, providing good structural rigidity and impact resistance. The protective grid is erected at the entrance of the slag collection pit, relying on gravity for passive slag and water separation. Both ends of the arc-shaped steel sections are inserted into corresponding grid insertion holes.

[0032] The drainage culvert is located below the protected site, with its inlet connected to the outlet of the wall corridor. This allows water accumulated in the slag pit to flow smoothly into the drainage culvert through the wall corridor, achieving orderly drainage. Furthermore, the drainage culvert has a significant longitudinal slope (e.g., greater than 5%) to ensure unobstructed drainage.

[0033] The embodiments of the present invention are as follows: 1. Lay out and position the slag pit according to the design location, and complete the earthwork excavation of the slag pit foundation 3, retaining wall foundation 2, and drainage culvert foundation 4. Control the elevation during the excavation stage to ensure that the bottom of the slag pit is lower than the bottom plate of the water inlet of the wall corridor 8 after the excavation is completed. After the excavation is completed, level and compact the base and accept it.

[0034] 2. Cast-in-place main structure. Tie the reinforcing bars, erect the formwork, and cast the retaining wall, slag collection pit and drainage culvert in one go; when casting the retaining wall, the wall corridor 8 is formed at the bottom of the wall at the same time to ensure that the slag collection pit, wall corridor and drainage culvert are interconnected; when casting the side wall of the slag collection pit, the grid insertion holes 10 are reserved at the perimeter of the pit opening at the same time.

[0035] 3. Install the protective grating. 5. Prefabricate the arc-shaped steel sections, insert the lower ends of the arc-shaped steel sections into the corresponding holes of the grating, and fill the gaps between the holes with fine sand to buffer and limit movement; lay out the transverse connecting steel sections, connect and fix all the arc-shaped steel sections, assemble them into an integral protective grating, and erect it on the upper part of the slag collection pit.

[0036] 4. Install top protective facilities. Install protective netting 7 on the top of the gravity retaining wall, and fix the netting posts 9 inside the retaining wall using a drilling and anchoring process to complete the construction of the entire structure.

[0037] The accompanying drawings illustrate preferred embodiments of the invention. However, the invention can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided to provide a thorough and complete understanding of the disclosure of the invention.

Claims

1. A drainage slag pit structure, characterized in that: It includes a retaining wall (2) located between the protected site (1) and the steep slope (6) and at least one slag collection pit (3); the slag collection pit is located between the retaining wall and the steep slope; a wall corridor (8) is provided at the lower part of the retaining wall, and the slag collection pit is connected to the drainage culvert (4) through the wall corridor.

2. The drainage slag pit structure according to claim 1, characterized in that: The retaining wall includes a wall body and a protective net (7) installed on the top of the wall body; the lower part of the wall body is buried in the soil layer, and the top elevation of the wall body is higher than the protected site; the wall body is a gravity retaining wall that is wider at the bottom and narrower at the top.

3. The drainage slag pit structure according to claim 2, characterized in that: The slag collection pit includes an upward-opening pit body and a protective grid (5) located above the pit body; the bottom surface of the pit body is lower than the bottom plate of the wall corridor water inlet, so as to form a water cushion or slag cushion to reduce the impact damage of slag during rainfall; a number of grid insertion holes (10) for fixing the protective grid are provided around the opening of the pit body.

4. The drainage slag pit structure according to claim 3, characterized in that: The drainage culvert is located below the protected site; the inlet of the drainage culvert is connected to the outlet of the wall corridor.

5. The drainage slag pit structure according to claim 4, characterized in that: The protective grid includes several parallel, spaced arc-shaped steel sections and multiple transverse connecting steel sections that connect the arc-shaped steel sections, so as to allow fine debris to fall and intercept large stones; the two ends of the arc-shaped steel sections are inserted into the grid insertion holes.

6. The drainage slag pit structure according to claim 5, characterized in that: The retaining wall has a right-angled trapezoidal cross-section, with its vertical side facing the slag collection pit and its angled side facing the protected site.

7. The drainage slag pit structure according to claim 6, characterized in that: The posts (9) of the protective netting are anchored inside the retaining wall.

8. A method for implementing the drainage slag pit structure according to any one of claims 1 to 6 above, comprising: Step 1, Foundation Excavation: According to the design requirements, locate and lay out the area between the protected site and the steep slope, and complete the earthwork excavation of the slag pit foundation, retaining wall foundation and drainage culvert foundation in sequence. After excavation, level, compact and inspect the foundation. Step 2, Main structure pouring construction: The retaining wall, slag collection pit and drainage culvert are poured and formed respectively. When pouring the retaining wall, the wall corridor is formed at the lower part of the wall at the same time, so that the slag collection pit is connected to the drainage culvert through the wall corridor; when pouring the slag collection pit, several grid insertion holes are reserved around the opening of the slag collection pit. Step 3: Install the protective grid: Prefabricate several parallel and spaced arc-shaped steel sections, and insert the two ends of each arc-shaped steel section into the corresponding grid insertion holes. Horizontal connecting steel sections are laid out to connect and fix all the arc-shaped steel sections in a unified manner, and the whole assembly forms a protective grid covering the upper part of the slag collection pit. Step 4, Ancillary Protective Construction: Install protective netting on the top of the retaining wall and drill holes to anchor the protective netting posts inside the retaining wall, thus completing the overall construction of the drainage and slag pit structure.

9. The method for implementing a drainage slag pit structure according to claim 8, characterized in that: In step 3, when the two ends of each arc-shaped steel section are inserted into the corresponding grid insertion holes, fine sand is also filled into the gaps of the grid insertion holes to achieve buffering and limiting.