A rapid filling and molding composite water-retaining structure for channels and its water-retaining method
By using a composite structure consisting of an upper water-filled bladder, a lower grouting bladder, and a bottom flexible water-stop pad, and utilizing fast-setting grout to form a self-weight base, the problem of flexible water-blocking structures requiring additional counterweight and being prone to instability during channel emergency repairs is solved. This achieves rapid installation and reliable sealing, preventing channel damage.
Patent Information
- Application Number
- CN202611433601.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-16
- Publication Date
- 2026-11-17
AI Technical Summary
Existing flexible water-retaining structures require additional counterweights or complex anchoring during channel emergency repairs, are prone to instability, are cumbersome to install, are difficult to deploy quickly, and are easily damaged by the channel.
The structure employs a composite structure consisting of an upper water-filled bladder, a lower grouting bladder, and a bottom flexible water-stop pad. By injecting fast-setting grout to form a self-weight base, combined with the design of interlayers and tension ropes, the structure achieves self-stability and rapid installation.
No additional counterweight or anchoring is required. The structure has good self-stability, can be quickly deployed, is easy to reuse, does not damage the channel, and reduces the cost of use and the risk of environmental pollution.
Smart Images

Figure CN123109110A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of channel emergency repair and temporary water-blocking facilities, specifically a rapidly filled composite water-blocking structure for channels and its water-blocking method. Background Technology
[0002] Canals are artificial waterways with free water surfaces, and are indispensable water conveyance facilities in water diversion projects. During long-term operation, canals are susceptible to severe damage from extreme factors such as high groundwater levels, floods, and torrential rains. This damage can cause cracking, bulging, collapse, or even complete failure of the canal lining and structure. In the event of an emergency, immediate emergency repairs must be carried out.
[0003] In emergency repair operations on water conveyance channels, temporary water-blocking facilities need to be quickly deployed within the channels to provide localized dry conditions for channel repair. However, traditional steel cofferdams are difficult to seal quickly with the channel bottom and slopes, leading to concentrated leakage at the bottom and joints. Earth-rock cofferdams suffer from technical drawbacks such as poor water-stopping effect, low construction efficiency, and the potential for channel siltation due to incomplete dismantling.
[0004] Currently, some flexible water-retaining devices (such as rubber dams and rubber cofferdams) are gradually being used in emergency rescue operations due to their advantages such as being lightweight and reusable. However, these flexible structures still have significant shortcomings in practical engineering applications, as follows:
[0005] First, flexible water-blocking structures need to withstand significant horizontal water pressure during the water-blocking process. To maintain their stability, additional counterweights, ballast bags, or complex anchoring systems are typically required at their bottom or on the water-facing side. These additional stabilization measures not only increase the installation process and handling load, but also make it difficult to deploy quickly and accurately in on-site emergency rescue scenarios, thus hindering rescue efficiency.
[0006] Secondly, for wider water conveyance channels, the lateral dimensions of the flexible water-retaining structure need to be increased accordingly, which significantly reduces its overall anti-overturning and anti-slipping capabilities. Due to the lack of sufficient self-weight and bottom friction constraints, the structure is prone to instability, such as forward sliding or backward overturning, under the influence of water level differences on both sides. At the same time, the installation of wide flexible structures needs to span the entire width of the channel, which greatly increases the difficulty of actual operation, makes rapid deployment difficult, and fails to meet the timeliness requirements of emergency rescue.
[0007] Therefore, how to ensure that flexible water-retaining structures have sufficient and controllable stability in channels without relying on additional counterweights or complex anchoring systems, while achieving rapid installation and reliable sealing, has become a technical challenge that urgently needs to be solved in this field.
[0008] The information disclosed in this background section is intended only to enhance understanding of the overall background of this application and should not be construed as an admission or in any way implying that the information constitutes prior art known to those skilled in the art. Summary of the Invention
[0009] The purpose of this invention is to overcome the technical defects of existing flexible water-blocking structures, such as the need for additional counterweights / anchoring, easy instability, cumbersome installation, and easy damage to the channel. The invention provides a rapid filling and molding composite water-blocking structure and its water-blocking method that does not require additional counterweights, has good self-stability, is quick to deploy, is reusable, and does not damage the channel.
[0010] To achieve the above objectives, the present invention provides the following technical solution:
[0011] A rapid filling and molding composite water-blocking structure for channels includes an upper water-filling bladder, a lower grouting bladder, a bottom flexible water-stop pad, and matching connecting components.
[0012] The upper water-filled bladder is a long, sealed bladder with a water inlet and a water-filled bladder exhaust outlet at each end.
[0013] The lower grouting bladder is located directly below the upper water-filled bladder. The lower grouting bladder is provided with at least one grouting port and at least one grouting bladder vent. The lower grouting bladder has a main partition layer along its length, which divides the lower grouting bladder into two independent areas. Each area has multiple isolation layers along its length, which divide each area into multiple small compartments. Each small compartment is provided with a tension rope. The two ends of the tension rope are fixed to the upper and lower walls of the small compartment, respectively, and its length is less than the design thickness of the small compartment in the filled state.
[0014] The bottom flexible water-stop pad is fixed to the lower surface of the lower grouting bladder.
[0015] Furthermore, the lower grouting bladder is equipped with inlet grout-blocking structures at both ends of the compartment.
[0016] Furthermore, the isolation layer is a flexible impermeable structure, which includes at least two layers of flexible material.
[0017] Furthermore, the water inlet of the upper water-filling bladder is connected to the internal water-filling tube located at the bottom of the upper water-filling bladder, and the internal water-filling tube is provided with multiple water outlets spaced apart.
[0018] Furthermore, the bottom flexible waterstop pad is made of a flexible seepage-proof material.
[0019] Furthermore, the vent of the grouting bladder also serves as an observation port.
[0020] A rapid water-blocking method based on the structure described above includes the following steps:
[0021] Step 1: Transport the composite water-blocking structure, which is rolled into a cylinder in its stored state, to the bank of the channel. Fix one end of the composite water-blocking structure to the anchor point on the bank, and connect a traction rope to the other end of the composite water-blocking structure. Pull the traction rope to the opposite bank and fix it to the traction equipment on the opposite bank.
[0022] Step 2: Inject fast-setting grout into the lower grouting bladder. During the grouting process, the traction device is started simultaneously to pull the other end of the composite water-retaining structure toward the opposite bank. The grouting compartment sinks and presses against the bottom of the channel due to the weight of the grout. When the lower grouting bladder is full, the other end of the composite water-retaining structure is fixedly connected to the anchor point on the opposite bank.
[0023] Step 3: After the grout in the lower grouting bladder reaches the initial solidification state, water is filled into the upper water filling bladder to the design pressure, so that the upper water filling bladder forms a water-retaining wall.
[0024] Step 4: After the emergency repair is completed, first drain the water from the upper water-filled bladder, then divide the lower grouting bladder into several small pieces along the isolation layer and the main partition layer and remove them separately, and finally recover the main body of the composite water-blocking structure.
[0025] Furthermore, the water filling pressure mentioned in the third step shall not be lower than the static water pressure corresponding to the designed water-blocking height.
[0026] Furthermore, the fast-setting grout is a cement-based fast-setting grout.
[0027] Furthermore, in the second step, the traction speed of the traction device is matched with the grouting speed, the vent of the grouting bladder remains open during the grouting process, and is closed and pressure maintained when grout continuously flows out of the vent of the grouting bladder.
[0028] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0029] 1. Excellent self-stability, requiring no additional counterweight or anchoring. This invention uses a lower grouting bladder to inject fast-setting grout, forming a self-weighted base that replaces the concrete base slab or counterweight blocks required for traditional rubber dams. The grouting bladder employs a combination design of a main diaphragm layer, an isolation layer, and tension ropes, effectively controlling uneven deformation during grouting and ensuring uniform distribution of the base within the channel. The weight of the formed grouting bladder is sufficient to provide anti-slip and anti-overturning capabilities.
[0030] 2. Rapid deployment and easy transport during emergency situations, suitable for emergency conditions. The entire structure is made of flexible materials, which can be rolled up and stored when not in use. Its small size and light weight facilitate rapid transportation to the emergency site. Once deployed on-site, only two steps are required: grouting and water filling. No on-site pouring, anchoring, or complex assembly is needed, significantly shortening the emergency response time.
[0031] 3. Reusable, does not damage the channel, environmentally friendly and leaves no residue. The grouting slurry can use recyclable materials; after emptying, the grouting bladder regains its flexibility, and the structure can be reused. No anchoring, concrete pouring, or heavy machinery compaction is required during construction, causing no damage to the channel lining. No soil, rock, or concrete blocks are produced after removal, avoiding channel siltation and water pollution problems.
[0032] 4. Modular structure facilitates maintenance and component replacement. The water-filled bladder and the grouting bladder are connected by a partition. If a bladder is damaged during use, it can be partially repaired instead of being scrapped entirely, thus reducing operating costs. Attached Figure Description
[0033] Figure 1 This is a schematic diagram of a channel composite water-blocking structure that can be quickly filled and formed according to an embodiment of the present invention;
[0034] Figure 2 yes Figure 1 Sectional view of AA in the middle;
[0035] Figure 3 yes Figure 1 Cross-sectional view of the middle section (BB);
[0036] Figure 4 This is a plan view of the grouting layer;
[0037] Figure 5 yes Figure 4 3D cross-sectional view of the middle CC section;
[0038] Figure 6 yes Figure 4 3D cross-sectional view of DD.
[0039] The reference numerals in the attached diagram are described as follows: 1-Lower grouting bladder; 2-Grouting port; 3-Grouting bladder vent; 4-Upper water-filling bladder; 5-Water-filling port; 6-Water-filling bladder vent; 7-Internal water-filling pipe; 8-Main partition; 9-Isolation layer; 10-Inlet grout-blocking structure; 11-Internal tension rope; 12-Bottom flexible water-stop pad; 13-Traction rope. Detailed Implementation
[0040] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0041] I. Device Implementation Examples
[0042] Example 1: Composite Water-Blocking Structure for Channels
[0043] See Figures 1 to 6 This embodiment provides a channel composite water-blocking structure that can be rapidly filled and formed, including an upper water-filling bladder 4, a lower grouting bladder 1, a bottom flexible water-stop pad 12, and matching connecting components.
[0044] The upper water-filled bladder 4 is a long, sealed bladder made of rubber, with a water inlet 5 and a water bladder vent 6 at each end. The water inlet 5 extends out of the bladder and connects to the internal water-filling tube 7 located at the bottom of the upper water-filled bladder 4. The internal water-filling tube 7 has multiple water outlets spaced apart to ensure that the water flow is evenly distributed along its length during filling, preventing the upper water-filled bladder 4 from expanding too quickly in certain areas. The water bladder vent 6 is used to expel air from the bladder during filling. When the water bladder vent 6 steadily sprays water without air bubbles, it indicates that the upper water-filled bladder 4 is full.
[0045] The lower grouting bladder 1 is located directly below the upper water-filled bladder 4 and is made of high-strength woven chemical fiber fabric. The lower grouting bladder 1 has a main partition 8 along its length, dividing it into two independent areas to ensure more uniform grout distribution during grouting. Each area has multiple isolation layers 9 along its length, dividing each area into several small compartments. The isolation layers 9 are flexible seepage-proof structures, comprising at least two layers of flexible material bonded together, facilitating small-piece disassembly along the isolation layers 9 after grout solidification. The lower grouting bladder 1 has inlet grout-blocking structures 10 at both ends of the compartments, which restrict the direct and rapid entry of grout into the end compartments, allowing the grout to preferentially fill the middle compartment, thus ensuring uniform expansion of the lower grouting bladder 1 as a whole.
[0046] Each small compartment is equipped with a tension rope 11, the two ends of which are fixed to the upper and lower walls of the compartment, and the length of the rope is less than the design thickness of the compartment in the filled state. When the grouting pressure is too high, the tension rope 11 is straightened, thereby limiting the excessive expansion of the compartment, controlling uneven deformation during the grouting process, and preventing the lower grouting bladder 1 from bulging or twisting locally.
[0047] The lower grouting bladder 1 has at least one grouting port 2 at one end and at least one grouting bladder vent 3 at the other end. In this embodiment, the lower grouting bladder 1 has two grouting ports 2 at one end and two grouting bladder vent 3 at the other end. The grouting bladder vent 3 also serves as an observation port to determine whether the grouting has filled the entire bladder. The design of the grouting ports 2 and the grouting bladder vent 3 is mutually redundant, and also improves the efficiency of grouting and venting.
[0048] The bottom flexible water-stop pad 12 is fixed to the lower surface of the lower grouting bladder 1. It is made of flexible, seepage-proof material, is elastic, and has anti-slip textures on its lower surface. After grouting is completed in the lower grouting bladder 1, the bottom flexible water-stop pad 12 is pressed against the bottom surface of the channel. After the upper water-filling bladder 4 is filled with water, the upper water pressure is further transmitted downwards, causing the bottom flexible water-stop pad 12 to undergo elastic deformation, tightly sealing the tiny unevenness of the channel bottom surface, thus achieving a water-stopping seal.
[0049] The upper water-filled bladder 4 and the lower grouting bladder 1 are connected by a partition to form a modular structure. If a bladder is damaged during use, it can be partially repaired instead of being scrapped entirely, thus reducing usage costs.
[0050] Example 2: Large-scale channel application structure
[0051] This embodiment uses a large trapezoidal cross-section water conveyance channel as an example. The channel has a bottom width of 24m, a surface width of 56m, and a normal water conveyance depth of 6m. Considering safety freeboard, the designed water-retaining height is 6.5m. The above-mentioned composite water-retaining structure is adopted, with a total structural length of 60m including the anchorage allowance at both ends and the channel slope.
[0052] The lower grouting bladder 1 is made of high-strength woven chemical fiber fabric, with a height of 0.4m and a base width of 3.0m along the direction of water flow. The total volume of the lower grouting bladder 1 is approximately 70m³. The interior of the lower grouting bladder 1 is divided into two independent regions along the length direction by a main partition layer 8. Each region has 13 isolation layers 9 evenly spaced along the length direction, forming a total of 28 small compartments, each with a volume of approximately 2.5m³.
[0053] The upper water-filled bladder 4 is made of rubber and has a height of 6.5m. The total volume of the upper water-filled bladder 4 is approximately 566m³, and the weight of the water after filling is approximately 566t.
[0054] Example 3: Application Structure of Small and Medium-Sized Channels
[0055] This embodiment uses a medium-sized trapezoidal cross-section water conveyance channel as an example. The channel has a bottom width of 8m, a surface width of 20m, and a normal water conveyance depth of 3m. Considering safety freeboard, the designed water-retaining height is 3.5m. The above-mentioned composite water-retaining structure is adopted, and the total length of the structure is 24m, including the anchorage allowance at both ends and the channel slope.
[0056] Unlike the large-scale channel in Example 2, this example adjusts the structural parameters to suit the characteristics of small and medium-sized channels: the height of the lower grouting bladder 1 is 0.25m, the base width along the water flow direction is 2.0m, and the total volume of the lower grouting bladder 1 is approximately 11.0m³. The interior of the lower grouting bladder 1 is divided into two independent regions along its length by a main partition 8. Within each region, six partition layers 9 are evenly spaced along the length, forming a total of 14 small compartments, each with a volume of approximately 0.8m³.
[0057] The upper water-filled bladder 4 has a height of 3.5m and a total volume of 77.0m³. After being filled with water, the weight of the water is approximately 77.0t.
[0058] This embodiment verifies that the structure can still achieve rapid deployment, stable water blocking, and convenient dismantling in small and medium-sized channels by adjusting parameters such as the height of the grouting bladder, the width of the base, and the number of compartments, proving the wide applicability of the invention to different channel widths.
[0059] II. Method Examples
[0060] Example 4: A rapid water-blocking method based on the above structure
[0061] This embodiment provides a rapid water-blocking method based on the structure described in the above-described device embodiment, including the following steps:
[0062] Step 1: Preparation. Transport the composite water-retaining structure, rolled into a cylinder in its stored state, to the bank of the section of the canal awaiting emergency repair. While stored, tightly roll the composite water-retaining structure along its length into a cylinder and temporarily secure it with straps to form a roll for easy transport. After releasing the straps, fix one end (end A) of the composite water-retaining structure to the pre-buried anchor point on the bank. Connect a long traction rope 13 to the other end (end B) of the composite water-retaining structure. Use a drone to carry the traction rope 13 across the canal to the opposite bank and smoothly deploy it to the opposite bank. Personnel on the opposite bank then secure the traction rope 13 to a winch on the opposite bank.
[0063] Step 2: Grouting and traction are performed simultaneously to form a self-weight base and deploy synchronously. The pipelines of the grouting pump and the water filling pump are connected to the grouting port 2 of the lower grouting bladder 1 and the water filling port 5 of the upper water filling bladder 4, respectively. The composite water-blocking structure is then pushed into the channel. The grouting pump is started, and fast-setting grout is injected into the lower grouting bladder 1 through the grouting port 2 at one end of the lower grouting bladder 1. The fast-setting grout is a cement-based fast-setting grout. In this embodiment, fast-setting and fast-hardening silicate cement and an appropriate amount of retarder are used to prepare the fast-setting grout. The grout density is 1600 kg / m³, and the initial setting time is controlled between 30 and 60 minutes by adjusting the retarder dosage. The grouting pressure is controlled between 0.07 and 0.14 MPa.
[0064] During grouting, operators on the opposite bank simultaneously start a winch to pull the traction rope 13, laterally pulling end B of the composite water-retaining structure towards the opposite bank. The traction speed matches the grouting speed; in this embodiment, the traction speed is approximately 1.2 m / min. The grouted compartments immediately sink due to the weight of the grout, pressing against the channel bottom to form local pressure points and prevent structural displacement. The grouting bladder vent 3 at the other end of the lower grouting bladder 1 remains open to expel air and excess grout. When grout begins to flow continuously from the grouting bladder vent 3, it indicates that the lower grouting bladder 1 is essentially full. The grouting bladder vent 3 valve is closed, and grouting is stopped after maintaining pressure for several minutes. The grouting port 2 valve is then closed. When end B is pulled to the anchor point on the opposite bank, the entire lower grouting bladder 1 has been fully grouted. End B is quickly and securely connected to the anchor point on the opposite bank. After grouting, the lower grouting bladder 1 weighs approximately 111.4 t, forming a self-weight base.
[0065] Step 3: Filling with water to form a water barrier. After the grout in the lower grouting bladder 1 reaches a preliminary solidification state, open the valves of the water bladder exhaust ports 6 at both ends of the upper water bladder 4, and start the water pump to fill the upper water bladder 4 with water from both sides simultaneously. The water filling pressure is not lower than the static water pressure corresponding to the designed water barrier height. In this embodiment, the bottom static water pressure corresponding to a water depth of 6m is 0.0588MPa. To ensure that the upper water bladder 4 can stand upright and remain stable, the water filling pressure is set to 0.07MPa. The water flows through multiple water outlets on the internal water filling pipe 7 and is evenly distributed to ensure that the upper water bladder 4 expands synchronously along its length. When the water bladder exhaust port 6 begins to spray water steadily without air bubbles, close the valve of the water bladder exhaust port 6 and continue filling with water to the designed pressure of 0.07MPa. At this time, the upper water bladder 4 stands upright to form a water barrier, and the bottom flexible water-stop pad 12 is pressed tightly to prevent leakage.
[0066] Step 4: Structural Dismantling. After all the emergency repair work on the canal is completed, first open the valve of the water inlet 5, and use a water pump to drain the water from the upper water-filling bladder 4, causing it to collapse. Then, use a cutting tool to cut open the lower grouting bladder 1 along the isolation layer 9 and the main partition layer 8, dividing it into multiple small pieces and removing them separately. In this embodiment, the weight of the grout in each small compartment is approximately 4.0t, requiring the use of light lifting equipment for handling. After removal, the main body of the composite water-blocking structure is cleaned, folded, and recycled.
[0067] This embodiment verifies that in a large channel with a width of 56m and a water depth of 6m, the grouting volume is reasonable when the grouting bladder height is 0.4m and the base width is 3m. Each compartment weighs about 4t, which is convenient for mechanical dismantling and recycling, achieving the dual goals of rapid emergency rescue and environmentally friendly dismantling.
[0068] Example 5: Rapid Water-Blocking Method for Small and Medium-Sized Channels
[0069] This embodiment takes a medium-sized trapezoidal cross-section water conveyance channel as an example. The channel has a bottom width of 8m, a channel surface width of 20m, a normal water conveyance depth of 3m, and a designed water-retaining height of 3.5m. The total length of the composite water-retaining structure is 24m.
[0070] The specific construction process is basically the same as in Example 4, but the traction method and grouting parameters are adjusted according to the channel width: the fast-setting grout is a fast-setting cement-based grout with a density of 1500 kg / m³. After grouting, the self-weight of the lower grouting bladder 1 is approximately 16.5 t. The initial setting time of the grout is controlled between 20 and 40 minutes to meet the needs of rapid emergency repairs in small and medium-sized channels. The grouting pressure is controlled between 0.045 and 0.09 MPa; the traction speed is 0.8 m / min. The weight of the grout in each small compartment is approximately 1.2 t. The weight of the water in the upper water-filled bladder 4 after filling is approximately 77.0 t. The bottom hydrostatic pressure corresponding to a water depth of 3.5 m is 0.0343 MPa. To ensure that the upper water-filled bladder 4 can stand upright and remain stable, the filling pressure is 0.045 MPa.
[0071] After the emergency repairs are completed, dismantling and recycling will proceed according to step four of Example 4. This example verifies that the structure can still achieve rapid deployment, stable water blocking, and convenient dismantling in small and medium-sized channels by adjusting parameters such as the height of the grouting bladder, the width of the base, and the number of compartments, demonstrating the wide applicability of this invention to different channel widths.
[0072] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention should be included within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.
Claims
1. A composite water-retaining structure for channels that can be rapidly filled and molded, characterized in that: It includes an upper water-filled bladder (4), a lower grouting bladder (1), a bottom flexible water-stop pad (12), and matching connecting components; The upper water-filled bladder (4) is a long, sealed bladder with a water-filling port (5) and a water-filled bladder exhaust port (6) at both ends. The lower grouting bladder (1) is located directly below the upper water-filled bladder (4). The lower grouting bladder (1) is provided with at least one grouting port (2) and at least one grouting bladder exhaust port (3). The lower grouting bladder (1) has a main partition (8) along its length, which divides the lower grouting bladder (1) into two independent areas. Each area has multiple isolation layers (9) along its length, which divide each area into multiple small compartments. Each small compartment is provided with a tension rope (11). The two ends of the tension rope (11) are fixed to the upper and lower walls of the small compartment, and its length is less than the design thickness of the small compartment in the filling state. The bottom flexible water-stop pad (12) is fixed to the lower surface of the lower grouting bladder (1).
2. The composite water-retaining structure for rapid filling and molding of channels according to claim 1, characterized in that: The lower grouting bladder (1) is equipped with an inlet grout-blocking structure (10) at both ends.
3. The rapid filling and molding composite water-retaining structure for channels according to claim 1, characterized in that: The isolation layer (9) is a flexible seepage-proof structure, which includes at least two layers of flexible material.
4. The rapid filling and molding composite water-retaining structure for channels according to claim 1, characterized in that: The water inlet (5) of the upper water-filling bladder (4) is connected to the internal water-filling tube (7) located at the bottom of the upper water-filling bladder (4), and the internal water-filling tube (7) is provided with multiple water outlet holes spaced apart.
5. The rapid filling and molding composite water-retaining structure for channels according to claim 1, characterized in that: The bottom flexible waterstop pad (12) is made of flexible waterproof material.
6. The rapid filling and molding composite water-retaining structure for channels according to claim 1, characterized in that: The vent (3) of the grouting bladder also serves as an observation port.
7. A rapid water-blocking method based on the structure described in any one of claims 1 to 6, characterized in that... Includes the following steps: Step 1: Transport the composite water-blocking structure rolled into a cylinder in the storage state to the bank of the channel. Fix one end of the composite water-blocking structure to the anchor point of the channel embankment on the bank. Connect the traction rope (13) to the other end of the composite water-blocking structure. Pull the traction rope (13) to the opposite bank and fix it to the traction equipment on the opposite bank. Step 2: Inject fast-setting grout into the lower grouting bladder (1). During the grouting process, the traction device is started simultaneously to pull the other end of the composite water-blocking structure to the opposite bank. The grouting compartment sinks and presses against the bottom of the channel due to the weight of the grout. When the lower grouting bladder (1) is full, the other end of the composite water-blocking structure is fixedly connected to the anchor point on the opposite bank. Step 3: After the grout in the lower grouting bladder (1) reaches the initial solidification state, water is filled into the upper water filling bladder (4) to the design pressure so that the upper water filling bladder (4) forms a water-blocking wall. Step 4: After the emergency repair is completed, first drain the water in the upper water-filled bladder (4), then divide the lower grouting bladder (1) into several small pieces along the position of the isolation layer (9) and the main partition layer (8) and take them out separately, and finally recycle the main body of the composite water-blocking structure.
8. The rapid water-blocking method according to claim 7, characterized in that: The water filling pressure mentioned in the third step shall not be lower than the static water pressure corresponding to the designed water-blocking height.
9. The rapid water-blocking method according to claim 7, characterized in that: The fast-setting grout is a cement-based fast-setting grout.
10. The rapid water-blocking method according to claim 7, characterized in that: In the second step, the traction speed of the traction device is matched with the grouting speed. The grouting bladder exhaust port (3) is kept open during the grouting process. When the grouting bladder exhaust port (3) continuously flows out of the grout, it is closed and pressure is maintained.