A method for replacing defects in cast-in-place piles with grouting
By employing pile foundation testing, in-hole camera inspection, and a high-pressure jet grouting method with systematic parameters, the problem of handling various defects in bored piles has been solved, improving treatment quality and economic benefits.
Patent Information
- Application Number
- CN202611300067.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-26
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies lack unified solutions for handling various defect types when dealing with defects in bored piles. The effectiveness of hole washing lacks objective standards, making it difficult to guarantee the stability and reliability of the treatment quality. Furthermore, there is a lack of intuitive verification methods.
Defects were located using pile foundation testing methods. High-pressure jet grouting was performed using a double-tube high-pressure jet grouting machine to clean the boreholes, and the cleaning effect was checked using an in-hole camera. Verification testing was conducted after high-pressure jet grouting, and systematic processing parameters such as water pressure, air pressure, and lifting speed were set.
It enables unified treatment of various defects such as pile concrete defects, excessive sediment at the pile bottom, and bearing strata not meeting design requirements, thereby improving the stability and reliability of treatment quality and reducing treatment costs.
Smart Images

Figure CN123109147A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of pile foundation construction technology in building engineering, and in particular to a method for replacing grouting defects in cast-in-place piles. Background Technology
[0002] Drilled piles are a widely used foundation type in building and bridge engineering, and their construction quality directly affects the safety and durability of the superstructure. However, due to the concealed nature of the drilling process, its complexity, and its susceptibility to geological conditions, various quality problems inevitably arise after pile completion. Common defects in cast-in-place piles include: defects in pile integrity (such as mud inclusions, segregation, honeycombing, voids, and broken piles), excessive sediment at the pile bottom, and the bearing stratum not meeting design requirements.
[0003] Currently, the traditional methods for handling substandard cast-in-place piles mainly include the following: 1. Re-pile, which involves constructing a new pile near the original pile location. However, this method is expensive and subject to significant limitations due to on-site construction conditions. 2. Design unit review and downgrade, which involves reducing the design bearing capacity requirement of the pile through design review and then continuing to use it. However, this method is only applicable when the pile foundation design has sufficient margin and has significant limitations. 3. Add a cross-ground beam to the adjacent pile cap, which involves transferring the load of the defective pile to the adjacent pile foundation through structural measures. However, this method is also only applicable to problems where the bearing capacity does not meet the design requirements and has a limited scope of application.
[0004] To address the shortcomings of traditional treatment methods, grouting technology has emerged in recent years as a technical solution for reinforcing defective cast-in-place piles. For example, Chinese patent CN103541359A discloses a method for remedying defects in cast-in-place piles, which involves steps such as low-strain dynamic testing to determine the defect location, core drilling, high-pressure hole washing, high-pressure hole cleaning, high-pressure cement grouting, pipe insertion, hole sealing, and high-pressure grouting to repair the defective pile. Chinese patent CN101413266B discloses a method for treating interlayer defects in drilled cast-in-place piles by injecting concrete, which involves steps such as CT or ultrasonic detection of the interlayer location, drilling, high-pressure jet grouting and cutting cleaning, cement grout injection, and concrete injection. Chinese patent CN111733823A discloses a grouting pipe structure and a method for treating broken piles during the grouting process of drilled cast-in-place piles. Chinese patent application CN115538425A discloses a construction method for reinforcing local slag inclusion defects in cast-in-place concrete piles, including steps such as drilling and core extraction, cleaning, slag removal, primary high-pressure jet grouting, secondary hole opening, re-cleaning and slag removal, and secondary high-pressure jet grouting.
[0005] However, the existing technologies still have the following shortcomings: First, most existing technologies only address a single type of defect, such as pile defects or sediment problems, lacking a unified solution for multiple defect types such as pile defects, excessive sediment thickness, and bearing layer problems; Second, the judgment of the hole washing effect in existing technologies lacks objective standards and relies heavily on the experience of operators, making it difficult to guarantee the stability and reliability of the treatment quality; Third, existing technologies lack intuitive verification methods for the hole washing effect, making it impossible to confirm whether the defective areas have been cleaned before grouting; Fourth, the treatment parameters of existing technologies (such as water pressure, air pressure, lifting speed, etc.) are relatively vague, lacking a systematic parameter optimization scheme. Summary of the Invention
[0006] This invention provides a method for replacing grouting defects in cast-in-place piles, which can effectively solve the above-mentioned problems.
[0007] This invention is implemented as follows: A method for replacing grouting defects in cast-in-place piles includes the following steps: S1. Defect Location and Identification: The pile foundation testing method is used to test the cast-in-place piles, identify and locate the defect types and locations of the cast-in-place piles; the defect types include at least one of the following: pile body concrete defects, excessive sediment at the pile bottom, and bearing stratum not meeting design requirements; S2. Core drilling: Using core drilling equipment, drill a hole from the top of the pile along the axial direction of the cast-in-place pile to a depth of 1m below the part to be treated, forming a core hole; S3. High-pressure jet grouting hole washing: A double-tube high-pressure jet grouting pile machine is used to jet grout the parts of the core hole that need to be treated with high-pressure water and high-pressure air to remove and discharge the clay particles, powder particles and medium and fine sand in the treated area. The standard for the end of the hole washing is that clean water returns to the hole opening. S4. Hole cleaning effect inspection: Use an in-hole camera to inspect the inside of the core hole after cleaning to confirm that the cleaning effect meets the requirements. S5. High-pressure jet grouting: High-pressure jet grouting is performed on the parts of the core hole that need to be treated using a double-tube high-pressure jet grouting machine to inject grout. S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles will be verified and tested using the original testing method. A qualified pile foundation test report will be issued after the test is passed.
[0008] As a further improvement, in step S1, the pile foundation testing method includes at least one of low-strain testing, ultrasonic testing, high-strain testing, and core drilling; when the defect type is a defect in the pile body concrete, the defect location is located by low-strain testing or ultrasonic testing; when the defect type is excessive sediment at the pile bottom or the bearing layer does not meet the design requirements, the defect location is located by core drilling.
[0009] As a further improvement, in step S2, the core sampling equipment is a geological core drilling rig, and the drilling depth is determined according to the location of the defect: when the defect is a defect in the pile body concrete, the drilling depth is 1m below the defect location; when the defect is excessively thick sediment at the pile bottom or the bearing layer does not meet the design requirements, the drilling depth is 1m below the end of the area to be treated.
[0010] As a further improvement, in step S3, when the double-tube high-pressure jet grouting pile machine performs high-pressure jet grouting and hole washing, the water pressure is not less than 30MPa, the air pressure is not less than 0.7MPa, the air compressor capacity is 12m³, the high-pressure water pump flow rate is 75~100L / min, and the lifting speed is 5cm / min.
[0011] As a further improvement, in step S3, when the defect is a local defect, a fixed-point high-pressure flushing method is used to clean the hole; when multiple core holes are provided on the same cast-in-place pile, each core hole is cleaned in sequence, and the interval between two adjacent core holes in the same core hole is not less than 12 hours.
[0012] As a further improvement, in step S3, the high-pressure jet cleaning hole is a dual-tube high-pressure jet cleaning hole, including the following sub-steps: S31. Lower the drill rod of the double-tube high-pressure jet grouting machine to below the part to be treated in the core hole; S32. Start the high-pressure water pump and air compressor, and spray high-pressure water and high-pressure air simultaneously through the nozzle at the end of the drill rod to perform rotary spray cutting on the part to be treated; S33. Control the drill rod to slowly lift it from bottom to top at a lifting speed of 5cm / min, and perform rotary jet cleaning on the entire section to be treated. S34. Repeat steps S31 to S33 at least once until clean water returns from the orifice and the returned water does not contain obvious impurities.
[0013] As a further improvement, in step S4, the inspection by the in-hole camera includes the following sub-steps: S41. Lower the in-hole camera into the area that needs to be processed inside the core retrieval hole; S42. Take a panoramic video of the hole wall in the area to be treated; S43. Determine whether the hole wall is clean and whether the loose concrete or sediment in the defective area has been completely removed based on the camera image. S44. If the cleaning effect does not meet the requirements, repeat step S3 to clean the holes again until the requirements are met.
[0014] As a further improvement, in step S5, the high-pressure jet grouting adopts a double-tube high-pressure jet grouting method, which includes the following sub-steps: S51. Lower the drill rod of the double-tube high-pressure jet grouting machine to below the part to be treated in the core hole; S52. Start the grouting pump and spray cement grout into the area to be treated through the nozzle at the end of the drill rod to perform high-pressure jet grouting. S53. Control the drill rod to slowly lift from bottom to top at a set speed, and perform jet grouting to fill the entire section of the part to be treated. S54. After grouting is completed, seal the core hole opening and perform curing.
[0015] As a further improvement, in step S5, the cement strength of the cement grout is one grade higher than the cement strength originally used in the design of the cast-in-place pile, the water-cement ratio of the cement grout is less than 0.45, and it contains 0.6% expansion agent, 3% water-reducing agent and retarder.
[0016] As a further improvement, in step S6, the detection method used for verification testing is the same as the detection method used for identifying defects in step S1; when the verification test is qualified, the cast-in-place pile continues to be used as a qualified engineering pile; when the verification test is unqualified, steps S2 to S5 are repeated for secondary processing.
[0017] The beneficial effects of this invention are: 1) This treatment method can be applied to the treatment of various types of defects in cast-in-place piles, such as defects in the pile body concrete, excessive sediment at the pile bottom, and failure of the bearing layer to meet design requirements. It has a wide range of applications and breaks through the limitation of existing technologies that only target a single type of defect.
[0018] 2) After high-pressure rotary jet cleaning of the borehole, an in-hole camera is introduced to check the cleaning effect. The intuitive video images are used to judge whether the cleaning effect meets the requirements, avoiding the subjectivity and uncertainty of the traditional method that relies solely on the operator's experience, and significantly improving the stability and reliability of the treatment quality.
[0019] 3) By setting systematic processing parameters, such as water pressure not less than 30MPa, air pressure not less than 0.7MPa, and lifting speed of 5cm / min, the processing process has clear operating standards, strong operability, and is easy to promote and apply in engineering projects.
[0020] 4) A closed-loop process of "hole cleaning, inspection and grouting" is adopted. The verification by the in-hole camera ensures that the defective parts have been cleaned before grouting, thereby ensuring the quality of grouting and the final reinforcement effect.
[0021] 5) It eliminates the need for expensive pile replacement due to defects in the pile concrete that do not meet design requirements, significantly reducing the cost of pile foundation treatment and resulting in good economic benefits. Attached Figure Description
[0022] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention and should not be regarded as a limitation of the scope. For those skilled in the art, other related drawings can be obtained from these drawings without creative effort.
[0023] Fig. 1 This is a schematic flowchart of the defect replacement grouting treatment method for cast-in-place piles according to an embodiment of the present invention.
[0024] Fig. 2 This is a schematic diagram of the core sampling device drilling a hole from the top of the pile in step S2 of an embodiment of the present invention.
[0025] Fig. 3 This is a schematic diagram of the high-pressure jet grouting pile machine washing process in step S3 of an embodiment of the present invention.
[0026] Fig. 4 This is a schematic diagram of the in-hole camera checking the cleaning effect in step S4 of an embodiment of the present invention.
[0027] In the picture: 1. High-pressure jet grouting machine; 2. Concrete defects; 3. High-pressure jet grouting; 4. Excessive sediment / bearing layer; 5. Drilling; 6. Pile body. Detailed Implementation
[0028] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to represent selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0029] In the description of this invention, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this invention, "a plurality of" means two or more, unless otherwise explicitly specified.
[0030] Reference Figs. 1-4 As shown, a method for replacing grouting defects in cast-in-place piles includes the following steps: S1. Defect location and identification: The pile foundation testing method is used to test the cast-in-place piles, identify and locate the defect types and locations of the cast-in-place piles; the defect types include at least one of the following: concrete defects in the pile body 6, excessive sediment at the pile bottom, and the bearing layer 4 not meeting the design requirements; S2, Core sampling at borehole 5: Using a core sampling device, borehole 5 is drilled from the top of the pile along the axial direction of the cast-in-place pile to a depth of 1m below the part to be treated, forming a core sampling hole; S3. High-pressure jet grouting hole washing: A double-tube high-pressure jet grouting pile machine 1 is used to jet grout the parts of the core hole that need to be treated by high-pressure water and high-pressure air to remove and discharge the clay particles, powder particles and medium and fine sand at the treatment location. The standard for the end of the hole washing is that clean water returns to the hole opening. S4. Hole cleaning effect inspection: Use an in-hole camera to inspect the inside of the core hole after cleaning to confirm that the cleaning effect meets the requirements. S5, High-pressure jet grouting 3: High-pressure jet grouting 3 is performed on the part to be treated in the core hole using a double-tube high-pressure jet grouting pile machine 1, and grout is injected. S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles will be verified and tested using the original testing method. A qualified pile foundation test report will be issued after the test is passed.
[0031] Furthermore, in step S1, the pile foundation testing method includes at least one of low-strain testing, ultrasonic testing, high-strain testing, and core drilling; when the defect type is concrete defect 2 in the pile body 6, the defect location is located by low-strain testing or ultrasonic testing; when the defect type is excessive sediment at the pile bottom or the bearing layer 4 does not meet the design requirements, the defect location is located by core drilling.
[0032] Furthermore, in step S2, the core sampling equipment is a geological core drilling rig, and the depth of the borehole 5 is determined according to the location of the defect: when the defect is a concrete defect 2 in the pile body 6, the depth of the borehole 5 is 1m below the defect location; when the defect is excessively thick sediment at the bottom of the pile or the bearing layer 4 does not meet the design requirements, the depth of the borehole 5 is 1m below the end of the area to be treated.
[0033] Furthermore, in step S3, when the double-tube high-pressure jet grouting pile machine 1 performs high-pressure jet grouting and hole washing, the water pressure is not lower than 30MPa, the air pressure is not lower than 0.7MPa, the air compressor capacity is 12m³, the high-pressure water pump flow rate is 75-100L / min, and the lifting speed is 5cm / min. When the defect is a local defect, a fixed-point high-pressure flushing method is used for hole washing; when multiple core holes are provided on the same cast-in-place pile, each core hole is washed sequentially, and the interval between two adjacent core hole washings in the same core hole is not less than 12 hours.
[0034] Furthermore, in step S5, the cement strength of the cement grout is one grade higher than the cement strength originally used in the design of the cast-in-place pile, the water-cement ratio of the cement grout is less than 0.45, and it contains 0.6% expansion agent, 3% water-reducing agent and retarder.
[0035] Furthermore, in step S6, the detection method used for verification testing is the same as the detection method used for identifying defects in step S1; when the verification test is qualified, the cast-in-place pile continues to be used as a qualified engineering pile; when the verification test is unqualified, steps S2 to S5 are repeated for secondary processing.
[0036] Furthermore, in step S3, the high-pressure jet cleaning orifice is a dual-tube high-pressure jet cleaning orifice, including the following sub-steps: S31. Lower the drill rod of the double-tube high-pressure jet grouting machine 1 to below the part to be treated in the core hole; S32. Start the high-pressure water pump and air compressor, and spray high-pressure water and high-pressure air simultaneously through the nozzle at the end of the drill rod to perform rotary spray cutting on the part to be treated; S33. Control the drill rod to slowly lift it from bottom to top at a lifting speed of 5cm / min, and perform rotary jet cleaning on the entire section to be treated. S34. Repeat steps S31 to S33 at least once until clean water returns from the orifice and the returned water does not contain obvious impurities.
[0037] In step S4, the in-hole camera inspection includes the following sub-steps: S41. Lower the in-hole camera into the area that needs to be processed inside the core retrieval hole; S42. Take a panoramic video of the hole wall in the area to be treated; S43. Determine whether the hole wall is clean and whether the loose concrete or sediment in the defective area has been completely removed based on the camera image. S44. If the cleaning effect does not meet the requirements, repeat step S3 to clean the holes again until the requirements are met.
[0038] In step S5, the high-pressure jet grouting 3 adopts a double-tube high-pressure jet grouting 3, which includes the following sub-steps: S51. Lower the drill rod of the double-tube high-pressure jet grouting machine 1 to below the part to be treated in the core hole; S52. Start the grouting pump and spray cement grout into the area to be treated through the nozzle at the end of the drill rod to perform high-pressure jet grouting 3; S53. Control the drill rod to slowly lift from bottom to top at a set speed, and perform jet grouting to fill the entire section of the part to be treated. S54. After grouting is completed, seal the core hole opening and perform curing. Example 1: This embodiment takes the foundation of bored pile 5 in a certain building project as an example. The geological conditions of this project are as follows: a top layer of plain fill about 1m thick, followed by a silt layer of 18-26m thick, then a silty soil layer of 0-3m thick, a silty clay layer of 0-11m thick, a gravel layer of 0-3m thick, a sandy strongly weathered granite layer of 0-2m thick, a blocky strongly weathered granite layer of 0-1m thick, and the bearing layer 4 is a moderately weathered granite layer. The bearing layer 4 of the bored pile 5 is designed to be moderately weathered granite, and the thickness of the sediment at the bottom of the pile is required to be less than or equal to 50mm.
[0039] During the pile foundation testing process of this project, a concrete defect 2 was discovered in a cast-in-place pile at a location 3.5m below the design elevation of the pile top using the low-strain testing method. The defective pile was treated using the method of this invention, and the specific steps are as follows: S1. Defect location and identification: The low strain test method was used to test the cast-in-place pile and the defect location was determined to be 3.5m below the design elevation of the pile top. The defect type was 6 concrete defect 2 in the pile body.
[0040] S2. Core sampling at borehole 5: A geological core drilling rig is used to drill borehole 5 from the top of the pile along the axial direction of the cast-in-place pile to 1m below the defect location, that is, the depth of borehole 5 is 3.5m + 1m = 4.5m, forming a core sampling hole.
[0041] S3. High-Pressure Jet Grouting: A double-tube high-pressure jet grouting machine 1 is used for hole cleaning. The drill rod of the double-tube high-pressure jet grouting machine 1 is lowered below the area to be treated within the core hole. The high-pressure water pump and air compressor are started, and high-pressure water and high-pressure air are simultaneously sprayed through the nozzle at the end of the drill rod to perform rotary jet cutting on the area to be treated. The hole cleaning parameters are: water pressure 30MPa, air pressure 0.7MPa, air compressor capacity 12m³, high-pressure water pump flow rate 85L / min, and lifting speed 5cm / min. The drill rod is slowly raised from bottom to top, and the entire section to be treated is jet-cleaned. The hole cleaning operation is repeated until clean water returns to the hole opening and the returned water does not contain obvious impurities.
[0042] S4. Hole Cleaning Effect Inspection: Lower the in-hole camera into the core hole to the area requiring treatment and take a panoramic video of the hole wall in the area to be treated. Based on the video images, determine that the hole wall has been cleaned thoroughly, the loose concrete in the defective area has been completely removed, and the cleaning effect meets the requirements.
[0043] S5. High-Pressure Jet Grouting 3: Grouting is performed using a double-tube high-pressure jet grouting machine 1. The drill rod of the double-tube high-pressure jet grouting machine 1 is lowered below the area to be treated within the core hole; the grouting pump is started, and cement grout is sprayed into the area to be treated through the nozzle at the end of the drill rod, performing high-pressure jet grouting 3. The cement grout is prepared with cement of a strength one grade higher than the original design, with a water-cement ratio of 0.4, and contains 0.6% expansion agent, 3% water-reducing agent, and retarder. The drill rod is slowly raised from bottom to top, and jet grouting is performed to fill the entire section to be treated. After grouting is completed, the core hole opening is sealed and cured.
[0044] S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles are verified and tested using the low-strain testing method. If the test results are qualified, a qualified pile foundation test report is issued, and the cast-in-place piles continue to be used as qualified engineering piles.
[0045] Example 2: The difference between this embodiment and Embodiment 1 lies in the type of defect. In this embodiment, core drilling revealed that the thickness of the sediment at the bottom of a certain cast-in-place pile reached 80mm, exceeding the design requirement of 50mm, which constitutes an excessive sediment thickness defect at the pile bottom.
[0046] S1. Defect location and identification: The core drilling method is used to detect the cast-in-place pile and determine that the defect location is at the bottom of the pile and the defect type is excessive sediment at the bottom of the pile.
[0047] S2, Core sampling at borehole 5: Using a geological core drilling rig, borehole 5 is drilled from the top of the pile along the axial direction of the cast-in-place pile to 1m below the end of the area to be treated at the bottom of the pile, forming a core sampling hole.
[0048] S3. High-Pressure Jet Grouting Hole Washing: A double-tube high-pressure jet grouting pile machine 1 is used for hole washing. The washing parameters are: water pressure 32MPa, air pressure 0.8MPa, air compressor capacity 12m³, high-pressure water pump flow rate 90L / min, and lifting speed 5cm / min. Since the sediment is located at the bottom of the pile, a fixed-point high-pressure flushing method is used to wash the hole to ensure that the sediment at the bottom of the pile is completely removed. The hole washing operation is repeated until clean water returns to the hole opening.
[0049] S4. Hole Cleaning Effect Inspection: Lower the in-hole camera to the bottom of the pile inside the core sampling hole to capture a panoramic view of the pile bottom. Based on the camera images, it is determined that the sediment at the pile bottom has been completely removed, and the cleaning effect meets the requirements.
[0050] S5. High-pressure jet grouting 3: Grouting is performed using a double-tube high-pressure jet grouting pile machine 1, injecting cement grout into the area to be treated at the bottom of the pile using high-pressure jet grouting. The cement grout mix ratio is the same as in Example 1.
[0051] S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles are verified and tested using the core drilling method. If the test results are qualified, a qualified pile foundation test report is issued.
[0052] Example 3: The difference between this embodiment and Embodiment 1 lies in the type of defect. In this embodiment, core drilling revealed a weak interlayer in the bearing stratum 4 of a certain cast-in-place pile, indicating that bearing stratum 4 does not meet the design requirements.
[0053] S1. Defect location and identification: Core drilling method is used to detect the cast-in-place piles and determine the specific location of the weak interlayer in bearing layer 4.
[0054] S2, Core sampling at borehole 5: Using a geological core drilling rig, borehole 5 is drilled from the top of the pile along the axial direction of the cast-in-place pile to 1m below the end of the bearing layer 4 that needs to be treated, forming a core sampling hole.
[0055] S3. High-Pressure Jet Grouting Hole Washing: A double-tube high-pressure jet grouting pile machine 1 is used for hole washing. The washing parameters are: water pressure 30MPa, air pressure 0.7MPa, air compressor capacity 12m³, high-pressure water pump flow rate 80L / min, and lifting speed 5cm / min. Jet grouting is performed on the weak interlayer locations in the bearing stratum 4 to remove clay particles, silt, and medium to fine sand from the weak interlayers. The hole washing operation is repeated until clean water returns to the hole opening.
[0056] S4. Hole Cleaning Effect Inspection: Lower the in-hole camera to the weak interlayer (holding layer 4) inside the core hole to capture a panoramic view of the hole wall. Based on the camera images, it is determined that the weak interlayer has been completely removed, and the cleaning effect meets the requirements.
[0057] S5. High-pressure jet grouting 3: Grouting is performed using a double-tube high-pressure jet grouting machine 1. Cement grout is injected into the bearing layer 4 at the location requiring treatment using high-pressure jet grouting to replace and reinforce the bearing layer 4. The cement grout mix ratio is the same as in Example 1.
[0058] S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles are verified and tested using the core drilling method. If the test results are qualified, a qualified pile foundation test report is issued.
[0059] Example 4: This embodiment involves a situation where multiple core holes are set on the same cast-in-place pile. When the diameter of the cast-in-place pile is large or the defect range is wide, multiple core holes are required to ensure the treatment effect.
[0060] S1. Defect location and identification: Same as in Example 1.
[0061] S2, Core sampling at borehole 5: Three core sampling holes are evenly arranged along the circumference of the top of the cast-in-place pile. A geological core drilling rig is used to drill holes 5 to 1m below the part to be treated, forming three core sampling holes.
[0062] S3. High-pressure jet grouting hole washing: A double-tube high-pressure jet grouting pile machine 1 is used to wash the three core holes sequentially. The washing parameters for each core hole are the same as in Example 1. The interval between two adjacent washing operations in the same core hole is no less than 12 hours. Each core hole is washed sequentially until clean water returns to the opening of each core hole.
[0063] S4. Hole Cleaning Effect Inspection: Lower the in-hole camera sequentially into the areas requiring treatment within each core hole to capture a panoramic view of the hole wall. Confirm that the cleaning effect of all core holes meets the requirements.
[0064] S5, High-pressure jet grouting 3: The double-tube high-pressure jet grouting pile machine 1 is used to perform high-pressure jet grouting 3 on each core hole in sequence to ensure that the parts to be treated corresponding to each core hole are fully filled with grout.
[0065] S6. Verification and testing: Same as in Example 1.
[0066] Example 5: This embodiment describes the supplementary handling when the hole cleaning effect fails the inspection.
[0067] S1 to S3 are the same as in Example 1.
[0068] S4. Hole Cleaning Effect Inspection: Lower the in-hole camera into the core hole to capture a panoramic view of the area requiring treatment. Based on the camera images, some loose concrete remains in the defective area, and the cleaning effect does not meet the requirements.
[0069] S5. Supplementary Hole Cleaning: Repeat step S3, using a double-tube high-pressure jet grouting machine 1 to perform supplementary hole cleaning on the areas requiring treatment. During supplementary hole cleaning, appropriately extend the fixed-point flushing time to ensure that stubborn impurities are removed.
[0070] S6. Second inspection: Use an in-hole camera to inspect the areas that need to be treated after the supplementary cleaning to confirm that the cleaning effect meets the requirements.
[0071] S7. High-pressure jet grouting 3: Same as step S5 in Example 1.
[0072] S8. Verification and testing: Same as step S6 in Example 1.
[0073] The treatment method of this invention can effectively address various types of defects in cast-in-place piles, such as concrete defects in the pile body 6, excessive sediment at the pile bottom, and the bearing layer 4 not meeting design requirements. It has a wide range of applications and good treatment results. In particular, by introducing an in-hole camera to check the hole cleaning effect, it ensures that the defective areas have been thoroughly cleaned before grouting, thereby guaranteeing the final reinforcement effect.
[0074] The above description is merely a preferred embodiment of the present invention and is not intended to limit the invention. Various modifications and variations can be made to the invention by those skilled in the art. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the invention should be included within the scope of protection of the invention.
Claims
1. A method for replacing grouting defects in cast-in-place piles, characterized in that, Includes the following steps: S1. Defect Location and Identification: The pile foundation testing method is used to test the cast-in-place piles, identify and locate the defect types and locations of the cast-in-place piles; the defect types include at least one of the following: pile body concrete defects, excessive sediment at the pile bottom, and bearing stratum not meeting design requirements; S2. Core drilling: Using core drilling equipment, drill a hole from the top of the pile along the axial direction of the cast-in-place pile to a depth of 1m below the part to be treated, forming a core hole; S3. High-pressure jet grouting hole washing: A double-tube high-pressure jet grouting pile machine is used to jet grout the parts of the core hole that need to be treated with high-pressure water and high-pressure air to remove and discharge the clay particles, powder particles and medium and fine sand in the treated area. The standard for the end of the hole washing is that clean water returns to the hole opening. S4. Hole cleaning effect inspection: Use an in-hole camera to inspect the inside of the core hole after cleaning to confirm that the cleaning effect meets the requirements. S5. High-pressure jet grouting: High-pressure jet grouting is performed on the parts of the core hole that need to be treated using a double-tube high-pressure jet grouting machine to inject grout. S6. Verification and Testing: After the grouting reaches the required curing age, the treated cast-in-place piles will be verified and tested using the original testing method. A qualified pile foundation test report will be issued after the test is passed.
2. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S1, the pile foundation testing method includes at least one of low-strain testing, ultrasonic testing, high-strain testing, and core drilling. When the defect type is a defect in the pile body concrete, the defect location is located by low-strain testing or ultrasonic testing. When the defect type is excessive sediment at the pile bottom or the bearing layer does not meet the design requirements, the defect location is located by core drilling.
3. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S2, the core sampling equipment is a geological core drilling rig, and the drilling depth is determined according to the location of the defect: when the defect is a defect in the pile body concrete, the drilling depth is 1m below the defect location; When the defect is that the sediment at the bottom of the pile is too thick or the bearing layer does not meet the design requirements, the drilling depth is 1m below the end of the area to be treated.
4. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S3, when the double-tube high-pressure jet grouting pile machine performs high-pressure jet grouting and hole washing, the water pressure is not less than 30MPa, the air pressure is not less than 0.7MPa, the air compressor capacity is 12m³, the high-pressure water pump flow rate is 75~100L / min, and the lifting speed is 5cm / min.
5. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S3, when the defect is a local defect, the hole is washed by fixed-point high-pressure flushing; when there are multiple core holes on the same cast-in-place pile, each core hole is washed in sequence, and the interval between two adjacent core holes in the same core hole is not less than 12 hours.
6. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S3, the high-pressure jet cleaning hole is a dual-tube high-pressure jet cleaning hole, which includes the following sub-steps: S31. Lower the drill rod of the double-tube high-pressure jet grouting machine to below the part to be treated in the core hole; S32. Start the high-pressure water pump and air compressor, and spray high-pressure water and high-pressure air simultaneously through the nozzle at the end of the drill rod to perform rotary spray cutting on the part to be treated; S33. Control the drill rod to slowly lift it from bottom to top at a lifting speed of 5cm / min, and perform rotary jet cleaning on the entire section to be treated. S34. Repeat steps S31 to S33 at least once until clean water returns from the orifice and the returned water does not contain obvious impurities.
7. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S4, the in-hole camera inspection includes the following sub-steps: S41. Lower the in-hole camera into the core retrieval hole to the area that needs to be processed; S42. Take a panoramic video of the hole wall in the area to be treated; S43. Determine whether the hole wall is clean and whether the loose concrete or sediment in the defective area has been completely removed based on the camera image. S44. If the cleaning effect does not meet the requirements, repeat step S3 to clean the holes again until the requirements are met.
8. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S5, the high-pressure jet grouting adopts a double-tube high-pressure jet grouting method, which includes the following sub-steps: S51. Lower the drill rod of the double-tube high-pressure jet grouting machine to below the part to be treated in the core hole; S52. Start the grouting pump and spray cement grout into the area to be treated through the nozzle at the end of the drill rod to perform high-pressure jet grouting. S53. Control the drill rod to slowly lift from bottom to top at a set speed, and perform jet grouting to fill the entire section of the part to be treated. S54. After grouting is completed, seal the core hole opening and perform curing.
9. The method for replacing grouting defects in cast-in-place piles according to claim 8, characterized in that, In step S5, the cement strength of the cement grout is one grade higher than the cement strength originally used in the design of the cast-in-place pile, the water-cement ratio of the cement grout is less than 0.45, and it contains 0.6% expansion agent, 3% water-reducing agent and retarder.
10. The method for replacing grouting defects in cast-in-place piles according to claim 1, characterized in that, In step S6, the verification test uses the same detection method as the defect identification method used in step S1. When the verification test is qualified, the cast-in-place pile continues to be used as a qualified engineering pile. When the verification test is unqualified, steps S2 to S5 are repeated for secondary processing.
Citation Information
Patent Citations
Processing method of interlayer defect injection concrete of drill filling pile
CN101413266B
Method for repairing and treating quality defect of cast-in-place pile
CN103541359A
Grouting buried pipe structure and broken pile processing method in cast-in-situ bored pile pouring process
CN111733823A
Construction method for reinforcing local slag inclusion defect of cast-in-place concrete pile
CN115538425A