A grout conveying device for offshore wind power
By adopting an adaptive locking and separation butt joint design and a wear-resistant updated T-joint design, the problems of pipeline loosening and leakage and wear-resistant structure in offshore wind power grouting construction have been solved, achieving efficient and environmentally friendly grout material transportation.
Patent Information
- Application Number
- CN202611223549.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-13
- Publication Date
- 2026-11-17
AI Technical Summary
In existing offshore wind power grouting construction, the pipeline connection structure is easily affected by extreme sea conditions, leading to loosening and leakage. Moreover, the wear-resistant structure is costly and has a short lifespan, failing to meet environmental protection requirements and construction efficiency needs.
The design features an adaptive locking and separation butt joint, combined with a bidirectional self-sealing structure consisting of a breakable pin, a sealing plate, and a torsion spring, as well as an adaptive wear-resistant T-joint and a composite pipe wall structure, enabling automatic disconnection and wear-resistant protection of the pipeline under extreme sea conditions.
It improves the efficiency of emergency avoidance in offshore grouting operations, reduces equipment maintenance costs and marine pollution risks, extends pipeline service life, and enhances construction efficiency and environmental friendliness.
Smart Images

Figure CN123109173A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of wind power construction technology and relates to a grouting material conveying device for offshore wind power. Background Technology
[0002] Offshore wind turbine foundation grouting is a core process to ensure the overall stability and load transfer capacity of underwater foundation structures such as monopiles and jackets. The grouting quality directly determines the overturning resistance, scour resistance, and fatigue resistance of the wind turbine foundation. At present, offshore grouting construction generally uses ship-borne pumping pipelines to transport high-strength grouting materials, and connects the underwater grouting pipelines through the water transport pipelines to complete the cavity filling operation. However, the offshore construction environment is complex and changeable, and the existing transport devices still have many defects in actual application.
[0003] The existing connection structure between surface and underwater pipelines mostly adopts the traditional flange bolt fixing method, and the overall disassembly and assembly rely on manual operation. The marine climate changes rapidly, and extreme sea conditions such as storms and strong ocean currents are very likely to occur during construction. When the working vessel is drifted and swayed by the waves, the pipeline interface will be subjected to huge alternating tensile forces. Conventional flange structures cannot achieve active and controllable detachment. In emergency evacuation situations, the broken pipeline can only be forcibly pulled, which not only scraps the entire hose and flange joint, greatly increasing the cost of construction materials and equipment maintenance, but also causes the residual highly alkaline grout in the pipe to be directly released into the sea, causing marine water pollution and failing to meet the environmental protection and discharge ban requirements for marine construction.
[0004] Because offshore wind power grouting materials contain a large amount of high-hardness quartz sand and basalt aggregate, under high-pressure pumping conditions, the high-speed grout will continuously cut and scour the inner wall of the pipe elbow. Existing elbows mostly adopt the protection method of thickening the pipe wall or embedding a ceramic wear-resistant layer, which has high manufacturing cost and limited wear resistance life. Once local wear and perforation occur, the entire joint pipe needs to be replaced. This cannot meet the needs of long-term continuous grouting operations at sea. The equipment replacement frequency is high and the construction downtime is long, which seriously restricts the efficiency of offshore construction.
[0005] Therefore, we propose a grout conveying device for offshore wind power to solve the problems mentioned above. Summary of the Invention
[0006] In view of this, in order to solve the above problems, the present invention provides a grouting material conveying device for offshore wind power.
[0007] To achieve the above objectives, the present invention provides the following technical solution: a grouting material conveying device for offshore wind power, comprising a conveying vessel, a pumping crane mounted on the conveying vessel, and a grouting pipe disposed in the grouting area. Connector I is connected to the tail end of the delivery pipe in the pumping crane, and the top end of the grouting pipe is connected to connector II, which is used in conjunction with connector I. A protective assembly is disposed outside the connector I and connector II. The protective assembly includes a support ring sleeved on connector I and connector II. The inner wall of the support ring is integrally formed with multiple extension cylinders. The extension cylinders are threaded with easy-break pins. The top end of connector II is provided with an edge. The tail end of the easy-break pin passes through the edge on connector II and abuts against connector I. Connector I is fixed inside connector II by the easy-break pin. In extreme sea conditions, connector I and connector II can automatically separate under tension. The support arm of the pumping crane is equipped with a T-shaped joint at the corner. Two adjacent T-shaped joints are sealed and rotatably connected. The other end of the T-shaped joint is equipped with an adjustable valve seat. The inner end of the valve seat is provided with a guide groove for guiding the slurry. The inner end of the valve seat is provided with a stepped groove. When the slurry is transported, some slurry can fill the space between the stepped groove and the inner wall of the T-shaped joint to act as a wear-resistant pad. The other end of the T-shaped joint is connected to the corresponding conveying pipe.
[0008] Furthermore, the sides of the connector I and connector II that are close to each other are rectangular, and the ends of the connector I and connector II that are far apart from each other are cylindrical. The bottom end of connector I and the top end of connector II are each provided with two rotating shafts on their inner walls. The outer walls of the rotating shafts are fixedly fitted with sealing plates. When the two corresponding sealing plates are closed, they can seal the ports of connector I and connector II.
[0009] Furthermore, a torsion spring is sleeved on the outer wall of the rotating shaft. One end of each torsion spring abuts against one inner wall of a corresponding mating joint I and mating joint II, and the other end of the torsion spring abuts against the inner wall of the sealing plate. The inner walls of mating joint I and mating joint II are both fixedly provided with limiting strips for limiting the sealing plate.
[0010] Furthermore, the inner walls of both connector I and connector II are fixedly provided with support frames that cooperate with the sealing plates. During the insertion process of connector I and connector II, the support frame below connector I pushes open the two sealing plates at the top of connector II, and the support frame above connector II pushes open the two sealing plates at the bottom of connector I. The inner side of each sealing plate is provided with a clearance opening that is compatible with the support frame.
[0011] Furthermore, the protective assembly also includes two protective cylinders, which are respectively fitted onto the grouting pipe and the delivery pipe. The top wall of the upper protective cylinder and the bottom wall of the lower protective cylinder are both fixed with connecting rods. Both sets of connecting rods are arranged towards the central support ring. The middle of the easily broken pin passes through the connecting rod, so as to fix the protective cylinder to the support ring using the connecting rod.
[0012] Furthermore, a buoyancy ring is slidably fitted on the protective cylinder and the support ring. The top and bottom of the buoyancy ring are fixed with scrapers that contact the outer walls of the protective cylinder and the support ring. When the waves hit the buoyancy ring, the buoyancy ring is driven to move up and down, so as to drive the scrapers to move up and down reciprocally to clean the outer walls of the protective cylinder and the support ring. The top of the protective cylinder is provided with an edge to limit the buoyancy ring.
[0013] Furthermore, the outer end of the T-shaped connector is threaded with an end cap, and one end of the end cap is rotatably connected to a screw. The valve seat is threaded onto the screw, and the screw drives the valve seat to move within the T-shaped connector.
[0014] Furthermore, the inner end of the end cap is fixedly provided with multiple guide rods, and the tail end of the valve seat is provided with a guide hole that matches the guide rods. The guide rods slide in the guide hole, and the valve seat is guided by the guide hole and the guide rods.
[0015] Furthermore, the grouting pipe includes an inner pipe, the outer wall of which is composite-covered with an outer pipe, a sandwich layer is formed between the middle of the outer pipe and the inner pipe, the sandwich layer is filled with silicone oil, and a steel wire mesh is embedded in the outer pipe.
[0016] Furthermore, the interlayer is connected to an energy storage compensation tank via a high-pressure hose, and the energy storage compensation tank is installed on an offshore operating platform.
[0017] The beneficial effects of this invention are as follows: 1. The grouting material conveying device for offshore wind power disclosed in this invention features a self-adaptive locking and separation structure for connector I and connector II. It utilizes stress-calibrated breakable pins to achieve rigid locking under normal operating conditions and shear separation under extreme sea conditions. During normal grouting operations, multiple sets of breakable pins can stably lock the two connectors, resisting pipeline vibration, tension, and medium pressure, ensuring sealing and structural stability. In the event of sudden extreme sea conditions where the vessel drifts and pulls on the pipeline, the breakable pins can break synchronously under excessive tensile force, achieving fully automatic and rapid pipeline disconnection without manual intervention or prior shutdown for disassembly, greatly improving emergency avoidance efficiency at sea. Simultaneously, the connectors are equipped with a bidirectional self-sealing structure consisting of a rotating shaft, sealing plate, and torsion spring, which automatically closes and seals the upper and lower ports upon pipeline separation, effectively reducing marine pollution caused by residual grout leakage. 2. The grouting material conveying device for offshore wind power disclosed in this invention is equipped with a T-shaped joint with an adaptive wear-resistant renewal structure at the corner of the pipeline. The stepped groove at the end of the valve seat and the inner wall of the joint form a material storage cavity. The grouting material itself forms a wear-resistant buffer layer. At the same time, the axial position of the valve seat can be adjusted according to the construction conditions. The aged and compacted buffer grouting material is periodically pushed into the main stream and carried away, and fresh grouting material is added to form a brand-new wear-resistant layer, realizing the self-renewal of the wear-resistant structure without the need for frequent replacement of joints and pipelines. 3. The grouting material conveying device for offshore wind power disclosed in this invention forms an overall protective structure at the docking position through a support ring and a protective cylinder, effectively resisting wave erosion, seawater corrosion, and impacts from foreign objects, protecting the root structure of the pipeline docking. The buoyancy ring slidably mounted on the outside can achieve reciprocating motion without power by relying on the tidal potential energy of the waves, driving the scraper to continuously scrape off impurities such as salt, algae, and barnacle larvae attached to the outer wall of the joint. There is no need for regular underwater or high-altitude cleaning by manual personnel. It can keep the outer wall of the docking structure clean and the moving structure smooth for a long time, solving problems such as structural jamming, decreased docking accuracy, and equipment corrosion and aging caused by marine organisms attached to the splash zone. It significantly reduces the amount of preparatory work for phased construction and effectively improves construction efficiency.
[0018] Other advantages, objectives, and features of the invention will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination, or may be learned from practice of the invention. The objectives and other advantages of the invention can be realized and obtained through the following description. Attached Figure Description
[0019] To make the objectives, technical solutions, and advantages of the present invention clearer, the preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, wherein: Figure 1 This is a three-dimensional structural schematic diagram of a grouting material conveying device for offshore wind power according to the present invention; Figure 2 This is a cross-sectional view of a protective component of a grouting material conveying device for offshore wind power according to the present invention. Figure 3 This is a cross-sectional view of joint I and joint II of a grouting material conveying device for offshore wind power according to the present invention. Figure 4 for Figure 3 Enlarged structural diagram of section A in the middle; Figure 5 This is a schematic diagram of the joint I and joint II of a grouting material conveying device for offshore wind power according to the present invention; Figure 6 This is a schematic diagram of the installation position of a T-shaped joint in a grouting material conveying device for offshore wind power according to the present invention. Figure 7 This is a cross-sectional view of a T-shaped joint of a grouting material conveying device for offshore wind power according to the present invention. Figure 8 This is a cross-sectional view of the grouting pipe of a grouting material conveying device for offshore wind power according to the present invention.
[0020] Reference numerals: 1. Conveyor vessel; 2. Pumping crane; 21. Conveyor pipe; 22. Support arm; 23. T-joint; 24. End cap; 25. Screw; 26. Valve seat; 27. Step groove; 28. Guide groove; 29. Guide hole; 30. Guide rod; 3. Grouting pipe; 31. Inner pipe; 32. Outer pipe; 33. Interlayer; 34. Wire mesh; 35. High-pressure hose; 36. Energy storage compensation tank; 4. Protective components; 41. Support ring; 42. Protective cylinder; 43. Extension cylinder; 44. Breakable pin; 45. Connecting rod; 46. Buoyancy ring; 47. Scraper; 5. Butt joint I; 6. Butt joint II; 7. Rotating shaft; 8. Sealing plate; 9. Support frame; 10. Torsion spring; 11. Limiting strip; 12. Clearance port. Detailed Implementation
[0021] The following specific examples illustrate the implementation of the present invention. Those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of the present invention. Unless otherwise specified, the following embodiments and features can be combined with each other.
[0022] The accompanying drawings are for illustrative purposes only and are schematic diagrams, not actual pictures. They should not be construed as limiting the invention. To better illustrate the embodiments of the invention, some parts in the drawings may be omitted, enlarged, or reduced, and do not represent the actual product dimensions. It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.
[0023] In the accompanying drawings of the embodiments of the present invention, the same or similar reference numerals correspond to the same or similar components. In the description of the present invention, it should be understood that if terms such as "upper," "lower," "left," "right," "front," and "rear" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, they are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the drawings are only for illustrative purposes and should not be construed as limiting the present invention. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.
[0024] Example 1 like Figures 1-7As shown, a grouting material conveying device for offshore wind power consists of a conveying vessel 1, a pumping crane 2, and grouting pipes 3 arranged in the underwater grouting area. The pumping crane 2 is fixedly installed on the deck working area of the conveying vessel 1, serving as the core support and conveying carrier of the entire device. It can follow the conveying vessel 1 to complete sea area relocation and fixed-point parking, adapting to wind power foundation grouting operations. A conveying pipe 21 for transmitting grouting material is laid on the pumping crane 2. The tail end of the conveying pipe 21 is fixedly equipped with a coupling I5, and the top end of the corresponding grouting pipe 3 arranged in the underwater grouting area is fixedly equipped with a coupling II6. The coupling I5 and coupling II6 are detachable to achieve quick docking, completing the sealed connection of the upper and lower pipelines, thereby constructing a complete grouting material conveying channel and ensuring the continuous and stable operation of grouting.
[0025] The mating surfaces of joints I5 and II6, which are close to each other, are both machined into rectangular structures. This rectangular mating structure provides circumferential restraint after insertion, preventing relative rotation between the two sets of joints and effectively improving mating accuracy and overall sealing. The outer ends of the two sets of joints, which are far apart from each other, are designed as cylindrical structures, allowing for precise matching with the pipe structures of the delivery pipe 21 and the grouting pipe 3, facilitating pipe assembly and smooth grout delivery. Two rotating shafts 7 are symmetrically mounted on the inner bottom wall of joint I5 and the inner top wall of joint II6. A sealing plate 8 is fixedly fitted onto the outer side of each rotating shaft 7. The sealing plate 8 can rotate and open at a certain angle based on the rotating shaft 7. Under normal connection conditions, all four sealing plates 8 remain open, completely avoiding the pipe diameter and preventing obstruction of grout delivery. When extreme sea conditions cause the pipe to detach, each set of sealing plates 8 can automatically close inward, completely sealing the joint ports and achieving bidirectional sealing protection. Each rotating shaft 7 is fitted with a torsion spring 10 on its outer side. The torsion spring 10 is always in a pre-tightened, stored-force state. One end of each set of torsion springs 10 is fixed to the inner wall of the corresponding butt joint I5 and butt joint II6, while the other end of the torsion spring 10 is in contact with the inner wall of the sealing plate 8. When the sealing plate 8 is opened by the external structure, the torsion spring 10 continuously accumulates elastic potential energy. Once the sealing plate 8 loses its external support constraint, the torsion spring 10 can release its elastic force to drive the sealing plate 8 to close quickly. The torsion spring 10 is made of austenitic stainless steel that is resistant to seawater corrosion, and the pre-tightening force of the torsion spring 10 is designed to be no less than twice the minimum torque required for the sealing plate 8 to close. Limiting strips 11 are also fixedly installed on the inner walls of butt joint I5 and butt joint II6. The limiting strips 11 are located at the end of the closing stroke of the sealing plate 8, which can limit the maximum rotation angle of the sealing plate 8, ensuring that the sealing plate 8 completely fits the end face of the pipe after closing, achieving a gapless seal, and at the same time preventing the sealing plate 8 from being damaged by excessive rotation, such as structural impact or deformation.
[0026] Rigid support frames 9 are fixedly mounted on the inner walls of both connector I5 and connector II6. These support frames 9 are the core support structure controlling the opening and closing of the sealing plates 8. During the insertion and assembly of connector I5 and connector II6, the support frame 9 mounted below connector I5 gradually pushes open the two sealing plates 8 at the top of connector II6, while the support frame 9 mounted above connector II6 simultaneously pushes open the two sealing plates 8 at the bottom of connector I5. This allows the sealing plates 8 to overcome the pre-tightening force of the torsion spring 10 and remain stably open, ensuring smooth insertion and alignment of the two sets of connectors and complete pipeline continuity. To avoid structural interference during the opening and closing of the support frame 9 and the sealing plates 8, each sealing plate 8 has a clearance opening 12 on its inner side that matches the outer dimensions of the support frame 9. The clearance opening 12 fits the outer contour of the support frame 9, making the opening and closing of the sealing plates 8 smoother and more stable, ensuring the overall structural reliability.
[0027] Protective components 4 are installed on the outside of joints I5 and II6. These components primarily provide external protection and structural reinforcement at the docking points of the two joints, and also utilize their structural characteristics to enable fully automatic pipeline disconnection under extreme sea conditions. The protective components 4 include a ring-shaped support ring 41, which is integrally fitted onto the outside of the docking points of joints I5 and II6. The inner wall of the support ring 41 is integrally formed with multiple evenly arranged extension cylinders 43, which are radially arranged along the support ring 41. Each extension cylinder 43 has an internal thread structure, and a breakable pin 44 is fitted through threaded assembly. After the breakable pin 44 is assembled, a rubber gasket is filled inside the extension cylinder 43 to reduce corrosion of the breakable pin 44 by marine organisms. The top of the connector II6 is machined with an annular edge structure. The tail end of the easy-break pin 44 passes through the extension cylinder 43 and the annular edge at the top of the connector II6 in sequence, and finally forms a tight contact and limiting with the outer wall of the connector I5. Multiple sets of evenly distributed easy-break pins 44 work synchronously to lock and fix the connector I5 and connector II6 into one piece after insertion, effectively avoiding problems such as loosening, displacement, and leakage at the docking position during conventional grouting operations. The easy-break pin 44 is made of stress-calibrated alloy material and has a fixed and precise rated shear bearing capacity. During daily operation, it can fully withstand the tension, vibration and grout pressure generated by pipeline transportation, maintaining the overall stability of the docking structure. When encountering extreme sea conditions such as storms and strong ocean currents, the transport vessel 1 drifts and sways significantly. When the tensile force between joint I5 and joint II6 exceeds the preset shear threshold of the easy-break pin 44, all easy-break pins 44 will simultaneously undergo shear fracture, releasing the limiting constraint between joint I5 and joint II6. The two sets of joints can automatically and quickly separate under axial tensile force, completing the emergency disconnection of the pipeline. The entire process only consumes small components such as easy-break pins 44 and will not damage the main equipment such as joints and transport pipelines. This avoids problems such as equipment damage and slurry leakage and pollution during emergency evacuation from the source. Furthermore, the sealing plate 8 closes quickly after separation, which can reduce slurry leakage.
[0028] The protective component 4 is also equipped with two sets of symmetrically arranged protective cylinders 42. The two protective cylinders 42 are respectively fitted onto the outer pipe bodies of the grouting pipe 3 and the delivery pipe 21, which can provide all-round protection for the connection root of the pipeline and the joint, resist the continuous scouring of the waves and the friction and erosion of marine organisms, and avoid wear and corrosion failure at the interface. The top wall of the upper protective cylinder 42 and the bottom wall of the lower protective cylinder 42 are both fixedly equipped with connecting rods 45. Both sets of connecting rods 45 are arranged towards the middle support ring 41. The middle rod of each set of easy-break pins 44 passes through the corresponding connecting rod 45. Through the limiting and locking action of the easy-break pins 44, the connecting rod 45 and the support ring 41 are stably connected into an integral structure, so that the protective cylinder 42 and the support ring 41 form an integrated protective component, which greatly improves the overall structural strength and stability of the docking position. A buoyancy ring 46 is slidably fitted onto the outer sides of the protective cylinder 42 and the support ring 41. The buoyancy ring 46 can slide freely up and down against the outer wall of the cylinder due to its own buoyancy. Multiple sets of scrapers 47 are fixedly mounted on the top and bottom of the buoyancy ring 46, and the inner edge of the scraper 47 always maintains a tight fit with the outer walls of the protective cylinder 42 and the support ring 41. During offshore operations, waves will continuously pound, lift, and impact the buoyancy ring 46, causing it to slide continuously up and down along the outer wall of the cylinder. During this sliding process, the scraper 47 can continuously scrape away various impurities such as salt deposits, seaweed films, and barnacle larvae adhering to the outer wall of the equipment, preventing structural jamming, outer wall corrosion, and dimensional misalignment caused by long-term attachment and growth of marine organisms. The top of the protective cylinder 42 is provided with an annular edge structure, which can limit the maximum upward stroke of the buoyancy ring 46, prevent the buoyancy ring 46 from detaching from the protective structure, and ensure the stable operation of the equipment for long-term unattended automatic cleaning. It does not require manual climbing or underwater cleaning, and is suitable for the working conditions of long-term offshore construction. In addition, there are sealing rings between the protective cylinder 42 and the support ring 41, and between the protective cylinder 42 and the butt joint I5 and the butt joint II6, to ensure that seawater cannot enter the central enclosed space, thereby protecting the easily broken pin 44.
[0029] The support arm 22 of the pumping crane 2 has a multi-segment tilting structure. Each corner of the support arm 22 is equipped with a T-joint 23. Adjacent T-joints 23 are connected by a sealed rotational connection, which can adapt to changes in the opening angle of the support arm 22, effectively releasing alternating stress at the pipe corners and preventing pipe wall wear, joint cracking, and other malfunctions caused by stress concentration. One port of each T-joint 23 is sealed and connected to the corresponding delivery pipe 21. The remaining port of the T-joint 23 is adjustablely equipped with a valve seat 26, which is housed in the internal end area of the T-joint 23. The inner end of the valve seat 26 has a guide groove 28 and a stepped groove 27. The guide groove 28 can streamline the high-speed pumped grout, regulate the grout flow direction, reduce the disorderly impact of turbulent grout flow on the pipe wall, and ensure smooth grout delivery without dead zones. The stepped groove 27 and the inner wall of the T-joint 23 form an annular storage cavity. During continuous pumping of grout, some grout will automatically fill into this cavity, forming a soft grout buffer wear-resistant pad that adheres to the metal pipe wall. The grout itself acts as a medium layer, directly bearing the scouring and cutting action of the high-speed grout and hard aggregate, reducing the scouring and wear rate at the corner of the T-joint 23. After prolonged operation, the buffer grout pad inside the cavity may experience surface solidification, aggregate compaction, and wear. By adjusting the position of the valve seat 26, the distance between the cavity of the stepped groove 27 and the inner wall of the T-joint 23 can be changed, pushing the aged and ineffective grout pad into the mainstream grout and carrying it away. At the same time, fresh grout refills the cavity, forming a new wear-resistant buffer layer, achieving self-renewal of the wear-resistant layer. This effectively extends the service life of the pipe corner joint and reduces equipment replacement frequency and on-site maintenance costs.
[0030] An end cap 24 is threaded onto the outer end of the T-joint 23. The end cap 24 seals the end of the T-joint 23 and provides a stable support for the internal adjustment components. A screw 25 is rotatably mounted through the center of the end cap 24. The screw 25 can rotate freely in the circumferential direction under external force. A valve seat 26 is threadedly fitted onto the inner side of the screw 25. When the operator rotates the screw 25, the valve seat 26 can be precisely axially translated within the T-joint 23 based on the thread transmission principle. This adjusts the distance between the valve seat 26 and the end of the joint, flexibly changing the size of the storage cavity to adapt to the wear-resistant layer replacement needs of slurries with different pumping flows and aggregate particle sizes. Multiple evenly distributed guide rods 30 are fixedly installed on the inner end face of the end cap 24. The guide rods 30 are arranged parallel to the screw 25. The tail end of the valve seat 26 has corresponding guide holes 29 with perfectly matched numbers and positions. The guide rods 30 are slidably fitted inside the guide holes 29. During the translational adjustment of the valve seat 26 with the screw 25, the guide rod 30 and the guide hole 29 slide against each other, which can precisely constrain the movement trajectory of the valve seat 26, prevent the valve seat 26 from rotating circumferentially and shifting radially, ensure the smooth movement of the valve seat 26 throughout the process, avoid problems such as adjustment jamming and sealing misalignment, and greatly improve the stability and accuracy of the adjustment structure. The part of the screw 25 that extends out of the end cover 24 is fitted with a bellows-type sealing sleeve, the outer wall of the guide rod 30 is coated with a salt spray-resistant anti-corrosion coating, and the outer end face of the end cover 24 is also provided with a grease injection nozzle (not shown) for periodically injecting grease into the rotational fit gap between the screw 25 and the end cover 24.
[0031] Example 2 Reference Figure 8 This invention provides a novel technical solution: a grouting material conveying device for offshore wind power. The grouting pipe 3 adopts a pressure-resistant and deformation-resistant composite pipe wall structure, specifically composed of an inner pipe 31 and an outer pipe 32. The outer pipe 32 is integrally formed and covers the outer wall of the inner pipe 31. The middle area of the inner pipe 31 and the outer pipe 32 forms a sealed annular interlayer 33, which is completely filled with low-compressibility industrial silicone oil medium. A steel wire mesh 34 is embedded and fixed inside the pipe wall of the outer pipe 32. The steel wire mesh 34 adopts an integral woven structure, which can significantly improve the structural strength and deformation resistance of the outer pipe 32 and withstand the squeezing effect of high hydrostatic pressure in the deep sea. During deep-sea grouting operations, if the pumping equipment is temporarily shut down, the pressure of the grout inside the pipe will drop rapidly. The huge external deep-sea hydrostatic pressure will directly act on the outer wall surface of the grouting pipe 3. At this time, the low compressibility silicone oil medium inside the interlayer 33 can form a stable liquid support skeleton. Combined with the rigid support of the wire mesh 34, it provides all-round and uniform support for the inner pipe 31 wall, preventing the pipe from being flattened, wrinkled, or undergoing irreversible deformation by water pressure. It also prevents pipe bursting when the pump is restarted for pressurization, and can stably adapt to the grouting construction conditions of deep-sea wind power foundations.
[0032] The processing method of grouting pipe 3 is as follows: first, the inner tube 31 is extruded and then vulcanized and shaped.
[0033] On the outer wall of the inner tube 31, a layer of isolation line (fine steel wire or high-strength chemical fiber, with a wire diameter equal to the thickness of the interlayer, such as 2~3mm) is spirally wound like a hemp rope.
[0034] Outside the isolation line, a middle layer of steel wire mesh 34 is woven.
[0035] The outer sleeve 32 is extruded to enclose the entire structure, and then vulcanized at high temperature to fuse the rubber together.
[0036] After vulcanization, the wound isolation wire is pulled out from the end. Once the wire is removed, the space originally occupied by the wire becomes the annular interlayer 33.
[0037] Silicone oil is injected into the interlayer 33 from the end, then the end cap is welded and connected to the micro-conduit.
[0038] The energy storage compensation tank 36 is fixedly installed in the working platform area of the transport vessel 1. The interlayer 33 is connected to the energy storage compensation tank 36 via a high-pressure hose 35. The energy storage compensation tank 36 is equipped with an isolation bladder, one side of which is filled with nitrogen and the other side is connected to silicone oil. When the external seawater pressure increases, the silicone oil pressure in the interlayer 33 increases, pushing the bladder to compress the nitrogen, causing some silicone oil to flow into the energy storage compensation tank 36, thereby establishing a support pressure in the interlayer 33 that is balanced with the external seawater pressure. The bulk elastic modulus of silicone oil is much greater than that of nitrogen. As a compressible medium, nitrogen absorbs the volume change, thus ensuring that the interlayer 33 always maintains a support back pressure that matches the external water depth in real time, achieving a dynamic balance of "pressure transmission by liquid and energy storage by gas".
[0039] The specific construction process is as follows: During the pre-treatment phase, the surface of the underwater foundation grouting area for the wind turbine was first cleaned, removing floating mud, sea sand, and loose impurities from the inner wall of the sleeve and the annular area to ensure the grouting cavity was clean and free of debris, preventing impurities from mixing into the grout and affecting its curing strength. Simultaneously, a complete inspection of the equipment mounted on the deck of the transport vessel 1 was conducted. This confirmed that the pumping crane 2, transport pipe 21, and grouting pipe 3 were unobstructed, the energy storage compensation tank 36 was checked for normal operation, the silicone oil pressure inside the interlayer 33 was ensured to be within a stable compensation range, and the adjustment structures of each T-joint 23 and valve seat 26 were confirmed to be flexible and without jamming. The torsion spring 10 and sealing plate 8 opened and closed smoothly, and the easily broken pin 44 was found to be in good condition with no fatigue deformation. The overall equipment met the requirements for offshore grouting construction. After pre-treatment, the transport vessel 1 sailed to the pre-set construction point of the wind turbine foundation and stopped at the designated location using the hull positioning system to offset minor sea surface swell displacement, providing a stable working platform for underwater pipeline connection.
[0040] During the equipment alignment and locking stage, the underwater grouting pipe 3 is lowered using the water equipment control system, ensuring that the grouting pipe 3 is vertically aligned with the grouting sleeve position of the wind power foundation. The pumping crane 2 is then used to fine-tune the attitude and height of the delivery pipe 21, ensuring that the butt joint I5 at the tail end of the delivery pipe 21 is precisely aligned and inserted with the butt joint II6 at the top end of the grouting pipe 3. During the insertion of the two sets of butt joints, the support frame 9 fixed below the butt joint I5 and the support frame 9 fixed above the butt joint II6 abut against each other, gradually opening the corresponding sealing plate 8. This allows the sealing plate 8 to overcome the pre-tightening force of the torsion spring 10 and remain fully open, allowing the positioning port 12 to slide and adapt to the outer wall of the support frame 9, avoiding structural interference and ensuring that the pipeline is completely unobstructed. After connector I5 and connector II6 are fully inserted, the workers screw multiple sets of easy-break pins 44 into the threaded extension cylinder 43 along the inner wall of the support ring 41, so that the tail end of the easy-break pin 44 passes through the top edge of connector II6 and presses against the outer wall of connector I5. At the same time, the middle of the easy-break pin 44 passes through the connecting rod 45, locking the protective cylinder 42 and the support ring 41 into an integrated protective structure, completing the rigid fixation of the two sets of connectors and preventing loosening or displacement during construction. At this time, the buoyancy ring 46 and the scraper 47 are slidably assembled on the outside of the protective cylinder 42 and the support ring 41, entering the cleaning working state.
[0041] During the pre-conditioning stage, based on the design flow rate and aggregate characteristics of the grouting operation, workers manually rotate the screw 25 at the outer end of the T-joint 23. During rotation, the screw 25 drives the valve seat 26 to axially translate within the T-joint 23 via threaded transmission. The guide hole 29 at the tail end of the valve seat 26 slides precisely along the guide rod 30 inside the end cap 24, limiting the rotational offset of the valve seat 26 and ensuring a smooth and precise adjustment process. By adjusting the position of the valve seat 26, the volume of the annular storage cavity formed by the stepped groove 27 and the inner wall of the T-joint 23 is changed to suit the current construction conditions. Subsequently, a small amount of grout is pumped in advance to fill the storage cavity, forming an initial wear-resistant buffer layer to prevent the high-speed grout from directly scouring the metal pipe wall during the initial stage of formal grouting. Simultaneously, it is confirmed that the guide groove 28 at the inner end of the valve seat 26 faces the grout flow direction, ensuring a regular grout delivery flow line without turbulent dead zones.
[0042] During the continuous pressure grouting stage, the pumping system of the overhead pump trolley 2 is activated to pump the high-strength grout, pre-mixed in the ship-borne hopper, into the delivery pipe 21 at a uniform speed. The grout flows along the delivery pipe 21 through the corner positions of each T-joint 23. The guide groove 28 continuously regulates the flow direction of the grout, reducing turbulent impact. Some grout remains in the storage cavity of the stepped groove 27. Old grout is carried away by the main flow, while fresh grout is continuously added, achieving dynamic self-renewal of the wear-resistant buffer layer and protecting the pipe corner joints from erosion and wear by hard aggregates throughout the process. The grout continues to flow into the underwater grouting pipe 3 through butt joints I5 and II6, finally filling the annulus and rock-embedded cavity of the wind turbine foundation smoothly. The entire grouting process maintains continuous pumping to avoid interruptions that could cause cold joints and ensure that the foundation grouting is dense and uniform. Throughout the operation, the grouting pipe 3 in the deep-sea area relies on the composite structure of the inner silicone oil medium and the steel wire mesh 34 to resist the hydrostatic pressure of the deep sea. The energy storage compensation tank 36 continuously provides dynamic pressure compensation to the interlayer 33 through the high-pressure hose 35, balancing the internal and external pressure difference and preventing pipeline deformation, wrinkling, and damage due to pressure loss. At the same time, the sea waves continuously beat against the buoyancy ring 46, causing it to slide up and down along the outer wall of the protective cylinder 42 and the support ring 41. The scraper 47 continuously scrapes away impurities such as salt, seaweed, and barnacle larvae adhering to the outer wall of the equipment, keeping the outer wall of the docking protection structure clean throughout the process and preventing marine organisms from affecting the accuracy of equipment operation and structural strength.
[0043] During the final stage of normal pump shutdown, grouting continues until the grouting cavity of the wind turbine foundation is completely filled and the grout steadily overflows from the vent. After confirming that there are no air bubbles or voids inside, the pumping equipment of the pumping crane 2 is shut down, the grout delivery is stopped, and the main grouting operation is completed. After shutdown, the pipeline is kept in the connected state and left to stand for a period of time until the residual pressure in the pipe is stable, the grout on the foundation surface has initially set and stabilized, and there is no backflow or leakage. Then, the workers unscrew the easy-break pins 44 at each position, release the rigid locking constraints of the butt joints I 5 and II 6, and slowly separate the two sets of butt joints. At the moment of separation of the butt joints, the sealing plate 8 loses the support and limit of the support frame 9, the torsion spring 10 releases the pre-tightening force instantly, drives the rotating shaft 7 to rotate, and drives the upper and lower sets of sealing plates 8 to close inward quickly. The limit strip 11 restricts the closing stroke of the sealing plate 8, ensuring that the sealing plate 8 completely fits the end face of the pipe opening, and bidirectionally seals the bottom end of the delivery pipe 21 and the top end of the grouting pipe 3, reducing the leakage of a large amount of residual grout into the sea and causing pollution. After the pipeline separation is completed, the underwater grouting pipe 3 and the above-water delivery pipeline are gradually recovered to complete a single routine grouting operation.
[0044] In the emergency disconnection phase under extreme sea conditions, if a sudden storm, strong ocean current, or other severe weather occurs during the grouting operation, causing a sharp increase in sea surge and significant drifting and swaying of the transport vessel 1, the axial tensile force between joint I5 and joint II6 will continuously increase and exceed the preset shear threshold of the easy-break pin 44. At this point, multiple sets of easy-break pins 44 will simultaneously undergo pure shear fracture, instantly releasing the locking limit of the support ring 41 on the two sets of joints. Under the drifting force of the hull, joint I5 and joint II6 will quickly and automatically separate, preventing damage to the main body of the equipment. Simultaneously with the separation of the two sets of joints, the sealing plates 8 on both sides will close rapidly under the drive of the torsion spring 10, sealing the upper and lower pipe ports in both directions, achieving leak-free and backflow-free pipe disconnection. The transport vessel 1 can directly initiate the emergency evacuation procedure without waiting for pipe recovery or manual operation, quickly leaving the work area and avoiding multiple risks such as equipment damage, hull distress, and grout contamination. After the sea conditions stabilize, the vessel will return to the construction site, reassemble the equipment, and continue the grouting operation.
[0045] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.
Claims
1. A grout conveying device for offshore wind power, comprising a conveying vessel (1), a pumping crane (2) mounted on the conveying vessel (1), and a grouting pipe (3) disposed in the grouting area, characterized in that, Connector I (5), which is connected to the end of the delivery pipe (21) in the pumping crane (2), and the top end of the grouting pipe (3) is connected to connector II (6) which is used in conjunction with connector I (5). The protective component (4) is disposed outside the connector I (5) and connector II (6). The protective component (4) includes a support ring (41) sleeved on the connector I (5) and connector II (6). The inner wall of the support ring (41) is integrally formed with multiple extension cylinders (43). The extension cylinders (43) are provided with a breakable pin (44) in the internal thread. The top end of the connector II (6) is provided with an edge. The tail end of the breakable pin (44) passes through the edge on the connector II (6) and abuts against the connector I (5). The connector I (5) is fixed inside the connector II (6) by the breakable pin (44). In extreme sea conditions, the connector I (5) and connector II (6) can automatically separate under tension. The support arm (22) on the pumping crane (2) is provided with a T-shaped joint (23) at the corner. Two adjacent T-shaped joints (23) are sealed and rotated. The other end of the T-shaped joint (23) is provided with an adjustable valve seat (26). The inner end of the valve seat (26) is provided with a guide groove (28) for guiding the slurry. The inner end of the valve seat (26) is provided with a stepped groove (27). When the slurry is transported, some slurry can fill between the stepped groove (27) and the inner wall of the T-shaped joint (23) to act as a wear-resistant pad. The other end of the T-shaped joint (23) is connected to the corresponding conveying pipe (21).
2. A grout delivery device for offshore wind power according to claim 1, characterized in that The sides of the connector I (5) and connector II (6) that are close to each other are rectangular, and the ends of the connector I (5) and connector II (6) that are far apart from each other are cylindrical. The bottom end of the connector I (5) and the top end of the connector II (6) are each provided with two rotating shafts (7). The outer wall of the rotating shaft (7) is fixedly fitted with a sealing plate (8). When the two corresponding sealing plates (8) are closed, they can seal the ports of the connector I (5) and connector II (6).
3. A grout delivery device for offshore wind power according to claim 2, characterized in that The outer wall of the rotating shaft (7) is fitted with a torsion spring (10). One end of each torsion spring (10) abuts against the inner wall of one side of a corresponding mating joint I (5) and mating joint II (6). The other end of the torsion spring (10) abuts against the inner wall of the sealing plate (8). The inner walls of mating joint I (5) and mating joint II (6) are fixedly provided with limiting strips (11) for limiting the sealing plate (8).
4. A grout delivery device for offshore wind power according to claim 3, characterized in that The inner walls of both the connector I (5) and the connector II (6) are fixedly provided with support frames (9) that cooperate with the sealing plates (8). During the insertion process of the connector I (5) and the connector II (6), the support frame (9) below the connector I (5) pushes open the two sealing plates (8) at the top of the connector II (6), and the support frame (9) above the connector II (6) pushes open the two sealing plates (8) at the bottom of the connector I (5). The inner side of the sealing plates (8) is provided with clearance openings (12) that are compatible with the support frames (9).
5. The grout delivery device for offshore wind power according to claim 1, characterized in that, The protective assembly (4) also includes two protective cylinders (42), which are respectively fitted onto the grouting pipe (3) and the conveying pipe (21). The top wall of the upper protective cylinder (42) and the bottom wall of the lower protective cylinder (42) are both fixedly provided with connecting rods (45). Both sets of connecting rods (45) are arranged in the direction of the middle support ring (41). The middle part of the easy-break pin (44) passes through the connecting rod (45) so as to use the connecting rod (45) to fix the protective cylinder (42) onto the support ring (41).
6. A grout delivery device for offshore wind power according to claim 5, characterized in that A buoyancy ring (46) is slidably fitted on the protective cylinder (42) and the support ring (41). The top and bottom of the buoyancy ring (46) are fixed with scrapers (47) that contact the outer walls of the protective cylinder (42) and the support ring (41). When the waves hit the buoyancy ring (46), the buoyancy ring (46) is driven to move up and down, so as to drive the scraper (47) to move up and down to clean the outer walls of the protective cylinder (42) and the support ring (41). The top of the protective cylinder (42) is provided with an edge to limit the buoyancy ring (46).
7. The grout delivery device for offshore wind power according to claim 1, characterized in that, The outer end of the T-shaped connector (23) is threaded with an end cap (24), and one end of the end cap (24) is rotatably provided with a screw (25). The valve seat (26) is threaded on the screw (25), and the screw drives the valve seat (26) to move within the T-shaped connector (23).
8. A grout delivery device for offshore wind power according to claim 7, characterized in that The inner end of the end cap (24) is fixedly provided with a plurality of guide rods (30), and the tail end of the valve seat (26) is provided with a guide hole (29) that is adapted to the guide rods (30). The guide rods (30) slide in the guide hole (29) and guide the valve seat (26) by means of the guide hole (29) and the guide rods (30).
9. The grout delivery device for offshore wind power according to claim 1, characterized in that, The grouting pipe (3) includes an inner pipe (31), the outer wall of the inner pipe (31) is covered with an outer pipe (32), a sandwich layer (33) is formed between the middle of the outer pipe (32) and the inner pipe (31), the sandwich layer (33) is filled with silicone oil, and a wire mesh (34) is embedded in the outer pipe (32).
10. A grout delivery device for offshore wind power according to claim 9, characterized in that The interlayer (33) is connected to an energy storage compensation tank (36) via a high-pressure hose (35), and the energy storage compensation tank (36) is installed on the offshore operating platform.