Precast infill wall panels, steel frame-wall panel integrated components and their construction methods

By designing prefabricated infill wall panels and integrated steel frame components, the problem of low construction efficiency in the wall filling area of ​​the lateral force resisting component in steel structure prefabricated buildings is solved, realizing efficient prefabrication and rapid installation of the wall.

CN123109332APending Publication Date: 2026-11-17CHINA CONSTR SCI & IND CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611442759.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-17
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing steel structure prefabricated buildings, the construction of wall filling in the lateral force resisting component area involves many on-site procedures, a large amount of wet work, low construction efficiency, and is difficult to complete in the factory.

Method used

It provides prefabricated infill wall panels and steel frame integrated components. By prefabricating continuous concave cavities and edge thinning sections in the wall panels, combined with crisscrossing steel bars and tie bars, an edge overlapping area is formed, realizing the prefabricated connection between the wall panels and the steel frame. Concrete filling and connection are completed in the factory, reducing on-site construction.

Benefits of technology

The prefabrication of the wall structure was improved, the on-site construction procedures and wet work were reduced, construction efficiency was improved, and rapid installation and integrated construction of lateral force resisting components were achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109332A_ABST
    Figure CN123109332A_ABST
Patent Text Reader

Abstract

This invention discloses a precast infill wall panel, a steel frame-wall panel integrated component, and its construction method, relating to the field of prefabricated building technology. The wall panel includes a concrete slab, comprising a central precast main section and peripheral thinning sections. One side surface of the thinning sections is coplanar with one side surface of the precast main section, forming a continuous and flat first slab surface. The other side is concave, forming a cavity that connects end-to-end along the outer perimeter and opens bidirectionally towards the second slab surface and the outer perimeter. The thickness of the thinning sections is less than the depth of the cavity. Longitudinal and transverse reinforcing bars within the slab extend to the edge overlap area and at least partially extend into the cavity. Tie bars, partially embedded in the thinning sections and partially extending into the cavity, are provided at the intersections of the reinforcing bars within the edge overlap area. This invention facilitates peripheral connection construction, enhances the overall integrity of the connection between the precast portion and the subsequent filling concrete, improves the prefabrication degree of the wall, reduces on-site construction procedures and wet work, and improves assembly construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of prefabricated building technology, and in particular to prefabricated infill wall panels, steel frame-wall panel integrated components, and their construction methods. Background Technology

[0002] Prefabricated steel structure buildings employ a construction method that combines factory processing with on-site assembly. The degree of factory production of components and the efficiency of on-site construction are important factors in their engineering applications. In such buildings, the walls in the areas where lateral force resisting components are located must also meet building usage requirements such as enclosure infill, fireproofing, and sound insulation. The infill construction is an important part of the building construction.

[0003] Currently, the lateral force resisting components in steel structure prefabricated buildings mainly adopt steel bracing or steel plate shear walls. When steel bracing is used, the bracing area is usually filled and sealed with masonry blocks, and fireproof coating of the steel bracing, mesh laying at the junction of the masonry blocks and the steel structure, and wall surface treatment are carried out in conjunction with these constructions. When steel plate shear walls are used, autoclaved aerated concrete slabs can be installed on both sides of the wall, or the filling can be completed by spraying gypsum-based lightweight concrete with mesh.

[0004] The above-mentioned methods involve numerous on-site construction procedures, significant labor input, and complex on-site construction organization. In particular, the wire mesh spraying filling method also involves considerable on-site wet work. The prefabrication level of the wall filling portion in the lateral force resisting component area is low, resulting in a large amount of on-site work and room for improvement in construction efficiency.

[0005] Therefore, how to reduce the on-site procedures and wet work volume of wall filling in the lateral force resisting component area of ​​steel structure prefabricated buildings and improve construction efficiency is a technical problem that needs to be solved in this field. Summary of the Invention

[0006] The present invention aims to provide prefabricated infill wall panels, steel frame-wall panel integrated components and their construction methods to solve the above-mentioned technical problems.

[0007] In a first aspect, the present invention provides a precast infill wall panel, comprising a concrete slab having opposing first and second slab surfaces; The panel includes a prefabricated main body segment located in the middle and an edge thinning segment surrounding the prefabricated main body segment along the four edges of the panel. The prefabricated main body segment and the edge thinning segment are prefabricated integrally. The prefabricated main body segment extends from the first panel surface to the second panel surface. The surface of the edge-thinning section facing the first plate is coplanar with the corresponding surface of the prefabricated main body section and together constitutes a continuous and flat first plate surface; the surface of the edge-thinning section facing the second plate is concave relative to the side of the second plate facing the first plate, so that the plate body forms an open cavity connected end to end along its outer periphery, the open cavity is open in both directions towards the second plate and towards the outer periphery, and the thickness of the edge-thinning section is less than the depth of the open cavity along the thickness direction of the plate body; The edge thinning section and the open cavity form an edge overlapping area; the plate body is provided with crisscrossing distributed reinforcing bars, which extend from the precast main body section to the edge overlapping area, and at least part of the distributed reinforcing bars extend from the precast main body section into the open cavity; tie bars are provided at the intersection of the distributed reinforcing bars in the edge overlapping area, part of which is embedded in the edge thinning section and the other part extends into the open cavity.

[0008] In a second aspect, the present invention provides an integrated steel frame-prefabricated infill wall panel component, comprising a steel frame and a wall panel, wherein the wall panel is a prefabricated infill wall panel as described in the first aspect; The steel frame includes two steel columns and at least two steel beams spaced apart along the length of the steel columns. Two adjacent steel beams and two steel columns form a frame, and the wall panel is embedded in the frame. The steel column and the steel beam are provided with supporting angle steel on the side facing the frame. One leg of the supporting angle steel is welded to the corresponding steel column or the steel beam, and the other leg is located on one side of the first plate surface and overlaps with the edge thinning section to support the wall panel and cover the gap between the wall panel and the steel frame at the overlap. The steel columns and steel beams are welded with studs extending into the open cavity on the side facing the frame; the open cavity is provided with a post-cast concrete layer, which covers the studs and reinforcing bars extending into the open cavity in its area, and combines with the edge thinning section and the precast main body section to form an edge reinforcement band.

[0009] Thirdly, the present invention provides a construction method for an integrated steel frame-prefabricated infill wall panel component, comprising: The steel frame is laid flat. The steel frame includes two single-section steel columns and multiple steel beams, forming multiple frames arranged along the length of the steel columns. Supporting angle steels are pre-welded to the side of the steel columns and steel beams facing the frames. The lower end of the steel column is provided with a splicing part, and the column wall near the splicing part is provided with welding operation holes with openings facing upwards. Multiple wall panels are embedded into each of the aforementioned frames, and the supporting angle steel supports the wall panels and also serves as the edge casting template, so that the second panel surface faces upward; Studs are welded to the steel column and the steel beam through the open cavity, so that the studs extend into the open cavity, and additional reinforcing bars are tied in the open cavity; The portion of the open cavity of the lowest wall panel located below the splicing part is reserved as a post-casting area. Concrete is poured into the area of ​​the open cavity other than the post-casting area and cured to form an edge reinforcement zone, thus obtaining an integrated component. The integrated component is supported from the bottom and hoisted into place as a whole. The steel column is spliced ​​and welded to the lower steel column through the welding operation hole. The welding operation hole is then sealed, and concrete is filled into the post-pouring area.

[0010] Beneficial technical effects of the present invention: This invention prefabricates the main precast section and the surrounding thinned edge sections as a single unit, allowing the panel and its edge structure to be completed in advance. While forming a continuous and flat first panel surface, it creates a continuous cavity around the panel's perimeter that opens to both the second panel surface and the outer edge, reserving space for subsequent connections and facilitating connection and concrete filling operations from the second panel surface. By ensuring the thickness of the thinned edge sections is less than the depth of the cavities, it preserves the precast edge layer while providing thickness-direction space for the connection points. By extending the distributed reinforcing bars from the precast main section into the cavities, and pre-embedding some tie bars in the thinned edge sections and partially extending them into the cavities, it strengthens the connection between the precast main section, the thinned edge sections, and the subsequent concrete filling, improving the overall integrity of the overlapping edge areas and reducing the need for subsequent tie bar installation. This structure allows for seamless integration of wall panel prefabrication and peripheral connection construction, providing structural conditions for increasing the degree of wall prefabrication, reducing on-site construction procedures and wet work, and improving assembly efficiency. Attached Figure Description

[0011] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below show some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a schematic plan view of a prefabricated infill wall panel provided in an embodiment of the present invention; Figure 2 This is a schematic diagram of the steel reinforcement distribution in a precast infill wall panel provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the combination of steel columns and wall panels in an integrated steel frame-wall panel component provided in an embodiment of the present invention; Figure 4This is a schematic elevation view of the integrated steel frame-wall panel component provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of the construction method provided in an embodiment of the present invention.

[0013] Explanation of reference numerals in the attached figures: In the diagram: 100-Precast infill wall panel, 10-Plate body, 11-First panel surface, 12-Second panel surface, 13-Precast main body section, 14-Edge thinning section, 15-Open cavity, 16-Edge overlapping area, 20-Distribution reinforcement, 21-Tie reinforcement, 22-Additional stirrups, 30-Steel frame, 31-Steel column, 34-Splice, 35-Welding operation hole, 32-Steel beam, 33-Frame, 40-Supporting angle steel, 50-Stud, 60-Post-cast concrete layer, 61-Edge reinforcing strip, 62-Post-cast area, 70-Additional reinforcement, 80-Lower section steel column, 81-Lower steel beam. Detailed Implementation

[0014] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0015] It should be understood that, when used in this specification and the appended claims, the terms "comprising" and "including" indicate the presence of the described features, integrals, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integrals, steps, operations, elements, components and / or collections thereof.

[0016] It should also be understood that the terminology used in this specification is for the purpose of describing particular embodiments only and is not intended to limit the invention. As used in this specification and the appended claims, the singular forms “a,” “an,” and “the” are intended to include the plural forms unless the context clearly indicates otherwise.

[0017] It should also be further understood that the term "and / or" as used in this specification and the appended claims refers to any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.

[0018] Currently, steel bracing or steel plate shear walls are commonly used as lateral force resisting components in prefabricated steel structure buildings. When using steel bracing, the supporting area must first be filled and sealed with masonry blocks. After the steel bracing is coated with fire-retardant paint, steel mesh must be laid at the junction of the masonry blocks and the steel structure before subsequent processes can proceed. When using steel plate shear walls, the filling on both sides of the wall either requires attaching thin plates one by one or spraying with mesh, resulting in a large amount of wet work on site. In both of these approaches, the filling is difficult to complete using a factory assembly line, and the lateral force resisting components need to be installed layer by layer, leading to a high frequency of on-site hoisting.

[0019] This invention provides a precast infill wall panel, which uses a precast concrete slab to replace steel supports or steel plate shear walls as an infill lateral force resisting member. The wet connection interface between the wall panel and the steel frame is centralized within a cavity formed along the perimeter of the wall panel, opening to one side, allowing this connection interface to be precast in the factory along with the wall panel. Furthermore, this invention provides an integrated component combining the wall panel and the steel frame, along with its construction method, enabling the installation of the wall panel, welding of connectors, and pouring of edge concrete to be completed in the factory.

[0020] See Figure 1 and Figure 2 , Figure 1 The planar structure and pre-embedded features of the wall panel are shown; Figure 2 The distribution of reinforcing steel bars in the wall panel is shown. An embodiment of the present invention provides a precast infill wall panel 100, comprising a concrete slab 10, the slab 10 having opposing first surfaces 11 and second surfaces 12.

[0021] The slab 10 includes a precast main section 13 located in the center and edge thinning sections 14 surrounding the precast main section 13 along its four edges. The precast main section 13 and the edge thinning sections 14 are precast integrally and formed in the same pour, without any construction joint between them. The precast main section 13 extends from the first slab surface 11 to the second slab surface 12, that is, in the center of the slab 10, where the concrete fills the entire thickness of the slab 10.

[0022] The surface of the edge-thinned section 14 facing the first plate surface 11 is coplanar with the corresponding surface of the prefabricated main body section 13, together forming a continuous and flat first plate surface 11; the surface of the edge-thinned section 14 facing the second plate surface 12 is concave relative to the side of the second plate surface 12 facing the first plate surface 11. Thus, the plate body 10 forms an open-ended, closed annular cavity 15 along its outer periphery. The open-ended cavity 15 is open in both directions: open to the second plate surface 12, ensuring the cavity space is always visible and accessible before filling; and open to the outer periphery, connecting the cavity space with the space outside the plate body 10. The open-ended cavity 15 extends continuously along the four edges of the plate body 10 and transitions continuously at the four corners of the plate body 10, forming a closed annular cavity on the side of the second plate surface 12 of the plate body 10.

[0023] The thickness of the edge thinning section 14 is less than the depth of the open cavity 15 along the thickness direction of the plate 10. In this embodiment, the thickness of the plate 10 is 200mm, the thickness of the edge thinning section 14 is 60mm, and the depth of the open cavity 15 is 140mm accordingly; the thickness of the plate 10 can also be other dimensions according to engineering needs. The width of the edge thinning section 14 extending inward from the outer periphery of the plate 10 is 350mm, that is, the bandwidth of the annular cavity formed by the open cavity 15 is 350mm. The length of the plate 10 is taken according to the clear span of the building columns in the area where it is embedded, and the height of the plate 10 is taken according to the building floor height minus the structural beam height.

[0024] The edge thinning section 14 and the open cavity 15 constitute the edge overlapping area 16. The edge overlapping area 16 is the area on the plate 10 where the pre-formed edge thinning section 14 and the subsequent filling portion overlap each other along the thickness direction: in this area, the pre-formed edge thinning section 14 is on the side facing the first plate surface 11, and the space defined by the open cavity 15 on the side facing the second plate surface 12 is reserved for subsequent filling.

[0025] The slab 10 is provided with crisscrossing distributed reinforcing bars 20. The distributed reinforcing bars 20 extend from the precast main section 13 to the edge overlapping area 16, and at least a portion of the distributed reinforcing bars 20 extend from the precast main section 13 into the open cavity 15. The ends of the distributed reinforcing bars 20 extending into the open cavity 15 are located in the cavity, and are covered by the concrete after the open cavity 15 is filled with concrete, thereby making the reinforcement in the precast main section 13 and the subsequently filled concrete integral.

[0026] Tie bars 21 are provided at the intersections of the distributed reinforcing bars 20 within the edge overlap zone 16. A portion of the tie bar 21 is pre-embedded within the edge thinning section 14, and the other portion extends into the open cavity 15, meaning the tie bar 21 spans the interface between the edge thinning section 14 and the open cavity 15. The tie bar 21 is cast together with the edge thinning section 14 during the prefabrication stage of the slab 10, eliminating the need for post-installation within the open cavity 15. In this embodiment, tie bars 21 are provided at each intersection of the distributed reinforcing bars 20 within the edge overlap zone 16.

[0027] Regarding the distribution of the edge thinning sections 14, the edge thinning sections 14 surround the prefabricated main body section 13, rather than being located only on one or two edges of the panel 10. When the wall panel is installed within the frame formed by the steel frame, its four edges are adjacent to the steel columns and steel beams respectively, and each edge can be connected to the steel frame; the edge thinning sections 14 and the open recesses 15 extend continuously around the perimeter of the panel 10 and transition continuously at the four corners. Each panel 10 itself has a connection interface that opens to one side along its entire circumference, without relying on adjacent panels of the same type to form this interface.

[0028] The thickness of the edge thinning section 14 is less than the depth of the open cavity 15, so that the open cavity 15 has a certain net depth outside the edge thinning section 14 to accommodate the connector extending into the cavity from outside the plate 10, and to leave working space for the installation of the connector; in this embodiment, the net depth is 140mm.

[0029] Tie bar 21 spans the interface between the thinned edge section 14 and the open cavity 15. The thickness of the thinned edge section 14 is much smaller than the thickness of the plate 10. Without a cross-interface connector, after the open cavity 15 is filled with concrete, the thinned edge section 14 can only rely on the bond between itself and the concrete to transmit force. With tie bar 21, the thinned edge section 14 and the subsequently filled concrete are connected by tie bar 21, and the two are superimposed as a whole to bear force, so the thinned edge section 14 will not become a thin layer that is separated from the subsequently filled concrete.

[0030] The main function of the above structure is that the open cavity 15 closes around the perimeter of the panel 10, and its depth is greater than the thickness of the edge thinning section 14. Each wall panel itself has a wet connection interface with sufficient net depth along its entire circumference. Tie bars 21 are anchored from the edge thinning section 14 within the cavity. After the cavity is filled with concrete, the edge thinning section 14 and the concrete overlap to form a load-bearing whole. Furthermore, because the cavity is open towards the second panel 12, the reinforcement and embedded parts within the cavity remain visible and accessible before the concrete is filled. Welding, binding, and pouring operations within the cavity can be carried out from the same direction, instead of being performed separately on both sides of the wall as in existing methods. In addition, the first panel 11 is jointly formed by the surfaces of the precast main section 13 and the edge thinning section 14, and this side panel is a continuous and flat surface when the wall panel leaves the factory.

[0031] Based on the above specific embodiments, in some optional implementations, in addition to the tie bars 21, multiple additional stirrups 22 are pre-embedded in the edge thinning section 14. The multiple additional stirrups 22 are arranged at intervals along the extension direction of the edge thinning section 14, that is, along the direction of the annular cavity formed by the open recess 15; a part of each additional stirrup 22 is embedded in the edge thinning section 14, and another part extends into the open recess 15.

[0032] Additional stirrups 22 are arranged at intervals along the direction of the annular cavity, while tie bars 21 are set at each intersection of the distributed reinforcing bars 20. The two constitute two types of cross-interface embedded bars with different distribution methods. As a result, the connection between the edge thinning section 14 and the concrete subsequently filled into the open concave cavity 15 is strengthened throughout the entire annular area.

[0033] See Figure 3 and Figure 4 , Figure 3 The diagram shows the connection between the steel column and the wall panel; Figure 4 The facade structure of the integrated component is shown. This embodiment of the invention also provides an integrated steel frame-prefabricated infill wall panel component, including a steel frame 30 and a wall panel, wherein the wall panel is the aforementioned prefabricated infill wall panel 100.

[0034] The steel frame 30 includes two steel columns 31 and at least two steel beams 32 spaced apart along the length of the steel columns 31. The two ends of each steel beam 32 are connected to the two steel columns 31. Two adjacent steel beams 32 and two steel columns 31 form a frame 33, and wall panels are installed within the frame 33. After the wall panels are installed, the four edges of the panel 10 are opposite to the two steel columns 31 and the two adjacent steel beams 32, respectively. The overlapping areas 16 of the panel 10's edges are distributed along the periphery of the frame 33. The open recess 15 facing the outer periphery of the panel 10 is directly opposite the side of the steel columns 31 and steel beams 32 facing the frame 33.

[0035] Supporting angle steel 40 is provided on the side of the steel column 31 and steel beam 32 facing the frame 33. One leg of the supporting angle steel 40 is welded to the corresponding steel column 31 or steel beam 32, and the other leg is located on one side of the first plate surface 11 and overlaps with the edge thinning section 14. The supporting angle steel 40 thus serves two purposes: firstly, its extended leg supports the edge thinning section 14 from the first plate surface 11 side, and the wall panel is supported by the supporting angle steel 40 after being embedded in the frame 33; secondly, this leg covers the local joint between the wall panel and the steel frame 30 at the overlapping part. In this embodiment, the supporting angle steel 40 is an L50×50×5 angle steel, which is welded and fixed to the steel column 31 and steel beam 32.

[0036] Studs 50 are welded to the steel columns 31 and steel beams 32 on the side facing the frame 33, and the studs 50 extend into the open recess 15. Since the open recess 15 is open towards the outer periphery of the plate 10, the studs 50 extending from the steel columns 31 and steel beams 32 on the side facing the frame 33 can enter the cavity. In this embodiment, the length of the studs 50 is not less than 130 mm.

[0037] A post-cast concrete layer 60 is provided within the open cavity 15. The post-cast concrete layer 60 fills the open cavity 15, covering the studs 50 and reinforcing bars extending into the open cavity 15 within its area. The latter includes the distribution reinforcing bars 20 extending into the cavity from the precast main body section 13, the portions of the tie bars 21 extending into the cavity, and the additional reinforcing bars 70 tied within the cavity. The post-cast concrete layer 60 combines with the edge thinning section 14 and the precast main body section 13 to form an edge reinforcement band 61.

[0038] It should be noted that the edge overlapping area 16 and the edge reinforcing strip 61 are two different parts. The edge overlapping area 16 consists of the edge thinning section 14 and the open cavity 15, and is part of the wall panel's own structure, existing when the wall panel leaves the factory; the edge reinforcing strip 61 is a whole strip formed by filling the open cavity 15 with the post-cast concrete layer 60, and combining the post-cast concrete layer 60 with the edge thinning section 14 and the precast main body section 13, and exists only in the integrated component.

[0039] After the integrated component is formed, the connection between the steel frame 30 and the wall panel is undertaken by the edge reinforcement strip 61. Studs 50 extend from the steel columns 31 and steel beams 32 into and are encased in the post-cast concrete layer 60, forming a connection between the steel frame 30 and the post-cast concrete layer 60. The post-cast concrete layer 60 is then connected to the precast main body section 13 via the distributed reinforcing bars 20 extending into the cavity, and to the edge thinning section 14 via tie bars 21. The horizontal force borne by the steel frame 30 is thus transmitted to the edge reinforcement strip 61 via the studs 50, and then to the precast main body section 13 via the edge reinforcement strip 61. The wall panel, as an infilled lateral force resisting component, participates in the load-bearing process.

[0040] When pouring edge concrete, the supporting angle steel 40 can also serve as a local pouring formwork at the lap joint, sealing the joint and helping to reduce grout leakage.

[0041] In this embodiment, regarding the number of frames 33, there can be multiple frames 33 arranged along the length of the steel columns 31, and multiple wall panels are embedded in each frame 33. In this case, two steel columns 31 are separated along their length by multiple steel beams 32, and a frame 33 is formed between two adjacent steel beams 32 and two steel columns 31. Each frame 33 is arranged sequentially along the length of the steel columns 31, and a wall panel is embedded in each frame 33. After being filled with concrete, the overlapping edge areas 16 of each wall panel form their respective edge reinforcement bands 61.

[0042] In a further implementation, each steel column 31 is a single-section steel column spanning multiple frames 33, and the lower end of the single-section steel column is provided with a splicing part 34 for docking with the next steel column 80.

[0043] In prefabricated steel structure buildings, steel columns are typically divided into hoisting sections based on several floors, with each section being hoisted into place as a unit. When steel column 31 is a single section spanning multiple frames 33, the vertical range of the integrated component is determined by the segment height of the single steel column: the multiple frames 33 arranged along the length of steel column 31 and the multiple wall panels embedded within them, together with two steel columns 31 and multiple steel beams 32, constitute a hoisting unit. Accordingly, the integrated component hoists multiple wall panels at a time, rather than hoisting them layer by layer.

[0044] The splice joint 34 is located at the lower end of the single-section steel column and is used to connect with the already positioned lower-section steel column 80. After the integrated component is hoisted into place, the splice joint 34 is welded to the lower-section steel column 80 at this point, thereby connecting the steel column 31 to the lower-section steel column 80 as a whole. See also Figure 4 The splicing part 34 falls within the height range of the lowest wall panel. Therefore, the lowest frame 33 is formed by the lowest steel beam 32 and the lower sections of the two steel columns 31, with its lower part open at the lower end of the steel columns 31. The upper part of the lowest wall panel is embedded in the frame 33, and the lower part extends out from the lower end of the steel columns 31, facing the already positioned lower section steel column 80 and the lower steel beam 81 located below the wall panel in the lower structure. The lower section steel column 80 and the lower steel beam 81 are not part of the steel frame 30 and are not adjacent to the wall panel before the integrated component is hoisted into place.

[0045] In one specific structure, there are three frames 33, each containing a wall panel. This structure corresponds to the scenario where the steel column is hoisted in sections divided into three floors, meaning a single steel column spans three floors. The three frames 33 are arranged sequentially along the length of the steel column 31, each containing a wall panel. In this case, there are three steel beams 32, located above the three wall panels. The bottommost frame 33 is formed by the bottommost steel beam 32 and the lower sections of the two steel columns 31.

[0046] See also Figure 4 In some implementations, the steel column 31 has a welding operation hole 35 on the column wall near the splicing part 34. The welding operation hole 35 is located on the side facing the second plate surface 12 and is used for splicing welding from the inside of the steel column 31. In this embodiment, after the wall panel is installed in the frame 33, the first plate surface 11 faces the outside and the second plate surface 12 faces the inside, and the welding operation hole 35 is correspondingly opened on the column wall of the steel column 31 facing the inside.

[0047] The function of the welding operation hole 35 is related to the position of the splice 34. The splice 34 is located at the lower end of the single-section steel column, which falls within the height range of the lowest wall panel. The steel column 31 is adjacent to the wall panel on the side facing the frame 33 at this location. After the welding operation hole 35 is opened on the column wall of the steel column 31 near the splice 34, the operator can weld the joint between the splice 34 and the lower section steel column 80 from the inside of the steel column 31 through the welding operation hole 35. The welding operation hole 35 is opened on the side facing the second plate 12, so that it faces the interior side after the building is completed, and the operator can approach the hole from the interior side during operation. After the splice welding is completed, the welding operation hole 35 is closed, and the column wall of the steel column 31 is restored to continuity at this location.

[0048] The components and their mating relationships of the integrated structure have been described above. Regarding the molding and placement of this integrated structure, embodiments of the present invention also provide a construction method for an integrated steel frame-prefabricated infill wall panel structure. See [link to documentation]. Figure 5 The method includes: Step S601: Lay the steel frame flat. The steel frame includes two single-section steel columns and multiple steel beams, forming multiple frames arranged along the length of the steel columns. Supporting angle steels are pre-welded to the side of the steel columns and steel beams facing the frames. The lower end of the steel column is provided with a splicing part, and the column wall near the splicing part is provided with an upward-facing welding operation hole.

[0049] The steel frame 30 is fabricated as a whole according to the construction drawings by the steel component processing plant: two single-section steel columns 31 are welded together with multiple steel beams 32 to form a whole frame, with the multiple steel beams 32 arranged at intervals along the length of the steel columns 31 and forming multiple frames 33 with the two steel columns 31; at the same time, supporting angle steel 40 is welded to the side of the steel columns 31 and steel beams 32 facing the frames 33, forming a splice 34 at the lower end of the steel column 31, and welding operation holes 35 are opened on the column wall of the steel column 31 near the splice 34. Stiffening ribs and other accessories are also processed at this stage. The studs 50 are not welded at the steel component processing plant.

[0050] The prefabricated steel frame 30 is transported to the precast concrete component plant. The precast concrete component plant lays the steel frame 30 flat on the work site, with the side that will face indoors facing upwards, and the welding operation holes 35 on the column wall of the steel column 31 are thus in an open and upward-facing state.

[0051] The supporting angle steel 40 is pre-welded to the steel column 31 and steel beam 32 at this stage, so that it is fixed before the wall panel is placed, so as to support the wall panel when it is embedded in the frame 33. The stud 50 is different. It extends from the side of the steel column 31 and steel beam 32 toward the frame 33 and occupies the space around the frame 33. The wall panel needs to pass through this point when it is embedded in the frame 33, so it is left to be welded after the wall panel is in place. The welding operation hole 35 is opened on one side of the column wall of the steel column 31. This side faces the same side as the second plate surface 12 after the wall panel is installed. Therefore, the hole is in the upward opening state after the steel frame 30 is laid flat. The purpose of this hole will be explained in step S605.

[0052] Step S602: Embed the multiple wall panels into each of the frames respectively, with the supporting angle steel supporting the wall panels and also serving as the edge casting template, so that the second panel surface faces upward.

[0053] The wall panel 100 is prefabricated and cured by a precast concrete component factory in the aforementioned manner. Subsequently, the factory uses a crane to hoist the wall panel 100 from above into the frame 33, with the first panel surface 11 facing down and the second panel surface 12 facing up. The thinned edges 14 of the panel 10 rest on one extended leg of the supporting angle steel 40. Multiple wall panels are embedded into each frame 33. The installation of the wall panels within each frame 33 can be performed sequentially according to the arrangement of the frames 33, or it can be done without regard to the order; this embodiment of the invention does not impose such a limitation.

[0054] After the wall panel is in place, the open cavity 15 opens upward along with the second panel 12. The surface of the edge thinning section 14 facing the open cavity 15 becomes the bottom surface inside the cavity and also serves as the bottom formwork during casting. The supporting angle steel 40 also serves as a local casting template at the part where it overlaps with the edge thinning section 14, and plays a sealing role at the joint.

[0055] Step S603: Weld studs to the steel column and the steel beam through the open cavity, so that the studs extend into the open cavity, and tie additional reinforcing bars in the open cavity.

[0056] After the wall panels are installed, workers work into the cavity 15 from the upward-facing side, welding studs 50 one by one onto the steel columns 31 and steel beams 32 facing the frame 33, so that the studs 50 extend from the periphery of the frame 33 into the open cavity 15. Since the open cavity 15 is now facing upward, the welding surface and weld points are visible from above, allowing the studs 50 to be welded after the wall panels are in place, without having to be pre-welded during the fabrication of the steel frame 30.

[0057] After the studs 50 are welded, additional reinforcing bars 70 are tied inside the open cavity 15. The additional reinforcing bars 70, together with the existing reinforcing bars in the cavity, constitute the reinforcement of the edge reinforcing strip 61. The existing reinforcing bars include the distribution reinforcing bars 20 extending into the cavity from the precast main section 13, the portion of the tie bars 21 extending into the cavity, and the additional stirrups 22 pre-embedded in the edge thinning section 14 and extending into the cavity. The additional reinforcing bars 70 in the post-cast area can be tied together with this step, or they can be tied before filling the area on-site; this embodiment of the invention does not limit this. The electromechanical pipelines and embedded parts within the wall panel are pre-installed and embedded by the precast concrete component manufacturer during the precast stage of the panel 10.

[0058] Step S604: Reserve the portion of the open cavity of the lowest wall panel below the splicing part as the post-casting area, pour concrete into the area of ​​the open cavity other than the post-casting area and cure it to form an edge reinforcement zone, thereby obtaining an integrated component.

[0059] The terms "bottom", "top", and "bottom" as used below refer to the upright posture of the integrated component after it is in place, i.e., the end of the steel column 31 with the splicing part 34 is the bottom end.

[0060] Before pouring, the precast concrete component manufacturer first marks out the portion below the splice 34 in the open cavity 15 of the lowest wall panel 100. This portion is the post-pouring area 62, which will not be filled in this pour. The post-pouring area 62 includes the sections below the splice 34 in the open cavities 15 on both sides of the lowest wall panel 100, as well as the entire open cavity 15 along the lower edge of the wall panel. The side of the post-pouring area 62 that is open to the outer perimeter is opposite to the lower steel column 80 and the lower steel beam 81. This area will not be poured in this time, but will be poured after the integrated component is hoisted into place and spliced.

[0061] Subsequently, the plant poured concrete into the open cavity 15, excluding the post-cast area, including the entire open cavity 15 around each of the upper wall panels and the portion of the open cavity 15 of the lowermost wall panel excluding the post-cast area. The concrete was vibrated and compacted before curing to the designed strength. After hardening, the concrete became the post-cast concrete layer 60, covering the studs 50 and various reinforcing bars within the cavity, and combining with the edge thinning section 14 and the precast main body section 13 to form an edge reinforcement band 61. The steel frame 30 and the multiple wall panels embedded in each frame 33 were thus integrated into a single, unified component.

[0062] Step S605: Support the integrated component from the bottom and hoist it into place as a whole. Weld the steel column to the lower steel column through the welding operation hole, seal the welding operation hole, and fill the post-cast area with concrete.

[0063] After the integrated component is formed, it is lifted and hoisted as a whole from a flat position, and then placed in an upright position. During hoisting, slings are used to pass around and support the component from the bottom, lifting it as a whole, transporting it to the installation position, and positioning it so that the splice 34 at the lower end of the steel column 31 is aligned with the already positioned lower steel column 80. The reason for supporting it from the bottom is that at this time, the post-cast area of ​​the bottom wall panel has not yet been filled, and the lower part of the bottom wall panel has not yet been connected to the lower steel column 80 and the lower steel beam 81. Supporting it from the bottom can keep the stress on the component stable at this stage.

[0064] After the components are in place, on-site workers weld the splice 34 to the lower section of the steel column 80 from the inside of the steel column 31 through the welding operation hole 35 on the column wall, completing the splicing of the steel column 31 and the lower section of the steel column 80. After welding, the welding operation hole 35 is sealed, restoring the continuity of the column wall of the steel column 31 at that point. Subsequently, through the cavity open towards the second panel 12 in the post-cast zone 62, studs 50 are welded to the lower section of the steel column 80 and the lower steel beam 81 towards the wall panel; then concrete is filled into the post-cast zone 62, so that the concrete in the post-cast zone 62 covers the studs 50 and reinforcing bars, and combines with the edge reinforcement strip 61 formed in step S604, thus continuously closing the edge reinforcement strip 61 around the bottom wall panel. At this point, the integrated component and the lower structure are connected as a whole, and the infill walls of multiple floors above are in place.

[0065] In existing practices, the infilling of steel-supported or steel plate shear wall areas must be completed on-site layer by layer: first, the sealing or thin plates are laid, then wire mesh is installed, plastered, or sprayed. Each process is carried out on the facade, and the lateral force resisting components themselves also need to be installed layer by layer. The main advantage of the above method is that it changes the location and posture of these operations: since the open cavity is opened upward along with the second plate after the steel frame is laid flat, the welding, reinforcement binding, and pouring operations that originally needed to be carried out on the facade are now carried out on the overhead surface. The edge thinning section is located below and also serves as the bottom formwork, and the supporting angle steel at the overlap also serves as the local pouring template. The connection between the wall panel and the steel frame can thus be formed before hoisting. In addition, since the steel column is a single-section steel column that spans multiple frames, multiple wall panels are integrated into the same hoisting unit. On-site hoisting can simultaneously position the infill walls of multiple floors in one operation, thus reducing the number of on-site hoisting operations.

[0066] Furthermore, the two scenarios derived from the aforementioned integration have been addressed separately in the method. The splice section at the lower end of the steel column is within the height range of the lowest wall panel. After the integrated component is in place, this area is adjacent to the wall panel. Therefore, welding operation holes are pre-drilled on the steel column wall to allow splicing welding to be performed from the inside of the steel column. Sealing the holes after welding restores the continuity of the column wall. When the integrated component is lifted, the post-cast area of ​​the lowest wall panel has not yet been filled, and the bottom connection is not yet complete. Therefore, it is lifted from the bottom with support, and the filling of the post-cast area is arranged after placement, splicing welding, and hole sealing are completed. In this method, the wall portion requiring wet work on-site converges to the post-cast area around the lowest wall panel, located below the splice section.

[0067] It should be noted that the above steps are only one embodiment of the present invention, and the specific operation method of each step can be adjusted according to the engineering conditions. For example, the flat laying, panel installation, welding of studs, binding of reinforcement and pouring and curing operations described in steps S601 to S604 can be completed in the precast concrete component factory as described above, or the steel frame 30 and the precast wall panels can be transported to the construction site together, the steel frame 30 can be laid flat on the vacant space of the construction site and the above operations can be completed. After the edge reinforcement strip 61 is cured and formed, the integrated component is supported from the bottom and hoisted into place as a whole according to step S605. The change of the work site does not affect the working posture of the open cavity 15 facing upward and the various operations being carried out from the top, nor does it affect the setting of the post-pouring area and its subsequent filling. For example, in engineering conditions where overall hoisting is not used, the wall panels can also be installed layer by layer: after the steel frame 30 is in place, the wall panels are hoisted to the corresponding floor and embedded into the corresponding frame 33, supported by pre-welded supporting angle steel 40. Studs 50 are welded to the steel columns 31 and steel beams 32, and additional reinforcing bars 70 are tied in the open cavity 15. Then, concrete is filled into the open cavity 15. The concrete can be sprayed into the cavity from the side of the second panel 12 using a shotcrete process, or it can be poured after setting up a formwork on the side of the second panel 12. After the concrete hardens, a post-cast concrete layer 60 covering the studs 50 and the reinforcing bars in the cavity, as well as an edge reinforcing strip 61, are formed on site, thus obtaining the above-mentioned integrated steel frame-prefabricated infill wall panel component on site.

[0068] The operation of welding studs 50 to the steel column 31 and steel beam 32 in step S603 above can be carried out as follows: insert a 90° elbow stud welding gun into the open side of the open cavity 15, and use the 90° elbow stud welding gun to weld the studs 50 to the side of the steel column 31 and steel beam 32 facing the frame 33.

[0069] The open cavity 15 faces upwards, and the welding surface of the stud 50 is the side of the steel column 31 and steel beam 32 facing the frame 33. This surface is vertical inside the cavity and perpendicular to the plane where the cavity opening is located. The nozzle of the 90° bent stud welding torch is bent relative to the torch body. After the welding torch is vertically extended into the cavity from the cavity opening, the nozzle is exactly aligned with the vertical welding surface, thus allowing the stud 50 to be welded inside the cavity.

[0070] Since the welding torch tip is directly facing the welding surface after it is inserted into the cavity, the welding of the stud 50 does not require increasing the depth of the open cavity 15 along the thickness direction of the plate 10 for the entry and turning of the welding torch, nor does it require widening the edge overlapping area 16. The edge overlapping area 16 can be limited to a certain range around the plate 10, and the proportion of the prefabricated part in the wall panel can be maintained.

[0071] In this embodiment, the filling of concrete in the post-cast area, i.e. the final operation of step S605 above, can also be completed by sprayed concrete process: concrete is sprayed into the cavity from the open side of the post-cast area using a spraying device, so that the concrete in the post-cast area is combined with the edge reinforcement strip 61 formed in step S604.

[0072] The following example, using a lateral force resisting member within a column span of a prefabricated steel structure building, further illustrates the above embodiments.

[0073] The steel columns of the building are divided into hoisting sections according to three floors. The steel component processing plant fabricates a steel frame 30 according to the construction drawings. The two steel columns 31 are single-section steel columns spanning three floors. Three steel beams 32 are arranged at intervals along the length of the steel columns 31 and form three frames 33 with the two steel columns 31. The bottom frame 33 is open at the bottom. The supporting angle steel 40 is made of L50×50×5 angle steel and is pre-welded to the side of the steel columns 31 and steel beams 32 facing the frame 33. The lower end of the steel column 31 is provided with a splicing part 34, and a welding operation hole 35 is opened on the column wall near the splicing part 34.

[0074] The precast concrete component factory prefabricates three precast infill wall panels 100 according to the quantity of one panel per frame 33. Each wall panel 10 is 200mm thick, the length is the clear distance of the column span, and the height is the floor height minus the structural beam height. The thinned edge section 14 of the panel 10 is 60mm thick and extends 350mm inward from the outer perimeter, and the depth of the open cavity 15 is 140mm accordingly. The distributed steel bars 20 are crisscrossed and extend into the open cavity 15 from the precast main section 13. Tie bars 21 are pre-embedded at each intersection of the distributed steel bars 20 in the edge overlapping area 16, and additional stirrups 22 are pre-embedded at intervals along the direction of the annular cavity in the thinned edge section 14.

[0075] The factory lays the steel frame 30 flat with the welding operation hole 35 facing upwards. The three wall panels are hoisted into the three frames 33 and supported by the supporting angle steel 40, with the second panel surface 12 facing upwards. Then, studs 50 with a length of not less than 130mm are welded to the steel column 31 and steel beam 32 from the open recess 15 facing upwards, and additional reinforcing bars 70 are tied in the cavity. The part of the open recess 15 of the lowest wall panel below the splice part 34 is reserved as the post-cast area 62, and the remaining part is cast and cured at one time to form the edge reinforcement band 61, thus obtaining an integrated component that integrates two single-section steel columns 31, multiple steel beams 32 and three wall panels.

[0076] At the construction site, the integrated component is supported from the bottom by slings and lifted as a whole, so that it is placed on the completed lower section steel column 80. After the splicing and welding is completed from the inside of the steel column 31 through the welding operation hole 35, the hole is sealed. Studs 50 are welded to the lower section steel column 80 and the lower steel beam 81 through the post-pouring zone 62 and additional reinforcing bars 70 are tied. Then, concrete is filled into the post-pouring zone 62 using the sprayed concrete process.

[0077] In this scenario, even if the infill walls of three floors are in place simultaneously during a single hoisting operation, the only wet work left on site for the wall section is the post-cast area 62 around the bottom wall panel, located below the splicing part 34. On the integrated components shipped from the factory, the post-cast area of ​​the bottom wall panel is an unfilled cavity, and the welding operation hole 35 is an unclosed opening. These two features can be directly observed when the components leave the factory.

[0078] The values ​​in the above application scenarios are merely examples, and the implementation of this invention is not limited to these values.

[0079] The above description is merely a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any person skilled in the art can easily conceive of various equivalent modifications or substitutions within the technical scope disclosed in the present invention, and these modifications or substitutions should all be covered within the scope of protection of the present invention. Therefore, the scope of protection of the present invention should be determined by the scope of the claims.

Claims

1. A precast infill wall panel, characterized in that, Includes a concrete slab, the slab having opposing first and second surfaces; The panel includes a prefabricated main body segment located in the middle and an edge thinning segment surrounding the prefabricated main body segment along the four edges of the panel. The prefabricated main body segment and the edge thinning segment are prefabricated integrally. The prefabricated main body segment extends from the first panel surface to the second panel surface. The surface of the edge-thinning section facing the first plate is coplanar with the corresponding surface of the prefabricated main body section and together constitutes a continuous and flat first plate surface; the surface of the edge-thinning section facing the second plate is concave relative to the side of the second plate facing the first plate, so that the plate body forms an open cavity connected end to end along its outer periphery, the open cavity is open in both directions towards the second plate and towards the outer periphery, and the thickness of the edge-thinning section is less than the depth of the open cavity along the thickness direction of the plate body; The edge thinning section and the open cavity form an edge overlapping area; the plate body is provided with crisscrossing distributed reinforcing bars, which extend from the precast main body section to the edge overlapping area, and at least part of the distributed reinforcing bars extend from the precast main body section into the open cavity; tie bars are provided at the intersection of the distributed reinforcing bars in the edge overlapping area, part of which is embedded in the edge thinning section and the other part extends into the open cavity.

2. The precast infill wall panel according to claim 1, characterized in that, The edge thinning section is also pre-embedded with multiple additional stirrups. The multiple additional stirrups are arranged at intervals along the extension direction of the edge thinning section. A portion of each additional stirrup is embedded in the edge thinning section, and the other portion extends into the open cavity.

3. A steel frame-prefabricated infill wall panel integrated component, characterized in that, Includes a steel frame and wall panels, wherein the wall panels are prefabricated infill wall panels according to any one of claims 1 to 2; The steel frame includes two steel columns and at least two steel beams spaced apart along the length of the steel columns. Two adjacent steel beams and two steel columns form a frame, and the wall panel is embedded in the frame. The steel column and the steel beam are provided with supporting angle steel on the side facing the frame. One leg of the supporting angle steel is welded to the corresponding steel column or the steel beam, and the other leg is located on one side of the first plate surface and overlaps with the edge thinning section to support the wall panel and cover the gap between the wall panel and the steel frame at the overlap. The steel columns and steel beams are welded with studs extending into the open cavity on the side facing the frame; the open cavity is provided with a post-cast concrete layer, which covers the studs and reinforcing bars extending into the open cavity in its area, and combines with the edge thinning section and the precast main body section to form an edge reinforcement band.

4. The integrated steel frame-prefabricated infill wall panel component according to claim 3, characterized in that, The frame consists of multiple frames arranged along the length of the steel column, and the wall panel consists of multiple pieces, each embedded in one of the frames.

5. The integrated steel frame-prefabricated infill wall panel component according to claim 4, characterized in that, Each of the steel columns is a single-section steel column that spans multiple of the frames, and the lower end of the single-section steel column is provided with a splicing part for docking with the next steel column.

6. The integrated steel frame-prefabricated infill wall panel component according to claim 5, characterized in that, The steel column has a welding operation hole on the column wall near the splicing part. The welding operation hole is located on the side facing the second plate surface and is used for splicing welding from the inside of the steel column.

7. The integrated steel frame-prefabricated infill wall panel component according to claim 5, characterized in that, There are three frames, and the wall panel is embedded in each of the three frames.

8. A construction method for an integrated steel frame-prefabricated infill wall panel component, characterized in that, include: The steel frame is laid flat. The steel frame includes two single-section steel columns and multiple steel beams, forming multiple frames arranged along the length of the steel columns. Supporting angle steels are pre-welded to the side of the steel columns and steel beams facing the frames. The lower end of the steel column is provided with a splicing part, and the column wall near the splicing part is provided with welding operation holes with openings facing upwards. Multiple wall panels are respectively embedded in each of the aforementioned frames, wherein the wall panels are the prefabricated infill wall panels as described in claim 1 or 2; the wall panels are supported by the supporting angle steel, which also serves as the edge casting template, so that the second panel surface faces upward; Studs are welded to the steel column and the steel beam through the open cavity, so that the studs extend into the open cavity, and additional reinforcing bars are tied in the open cavity; The portion of the open cavity of the lowest wall panel located below the splicing part is reserved as a post-casting area. Concrete is poured into the area of ​​the open cavity other than the post-casting area and cured to form an edge reinforcement zone, thus obtaining an integrated component. The integrated component is supported from the bottom and hoisted into place as a whole. The steel column is spliced ​​and welded to the lower steel column through the welding operation hole. The welding operation hole is then sealed, and concrete is filled into the post-pouring area.

9. The construction method of the integrated steel frame-prefabricated infill wall panel component according to claim 8, characterized in that, When welding the studs, a 90° bent stud welding gun is inserted from the open side of the cavity facing upwards, and the studs are welded to the steel column and the steel beam on the side facing the frame using the 90° bent stud welding gun.

10. The construction method of the integrated steel frame-prefabricated infill wall panel component according to claim 8, characterized in that, The filling of the post-cast zone with concrete includes: filling the post-cast zone with concrete using a shotcrete process, so that the concrete in the post-cast zone is combined with the already formed edge reinforcement strip.