A modular prestressed polygonal roof truss and its manufacturing method

By breaking down the roof truss into modular units and prefabricating through-holes in the factory, and then assembling and tensioning the prestressing tendons on site, the problem of the prestressing tendons not being able to be continuously connected in the segmented roof truss was solved, improving the overall stress performance of the roof truss and the tightness of the node connections, and realizing the effective transfer of prestress and structural lightweighting.

CN123109334APending Publication Date: 2026-11-17CHINA FIRST METALLURGICAL GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611463303.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-20
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing prestressed polygonal roof trusses, the prestressing tendons cannot be continuously connected after segmented assembly, resulting in insufficient stress on the overall prestressed structure and weakening the technical effects of prestressing in reducing cross-section and self-weight.

Method used

The roof truss is decomposed into multiple modular units. Through-holes are set in the prefabricated lower chord in the factory. After on-site assembly, prestressed tendons are inserted along the span direction and the whole structure is tensioned and anchored. Modular connection nodes are connected by a combination of positioning pins and high-strength bolts to form a continuous stress-bearing whole structure.

Benefits of technology

This method enables continuous connection of prestressed tendons between module units, improves the shear resistance of module connection nodes and the overall stiffness of the roof truss, enhances the tightness of node connections and the effective transfer of prestress, and reduces the cross-section of members and the self-weight of the roof truss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109334A_ABST
    Figure CN123109334A_ABST
Patent Text Reader

Abstract

This invention provides a modular prestressed polygonal roof truss and its manufacturing method, comprising a roof truss body, which is assembled sequentially from at least two modular units along the span direction; each modular unit includes a polygonal upper chord, a lower chord corresponding to the upper chord, and a web member assembly connecting the upper and lower chords, wherein the lower chord has a through-hole pre-drilled along the axial direction; adjacent modular units are fixedly connected by modular connection nodes, each module connection node including two connecting plates fixed to the mating ends of adjacent modular units, multiple high-strength bolts passing between the two connecting plates, and at least one locating pin for mating positioning. This invention, by decomposing the roof truss into multiple standard modular units for prefabrication in the factory and assembly on-site, can improve component processing accuracy and welding quality, reduce on-site work, and shorten the construction cycle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building structure engineering technology, specifically to a modular prestressed polygonal roof truss and its manufacturing method. Background Technology

[0002] Roof trusses, as the main load-bearing components of roof structures in large-span buildings, are widely used in industrial plants, stadiums, exhibition centers, and warehousing and logistics buildings. Among them, the upper chord of a polygonal roof truss exhibits a polygonal arrangement according to the bending moment diagram, resulting in a relatively uniform distribution of internal forces within the members. This makes it well-suited for medium- and large-span roofs. The application of prestressing technology in roof trusses mainly involves setting prestressing tendons in the lower chord to apply prestress to the roof truss with a pre-compressive stress opposite to the load effect. This counteracts some of the tensile stress generated by the service load, thereby reducing the cross-section of the members, lowering the structural self-weight, and improving crack resistance.

[0003] In terms of manufacturing and construction methods, traditional prestressed zigzag roof trusses are mostly manufactured using on-site integral welding or prefabrication in the factory followed by transportation and hoisting. On-site integral welding has high requirements for construction site and welding quality control, a long construction period, and is significantly affected by weather conditions; integral prefabrication and transportation are subject to transportation clearance restrictions, and large-span roof trusses often cannot be transported as a whole. To solve the transportation problem, existing technologies have emerged that involve fabricating large-span steel trusses into segments and then splicing them on-site. However, such segmented splicing mainly uses ordinary bolt or welding connections, and the splicing nodes only serve the function of structural connection. The prestressing system between the segments cannot be continuously connected, resulting in the assembled roof truss not being able to bear the load as a whole prestressed structure, thus weakening the technical effects of prestressing in reducing cross-section and self-weight. Existing prestressed roof trusses mostly have prestressing tendons arranged and tensioned after integral assembly. For schemes that apply prestress after segmented assembly, how to ensure the continuous connection of prestressing tendons between segments and the effective transfer of prestress at the segment connection nodes are key problems that have not yet been effectively solved in this field. Summary of the Invention

[0004] The purpose of this invention is to address the shortcomings of existing technologies by providing a modular prestressed polygonal roof truss.

[0005] The specific technical solution is as follows: A modular prestressed zigzag roof truss includes a truss body, which is assembled sequentially from at least two modular units along the span direction. Each modular unit includes a zigzag-shaped upper chord, a lower chord corresponding to the upper chord, and a web member assembly connecting the upper and lower chords. The lower chord has a through-hole pre-drilled along the axial direction. Adjacent modular units are fixedly connected by modular connection nodes, which include two connecting plates fixed to the mating ends of adjacent modular units, multiple high-strength bolts passing between the two connecting plates, and at least one positioning pin for mating. The truss body contains prestressing tendons arranged along the span direction. The prestressing tendons pass sequentially through the pre-drilled holes in the lower chords of each modular unit, and both ends of the prestressing tendons are anchored to both ends of the truss body by anchors.

[0006] Optionally, the upper chord includes at least two straight segments, which are welded together by a node plate to form a broken line transition section; the web member assembly includes a vertical web member and an oblique web member, the upper end of the vertical web member is welded to the node plate at the broken line transition section, the lower end of the vertical web member is welded to the lower chord, and the oblique web member is obliquely connected between the upper chord and the lower chord.

[0007] Optionally, the lower chord is a box-section member, and the reserved duct is provided through the axial center of the lower chord; before the prestressing tendon is inserted into the reserved duct, a liner is provided in the reserved duct; after the prestressing tendon is inserted, anchor plates are installed at both ends of the reserved duct, and the anchor transmits the anchoring force to the end section of the lower chord through the anchor plates.

[0008] Optionally, the surface of the connecting plate is perpendicular to the span direction of the roof truss. Each connecting plate is provided with a positioning pin hole and multiple sets of bolt holes. The positioning pin hole is located in the central area of ​​the connecting plate, and the multiple sets of bolt holes are evenly arranged around the positioning pin hole. In the assembled state, the positioning pin passes through the positioning pin holes of the two connecting plates to achieve alignment, and the multiple high-strength bolts pass through the bolt holes of the two connecting plates and are tightened according to the design torque.

[0009] Optionally, supports are provided at the bottom of both ends of the roof truss body. Each support includes a horizontally arranged support base plate and multiple support stiffening ribs vertically welded to the upper surface of the support base plate. The support stiffening ribs are also welded to the end side of the lower chord. Multiple purlin support plates are provided at intervals on the top of the upper chord.

[0010] This invention provides a method for manufacturing a modular prestressed polygonal roof truss, comprising the following steps: S1. Prefabricate multiple standard modular units in the factory. Each modular unit includes a zigzag-shaped upper chord, a lower chord with a through reserved channel along the axial direction inside, and a web member assembly connecting the upper chord and the lower chord. S2. Transport each of the module units to the construction site, connect them sequentially along the span direction, and fix adjacent module units to form the roof truss body through module connection nodes. The module connection nodes include connection plates fixed to the docking ends of adjacent module units, high-strength bolts passing through the two connection plates, and positioning pins for docking and positioning. S3. Insert the prestressing tendons sequentially into the reserved holes of the lower chord of each module unit along the span direction, so that the prestressing tendons are arranged along the entire length of the roof truss body. S4. Fix and anchor one end of the prestressed tendon, and tension the other end to the designed prestress value and then anchor it. S5. The roof truss body, after tensioning and anchoring, is hoisted into place and connected and fixed to the end support.

[0011] Optionally, in step S1, the prefabrication of the upper chord includes welding at least two straight bar segments to form a polygonal structure by welding them together with node plates, and welding the upper end of the vertical web member at the bend of the polygonal structure, and welding the lower end of the vertical web member to the lower chord; the lower chord is a box-section bar, and the reserved hole is provided through the axial center of the lower chord.

[0012] Optionally, in step S2, when adjacent module units are docked, the positioning pin is first inserted into the positioning pin hole of one side connecting plate, and then the connecting plate of the adjacent module unit is aligned with the positioning pin and pushed in, so that the surfaces of the two connecting plates fit together, achieving vertical and horizontal alignment; after alignment, high-strength bolts are inserted into the bolt holes of the connecting plates on both sides and tightened according to the design torque, so that the adjacent module units form a rigid connection.

[0013] Optionally, in step S3, before the prestressing tendon is inserted, a liner is first installed in the reserved duct. After the prestressing tendon is inserted, anchor plates are installed at both ends of the reserved duct. In step S4, the tensioning is carried out by tensioning one end and fixing the other end. The tensioning process is divided into two stages of loading. The first stage is loaded to 40% to 60% of the design prestress value and stabilized. After checking the fit of the connecting plates of each module connection node, the second stage is loaded to the design prestress value and stabilized before anchoring. After tensioning is completed, pressure grouting is performed on the reserved duct. The grouting material is injected from one end of the reserved duct and overflows from the other end. After the grouting material solidifies, the excess length of the prestressing tendon exposed is cut off.

[0014] Optionally, in step S5, the roof truss body is hoisted using a two-point binding method, with the binding points located at the left quarter point and right quarter point in the span direction of the roof truss body; after hoisting into place, the lower chord at the end of the roof truss body is welded and fixed to the support base plate of the support, and support stiffening ribs are welded in the support area.

[0015] Compared with the prior art, the present invention has the following beneficial effects: This invention decomposes the roof truss into multiple standard modular units for prefabrication in the factory. Each modular unit has a pre-reserved through-hole in its lower chord. After on-site assembly, prestressed tendons are inserted along the span direction into the pre-reserved holes in each modular unit and tensioned and anchored as a whole. This allows the dispersed modular units to form a continuously stressed overall structure under prestress. The prestress not only counteracts the tensile stress generated by the service load, but also enhances the tightness of the contact surface of the connection plate at the modular connection node through prestress, thereby improving the shear resistance of the node and the overall stiffness of the roof truss, achieving a synergistic effect of one tendon serving two purposes. The modular connection node adopts a combination of locating pins and high-strength bolts. The locating pins ensure the assembly alignment accuracy, while the high-strength bolts provide the node bearing capacity, resulting in a simple and reliable structure. The upper chord uses multiple straight segments welded together with node plates to form a polygonal shape, which is easy to process, and the polygonal shape is adapted to the bending moment diagram trend, which helps to reduce the cross-section of the members and the self-weight of the roof truss. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the overall three-dimensional structure of the modular prestressed polygonal roof truss of the present invention; Figure 2 yes Figure 1 A three-dimensional structural diagram of a single module unit; Figure 3 yes Figure 1 A three-dimensional structural diagram of the tensioning end node of the prestressed tendon; Figure 4 yes Figure 1 A schematic diagram of the structural connection nodes between adjacent module units; Figure 5 yes Figure 1 A three-dimensional structural diagram of the end support of the middle roof truss.

[0017] The reference numerals in the figures are as follows: 1. Roof truss body; 2. Module unit; 200. Web member assembly; 201. Top chord; 202. Bottom chord; 203. Vertical web member; 204. Diagonal web member; 205. Node plate; 206. Reserved duct; 3. Prestressed tendon; 301. Tensioning end anchor; 302. Fixed end anchor; 303. Anchor plate; 4. Module connection node; 401. Connecting plate; 402. High-strength bolt; 403. Locating pin; 5. Support; 501. Support base plate; 502. Support stiffening rib; 6. Purlin support plate. Detailed Implementation

[0018] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0019] It should be noted that, unless otherwise specified, the embodiments and features described in the present invention can be combined with each other.

[0020] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, but this is not intended to limit the scope of the invention.

[0021] like Figures 1 to 5 As shown, the modular prestressed polygonal roof truss of this embodiment includes a roof truss body 1, which is assembled sequentially from three modular units 2 along the span direction, namely the left-end modular unit, the middle modular unit, and the right-end modular unit. Each modular unit 2 has the same span, forming a standardized series. The number of modular units 2 can be adjusted to two, four, or more depending on the total span of the roof truss. Supports 5 are respectively provided at the bottom of both ends of the roof truss body 1 to support the roof truss on the substructure.

[0022] like Figure 2 As shown, each module unit 2 includes an upper chord 201, a lower chord 202, and a web member assembly 203. The upper chord 201 is a polygonal shape, composed of three straight segments. Adjacent straight segments are welded together by node plates 205, forming two polygonal turning points. The middle straight segment is horizontally positioned, while the two side straight segments slope downwards at both ends, giving the upper chord 201 an overall polygonal shape that is high in the middle and low at both ends. Depending on the roof truss span and load conditions, the number of straight segments can be adjusted to two, four, or more. The lower chord 202 is a horizontally positioned box-section member, with the upper chord 201 and lower chord 202 positioned vertically opposite each other. The lower chord 202 has a through-hole 206 along its axial center for the prestressing tendons 3 to pass through. The web member assembly 200 includes two vertical web members 203 and four diagonal web members 204. Vertical web members 203 are arranged vertically, with their upper ends welded to the node plate 205 at the bend of the upper chord 201 and their lower ends welded to the upper surface of the lower chord 202. Diagonal web members 204 are arranged obliquely, connecting the endpoints of each segment of the upper chord 201 to the corresponding positions of the lower chord 202, forming a geometrically invariant truss system together with the vertical web members 203. The placement of vertical web members 203 at the bend of the upper chord 201 effectively transfers the concentrated force at the bend to the lower chord 202, preventing excessive local stress at the bend.

[0023] like Figure 3 and Figure 4 As shown, adjacent module units 2 are fixedly connected by module connection nodes 4. Module connection nodes 4 include two connecting plates 401, multiple high-strength bolts 402, and two locating pins 403. The two connecting plates 401 are welded and fixed to the mating ends of adjacent module units 2, with the plate surface of the connecting plate 401 perpendicular to the roof truss span direction. Each connecting plate 401 has locating pin holes and multiple sets of bolt holes. The locating pin holes are located in the central area of ​​the connecting plate 401, and the multiple sets of bolt holes are evenly arranged around the locating pin holes. The high-strength bolts 402 are preferably M20 to M30 grade 10.9 or 12.9 high-strength bolts, and the quantity and specifications are determined based on the internal force calculation of the node. During assembly, the locating pins 403 are first inserted into the locating pin holes of one side of the connecting plate 401, and then the connecting plate 401 of the adjacent module unit 2 is aligned with the locating pins 403 and pushed in, so that the plate surfaces of the two connecting plates 401 are in contact. The locating pin 403 ensures the vertical and horizontal alignment accuracy of adjacent module units 2, with alignment tolerance controlled within ±2mm. After alignment, high-strength bolts 402 are inserted into the bolt holes of the connecting plates 401 on both sides and tightened twice using a torque wrench according to the design torque. The initial tightening torque is 50% of the final tightening torque, and the final tightening torque is determined based on the bolt specifications and the anti-slip coefficient of the friction surface. The reserved holes 206 in the lower chord 202 are aligned and connected at the mating ends to ensure that the prestressing tendons 3 can pass through smoothly.

[0024] The prestressing tendons 3 are arranged along the span of the roof truss body 1, passing sequentially through the reserved ducts 206 in the lower chords 202 of the three modular units 2. The prestressing tendons 3 can be prestressed steel strands, high-strength steel wire bundles, or precision-rolled threaded steel bars. In this embodiment, low-relaxation prestressed steel strands with a nominal diameter of 15.2 mm and a standard tensile strength of 1860 MPa are preferably used, and multiple steel strands form a prestressed bundle.

[0025] Before the prestressing tendon 3 is inserted into the reserved duct 206, a liner is first installed inside the reserved duct 206 to reduce frictional resistance during the tendon insertion process and protect the inner wall of the duct. The liner is preferably made of polyethylene or polypropylene. After the prestressing tendon 3 is inserted, anchor plates 303 are installed at both ends of the reserved duct 206.

[0026] One end of the prestressing tendon 3 is a fixed end, anchored to the end of the lower chord 202 of the left module unit via a fixed end anchor 302; the other end is a tensioning end, anchored to the end of the lower chord 202 of the right module unit via a tensioning end anchor 301. Anchor plates 303 are provided between both the fixed end anchor 302 and the tensioning end anchor 301 and the end face of the lower chord 202. The anchor plates 303 evenly transmit the concentrated reaction force of the anchor to the end section of the lower chord 202, avoiding local stress concentration. The tensioning end anchor 301 and the fixed end anchor 302 are preferably wedge-type anchors or nut anchors.

[0027] During tensioning, a through-type jack is installed at the tensioning end to apply tension to the prestressing tendon 3. Tensioning is carried out in two stages: the first stage loads to 50% of the design prestress value, stabilizes for two minutes, and then checks the fit of the connecting plates 401 at each module connection node 4 and the working status of the anchorages. After confirming that there are no abnormalities, loading continues; the second stage loads to the design prestress value, stabilizes for two minutes again, and then tightens the clamps or nuts of the anchorage 301 at the tensioning end to complete the anchoring. The design prestress value is determined by structural calculations based on the roof truss span, load level, and number of prestressing tendons. The typical effective prestress value ranges from 50% to 75% of the standard value of the tensile strength of the prestressing tendons. During the tensioning process, the elastic recoil of the prestressing tendon 3 causes the lower chord 202 of each module unit 2 to obtain axial prestress. This prestress is transmitted between each module unit 2 through the contact surface of the connecting plate 401 of the module connection node 4, so that the contact surface between the connecting plates 401 is under pressure, which improves the shear resistance and integrity of the node, and makes the entire roof truss body 1 form a prestressed integral structure.

[0028] After tensioning and anchoring are completed, pressure grouting is performed on the reserved duct 206. The grouting material is cement-based grout with a water-cement ratio controlled between 0.35 and 0.42, a flowability controlled between 14s and 26s (flow cone method), and a 28-day compressive strength of not less than 40MPa. Grouting is injected from one end of the reserved duct 206. After the grouting material overflows evenly from the other end, the outlet is sealed, and pressure is continued to be applied until the grouting pressure reaches 0.5MPa to 0.7MPa. The pressure is then stabilized for 3 minutes before the grouting port is sealed. After the grouting material sets, a bond is formed between the prestressing tendon 3 and the lower chord 202, allowing the prestressing tendon 3 and the lower chord 202 to work together, further ensuring the long-term effective transmission of prestress. At the same time, the grouting material provides corrosion protection for the prestressing tendon 3. After the grouting material reaches more than 75% of the design strength, use a grinding wheel cutter to cut off the excess length of the prestressing tendon 3 exposed outside the anchor. The exposed length should not be less than 30mm, and the end of the anchor should be sealed with epoxy resin or cement mortar for corrosion protection.

[0029] like Figure 5As shown, supports 5 are respectively installed at the bottom of both ends of the roof truss body 1. Support 5 includes a support base plate 501 and multiple support stiffening ribs 502. The support base plate 501 is horizontally positioned and made of Q345 or Q420 steel. The upper surface of the support base plate 501 is welded and fixed to the bottom end of the lower chord 202. Two support stiffening ribs 502 are vertically welded between the upper surface of the support base plate 501 and the side end of the lower chord 202. The support stiffening ribs 502 are used to enhance the local stiffness and shear resistance of the support area. Bolt holes are provided on the support base plate 501, which is connected and fixed to the embedded parts of the substructure via anchor bolts. The preferred specifications for the anchor bolts are M24 to M36, and the anchorage length is determined according to the concrete strength grade and specifications.

[0030] The roof truss body 1 was hoisted using a two-point binding method, with the binding points located at the left and right quarter points along the span direction of the roof truss body 1. This ensured that the bending moment distribution of the roof truss body 1 during hoisting was similar to that during its service life, preventing excessive hoisting stress that could lead to deformation or damage to the roof truss. Two cranes were used for simultaneous hoisting, with the hoisting speed controlled between 2 and 5 meters per minute. After hoisting into place, the support base plate 501 was aligned with the embedded parts of the substructure and temporarily fixed with anchor bolts. A level and total station were used to verify the span, elevation, and camber of the roof truss. Once all deviations met the design requirements, final fixing was performed, and the anchor bolts were tightened to the design torque.

[0031] like Figures 1-5 As shown, the manufacturing method of the modular prestressed polygonal roof truss in this embodiment includes the following steps: S1. Prefabricate multiple standard modular units 2 in the factory. Each modular unit 2 includes an upper chord 201, a lower chord 202, and a web member assembly 203. The prefabrication of the upper chord 201 includes welding three straight segments together to form a polygonal structure through node plates 205. The upper end of the vertical web member 203 is welded at the bend of the polygonal structure. The lower end of the vertical web member 203 is welded to the lower chord 202. The lower chord 202 is a box-section member with a pre-reserved channel 206 running through the axial center. S2. Transport each module unit 2 to the construction site and connect them sequentially along the span direction. First, insert the positioning pin 403 into the positioning pin hole of the connecting plate 401 on one side. Then, align the connecting plate 401 of the adjacent module unit 2 with the positioning pin 403 and push it in to achieve vertical and horizontal alignment. Then, insert the high-strength bolt 402 into the bolt holes of the connecting plates 401 on both sides and tighten it according to the design torque so that the adjacent module units 2 form a rigid connection through the module connection node 4. S3. After the liner is installed in the reserved duct 206, the prestressed tendons 3 are sequentially inserted into the reserved duct 206 of the lower chord 202 of each module unit 2 along the span direction, so that the prestressed tendons 3 are arranged along the entire length of the roof truss body 1, and anchor plates 303 are installed at both ends of the reserved duct 206. S4. One end of the prestressed tendon 3 is anchored through the fixed end anchor 302, and the other end is tensioned by two-stage loading. The first stage is loaded to 50% of the design prestress value and stabilized. After checking the fit of the connecting plate 401 of each module connection node 4, the second stage is loaded to the design prestress value and stabilized, and then anchored through the tensioning end anchor 301. After tensioning is completed, the reserved duct 206 is pressure grouted. After the grouting material solidifies, the excess length of the prestressed tendon 3 exposed is cut off. S5. Tie the roof truss body 1 at the left quarter point and right quarter point in the span direction, hoist the roof truss body 1 into place, weld the bottom surface of the lower chord 202 end to the support base plate 501 and weld the support stiffening rib 502.

[0032] The number of module units 2, the number of broken lines of the upper chord 201, the type and specifications of prestressing tendons 3, the specifications and quantity of high-strength bolts 402 of module connection nodes 4, and the specific dimensions of supports 5 can all be adjusted according to actual engineering conditions, and these adjustments are all within the protection scope of this invention.

[0033] The above are merely preferred embodiments of the present invention and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should recognize that any equivalent substitutions and obvious changes made based on the description and illustrations of the present invention should be included within the protection scope of the present invention.

Claims

1. A modular prestressed polygonal roof truss, comprising a roof truss body, characterized in that, The roof truss body is assembled sequentially from at least two modular units along the span direction. Each modular unit includes a zigzag-shaped upper chord, a lower chord corresponding to the upper chord, and a web member assembly connecting the upper and lower chords. The lower chord has a through-hole pre-drilled in the axial direction. Adjacent modular units are fixedly connected by modular connection nodes, which include two connecting plates fixed to the mating ends of adjacent modular units, multiple high-strength bolts passing between the two connecting plates, and at least one positioning pin for mating. The roof truss body is provided with prestressed tendons arranged along the span direction. The prestressed tendons pass sequentially through the pre-drilled holes in the lower chords of each modular unit, and the two ends of the prestressed tendons are anchored to the two ends of the roof truss body by anchors.

2. The modular prestressed polygonal roof truss according to claim 1, characterized in that, The upper chord includes at least two straight segments, which are welded together by a node plate to form a broken line transition section; the web member assembly includes a vertical web member and an oblique web member, the upper end of the vertical web member is welded to the node plate at the broken line transition section, the lower end of the vertical web member is welded to the lower chord, and the oblique web member is obliquely connected between the upper chord and the lower chord.

3. The modular prestressed polygonal roof truss according to claim 2, characterized in that, The lower chord is a box-section member, and the reserved duct is provided through the axial center of the lower chord. Before the prestressing tendon is inserted into the reserved duct, a liner is provided in the reserved duct. After the prestressing tendon is inserted, anchor plates are installed at both ends of the reserved duct. The anchor transmits the anchoring force to the end section of the lower chord through the anchor plates.

4. The modular prestressed polygonal roof truss according to claim 1, characterized in that, The surface of the connecting plate is perpendicular to the span direction of the roof truss. Each connecting plate is provided with a positioning pin hole and multiple sets of bolt holes. The positioning pin hole is located in the central area of ​​the connecting plate, and the multiple sets of bolt holes are evenly arranged around the positioning pin hole. In the assembled state, the positioning pins pass through the positioning pin holes of the two connecting plates to achieve alignment, and multiple high-strength bolts pass through the bolt holes of the two connecting plates and are tightened according to the design torque.

5. The modular prestressed polygonal roof truss according to claim 1, characterized in that, Supports are provided at the bottom of both ends of the roof truss body. Each support includes a horizontally arranged support base plate and multiple support stiffening ribs welded vertically to the upper surface of the support base plate. The support stiffening ribs are also welded to the end side of the lower chord. Multiple purlin support plates are provided at intervals on the top of the upper chord.

6. A method for manufacturing a modular prestressed polygonal roof truss according to any one of claims 1-5, characterized in that, Includes the following steps: S1. Prefabricate multiple standard modular units in the factory. Each modular unit includes a zigzag-shaped upper chord, a lower chord with a through reserved channel opened along the axial direction inside, and a web member assembly connecting the upper chord and the lower chord. S2. Transport each of the module units to the construction site, connect them sequentially along the span direction, and fix adjacent module units to form the roof truss body through module connection nodes. The module connection nodes include connection plates fixed to the docking ends of adjacent module units, high-strength bolts passing through the two connection plates, and positioning pins for docking and positioning. S3. Insert the prestressing tendons sequentially into the reserved holes of the lower chord of each module unit along the span direction, so that the prestressing tendons are arranged along the entire length of the roof truss body. S4. Fix and anchor one end of the prestressed tendon, and tension the other end to the designed prestress value and then anchor it. S5. Hoist the tensioned and anchored roof truss body into place and connect and fix it to the end support.

7. The manufacturing method of the modular prestressed polygonal roof truss according to claim 6, characterized in that, In step S1, the prefabrication of the upper chord includes welding at least two straight bar segments to form a polygonal structure by welding them together with node plates, and welding the upper end of the vertical web bar at the bend of the polygonal structure. The lower end of the vertical web bar is welded to the lower chord. The lower chord is a box-section bar, and the reserved hole is provided through the axial center of the lower chord.

8. The manufacturing method of the modular prestressed polygonal roof truss according to claim 6, characterized in that, In step S2, when adjacent module units are docked, the positioning pin is first inserted into the positioning pin hole of one side connecting plate, and then the connecting plate of the adjacent module unit is aligned with the positioning pin and pushed in, so that the surfaces of the two connecting plates fit together, achieving vertical and horizontal alignment; after alignment, high-strength bolts are inserted into the bolt holes of the connecting plates on both sides and tightened according to the design torque, so that the adjacent module units form a rigid connection.

9. The manufacturing method of the modular prestressed polygonal roof truss according to claim 6, characterized in that, In step S3, before the prestressing tendon is inserted, a liner is first installed in the reserved duct. After the prestressing tendon is inserted, anchor plates are installed at both ends of the reserved duct. In step S4, the tensioning is carried out by tensioning one end and fixing the other end. The tensioning process is divided into two loading stages. The first stage is loaded to 40% to 60% of the design prestress value and stabilized. After checking the fit of the connecting plates of each module connection node, the second stage is loaded to the design prestress value and stabilized before anchoring. After tensioning is completed, pressure grouting is performed on the reserved duct. The grouting material is injected from one end of the reserved duct and overflows from the other end. After the grouting material solidifies, the excess length of the prestressed tendon exposed is cut off.

10. The method for manufacturing a modular prestressed polygonal roof truss according to claim 6, characterized in that, In step S5, the roof truss body is hoisted using a two-point binding method, with the binding points located at the left quarter point and right quarter point in the span direction of the roof truss body; after hoisting into place, the lower chord at the end of the roof truss body is welded and fixed to the support base plate of the support, and support stiffening ribs are welded in the support area.