Drilling tools, extraction apparatus and methods for natural gas hydrates

The drilling and extraction equipment used for natural gas hydrates enables efficient extraction without the need for well construction, solving the problems of long construction cycles and environmental pollution, reducing costs and improving safety.

CN123109543APending Publication Date: 2026-11-17CHINA PETROLEUM & CHEMICAL CORP +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510618777.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technologies for extracting combustible ice require long well-building periods and high construction costs. Furthermore, the extraction process may lead to pipeline blockages and equipment damage, posing safety hazards.

Method used

A drilling and production device for natural gas hydrates is used, which transports natural gas hydrate debris to the central fluid channel through the axial channel of the drill bit, and uses a delivery cable to transport the gas products to the drilling and production vessel, avoiding well construction and the use of cement slurry, thus achieving efficient extraction of gas products.

Benefits of technology

Shorten the construction period, reduce construction costs, protect the marine environment, avoid pipeline blockage and equipment damage, and improve mining safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109543A_ABST
    Figure CN123109543A_ABST
Patent Text Reader

Abstract

This invention relates to a drilling and production apparatus, extraction device, and method for natural gas hydrates. The drilling and production apparatus for natural gas hydrates includes a drill bit with an internal axial channel configured to communicate with a central fluid channel for conveying gaseous products to a drilling and production vessel. During drilling, when encountering natural gas hydrates, the drill bit breaks them down into natural gas hydrate fragments. These fragments enter the central fluid channel through the axial channel, and the central fluid channel conveys the gaseous products obtained from the decomposition of the natural gas hydrate fragments to the drilling and production vessel.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of marine unconventional energy development technology, and more particularly to a drilling and extraction device for natural gas hydrates. The invention also relates to an apparatus for extracting natural gas hydrates. Furthermore, the invention relates to a method for extracting natural gas hydrates. Background Technology

[0002] Natural gas hydrate is a solid crystalline substance formed by natural gas and water molecules under high pressure (>10 MPa) and low temperature (0–10°C), commonly known as combustible ice. The main component of combustible ice is methane, which can be used as a fuel energy source and is characterized by being clean and pollution-free, with a large heat release during combustion. 1m 3 The heat released by the combustion of combustible ice is equivalent to 164m³ 3 The heat released by the combustion of natural gas. Currently, combustible ice is mainly distributed in the eastern and western Pacific Oceans and the western edge of the Atlantic Ocean in the Northern Hemisphere (water depth 300-4000m) at seabed and in the sedimentary layer about 650m below, as well as in the polar continental shelf and high-latitude permafrost areas of the ocean at water depths of 100-250m.

[0003] Existing technologies for extracting methane hydrate typically require the construction of production wells, which have several drawbacks. Firstly, well construction is time-consuming and costly. Secondly, the well construction process involves drilling mud, which can severely pollute the seabed.

[0004] Furthermore, during the process of transporting methane obtained from the decomposition of methane hydrate to the water surface, the methane may absorb heat and reform into solid methane hydrate. This could lead to ice blockage in the pipeline, causing blockages and halting mining operations, potentially damaging mining equipment, and causing safety accidents. Summary of the Invention

[0005] To address the aforementioned problems, this invention proposes a drilling and extraction tool for natural gas hydrates, capable of solving at least one of the problems mentioned above. This invention also proposes an extraction apparatus for natural gas hydrates. Furthermore, this invention proposes a method for extracting natural gas hydrates.

[0006] According to a first aspect of the invention, a drilling and production device for natural gas hydrates is provided, comprising a drill bit having an axial channel configured to communicate with a central fluid channel for conveying gaseous products to a drilling and production vessel. During drilling, when encountering natural gas hydrates, the drill bit breaks them down to obtain natural gas hydrate fragments, which enter the central fluid channel through the axial channel. The central fluid channel then conveys the gaseous products obtained from the decomposition of the natural gas hydrate fragments to the drilling and production vessel.

[0007] The drilling rig is connected to the drilling vessel via a delivery cable. During drilling, if natural gas hydrate (methane hydrate) is encountered, the resulting gas hydrate fragments can be fed into the drilling rig through the drill bit's axial channel. The gas hydrate fragments decompose within the drilling rig, releasing gaseous products (including methane). These gaseous products are then transported to the drilling vessel via the delivery cable, thus enabling the extraction of natural gas hydrate. This process eliminates the need for well construction on the seabed, effectively shortening the construction period and reducing costs. Furthermore, because no well is required, there is no need to inject cement slurry into the sea, preventing marine pollution.

[0008] In a preferred embodiment, the drilling and production device further includes a drilling and production body, which has an internal axial channel connecting the drill bit axial channel and the central fluid channel. The drilling and production body is rotatably engaged with the drill bit. The drilling and production device also includes a stepping mechanism, which includes: a connecting rod connected to the upper end of the drilling and production body, which has an internal connecting axial channel connecting the main body axial channel and the central fluid channel; and a stepping sleeve sleeved outside the connecting rod, the stepping sleeve being configured to move axially relative to the connecting rod. The stepping sleeve is axially spaced from the drilling and production body, and a first anchoring element is provided on the outer side wall of the stepping sleeve. The first anchoring element is configured to radially engage with the drill bit. The drill bit extends outward to anchor to the well wall and can retract radially outward to separate from the well wall; and a second anchoring member is disposed on the outer side wall of the drilling body, the second anchoring member being configured to extend radially outward to anchor to the well wall and retract radially outward to separate from the well wall; wherein, in a first state, when the first anchoring member is anchored to the well wall, the second anchoring member is separated from the well wall, and the connecting rod moves axially toward the drilling direction relative to the stepping sleeve, so that the drilling body and the drill bit move toward the drilling direction; wherein, in a second state, when the second anchoring member is anchored to the well wall, the first anchoring member is separated from the well wall, and the stepping sleeve moves axially toward the drilling direction relative to the connecting rod; wherein, the first state and the second state alternate to make the drill bit continuously move toward the drilling direction.

[0009] In a preferred embodiment, the connecting rod engages with the stepping sleeve piston.

[0010] In a preferred embodiment, a piston body is constructed on the outside of the connecting rod, and a piston cylinder is constructed inside the stepping sleeve. The piston body is disposed inside the piston cylinder to form a first piston chamber away from the drilling and production body and a second piston chamber close to the drilling and production body. In a first state, fluid is supplied to the first piston chamber. In a second state, fluid is supplied to the second piston chamber.

[0011] In a preferred embodiment, the connecting rod is threaded into the stepping sleeve.

[0012] In a preferred embodiment, a first thread is formed on the outer wall of the connecting rod, and a first motor is disposed inside the stepping sleeve. The first motor is configured to drive the connecting rod and the stepping sleeve to move relative to each other axially. The first motor includes a first motor stator fixed to the stepping sleeve and a first motor rotor rotatably engaged with the first motor stator. A second thread is formed on the inner side of the first motor rotor to mesh with the first thread. In a first state, the first motor rotor rotates in a first direction to move the connecting rod relative to the stepping sleeve axially toward the drilling direction. In a second state, the first motor rotor rotates in a second direction to move the stepping sleeve relative to the connecting rod axially toward the drilling direction.

[0013] In a preferred embodiment, a positioning module is provided within the drilling and production body. The positioning module is configured to determine whether the position of the drilling and production device deviates from a preset drilling trajectory. A guiding mechanism is also provided within the drilling and production body. The guiding mechanism is configured to adjust the drilling direction of the drilling and production device. The guiding mechanism includes a plurality of guide push rods spaced apart circumferentially on the outside of the drilling and production body. The guide push rods are configured to extend radially outward to push against the well wall and retract radially inward to separate from the well wall.

[0014] In a preferred embodiment, a helical mechanism is provided within the main body axial channel and the drill bit axial channel. The helical mechanism extends axially and is rotatable about the axial direction. When no natural gas hydrate is encountered during drilling, the helical mechanism can rotate in a third direction to discharge the drilled formation debris from the drill bit. When natural gas hydrate is encountered during drilling, the helical mechanism can rotate in a fourth direction to draw the drilled natural gas hydrate debris into the helical mechanism for further crushing.

[0015] According to a second aspect of the present invention, an apparatus for the extraction of natural gas hydrates is provided, comprising: the aforementioned drill bit; and a conveying cable connected between the drill bit and a drill-production vessel, the conveying cable having a central fluid channel configured therein, the central fluid channel being connected to the axial channel of the drill bit; wherein, when encountering natural gas hydrates during drilling, the drill bit breaks down to obtain natural gas hydrate fragments, the natural gas hydrate fragments entering the central fluid channel through the axial channel of the drill bit, and the central fluid channel conveying the gaseous products obtained from the decomposition of the natural gas hydrate fragments to the drill-production vessel.

[0016] In a preferred embodiment, the transmission cable includes a protective outer layer and an insulating inner layer coaxially sleeved within the protective outer layer. A central fluid channel is formed within the insulating inner layer. A transmission wire is threaded between the protective outer layer and the insulating inner layer. The transmission wire is configured to transmit electrical energy to the drill bit. A hydraulic pipe is threaded between the protective outer layer and the insulating inner layer. The hydraulic pipe is configured to transmit hydraulic fluid to the drill bit. A signal line is threaded between the protective outer layer and the insulating inner layer. The signal line is configured to transmit information between the drill bit and the drill vessel.

[0017] According to a third aspect of the present invention, a method for extracting natural gas hydrates is provided, which is carried out using the above-described apparatus for extracting natural gas hydrates.

[0018] In a preferred embodiment, the method for extracting natural gas hydrate includes the following steps: lowering the drill bit to the seabed; drilling with the drill bit; discharging drill-broken formation debris through the drill bit when no natural gas hydrate is encountered; and drawing the drill-broken natural gas hydrate debris into the drill bit when a natural gas hydrate is encountered, thereby decomposing the natural gas hydrate debris into gaseous products, which are then transported to the drilling vessel through the central fluid channel of the transport cable.

[0019] In a preferred embodiment, when no natural gas hydrate is encountered, a first auxiliary fluid is supplied to the drill bit axial channel through the central fluid channel of the delivery cable to help remove formation debris from the drill bit; when a natural gas hydrate is encountered, a second auxiliary fluid is supplied to the drill bit through the central fluid channel of the delivery cable to help decompose the natural gas hydrate debris into gaseous products.

[0020] In a preferred embodiment, the drilling rate of the drill bit, the rate at which the second auxiliary fluid is delivered into the central fluid channel, and / or the rotational rate of the auger mechanism are adjusted to alter the rate of decomposition of gas hydrate debris. Attached Figure Description

[0021] The invention will be described in more detail below with reference to the accompanying drawings. Wherein:

[0022] Figure 1 A schematic diagram showing the operational status of a natural gas hydrate extraction apparatus according to an embodiment of the present invention is provided.

[0023] Figure 2 Showing Figure 1 A schematic top view of the operational status of a natural gas hydrate extraction facility;

[0024] Figure 3 A schematic structural diagram of a drilling and production apparatus for natural gas hydrates according to an embodiment of the present invention is shown;

[0025] Figure 4 A partial view of another embodiment of a drill for natural gas hydrates is shown;

[0026] Figure 5 A partial view of yet another embodiment of a drilling and production apparatus for natural gas hydrates is shown;

[0027] Figure 6 Showing Figure 1 A schematic diagram of one embodiment of a transmission cable in a natural gas hydrate extraction apparatus.

[0028] In the accompanying drawings, the same parts use the same reference numerals. The drawings are not drawn to scale. Detailed Implementation

[0029] The invention will now be further described with reference to the accompanying drawings.

[0030] Figure 1 and Figure 2 The diagram schematically illustrates the usage state of a natural gas hydrate extraction apparatus (hereinafter referred to as "extraction apparatus") 1 according to an embodiment of the present invention.

[0031] The mining unit 1 typically operates on the sea surface aboard a drilling and production vessel 2. The drilling and production vessel 2 may be equipped with a gas product processing mechanism 3, a storage tank 4, a power supply unit, a hydraulic station, and a control system. The gas product processing mechanism 3 processes the gas products delivered to the drilling and production vessel 2 and stores the processed products in the storage tank 4. The power supply unit supplies power to the mining unit 1 mounted on the drilling and production vessel 2. The hydraulic station provides hydraulic fluid to the mining unit 1 mounted on the drilling and production vessel 2. The control system collects signals from the mining unit 1 and sends control signals to it. A more detailed description of the specific structure of the mining unit 1 will follow below.

[0032] It should be understood that the aforementioned drilling and production vessel 2, gas product processing unit 3, storage tank 4, power supply unit, hydraulic station and control system can be independent of the mining unit 1, or they can be part of the mining unit 1.

[0033] The mining apparatus 1 may include a conveyor cable 20 and a drill rig 10. The drill rig 10 may be a drilling robot. The conveyor cable 20 may be used to connect the drill rig 10 and the drilling vessel 2.

[0034] Figure 3 An embodiment of a drill bit 10 is shown. The drill bit 10 includes a drill body 12. The drill body 12 is generally cylindrical. An axial channel 121 extending axially is formed inside the drill body 12. The drill bit 10 also includes a drill bit 11. The drill bit 11 is connected to the drill body 12 via a drill motor. The drill motor includes a drill motor stator 122 disposed within the drill body 12 and a drill motor rotor 112 disposed at one end of the drill bit 11. The drill motor rotor 112 can be inserted into and rotatably engaged with the drill motor stator 122. A cutting mechanism 114 is provided on the end face of the other end of the drill bit 11 for drilling during the forward movement of the drill bit 11 while the drill bit 11 is rotating forward. A reaming mechanism 115 is also provided on the side of the other end of the drill bit 11 for removing obstructions during the retraction of the drill bit 10 while the drill bit 11 is reversing. The drill bit 11 has an axial channel 111 extending along the axial direction in its internal structure.

[0035] The aforementioned cutting mechanism 114 and shaving mechanism 115 may include toothed cones, PDC composite plates, carbide cutting teeth, high-strength alloy cutting tips, etc., and can be used to cut formations and gas hydrates.

[0036] For example Figure 3 As shown, the drill bit 10 also includes a stepping mechanism 13. The stepping mechanism 13 includes a connecting rod 131 connected to the upper end of the drill body 12. One end of the connecting rod 131 is connected to the drill body 12 via a flange, and the other end is connected to the delivery cable 20. The connecting rod 131 is generally cylindrical, and has an axially extending connecting channel 1311 inside. The connecting axial channel 1311, the main body axial channel 121, and the drill bit axial channel 111 are sequentially connected to form a passage for transporting natural gas hydrates. The stepping mechanism 13 also includes a stepping sleeve 132. The stepping sleeve 132 is sleeved on the connecting rod 131 and is axially spaced from the drill body 12. The stepping sleeve 132 and the connecting rod 131 can move relative to each other axially. Figure 3In the illustrated embodiment, this relative movement is achieved through a piston engagement between the stepping sleeve 132 and the connecting rod 131. Specifically, a radially outwardly protruding piston body 1312 is constructed on the outer side of the connecting rod 131. A corresponding piston cylinder 1323 is constructed within the stepping sleeve 132. The piston body 1312 is disposed within the piston cylinder 1323 and is sealed to the piston cylinder 1323 by a sealing ring (e.g., a Gladley seal). The piston cylinder 1323 is sealed to the side wall of the connecting rod 131 by the sealing ring. Thus, a sealed first piston chamber 1324 and a second piston chamber 1325 can be formed within the piston cylinder 1323. Figure 3 As shown, the first piston chamber 1324 is relatively far away from the drilling and production body 12. The second piston chamber 1325 is relatively close to the drilling and production body 12.

[0037] A first anchoring element 1321, which can extend and retract radially, is provided on the outer side of the stepping sleeve 132. When extended, the first anchoring element 1321 can be anchored to the well wall to fix the position of the stepping sleeve 132. When retracted, the first anchoring element 1321 can be separated from the well wall to allow the stepping sleeve 132 to move. A second anchoring element 1322, which can extend and retract radially, is provided on the outer side of the drilling and production body 12. When extended, the second anchoring element 1322 can be anchored to the well wall to fix the position of the drilling and production body 12. When retracted, the second anchoring element 1322 can be separated from the well wall to allow the drilling and production body 12 to move.

[0038] The first anchor 1321 and / or the second anchor 1322 can be extended and retracted by the corresponding anchoring hydraulic cylinder.

[0039] In the first state, the first anchor 1321 extends outward and is anchored to the well wall, while the second anchor 1322 retracts inward and separates from the well wall. By injecting fluid (e.g., hydraulic oil) into the first piston chamber 1324, the connecting rod 131 can be oriented relative to the stepping sleeve 132 in the drilling direction (i.e., ...). Figure 3 (The right side of the middle) moves. At this time, the drilling body 12 and the drill bit 11 move away from the stepping sleeve 132.

[0040] In the second state, the second anchor 1322 extends outward and is anchored to the well wall, while the first anchor 1321 retracts inward and separates from the well wall. By injecting fluid (e.g., hydraulic oil) into the second piston chamber 1325, the connecting rod 131 can be positioned away from the drilling direction relative to the stepping sleeve 132 (i.e., Figure 3 The stepping sleeve 132 moves relative to the connecting rod 131 in the drilling direction (to the left). At this time, the stepping sleeve 132 moves closer to the drilling body 12 and the drill bit 11.

[0041] By repeatedly alternating between the first and second states, the drill bit 10 can be continuously moved in the drilling direction.

[0042] The stepper sleeve 132 is also equipped with an electromagnetic directional valve 1326. The electromagnetic directional valve 1326 can be used to change the flow direction of the hydraulic fluid (selecting whether it flows to the first piston chamber 1324 or the second piston chamber 1325) to switch the stepper mechanism 13 between the first state and the second state. As needed, any other suitable method can also be used to change the flow direction of the hydraulic fluid to switch the stepper mechanism 13 between the first state and the second state.

[0043] Additionally, a positioning module 124 is provided within the drilling and production body 12. The positioning module 124 can detect the location of the drill and production device 10 and determine whether it has deviated from the preset drilling trajectory. Furthermore, the positioning module 124 can determine the orientation of the drill and production device 10 to ensure it is drilling in the expected direction. The positioning module 124 may include inertial navigation sensors and / or attitude sensors.

[0044] A guiding mechanism 125 is also provided inside the drilling and production body 12. The guiding mechanism 125 can be used to adjust the drilling direction of the drilling and production device 10. Figure 3 As shown, the guiding mechanism 125 may include a plurality of guide push rods 1251. The plurality of guide push rods 1251 are arranged circumferentially spaced apart on the outer side of the drilling body 12. Each guide push rod can independently extend radially outward to push against the well wall, and can independently retract radially inward to separate from the well wall.

[0045] When the positioning module 124 determines that the drill bit 10 has deviated from the predetermined drilling trajectory, the direction of the drill bit 10 (drill bit 11) can be changed by extending the corresponding guide mechanism 125. This effectively adjusts the drilling direction, allowing the drill bit 10 to return to the predetermined drilling trajectory.

[0046] The guide push rod 1251 can be extended and retracted by a guide hydraulic cylinder.

[0047] A logging module 126 can also be installed within the drilling and production unit 12. The logging module 126 includes various logging sensors (e.g., resistivity logging tools, sonic logging tools, density logging tools, etc.) to acquire logging-while-drilling data and transmit the measured data to the control system on the drilling and production vessel 2, allowing operators to understand the formation conditions of the drill-production unit 10 in real time. For example, the logging module 126 can determine the formation location of the drill-production unit 10, identifying whether it is currently in a methane hydrate reservoir, an upper overburden layer, or a lower overburden layer.

[0048] A power distribution module 127 may also be installed inside the drilling and production body 12. The power distribution module 127 can be used to distribute electrical energy to the required components, such as the drill bit motor.

[0049] A controller 128 may also be installed inside the drilling and production unit 12. The controller 128 can be used to receive control commands from the control system on the drilling and production vessel 2 at the water surface, and issue commands to the corresponding components in the drilling and production unit 10 so that they can operate as needed. In addition, the controller 128 can also be used to receive detection data from the logging module 126, the positioning module 124, etc., process the data, and transmit the processed data to the control system on the drilling and production vessel 2.

[0050] The aforementioned positioning module 124, logging module 126, and controller 128 can be integrated together or operate independently of each other.

[0051] In addition, such as Figure 3 As shown, a helical mechanism 123 is provided within the main body axial channel 121 and the drill bit axial channel 111. The helical mechanism 123 extends axially and can rotate around the central axis of the axial direction. The rotation direction of the helical mechanism 123 can be switched to correspond to different working states. For example, when no natural gas hydrate is encountered during drilling, the helical mechanism 123 can rotate in a third direction (forward rotation) to discharge the drilled fragments from the drill bit axial channel 111, thereby preventing the fragments from clogging the drill bit 10 and the delivery cable 20. When natural gas hydrate is encountered during drilling, the helical mechanism 11 can rotate in a fourth direction (reverse rotation) to draw the drilled fragments into the helical mechanism 123. The helical mechanism 123 can move towards the delivery cable 20 with the natural gas hydrate fragments, further breaking down the natural gas hydrate during the movement. This facilitates the decomposition of the natural gas hydrate into gaseous products (including methane), allowing the gaseous products to be transported to the drill vessel 2 via the delivery cable 20.

[0052] A rotary sealing structure is provided between the drilling body 12 and the drill bit motor rotor 112 to ensure the sealing of the pipeline used to transport gas hydrates and improve drilling efficiency.

[0053] Figure 4 Another embodiment of the drill bit is shown. The drill bit 11' of this drill bit is rotatably coupled to the drill body via a hydraulic motor. A hydraulic motor rotor 112' is provided at one end of the drill bit 11'. A corresponding hydraulic motor stator 122' is provided inside the drill body. A blade 113' is provided between the hydraulic motor rotor 112' and the hydraulic motor stator 122'. The supply direction of hydraulic fluid (e.g., hydraulic oil) can be controlled by a corresponding solenoid directional valve to switch the hydraulic motor between forward and reverse rotation.

[0054] Figure 5Another embodiment of the drill bit is shown. The connecting rod 131' of this drill bit has a first thread 1313' externally constructed. That is, the connecting rod 131' can be constructed as a lead screw. A first motor is disposed within the stepper sleeve 132'. The first motor includes a first motor stator 1327' fixed to the stepper sleeve 132', and a first motor rotor 1328' rotatably engaged with the first motor stator 1327'. A second thread 1329' is constructed on the inner side of the first motor rotor 1328', which can engage with the aforementioned first thread 1313'. The first motor can switch between forward and reverse rotation states.

[0055] In the first state, the first motor rotor 1328' rotates in the first direction (forward rotation). The connecting rod 131' moves axially toward the drilling direction relative to the stepping sleeve 132'.

[0056] In the second state, the first motor rotor 1328' rotates (reverses) in the second direction. The stepping sleeve 132' moves axially toward the drilling direction relative to the connecting rod 131'.

[0057] Figure 6 An embodiment of the delivery cable 20 is shown. The delivery cable 20 includes a protective outer layer 22 and an insulating inner layer 23 coaxially sleeved within the protective outer layer 22. A central fluid channel 21 is formed in the insulating inner layer 23. The central fluid channel 21 communicates with the connecting axial channel 1311, the main body axial channel 121, and the drill bit axial channel 111, and is connected to the gas product processing mechanism 3 and the storage tank 4 on the drilling vessel 2. The gas products obtained from drilling can be transported to the gas product processing mechanism 3 and the storage tank 4 through the central fluid channel 21.

[0058] A power transmission line 25 is installed between the outer protective layer 22 and the inner isolation layer 23. The power transmission line 25 connects the power supply unit and the power distribution module 127 and can be used to transmit electrical energy to corresponding components in the drill rig 10 (e.g., logging module, positioning module, drilling motor, anchoring hydraulic cylinder, guiding hydraulic cylinder, hydraulic cylinder in the stepping mechanism, hydraulic motor, etc.).

[0059] A hydraulic pipe 26 is installed between the outer protective layer 22 and the inner insulating layer 23. The hydraulic pipe connects the hydraulic station to the corresponding components in the drill rig 10 (e.g., anchoring hydraulic cylinder, guide hydraulic cylinder, hydraulic cylinder in the stepping mechanism, hydraulic motor, etc.) and is used to deliver hydraulic fluid to the corresponding components.

[0060] A signal line 27 is threaded between the outer protective layer 22 and the inner isolation layer 23. The signal line 27 connects the control system and the controller 128 to transmit data information and control signals between them.

[0061] The remaining pores between the outer protective layer 22 and the inner insulating layer 23 are filled with insulating filler 24.

[0062] The method for extracting natural gas hydrates according to the present invention can be carried out using the above-described drill rig 10 and extraction device 1.

[0063] First, the drilling and production vessel 2 transports the extraction equipment 1, along with the corresponding gas product processing unit 3, storage tank 4, power supply unit, hydraulic station, and control system, to the sea surface above the combustible ice reservoir to be drilled.

[0064] Then, the drill rig 10 is connected to the gas product processing mechanism 3, storage tank 4, power supply unit, hydraulic station, and control system installed on the drill rig 2 using the transmission cable 20. This establishes a gas product (methane) transmission channel, hydraulic power pipeline, power supply, and signal transmission lines.

[0065] Next, the ROV (Remotely Operated Vehicle) carrying the drill rig 10 is descended to the seabed drilling location. Other methods may also be used to transport the drill rig 10 to the seabed drilling location if needed.

[0066] Afterwards, the drill bit 11 is rotated at high speed by starting the drill rig 10. The orientation of the drill bit 11 can be adjusted using an ROV to guide it towards the formation for drilling. After drilling to a certain depth, the ROV disengages from the drill bit 10. The drill bit 10 then continues drilling.

[0067] During drilling, the stepping mechanism 13 propels the drill bit 10 forward continuously. The positioning module 124 determines the position and orientation of the drill bit 10. The guiding mechanism 125 adjusts the drilling direction of the drill bit 10.

[0068] During the drilling process, the well logging module 126 is used to determine the formation location of the drill bit 10, that is, to determine whether the drill bit 10 has encountered natural gas hydrate.

[0069] When the drill bit 10 is in the overburden and has not encountered natural gas hydrates, the auger mechanism 123 rotates clockwise to ensure that all formation debris generated during drilling is discharged from the drill bit 11. Simultaneously, a first auxiliary fluid can be supplied to the drill bit 10 through the central fluid channel 21 to further assist in the discharge of formation debris. This first auxiliary fluid can be seawater.

[0070] When the drill bit 10 enters the methane hydrate reservoir and encounters natural gas hydrate, the auger mechanism 123 reverses to draw the drilled natural gas hydrate debris into the drill bit 10. The auger mechanism 123 can further break up the debris, causing the natural gas hydrate in the debris to decompose into gaseous products. The gaseous products can be transported to the drill-production vessel 2 through the central fluid channel 21. The gaseous products processing mechanism 3 on the drill-production vessel 2 can process (purify and pressurize and liquefy) the gaseous products, and then transport them to the storage tank 4 for storage.

[0071] During this process, a second auxiliary fluid can be supplied to the drill bit 10 through the central fluid channel 21 to aid in the decomposition of gas hydrates. This second auxiliary fluid can be heated seawater. Continuously supplying heated seawater can also effectively prevent ice blockage.

[0072] By adjusting the drilling rate of drill bit 11, the rate at which the second auxiliary fluid is delivered to the central fluid channel 21, and / or the rotational rate of the auger mechanism 123, the rate of decomposition of gas hydrates in the cuttings can be adjusted, allowing the resulting gaseous products to be transported to the drilling vessel 2 in the form of small bubbles. The size of these small bubbles can be, for example, between 10 and 50 μm. This helps ensure that the gaseous products can be smoothly transported to the drilling vessel through the central fluid channel 21.

[0073] The debris that enters the drill bit 10 can be removed as needed using known methods.

[0074] Finally, the feed cable 20 is retrieved, thereby enabling the retrieval of the drill bit 10. During this process, the drill bit 11 is reversed and the drilling is carried out using the reamer mechanism 115 to ensure the successful retrieval of the drill bit 10.

[0075] In the aforementioned mining process, there is no need to lower drill pipes or construct wells, which effectively shortens the construction period and reduces costs. Furthermore, multiple mining units can be used simultaneously, further reducing the cost per operation.

[0076] Furthermore, no cement slurry or other chemical reagents are injected into the ocean or strata during the aforementioned mining process, thus maximizing the protection of the marine environment.

[0077] Although the invention has been described with reference to preferred embodiments, various modifications can be made and components can be replaced with equivalents without departing from the scope of the invention. In particular, the technical features mentioned in the various embodiments can be combined in any manner as long as there is no structural conflict. The invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

[0078] List of reference numerals

[0079] Mining Unit 1

[0080] Drilling and extraction device 10

[0081] Drill bit 11, 11'

[0082] Drill bit axial channel 111

[0083] Drill bit motor rotor 112

[0084] Hydraulic motor rotor 112'

[0085] Leaf 113'

[0086] Cutting mechanism 114

[0087] Inverted eyelid repair mechanism 115

[0088] Drilling and production body 12

[0089] Main body axial channel 121

[0090] Drill bit motor stator 122

[0091] Hydraulic motor stator 122'

[0092] Screw mechanism 123

[0093] Positioning module 124

[0094] Guiding mechanism 125

[0095] Guide push rod 1251

[0096] Logging Module 126

[0097] Power distribution module 127

[0098] Controller 128

[0099] Stepper mechanism 13

[0100] Connecting rods 131, 131'

[0101] Connecting axial channel 1311

[0102] Piston body 1312

[0103] First thread 1313'

[0104] Stepper sleeves 132, 132'

[0105] First anchoring component 1321

[0106] Second anchoring component 1322

[0107] Piston cylinder 1323

[0108] First piston chamber 1324

[0109] Second piston chamber 1325

[0110] Solenoid directional valve 1326

[0111] First motor stator 1327'

[0112] First motor rotor 1328'

[0113] Second thread 1329'

[0114] 20 Conveyor Cables

[0115] Central fluid channel 21

[0116] outer protective layer 22

[0117] Inner layer 23

[0118] 24 isolation filler

[0119] 25 transmission line

[0120] Hydraulic hose 26

[0121] Signal line 27

[0122] Drilling Vessel 2

[0123] Gas Product Processing Unit 3

[0124] Storage tank 4

Claims

1. A drilling and production device for natural gas hydrates, comprising a drill bit having an axial channel configured to communicate with a central fluid channel of a delivery cable used to transport gaseous products to a drilling and production vessel. in, When encountering natural gas hydrates during drilling, the drill bit breaks them down to obtain natural gas hydrate fragments. These fragments enter the central fluid channel through the axial channel of the drill bit, and the central fluid channel transports the gaseous products obtained from the decomposition of the natural gas hydrate fragments to the drilling vessel.

2. The drilling and production device for natural gas hydrates according to claim 1, characterized in that, The drilling and production device also includes a drilling and production body, which has an internal axial channel. The axial channel connects the drill bit axial channel and the central fluid channel. The drilling and production body is rotatably engaged with the drill bit. The drill bit further includes a stepping mechanism, which comprises: A connecting rod is connected to the upper end of the drilling and production body. An axial connection channel is constructed inside the connecting rod, and the axial connection channel connects the axial channel of the body and the central fluid channel. A stepping sleeve is fitted over the connecting rod. The stepping sleeve is configured to move axially relative to the connecting rod. The stepping sleeve is axially spaced from the drilling body. A first anchoring element is provided on the outer wall of the stepping sleeve. The first anchoring element is configured to extend radially outward to anchor to the wellbore and retract radially outward to separate from the wellbore. The second anchoring member is disposed on the outer side wall of the drilling and production body. The second anchoring member is configured to extend radially outward to anchor with the well wall and retract radially outward to separate from the well wall. In the first state, when the first anchoring member is anchored to the well wall, the second anchoring member is separated from the well wall, and the connecting rod moves axially toward the drilling direction relative to the stepping sleeve, so that the drilling and production body and the drill bit move toward the drilling direction; In the second state, when the second anchor is anchored to the well wall, the first anchor is separated from the well wall, and the stepping sleeve moves axially toward the drilling direction relative to the connecting rod; The first state and the second state are alternated to make the drill continuously move in the drilling direction.

3. The drilling and production device for natural gas hydrates according to claim 2, characterized in that, The connecting rod engages with the stepping sleeve piston.

4. The drilling and production device for natural gas hydrates according to claim 3, characterized in that, A piston body is constructed on the outside of the connecting rod, and a piston cylinder is constructed inside the stepping sleeve. The piston body is disposed inside the piston cylinder to form a first piston chamber away from the drilling and production body and a second piston chamber close to the drilling and production body within the piston cylinder. In the first state, fluid is supplied to the first piston chamber; In the second state, fluid is supplied to the second piston chamber.

5. The drilling and production device for natural gas hydrates according to claim 2, characterized in that, The connecting rod is threadedly engaged with the stepping sleeve.

6. The drilling and production apparatus for natural gas hydrates according to claim 5, characterized in that, A first thread is formed on the outer side wall of the connecting rod. A first motor is provided inside the stepper sleeve. The first motor is configured to drive the connecting rod and the stepper sleeve to move relative to each other axially. The first motor includes a first motor stator fixed to the stepper sleeve and a first motor rotor rotatably engaged with the first motor stator. A second thread that meshes with the first thread is constructed on the inner side of the first motor rotor. In the first state, the first motor rotor rotates in a first direction to cause the connecting rod to move axially toward the drilling direction relative to the stepping sleeve. In the second state, the first motor rotor rotates in the second direction to move the stepping sleeve relative to the connecting rod axially toward the drilling direction.

7. The drilling and production apparatus for natural gas hydrates according to any one of claims 2 to 6, characterized in that, A positioning module is provided inside the drilling and production body. The positioning module is configured to determine whether the position of the drilling and production device deviates from the preset drilling trajectory. A guiding mechanism is also provided inside the drilling and production body. The guiding mechanism is configured to adjust the drilling direction of the drilling and production device. The guiding mechanism includes a plurality of guide push rods arranged circumferentially spaced on the outside of the drilling and production body. The guide push rods are configured to extend radially outward to push against the well wall and retract radially inward to separate from the well wall.

8. The drilling and production apparatus for natural gas hydrates according to any one of claims 2 to 7, characterized in that, A helical mechanism is provided in the main body axial channel and the drill bit axial channel. The helical mechanism extends axially and can rotate around the axial direction. When no natural gas hydrate is encountered during drilling, the spiral mechanism can rotate in a third direction to discharge the drill bit with the broken formation debris. When encountering natural gas hydrates during drilling, the spiral mechanism can rotate in the fourth direction to draw in the broken natural gas hydrate fragments and further break them up.

9. An apparatus for the extraction of natural gas hydrates, comprising: The drilling and extraction device according to any one of claims 1 to 8; as well as A delivery cable is provided, which connects the drill bit to the drill vessel. The delivery cable has a central fluid channel that is connected to the axial channel of the drill bit. During the drilling process, when encountering natural gas hydrates, the drill bit breaks them up to obtain natural gas hydrate fragments. These fragments enter the central fluid channel through the axial channel of the drill bit, and the central fluid channel transports the gaseous products obtained from the decomposition of the natural gas hydrate fragments to the drilling and production vessel.

10. The apparatus for extracting natural gas hydrates according to any one of claims 1 to 8, characterized in that, The transmission cable includes a protective outer layer and an insulating inner layer coaxially sleeved within the protective outer layer. The central fluid channel is formed within the insulating inner layer. A transmission line is threaded between the protective outer layer and the insulating inner layer. The transmission line is configured to transmit electrical energy to the drill bit. A hydraulic pipe is threaded between the protective outer layer and the insulating inner layer. The hydraulic pipe is configured to transmit hydraulic fluid to the drill bit. A signal line is threaded between the protective outer layer and the insulating inner layer. The signal line is configured to transmit information between the drill bit and the drill vessel.

11. A method for extracting natural gas hydrates, using the apparatus for extracting natural gas hydrates according to claim 9 or 10, the method comprising the following steps: The drilling and extraction device was lowered to the seabed; Drilling is carried out using the drill bit. When no natural gas hydrate is encountered, the drill bit discharges the broken formation debris. When a natural gas hydrate is encountered, the drill bit sucks the broken natural gas hydrate debris into the drill bit, causing the natural gas hydrate debris to decompose and produce gaseous products. The gaseous products are then transported to the drilling vessel through the central fluid channel of the conveying cable.

12. The method for extracting natural gas hydrates according to claim 11, characterized in that, When no natural gas hydrate is encountered, a first auxiliary fluid is supplied to the drill bit axial channel through the central fluid channel of the delivery cable to help remove formation debris from the drill bit. When encountering natural gas hydrates, a second auxiliary fluid is supplied to the drill bit through the central fluid channel of the delivery cable to help decompose the natural gas hydrate debris into gaseous products.

13. The method for extracting natural gas hydrates according to claim 11 or 12, characterized in that, Adjusting the drilling rate of the drill bit, the rate at which the second auxiliary fluid is delivered into the central fluid channel, and / or the rotation rate of the auger mechanism alters the rate of decomposition of gas hydrate debris.