A method for CO2 injection and oil enhancement in ultra-short radius side-drilled horizontal wells

By injecting solutions such as water, surfactants, and liquid carbon dioxide into ultra-short radius side-drilled horizontal wells, the problem of low energy caused by imperfect well network injection and production was solved, achieving increased single-well production and improved economic benefits.

CN123109606APending Publication Date: 2026-11-17DAQING OILFIELD CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510626739.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In oilfield development, imperfect injection and production in local well networks leads to low formation energy levels in ultra-short radius side-drilled horizontal wells, resulting in rapid production decline, and there are currently no effective energy replenishment measures.

Method used

The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells involves injecting solutions such as water, surfactant solution, isolation fluid, and liquid carbon dioxide to reduce crude oil viscosity, replenish formation energy, and increase single-well production.

Benefits of technology

It effectively reduces the interfacial tension between oil and water, increases single-well production, extends the effective period of oil enhancement, and achieves better oil enhancement effect and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109606A_ABST
    Figure CN123109606A_ABST
Patent Text Reader

Abstract

A CO2 injection-enhanced oil production method for ultra-short radius sidetracked horizontal wells relates to the field of oilfield development technology, solving the problem of rapid decline in single-well production after sidetracking due to incomplete injection and production in local well networks and low formation energy levels. The method includes: S1, pre-construction preparation; S2, after pre-construction preparation, the injection process begins; during injection, relevant solutions are injected in stages from the annulus, with the injection solutions and steps as follows: 1) injection of pre-filled water fluid; 2) injection of a 0.5% surfactant solution; 3) injection of a separator fluid; 4) injection of liquid carbon dioxide; 5) injection of post-filled fluid, used to protect the tubing string while ensuring all carbon dioxide enters the formation; S3, after injection, the well is shut down, and after the shut-down time is reached, production is initiated. This method can replenish formation energy, increase single-well production in ultra-short radius sidetracked horizontal wells, and achieve the goal of improving oil recovery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of oil extraction, and in particular to a method for CO2 huff and puff enhancement in ultra-short radius side-drilled horizontal wells. Background Technology

[0002] During oilfield development, there are instances of incomplete well network injection and production, resulting in low formation energy levels. In these areas, some wells experience rapid production decline after sidetracking. If the distribution of water wells around the sidetracked well is incomplete, the number of water wells is insufficient, or the target formation plane exhibits strong heterogeneity, conventional water injection adjustments are insufficient to effectively replenish formation energy and increase production. If the sidetracked well utilizes natural energy and there are no surrounding water wells, then supplementary energy injection measures must be implemented to replenish formation energy and increase production. Currently, there are no specific measures for supplementary energy injection in the later stages of ultra-short radius sidetracked horizontal wells, leading to rapid production declines in some wells with low formation energy levels after sidetracking, preventing them from fully realizing their production potential. Summary of the Invention

[0003] This invention addresses the problem in the prior art where incomplete injection and production in local well networks leads to low formation energy levels, resulting in rapid decline in single-well production after sidetracking. It provides a CO2 huff and puff enhancement method for ultra-short radius sidetracked horizontal wells. This method reduces crude oil viscosity, expands its volume, lowers the interfacial tension between oil and water, replenishes formation energy, and increases single-well production in ultra-short radius sidetracked horizontal wells, thereby improving oil recovery.

[0004] The present invention solves its problem through the following technical solution: the CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells includes the following steps:

[0005] S1. Pre-construction preparations;

[0006] S2. After the preliminary preparations for construction are completed, the construction injection process begins. During the construction injection process, the relevant solutions are injected into the annulus in stages. The injection solutions and steps are as follows:

[0007] 1) Inject pre-conditioning solution with clean water;

[0008] 2) Inject a 0.5% surfactant solution to increase the swept volume, enlarge the front edge of the chemical flooding agent, and improve the effect of carbon dioxide flooding;

[0009] 3) Inject isolation fluid to prevent corrosion of the tubing by the chemicals and to prevent fluid freezing during later injections;

[0010] 4) Injecting liquid carbon dioxide to reduce crude oil viscosity, expand its volume, reduce the interfacial tension between oil and water, and replenish formation energy;

[0011] 5) Inject post-fluid to protect the tubing string while ensuring that all carbon dioxide enters the formation;

[0012] S3. After injection is completed, the well is shut down. Once the shut-down time has been reached, the pumping production is restarted.

[0013] Furthermore, the pre-construction preparations include: connecting the relevant wellhead accessories; pressure testing the surface pipelines; and hot washing the oil well after the pressure test is passed to remove dead oil and wax from the wellbore.

[0014] Furthermore, the injection rate of pre-fluid clean water is controlled at 15-20 cubic meters per hour; the injection volume of pre-fluid clean water is 20 cubic meters.

[0015] Furthermore, the injection rate of the surfactant solution is controlled at 15-20 cubic meters per hour;

[0016] The formula for determining the amount of surfactant solution injected is as follows:

[0017]

[0018] Where: Q—dosage of reagent (cubic meters); C—intake constant; L—side drilling length (meters); H—effective thickness of horizontal section (meters); R—treatment radius (meters); —Effective porosity (%); So—Residual oil saturation (%).

[0019] Furthermore, the injection rate of the isolation fluid is controlled at 15-20 cubic meters per hour;

[0020] The formula for determining the amount of isolation fluid injected is as follows:

[0021] V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 );

[0022] Where: V—Isolation fluid usage (m³) 3 );D 套内 —Casing inner diameter (m); D 油外 —Outer diameter of the tubing (m); D 油内 —Inner diameter of tubing (m); h —Depth of artificial well bottom (m).

[0023] Furthermore, the injection rate of the liquid carbon dioxide is controlled at 5-10 cubic meters per hour.

[0024] The formula for determining the amount of liquid carbon dioxide injected is as follows:

[0025]

[0026] Where: Q—dosage of reagent (cubic meters); C—intake constant; L—side drilling length (meters); H—effective thickness of horizontal section (meters); R—treatment radius (meters); —Effective porosity (%); So—Residual oil saturation (%).

[0027] Furthermore, the injection rate of the post-filled fluid is controlled at 15-20 cubic meters per hour;

[0028] The formula for determining the post-implant volume is:

[0029] V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 );

[0030] Where: V—Isolation fluid usage (m³) 3 );D 套内 —Casing inner diameter (m); D 油外 —Outer diameter of the tubing (m); D 油内 —Inner diameter of tubing (m); h —Depth of artificial well bottom (m).

[0031] Furthermore, throughout the injection process, the wellhead pressure does not exceed 16.0 MPa; the main components of the isolation fluid are corrosion inhibitors and ethylene glycol; the main components of the post-fill fluid are corrosion inhibitors and ethylene glycol.

[0032] Furthermore, the well-clogging time after the injection in step S3 is 7-15 days.

[0033] Furthermore, the conditions for starting production are determined as follows:

[0034] If the well is shut down for the designed maximum shut-down time after injection is completed and the wellhead pressure is greater than 5 MPa, the well will be pumped out for production.

[0035] If the well is not shut down for the designed maximum shut-down time after injection, the wellhead pressure is not greater than 5 MPa, and the pressure drop is less than 0.3 MPa for two consecutive days, the well can be started for pumping production.

[0036] Compared with the above-mentioned background technology, the present invention has the following beneficial effects:

[0037] This invention discloses a CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells. This method can reduce the viscosity and volume of crude oil, reduce the interfacial tension between oil and water, effectively replenish formation energy, increase the single-well production of ultra-short radius side-drilled horizontal wells, and extend the effective period of oil production enhancement measures. It has good oil production enhancement effect and benefits.

[0038] The present invention relates to a CO2 huff-n-puff oil increase method for ultra-short radius sidetracked horizontal wells, wherein well soaking is performed after the injection is completed, and after the well soaking time is reached, the timing of starting pumping for production is determined according to conditions such as whether the designed upper limit of well soaking time, wellhead pressure and other conditions are met. On the one hand, the conditions for starting pumping production of the oil well are provided, and on the other hand, the single well production of the ultra-short radius sidetracked horizontal well can be improved more effectively and efficiently, further ensuring that the measure achieves a good oil increase effect.

[0039] Through field application of the method of the present invention, up to now, a total of 6 CO2 huff-n-puff operations have been implemented. Before the measures, the average single well daily fluid production is 1.6 tons, daily oil production is 0.8 tons, and water cut is 48.9%. In the initial stage after the measures, the average single well daily fluid production is 5.8 tons, daily oil production is 2.9 tons, and water cut is 50.4%. The average single well daily increased fluid is 4.2 tons, daily increased oil is 2.1 tons, the water cut increased by 1.5 percentage points, the average single well stage cumulative oil increase is 307 tons, and the single well cost is 280,000 yuan. Calculated based on an oil price of 60 US dollars per barrel (2969 yuan per ton), the total profit obtained is 3.79 million yuan, and the input-output ratio reaches 1:3.3. Brief Description of the Drawings

[0040] Figure 1 is a flow block diagram of the CO2 huff-n-puff oil increase method for ultra-short radius sidetracked horizontal wells of the present invention. Detailed Description of the Embodiments

[0041] In order to make the purpose, technical solution and advantages of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0042] As Figure 1 shown, a CO2 huff-n-puff oil increase method for ultra-short radius sidetracked horizontal wells includes the following steps:

[0043] S1. Pre-construction preparation:

[0044] 1) Connect the relevant wellhead accessories before construction;

[0045] 2) Connect 2 from the casing flow line 7 / 8 TBG movable elbow and connect it to the placement position of the injection pump set, and check whether the switches of each valve are flexible;

[0046] 3) Anchor the surface pipelines, each surface pipeline must be anchored (the ground anchor depth is 1.5 meters, fixed with a steel wire rope with a diameter of 8mm, using three rope clamps in two forward and one reverse directions);

[0047] 4. Pump set cooling: cool the pump set by small displacement circulation;

[0048] 5) The surface pipeline is pressure-tested at 16 MPa for 30 minutes, which is qualified if there is no seepage or leakage;

[0049] 6) Perform hot washing on the oil well to remove dead oil and dead wax in the wellbore.

[0050] S2. Construction injection process:

[0051] During the injection process, the relevant solution is injected through the annulus of the casing. The injection steps are as follows:

[0052] 1) Inject 20 cubic meters of pre-fluid clean water at a rate of 15-20 cubic meters per hour.

[0053] 2) Inject a 0.5% surfactant solution to increase the swept volume, enlarge the front edge of the chemical flooding agent, and ensure the effect of carbon dioxide flooding. The injection rate should be controlled at 15-20 cubic meters per hour.

[0054] Formula for determining the amount of surfactant solution injected:

[0055]

[0056] Where: Q—dosage of reagent (cubic meters); C—intake constant; L—side drilling length (meters); H—effective thickness of horizontal section (meters); R—treatment radius (meters); —Effective porosity (%); So—Residual oil saturation (%).

[0057] The optimized design allows for a horizontal well treatment radius of 6.0-8.0 meters; when encountering sand bodies with good physical properties and good fluorescence response in the horizontal section, the gas intake constant is 0.50-0.60; when encountering sand bodies with poor physical properties and poor fluorescence response in the horizontal section, the gas intake constant is 0.40-0.50.

[0058] 3) Inject a separatory fluid whose main components are corrosion inhibitor and ethylene glycol to prevent corrosion of the tubing in the well by the agent and to prevent the well fluid from freezing during later injection. The injection rate is controlled at 15-20 cubic meters per hour. The mass ratio of the corrosion inhibitor to ethylene glycol is 1:1.

[0059] The formula for determining the amount of isolation fluid injected is:

[0060] V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 );

[0061] Where: V—Isolation fluid usage (m³) 3 );D 套内 —Casing inner diameter (m); D 油外 —Outer diameter of the tubing (m); D 油内 —Inner diameter of tubing (m); h—Depth of artificial well bottom (m). To fully protect the tubing string, the actual injection volume during construction is 1.5 times the calculated result.

[0062] 4) Inject liquid carbon dioxide. The carbon dioxide diffuses in the formation and mixes with the formation crude oil, which reduces the viscosity of the crude oil and reduces the interfacial tension between oil and water. After the liquid carbon dioxide expands, it generates gas driving force in the liquid, thereby increasing the production of the oil well. The injection rate should be controlled at 5-10 cubic meters per hour. If the injection pressure rises too quickly, the injection rate can be appropriately reduced. If the injection pressure exceeds 10 MPa in the later stage of injection, the injection rate should be reduced to 2 / 3 of the optimal displacement (the optimal displacement is determined according to the actual situation on site. Under the optimal displacement condition, the injection pressure is relatively stable) and small-displacement injection should be carried out.

[0063] The formula for determining the amount of liquid carbon dioxide injected is:

[0064]

[0065] Where: Q—dosage of reagent (cubic meters); C—intake constant; L—side drilling length (meters); H—effective thickness of horizontal section (meters); R—treatment radius (meters); —Effective porosity (%); So—Residual oil saturation (%). Optimize the design of the horizontal well treatment radius for sidetracking to 6.0-8.0 meters; when encountering sand bodies with good physical properties and good fluorescence response in the sand samples, the gas intake constant is 0.50-0.60; when encountering sand bodies with poor physical properties and poor fluorescence response in the sand samples, the gas intake constant is 0.40-0.50.

[0066] 5) Inject post-fluid, whose main components are corrosion inhibitor and ethylene glycol, to protect the tubing while ensuring that all carbon dioxide enters the formation. The injection rate is controlled at 15-20 cubic meters per hour. The mass ratio of the corrosion inhibitor to ethylene glycol is 1:1.

[0067] The formula for determining the post-implant volume is:

[0068] V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 );

[0069] Where: V—Isolation fluid usage (m³) 3 );D 套内 —Casing inner diameter (m); D 油外 —Outer diameter of the tubing (m); D 油内 —Inner diameter of tubing (m); h—Depth of artificial well bottom (m). To fully protect the tubing string and ensure that all carbon dioxide enters the formation, the actual injection volume during construction is 1.5 times the calculated result.

[0070] S3. After injection is completed, the well is shut down. Once the shut-down time has been reached, the pumping production is restarted.

[0071] During the entire injection process, the wellhead pressure shall not be higher than 16.0 MPa.

[0072] After the injection is completed, the well is shut in for 7 to 15 days. If the designed maximum shut-in time is reached and the wellhead pressure is greater than 5 MPa, the well can be put into production by pumping; if the upper limit of the designed shut-in time is not reached, the wellhead pressure is no greater than 5 MPa, and the pressure drop between two adjacent days is less than 0.3 MPa, the well can be put into production by pumping.

[0073] Example 1

[0074] In order to make the purpose and technical solution of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings and taking the actual application effect of Well Tai 87-102 in Daqing Yongle Oilfield as an example.

[0075] 1. Basic situation: The sidetracked horizon of this well is PI5, the perforated sandstone thickness is 6.2m, and the effective thickness is 6.0m. Sidetracking was implemented for the PI5 layer in 2019, with an initial daily oil increase of 6 tons and a cumulative oil increase of 1760 tons; since there is no water injection well point in the sidetracking direction, the daily oil production dropped to 1 ton in October 2023, with an oil production decline rate of 92.0%. In order to supplement formation energy and increase the production of a single well, carbon dioxide huff and puff was implemented for this well.

[0076] 2. Complete pre-construction preparations;

[0077] 1) Connect the wellhead-related accessories before construction;

[0078] 2) Connect 2 7 / 8 TBG movable elbow from the casing flow line to the placement position of the injection pump unit, and check whether each valve is flexible to switch;

[0079] 3) Anchor the surface pipelines, each surface pipeline must be anchored (the ground anchor has a depth of 1.5 meters, fixed with a steel wire rope of 8mm in diameter, and three rope clips in two forward and one reverse arrangement are used);

[0080] 4. Cooling of the pump unit: perform small-displacement circulating cooling on the pump unit;

[0081] 5) The surface pipeline pressure test is qualified when there is no leakage at 16 MPa for 30 minutes;

[0082] 6) Perform hot washing on the oil well to remove dead oil and dead wax in the wellbore.

[0083] 3. Construction parameter design:

[0084] 1) Determination of the injection volume of the spacer fluid and the post-fluid:

[0085] V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 );

[0086] Wherein: the inner diameter of the casing D 套内 It is 0.124m;

[0087] Oil pipe outer diameter D 油外 It is 0.073m;

[0088] Oil pipe inner diameter D 油内 It is 0.062m;

[0089] The depth h at the bottom of the artificial well is 1429.4 m, and π is 3.14.

[0090] The calculated injection volume of the isolation fluid and post-filled fluid is 15.6 cubic meters, and the actual injection volume of the isolation fluid and post-filled fluid is 15.6 × 1.5 = 23 cubic meters.

[0091] 2) Determination of surfactant and carbon dioxide injection amounts:

[0092]

[0093] Among them: the length of the side drilling L is 205m;

[0094] The effective thickness H of the horizontal section is 6.0m;

[0095] The processing radius R is 6.0m;

[0096] Effective porosity It was 18.9%;

[0097] The remaining oil saturation So is 0.40%;

[0098] Inspiratory constant: 0.40;

[0099] The calculated amount of surfactant and carbon dioxide injected was 446 cubic meters.

[0100] IV. Construction Injection Process:

[0101] During the injection process, the relevant solution is injected through the annulus of the casing. The injection steps are as follows:

[0102] 1. Inject 20 cubic meters of pre-fluid clean water at a rate of 15-20 cubic meters per hour.

[0103] 2. Inject 446 cubic meters of a 0.5% surfactant solution at a rate controlled at 15-20 cubic meters per hour.

[0104] 3. Inject a separation liquid 23 cubic meters consisting of corrosion inhibitor and ethylene glycol; the mass ratio of the corrosion inhibitor to ethylene glycol is 1:1.

[0105] 4. Inject 446 cubic meters of liquid carbon dioxide.

[0106] 5. Inject post-treatment solution 23, which consists of corrosion inhibitor and ethylene glycol; the mass ratio of the corrosion inhibitor to ethylene glycol is 1:1.

[0107] V. Well sealing and start-up production:

[0108] The injection was completed on October 28, 2023. After 15 days of well shut-in, the pressure stabilized at 2.5 MPa, and production was started.

[0109] VI. Construction Results:

[0110] Initially, daily liquid production increased from 1.3 tons to 5.1 tons, an increase of 3.8 tons; daily oil production increased from 1.0 tons to 3.5 tons, an increase of 2.5 tons; and water content increased from 27.1% to 31.5%, an increase of 4.4 percentage points. With an effective period of 459 days, the cumulative increase in oil production was 602 tons. Based on an oil price of $60 per barrel (2969 yuan per ton), the input-output ratio reached 1:6.38, achieving good results and benefits.

[0111] The method of this invention was applied in the field to six wells in the area, namely Tai 74-xie 89, Tai 87-102, Tai 83-101, Tai 71-xie 89, Tai 73-92, and Tai 73-90, using carbon dioxide huff and puff. The effect of carbon dioxide huff and puff in the side-drilled horizontal wells is shown in Table 1. As can be seen from Table 1, before the measure, the average daily fluid production per well was 1.6 tons, the daily oil production was 0.8 tons, and the water cut was 48.9%. After the measure, the initial average daily fluid production per well was 5.8 tons, the daily oil production was 2.9 tons, and the water cut was 50.4%. The average daily increase in fluid production per well was 4.2 tons, the daily increase in oil production was 2.1 tons, and the water cut increased by 1.5 percentage points. The average cumulative increase in oil production per well during the stage was 307 tons. The cost per well was 280,000 yuan. Based on an oil price of 60 US dollars per barrel (2,969 yuan per ton), the total profit was 3.79 million yuan, and the input-output ratio reached 1:3.3.

[0112] Table 1. Results of CO2 Huff and Puff Implementation in Sidetracked Horizontal Wells

[0113]

[0114] Those skilled in the art will recognize that the embodiments described herein are intended to help the reader understand the implementation methods of the present invention, and should be understood that the scope of protection of the present invention is not limited to such specific statements and embodiments. Those skilled in the art can make various other specific modifications and combinations based on the technical teachings disclosed in this invention without departing from the spirit of the invention, and these modifications and combinations are still within the scope of protection of the present invention.

Claims

1. A method for CO2 huff and puff enhancement in ultra-short radius side-drilled horizontal wells, characterized in that: Includes the following steps: S1. Pre-construction preparations; S2. After the preliminary preparations for construction are completed, the construction injection process begins; During the injection process, the relevant solutions are injected in stages from the annulus of the oil casing. The injection solutions and steps are as follows: 1) Inject pre-conditioning solution with clean water; 2) Inject a 0.5% surfactant solution to increase the swept volume, enlarge the front edge of the chemical flooding agent, and improve the effect of carbon dioxide flooding; 3) Inject isolation fluid to prevent corrosion of the tubing by the chemicals and to prevent fluid freezing during later injections; 4) Injecting liquid carbon dioxide to reduce crude oil viscosity, expand its volume, reduce the interfacial tension between oil and water, and replenish formation energy; 5) Inject post-fluid to protect the tubing string while ensuring that all carbon dioxide enters the formation; S3. After injection is completed, the well is shut down. Once the shut-down time has been reached, the pumping production is restarted.

2. The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The pre-construction preparations include: connecting the relevant accessories at the wellhead; pressure testing the surface pipelines; and hot washing the oil well after the pressure test is passed to remove dead oil and wax from the wellbore.

3. The CO2 huff and puff method for enhancing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The injection rate of pre-fluid clean water should be controlled at 15-20 cubic meters per hour; the injection volume of pre-fluid clean water should be 20 cubic meters.

4. The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The injection rate of the surfactant solution is controlled at 15-20 cubic meters per hour; The formula for determining the amount of surfactant solution injected is as follows: Where: Q—dosage of reagent, cubic meters; C—intake constant; L—side drilling length, meters; H—effective thickness of horizontal section, meters; R—treatment radius, meters; —Effective porosity, %; So—Residual oil saturation, %.

5. The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The injection rate of the isolation fluid is controlled at 15-20 cubic meters per hour; The formula for determining the amount of isolation fluid injected is as follows: V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 ); Where: V—volume of isolation fluid, m 3 ;D 套内 —Casing inner diameter, m; D 油外 —Outer diameter of the oil pipe, in meters; D 油内 —Inner diameter of tubing, m; h—Depth of artificial well bottom, m.

6. The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The injection rate of the liquid carbon dioxide is controlled at 5-10 cubic meters per hour. The formula for determining the amount of liquid carbon dioxide injected is as follows: Where: Q—dosage of reagent, cubic meters; C—intake constant; L—side drilling length, meters; H—effective thickness of horizontal section, meters; R—treatment radius, meters; —Effective porosity, %; So—Residual oil saturation, %.

7. The CO2 huff and puff method for enhancing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: The injection rate of the post-filled fluid is controlled at 15-20 cubic meters per hour; The formula for determining the post-implant volume is: V=πh / 4(D 套内 2 -D 油外 2 +D 油内 2 ); Where: V—volume of post-flush solution, m 3 ;D 套内 —Casing inner diameter, m; D 油外 —Outer diameter of the oil pipe, in meters; D 油内 —Inner diameter of tubing, m; h—Depth of artificial well bottom, m.

8. The CO2 huff and puff method for enhancing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: Throughout the injection process, the wellhead pressure does not exceed 16.0 MPa; the main components of the isolation fluid are corrosion inhibitors and ethylene glycol; the main components of the post-fill fluid are corrosion inhibitors and ethylene glycol.

9. The CO2 huff and puff method for increasing oil production in ultra-short radius side-drilled horizontal wells according to claim 1, characterized in that: After the injection in step S3 is completed, the well should be kept closed for 7-15 days.

10. The CO2 huff and puff method for enhancing oil production in ultra-short radius side-drilled horizontal wells according to claim 9, characterized in that: The conditions for determining the start of production are as follows: If the well is shut down for the designed maximum shut-down time after injection is completed and the wellhead pressure is greater than 5 MPa, the well will be pumped out for production. If the well is not shut down for the designed maximum shut-down time after injection, the wellhead pressure is not greater than 5 MPa, and the pressure drop is less than 0.3 MPa for two consecutive days, the well can be started for pumping production.