Downhole roof aquifer exploration-drilling-grouting collaborative management device and method
The integrated drilling and grouting treatment device for underground roof aquifer exploration has solved the problems of low construction efficiency and resource waste in existing technologies, and achieved efficient and integrated treatment of underground roof aquifers in coal mines.
Patent Information
- Application Number
- CN202611290840.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-25
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies for treating aquifers in the roof of coal mines suffer from limitations in construction location, separation of functional components, lack of dynamic control mechanisms, and limited adaptability, resulting in low construction efficiency and waste of resources.
The device employs a coordinated treatment system for exploration, drilling, and grouting of the aquifer in the well top plate. It integrates drilling tools, a drilling exploration system, a downhole grouting system, and a collaborative control platform to achieve synchronized treatment of exploration, drilling, and grouting. It utilizes multi-inner-wall drill pipes and switchable drill bits for real-time data processing and grout diffusion, and combines a digital twin engine and intelligent decision-making module to dynamically optimize grouting parameters.
It achieves highly efficient integration of exploration, drilling and grouting, improving treatment efficiency by more than 50%, reducing equipment replacement frequency, avoiding ineffective grouting, and increasing the utilization rate of grouting materials by 30%.
Smart Images

Figure CN123109660A_ABST
Abstract
Description
Technical Field
[0001] This application belongs to the field of mine water control technology, specifically relating to a device and method for the integrated treatment of underground roof aquifer exploration, drilling and grouting, which is applicable to the integrated treatment of underground roof aquifers through advanced exploration, directional drilling and targeted grouting. Background Technology
[0002] During coal mining, water hazards from aquifers in the coal seam roof are one of the main hazards threatening safe production in mines. Draining and depressurizing the aquifer roof is an effective means of ensuring safe underground production. However, the large amounts of mine water discharged into the mine place a significant safety and economic burden on coal mines.
[0003] For example, Chinese patent CN116950714A discloses a process for preventing water hazards in roof aquifers. The technical solution includes: selecting a target reinjection layer, drilling to the roof aquifer to form a first borehole channel, drilling to the target reinjection layer to form a second borehole channel, and introducing water from the roof aquifer into the target reinjection layer. Existing technologies mainly suffer from limitations in construction location, separation of functional components, lack of dynamic control mechanisms, and limited adaptability. There is an urgent need for a device and method that can achieve integrated and coordinated control of exploration, drilling, and grouting downhole. Summary of the Invention
[0004] To solve the above problems, the technical solution adopted in this application is: The first aspect of this application provides a device for the coordinated treatment of aquifer exploration, drilling, and grouting in the downhole roof, comprising: The drilling assembly includes a drill pipe, a switchable drill bit, and a measurement-while-drilling (MWD) sub. The switchable drill bit is located at the front end of the drill pipe, and the MWD sub is integrated and installed behind the switchable drill bit to carry the MWD sensor. The drilling exploration system is integrated into the drilling measurement sub; Downhole grouting systems are used to transport grouting materials; The collaborative control platform includes edge computing nodes, a digital twin engine, an intelligent decision-making module, and a communication transmission module. The edge computing nodes are deployed downhole for real-time processing of drilling exploration data. The digital twin engine is used to dynamically reconstruct a three-dimensional model of the aquifer based on real-time exploration data and locate the spatial position of the water-conducting channel. The intelligent decision-making module has a built-in deep reinforcement learning algorithm for autonomously optimizing grouting parameters based on the digital twin model. The communication transmission module is used for bidirectional data transmission between the downhole and the surface monitoring center.
[0005] Furthermore, the drill pipe is a multi-inner-wall drill pipe, which includes an inner tube, an inner second tube, and an outer tube. The inner tube is located at the innermost layer, and the inner second tube is embedded outside the inner second tube. The outer tube is embedded outside the inner second tube. The inner tube, inner second tube, and outer tube are coaxial. The inner tube is used to pass through the signal cable and transport flushing fluid. The first annular gap between the outer tube and the inner second tube serves as a grouting channel. The second annular gap between the inner tube and the inner second tube is connected to a switchable drill bit to provide hydraulic power.
[0006] Furthermore, the switchable drill bit includes a three-wing scraper body, a hydraulic opening mechanism, a spray nozzle, and opening wings, wherein the leading edge of the wings of the three-wing scraper body is inlaid with a polycrystalline diamond composite sheet; One end of the opening wing is hinged to the three-wing scraper body, and the middle section is hinged to the hydraulic opening mechanism, which is connected to the second annular gap. The outer side of the opening wing is provided with several grouting holes, and a grouting section is provided between the opening wing and the outer pipe. One end of the grouting section is connected to the first annular gap, and the other end is connected to the grouting hole. The opening wing contracts during drilling and opens during grouting to form a diffuser head. The hydraulic opening mechanism is driven by the hydraulic pressure of the second annular tube of the drill rod. The opening angle of the opening wing is adjustable in the range of 0 to 45°. The maximum outer diameter of the blades of the three-wing scraper body after opening is 15 to 25 mm larger than that in the contracted state, forming a grouting diffusion head and improving the uniformity of grout diffusion in the aquifer. The spray nozzle is connected to an inner pipe and is used to spray flushing fluid to cool the drill bit during drilling and as a grout diversion port during grouting.
[0007] Furthermore, a sealing mechanism is provided at the end of the inner tube. The sealing mechanism includes a top plate, a top rod, and a spring. The top plate is fixed to the end of the top rod and is used to seal the spray nozzle. The top rod is connected to the piston of the inner tube. The spring is located between the end of the top rod and the inner tube and is used to drive the top rod to move.
[0008] Furthermore, the grouting section includes a cavity tube and a piston tube. The piston tube is inserted into the cavity tube and is movably connected to the cavity tube. The other end of the piston tube is hinged to the openable wing ball head, and the other end of the cavity tube is hinged to the wall of the outer tube. A connecting hole is provided on the side wall of the cavity tube. The connecting hole is connected to the first annular gap through a pipeline. When the piston tube moves to the connecting hole and blocks it, the grouting hole is not connected to the first annular gap. When the piston tube moves away from the connecting hole, the grouting hole is connected to the first annular gap.
[0009] Furthermore, the downhole grouting system includes a micro grouting station, a high-pressure grouting pump, and an online grout monitoring instrument. The micro grouting station is equipped with a dual-compartment instant mixing structure for instant grout preparation according to instructions. The high-pressure grouting pump is connected to the first annular gap of the drill pipe for injecting grout into the target formation. The online grout monitoring instrument is used to monitor the grout density, viscosity, and setting time in real time. The micro pulping station includes: Chamber A, with a volume of 100L, stores water and is equipped with an electric heater, with a water temperature control range of 20~60℃; Bin B, with a volume of 100L, is used to store dry materials and is equipped with a screw feeder with a feeding accuracy of ±0.5kg; The mixing agitator is located below the dual chambers, and the mixing speed is adjustable from 100 to 300 r / min. The discharge ratio of the A and B bins is adjusted in real time by the intelligent decision module based on the porosity, permeability coefficient and water pressure data of the aquifer, so as to achieve adaptive optimization of the slurry mix ratio. The screw feeder, located in bin B, is used to regulate and control the feeding process.
[0010] Furthermore, the operation process of the digital twin engine includes: The data input layer receives drilling gamma, resistivity, temperature, and pressure data. Geological modeling layer: Kriging interpolation is used to construct the initial stratigraphic model; The real-time correction layer updates the model parameters using ensemble Kalman filtering, constrained by drilling data. The channel identification layer determines the location, direction, and opening of the water guiding channel based on resistivity gradient anomalies and mud leakage. The dynamic output layer updates the three-dimensional model of the aquifer and the spatial coordinates of the water-conducting channel every 10 seconds, with a positioning accuracy of ±1m.
[0011] Furthermore, the intelligent decision-making module employs a proximal policy optimization reinforcement learning algorithm, and its state space includes: Location, opening, and water pressure of the water diversion channel; Current slurry density, viscosity, and setting time; Grouting volume, grouting pressure, and formation absorption rate; The action space includes the grouting pressure setting value and the grout ratio adjustment amount; The reward function is: ,in The weights are determined through offline training, and the strategy network is automatically updated after each grouting section is completed following online deployment.
[0012] The second aspect of this application also provides a method for the coordinated treatment of aquifer exploration, drilling, and grouting in the well top plate, implemented based on any of the aforementioned coordinated treatment devices for aquifer exploration, drilling, and grouting in the well top plate, comprising the following steps: Step S1: Downhole drilling site setup and equipment placement Select the drilling site location in the underground roadway, deploy integrated drilling tool components, drilling exploration system, underground grouting system and collaborative control platform, and establish a communication link with the ground monitoring center; Step S2: Directional drilling and exploration while drilling are carried out simultaneously. Start the integrated drilling assembly and directionally drill into the top aquifer in drilling mode; The drilling exploration system collects natural gamma, multi-frequency resistivity, temperature, and pressure data in real time. Edge computing nodes process data in real time, and the digital twin engine dynamically updates the three-dimensional model of the aquifer. Step S3: Intelligent identification and positioning of water diversion channels Based on the multi-frequency resistivity inversion results and mud leakage analysis, the spatial location of the water diversion channel was identified. When an abnormal resistivity gradient >50%·m or mud loss >3m³ / h is detected, it is identified as a water guiding channel; the digital twin engine outputs the three-dimensional coordinates, opening degree and water pressure parameters of the water guiding channel; Step S4: Drill-Injection Mode Switching and Targeted Grouting No need to lift the drill bit; the hydraulic switch can switch the drill bit to the open state and the drill string assembly to the grouting mode. The intelligent decision-making module calculates the optimal grouting pressure and grout mix ratio based on the parameters of the water diversion channel; The micro-pulping station prepares slurry in real time, and the high-pressure grouting pump injects it into the target layer through the annular gap; Step S5: Dynamic control and real-time monitoring of the grouting process The online slurry monitoring instrument provides real-time feedback on slurry performance and automatically adjusts the mix ratio when the deviation exceeds 5%. Grouting pressure is calculated using a dynamic formula. Real-time adjustment; The drilling exploration system monitors the resistivity changes after grouting to determine the grout diffusion range and filling degree. Step S6: Grouting effect verification and closed-loop decision-making When the resistivity at the water guide channel increases by more than 200% or the water pressure decreases by more than 50% after grouting, the sealing is considered successful. If the standard is not met, the intelligent decision-making module will automatically optimize the parameters and perform supplementary grouting. Once the target is met, switch back to drilling mode and continue to the next stage of work; Step S7: Repeat the cycle until treatment is complete. Repeat steps S2 to S6 until the exploration-grouting operations of all designed boreholes are completed; Generate a digital archive for full-area aquifer management, including a 3D model, grouting parameters, and effect verification data.
[0013] Further, in the step S2, the trajectory control accuracy of directional drilling is: horizontal displacement deviation < 1% of the borehole depth, and vertical depth deviation < 0.5% of the borehole depth; The sampling frequencies of the while-drilling exploration data are: gamma 10Hz, four-frequency synchronous resistivity 1Hz, and temperature and pressure 10Hz; the data processing delay of the edge computing node is < 50ms, and the update period of the digital twin model is 10s; In the step S4, the method for determining the optimal grouting pressure is: For porous aquifers, the grouting pressure is 1.5 to 2.5 times the hydrostatic pressure of the aquifer; For fractured aquifers, the grouting pressure is 2.0 to 3.0 times the hydrostatic pressure, but does not exceed 80% of the fracture pressure of the overlying strata; For karst aquifers, low-pressure slow grouting is adopted, with the initial pressure being 1.2 times the hydrostatic pressure, which is gradually increased according to the absorption rate; The method for determining the slurry ratio is: When the aquifer permeability coefficient K > 10m / d, cement slurry with a water-cement ratio of 0.8:1 is adopted; When 1m / d < K ≤ 10m / d, cement-water glass two-component slurry with a water-cement ratio of 1:1 is adopted; When K ≤ 1m / d, superfine cement slurry or chemical slurry with a water-cement ratio of 1.5:1 is adopted.
[0014] Further, in the step S5, the feedback control period for dynamic adjustment of grouting pressure is 100ms, and PID + feedforward composite control is adopted: The PID link eliminates the steady-state pressure error, with a proportional coefficient Kp = 0.5, an integration time Ti = 2s, and a differentiation time Td = 0.2s The feedforward link performs predictive compensation according to the change of slurry viscosity and stratum absorption rate, with a feedforward coefficient Kf = 0.3; When the measured pressure exceeds 110% of the set value, the safety relief valve is automatically triggered to prevent stratum fracturing; In the step S6, the grouting effect verification adopts the joint judgment of three parameters of "resistivity - water pressure - temperature": The resistivity increases by > 200% and remains stable for 30 minutes; The water pressure at the channel decreases by > 50% or drops to below 1.2 times the hydrostatic pressure; The temperature recovers to the range of ±2°C of the original stratum temperature; When all three indicators are met, the sealing is considered successful; when two indicators are met, it is considered basically successful, and the inspection cycle should be shortened and monitoring intensified; when only one indicator is met, it is considered suspected success, and supplementary grouting and re-verification must be carried out.
[0015] Compared with the prior art, the beneficial effects of this application are as follows: 1. This application uses the same channel and the same drilling tool combination for exploration, drilling and grouting, which greatly reduces the time for process connection and the number of equipment replacements, and improves the treatment efficiency by more than 50%.
[0016] 2. This application proposes to achieve precise targeted grouting, avoid ineffective grouting and grout waste, and increase the utilization rate of grouting materials by more than 30%.
[0017] 3. This application is not limited by surface site conditions and is applicable to all types of mines, especially underground mines where surface construction is not feasible. Attached Figure Description
[0018] Figure 1 This is a structural diagram of the device in this application; Figure 2 This is a front view of the device in this application; Figure 3 This is a left view of the device described in this application; Figure 4 for Figure 2 Sectional view along the DD section; Figure 5 This is a structural diagram of the drill pipe in this application; Figure 6 This is the front view of the drill pipe in this application; Figure 7 This is a left view of the drill pipe in this application; Figure 8 This is a top view of the drill pipe in this application; Figure 9 for Figure 7 Sectional view along section AA; Figure 10 for Figure 9 Enlarged view of a portion of region C in the middle; Figure 11 This is the main view of the grouting section in this application; Figure 12 This is a left view of the grouting section in this application; Figure 13 for Figure 11 Sectional view along section BB; Figure 14 This is a flowchart of the governance method in this application.
[0019] In the diagram: 1. Drilling tool assembly; 11. Drill pipe; 12. Switchable drill bit; 13. Measurement while drilling sub; 111. Inner tube 1; 112. Inner tube 2; 113. Outer tube; 115. First annulus; 116. Second annulus; 117. Sealing mechanism; 121. Three-wing scraper body; 122. Hydraulic opening mechanism; 123. Spray nozzle; 124. Opening wing; 125. Grouting section; 126. Grouting hole; 127. Diamond composite sheet; 151. Cavity tube; 152. Piston tube; 153. Connecting hole; 171. Top plate; 172. Top rod; 173. Spring; 2. Drilling exploration system; 3. Downhole grouting system; 4. Collaborative control platform; 41. Edge computing node; 42. Digital twin engine; 43. Intelligent decision-making module; 44. Communication transmission module. Detailed Implementation
[0020] The present application will be further described in detail below with reference to the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solutions of the present application. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. All other embodiments obtained by those skilled in the art without creative effort are within the protection scope of the present application.
[0021] Example 1 like Figures 1 to 2 As shown, this application provides an embodiment of a well top aquifer exploration-drilling-grouting collaborative treatment device, which includes a drill string assembly 1, a drilling exploration system 2, a well grouting system 3, and a collaborative control platform 4.
[0022] The drill string assembly 1 includes a drill pipe 11, a switchable drill bit 12, and a measurement-while-drilling (MWD) sub 13. The switchable drill bit 12 is located at the front end of the drill pipe 11, and the MWD sub 13 is integrated and installed behind the switchable drill bit 12 to carry the MWD sensor. The inner tube 111, inner tube 213, and outer tube 113 all have a wall thickness of 3mm and are made of high-strength alloy steel with a yield strength ≥800MPa to ensure structural strength and sealing performance under high-pressure downhole conditions. The front end of the inner tube 111 is equipped with a cable sealing connector with a pressure resistance rating of 25MPa to ensure the electrical insulation and sealing reliability of the signal cable during high-pressure grouting; the rear end is equipped with a quick-connect interface to achieve signal transmission and fluid circuit connection between multiple hollow drill pipe sections 11.
[0023] The drill pipe 11 is a multi-inner-wall drill pipe, which includes an inner tube 111, an inner tube 112, and an outer tube 113. The inner tube 111 is located in the innermost layer, with the inner tube 112 embedded outside it. The outer tube 113 is embedded outside the inner tube 112. The inner tube 111, the inner tube 112, and the outer tube 113 are coaxial. The inner tube 111 is used to pass through signal cables and transport flushing fluid. The first annular gap 115 between the outer tube 113 and the inner tube 112 serves as a grouting channel. The second annular gap 116 between the inner tube 111 and the inner tube 112 is connected to the switchable drill bit 12 to provide hydraulic power.
[0024] The switchable drill bit 12 includes a three-wing scraper body 121, a hydraulic opening mechanism 122, a spray nozzle 123, and an opening wing 124. The leading edge of the wing of the three-wing scraper body 121 is inlaid with a polycrystalline diamond composite sheet 127. One end of the opening wing 124 is hinged to the three-wing scraper body 121, and the middle section is hinged to the hydraulic opening mechanism 122. The hydraulic opening mechanism 122 is connected to the second annular gap 116. A plurality of grouting holes 126 are provided on the outer side of the opening wing 124. A grouting joint 125 is provided between the opening wing 124 and the outer pipe 113. One end of the grouting joint 125 is connected to the first annular gap 115, and the other end is connected to the grouting hole 126. The opening wing 124 contracts during drilling and opens during grouting to form a diffuser head. The hydraulic opening mechanism 122 is driven by the hydraulic pressure of the second annular gap 116 of the drill rod 12. The opening angle of the opening wing 124 is adjustable in the range of 0 to 45°. The maximum outer diameter of the blade of the three-wing scraper body 121 after opening is 15 to 25 mm larger than that in the contracted state, forming a grouting diffusion head and improving the uniformity of grout diffusion in the aquifer. The spray nozzle 123 is connected to the inner pipe 111 and is used to spray flushing fluid to cool the drill bit during drilling and as a grout diversion port during grouting.
[0025] The specific structure of the switchable drill bit 12 in this embodiment is as follows: Three-wing scraper body 121: The wing substrate is 40Cr steel, with polycrystalline diamond composite sheet inlaid at the leading edge. The PDC diameter is 13mm, the thickness is 4mm, the exposed height is 2mm, the backward tilt angle is 15°, the three wings are evenly distributed, and the included angle between the wings is 120°. Hydraulic opening mechanism 122: Each blade root is equipped with a hydraulic piston chamber with a piston area of 50mm², driven by hydraulic pressure control within the drill pipe inner tube. The hydraulic pressure is provided by a ground hydraulic station and transmitted to the drill bit via the center hole of the drill pipe inner tube. The opening angle is continuously adjustable from 0 to 45°, controlled by a proportional pressure reducing valve. Center jet nozzle 123: Located at the center of the drill bit, with a diameter of 6mm, it connects to the inner tube. During drilling, it sprays flushing fluid at a flow rate of 30-50L / min to cool the drill bit and carry away rock cuttings; during grouting, it acts as a grout diversion port, allowing the grout to flow out simultaneously from the center and the gap between the blades, resulting in more uniform diffusion. Blades 121 open to form a diffuser head, increasing the grout diffusion radius by 25% compared to traditional drill bits, resulting in more uniform grout distribution in the aquifer and improving the sealing success rate from 75% to 92%. Hydraulic switching eliminates the need to lift the drill bit, saving 2-3 hours per switch, with particularly significant advantages in deep hole operations.
[0026] Opening Wing 124: A groove is provided in the middle of the rear end of each set of blades of the three-wing scraper body 121 for placing the opening wing 124. One end of the opening wing 124 is hinged to the three-wing scraper body 121, and the other end is hinged to the hydraulic opening mechanism 122. The hydraulic opening mechanism 122 is used to drive the opening wing 124 to rotate within a certain angle range along the hinge axis. Specifically, the maximum opening angle is parallel to the edge of the inclined wing of the three-wing scraper body 121, and the minimum opening angle is parallel to the vertical axis of the three-wing scraper body 121. The wings are parallel, so that when the open wing 124 is opened to its maximum angle, it is parallel to the edge of the inclined wing of the three-wing scraper body 121, which increases the opening range of the three-wing scraper body 121 and maximizes the grouting cross section. When the open wing 124 is retracted to its minimum angle, it is parallel to the vertical wing of the three-wing scraper body 121. In this way, when the three-wing scraper body 121 is drilling, the open wing 124 does not come into contact with the well section, reducing the stress on the open wing 124 and improving its service life.
[0027] The measurement-while-drilling sub 13 is integrated and installed behind the switchable drill bit 12 to carry the measurement-while-drilling sensor. The measurement-while-drilling sub 13 is made of high-strength non-magnetic stainless steel, with a length of 1.5 to 2.0 m. Its outer diameter is the same as that of the outer tube 112 of the hollow drill pipe 11, and it contains a sensor mounting chamber and a signal processing circuit board.
[0028] In this application, a sealing mechanism 117 is provided at the end of the inner tube 111. The sealing mechanism 117 includes a top plate 171, a top rod 172, and a spring 173. The top plate 171 is fixed to the end of the top rod 172 for sealing the spray nozzle 123. The top rod 172 is piston-connected to the inner tube 111. The spring 173 is disposed between the end of the top rod 172 and the inner tube 111 for driving the top rod 172 to move. A sealing mechanism 117 is located at the end of the inner tube 111, which contains cleaning fluid and signal transmission cables. When drilling reaches an aquifer and grouting is required, the injection of cleaning fluid needs to be stopped. Therefore, to prevent the cleaning fluid mixed with mud from flowing back into the inner tube 111, a sealing mechanism 111 is installed at the end of the inner tube 111. Specifically, a perforated disc is installed at the end of the inner tube 111, with a shaft hole in the center of the disc. The push rod 172 slides freely within the shaft hole. The top plate 171 is used to seal the end port of the inner tube 111. A spring is installed between the disc and the end of the push rod 172. 173. When the inner tube 111 is filled with flushing fluid, it has a certain pressure to overcome the elastic force of the spring 173, pushing the top plate 171 towards the end of the inner tube 111. Therefore, a gap is formed between the end of the inner tube 111 and the top plate 173, and the flushing fluid flushes the drill bit through the gap. When the flushing fluid supply is turned off, the pressure in the inner tube 111 decreases and is insufficient to overcome the elastic force of the spring. The spring 173 pushes the top rod 172 to retract, causing the top plate to retract and re-seal the end port of the inner tube 111, preventing the flushing mud from flowing back into the inner tube 111. In this application, the sealing mechanism 117 does not require an additional control mechanism. By controlling the shut-off of the flushing fluid, the automatic switching between sealing and flushing fluid outflow is achieved.
[0029] In this application, the grouting section 125 includes a cavity tube 151 and a piston tube 152. The piston tube 152 is inserted into the cavity tube 151 and is movably connected to the cavity tube 151. The other end of the piston tube 152 is hinged to the ball head of the opening wing 124. The other end of the cavity tube 151 is hinged to the wall of the outer tube 113. A connecting hole 153 is provided on the side wall of the cavity tube 151. The connecting hole 153 is connected to the first annular gap 115 through a pipeline. When the piston tube 152 moves to the connecting hole 153 and blocks it, the grouting hole 126 is not connected to the first annular gap 115. When the piston tube 152 moves away from the connecting hole 153, the grouting hole 126 is connected to the first annular gap 115. In this application, one end of the grouting section 125 is connected to the opening wing 124, and the other end is hinged to the wall of the outer pipe 113. An internal communication channel exists between the opening wing 124 and the grouting section 125. Specifically, both the cavity pipe 151 and the piston pipe 152 are hollow structures. One end of the piston pipe 152 is movably connected to the cavity pipe 151. When the hydraulic opening mechanism 122 retracts the opening wing 124, the piston pipe 152 inserts into the cavity pipe 151, and the wall of the piston pipe 152 seals the communication hole 153. Therefore, the piston tube 152 is not connected to the outside of the cavity tube 151. When the piston tube 152 is pulled back to the outside of the cavity tube 151, the pipe wall of the piston tube 152 is separated from the connecting hole, and the piston tube 152 is connected to the outside of the cavity tube 151. The piston tube 152 is connected to the first annular gap 115 through the connecting hole 153 via a pipeline for grouting channel connection. Therefore, when grouting is required, the opening wing 124 is opened to automatically connect the grouting channel and inject grout into the grouting layer. When grouting is not required, the opening wing 124 is retracted to automatically close the grouting channel, and the grout cannot be injected into the grouting layer, thus realizing integrated exploration and grouting treatment.
[0030] The drilling exploration system 2 is integrated into the drilling measurement sub 13 and includes a natural gamma detector 21, a multi-frequency resistivity detector 22, a mud pulse generator 23, and a downhole storage backup module 24.
[0031] The Natural Gamma Detector 21 employs a NaI scintillation crystal detector to identify lithological changes and aquifer interfaces in front of the drill bit in real time. Its measurement range is 0–500 API, with a measurement accuracy of ±5 API and a sampling frequency of 10 Hz.
[0032] The multi-frequency resistivity detector 22 has four detection frequencies: 0.5kHz, 2kHz, 8kHz, and 32kHz. Each frequency corresponds to a different detection depth: 32kHz corresponds to a depth of 0.5–1m, primarily used to identify fractures near the wellbore; 8kHz corresponds to a depth of 1–2m, used to determine near-wellbore aquifer boundaries; 2kHz corresponds to a depth of 2–4m, used to detect medium-distance water-rich zones; and 0.5kHz corresponds to a depth of 4–8m, used for locating long-distance water-conducting channels. The multi-frequency resistivity detector 22 uses a least-squares inversion algorithm to fuse the four-frequency data, effectively eliminating the influence of mud intrusion and improving detection accuracy by more than 30%. Specifically, let the measured apparent resistivity of the four frequencies be... Establish the objective function: , where m is the formation model parameter vector. As for frequency weights, in the embodiments of this application , Let be the standard deviation of the observation error, λ be the regularization factor, and Rm be the model roughness constraint. The Levenberg-Marquardt algorithm is used iteratively to solve the problem, and the convergence criterion is... The inversion results output a three-dimensional resistivity distribution with a 1m×1m×0.5m grid. The detection accuracy after mud invasion correction is: depth positioning ±0.3m, resistivity value ±10%. Compared to traditional single-frequency resistivity logging, the four-frequency detection information is increased fourfold. Multi-frequency fusion inversion effectively eliminates the influence of mud invasion, improving the accuracy of water-conducting channel identification from 65% to 88%.
[0033] The four frequencies of the multi-frequency resistivity detector 22 are acquired synchronously, with a sampling frequency of 1Hz.
[0034] The mud pulse generator 23 is used to encode the detection data into mud pulse signals and transmit them to the ground in real time. The mud pulse generator 23 adopts a positive pulse mode, a transmission rate of 12 bits / s, and Manchester encoding, which has the characteristics of strong anti-interference ability and long transmission distance.
[0035] The downhole storage backup module 24 is used to locally store all detection data when mud pulse transmission is interrupted. The storage capacity is ≥64GB and it can continuously record detection data for no less than 72 hours to ensure that the data is not lost.
[0036] The collaborative operation of the above-mentioned drilling exploration system enables real-time geological guidance during the drilling process: the natural gamma detector 21 provides lithological interface information, and the multi-frequency resistivity detector 22 provides aquifer water abundance and water conduction channel information. After the data of the two are fused, the spatial location of aquifer interface and water conduction channel can be accurately identified.
[0037] The downhole grouting system 3 includes a micro grouting station 31, a high-pressure grouting pump 32, an online grout monitoring instrument 33, and a blowout prevention mechanism 34.
[0038] The micro pulping station 31 features a dual-combination structure. The micro pulping station 31 includes a compartment A 311, a compartment B 312, and a mixer 313. Compartment A 311 has a volume of 100L, is used for water storage, and is equipped with an electric heater. The water temperature control range is 20–60℃, and can be adjusted according to the temperature requirements of different pulp types. Compartment B 312 has a volume of 100L, is used for storing dry materials, and is equipped with a screw feeder with a feeding accuracy of ±0.5kg. The mixer 313 is located below the dual compartments, and its mixing speed is adjustable from 100 to 300 r / min. The output ratio of compartments A 311 and B 312 is adjusted in real time by the intelligent decision module 43 based on aquifer porosity, permeability coefficient, and water pressure data, achieving adaptive optimization of the pulp ratio.
[0039] The high-pressure grouting pump 32 is connected to the annular gap 113 of the hollow drill rod 11 and is used to inject grout into the target layer. The high-pressure grouting pump 32 is a three-cylinder single-acting plunger pump with a maximum grouting pressure of 25MPa, a maximum displacement of 200L / min, and a pressure fluctuation of ≤±3%.
[0040] The online slurry monitor 33 is used to monitor the slurry density, viscosity, and setting time in real time. The online slurry monitor 33 includes a mass flow meter, a rotational viscometer, and a Vicat apparatus.
[0041] The orifice blowout prevention mechanism 34 is equipped with hydraulic slips 341 and a rubber sealing cylinder 342 for sealing and blowout prevention during high-pressure grouting. The clamping force of the hydraulic slips 341 is ≥200kN, and the pressure resistance of the rubber sealing cylinder 342 is 25MPa, which can achieve reliable sealing of the borehole orifice under grouting pressure.
[0042] The collaborative control platform 4 includes an edge computing node 41, a digital twin engine 42, an intelligent decision-making module 43, and a communication transmission module 44.
[0043] Edge computing node 41 is deployed downhole and uses an industrial-grade embedded computer equipped with a multi-core CPU and GPU acceleration unit to process drilling exploration data in real time, with a data processing latency of less than 50ms. Edge computing node 41 has built-in data preprocessing algorithms, including filtering, noise reduction, and outlier removal, to ensure the quality of data input to the digital twin engine.
[0044] The digital twin engine 42 is used to dynamically reconstruct the 3D model of the aquifer based on real-time exploration data and locate the spatial position of the water-conducting channel. The operation process of the digital twin engine 42 includes: a data input layer, which receives drilling gamma, resistivity, temperature, and pressure data; a geological modeling layer, which uses Kriging interpolation to construct an initial formation model; a real-time correction layer, which updates the model parameters using ensemble Kalman filtering, constrained by the drilling exploration data; a channel identification layer, which comprehensively determines the position, orientation, and opening of the water-conducting channel based on resistivity gradient anomalies and mud loss; and a dynamic output layer, which updates the 3D model of the aquifer and the spatial coordinates of the water-conducting channel every 10 seconds, with a positioning accuracy of ±1m.
[0045] The intelligent decision-making module 43 incorporates a deep reinforcement learning algorithm to autonomously optimize grouting parameters based on a digital twin model. The intelligent decision-making module 43 employs a proximal strategy optimization reinforcement learning algorithm. Its state space includes: the location, opening, and water pressure of the water guide channel; the current grout density, viscosity, and setting time; the amount of grout already injected, the grouting pressure, and the formation absorption rate. The action space consists of the grouting pressure setpoint and the grout mix ratio adjustment. The reward function is a multi-objective weighted function. ,in The weighting coefficients, determined through offline training, are used to automatically update the strategy network after each grouting segment is completed following online deployment. The network comprehensively considers sealing effectiveness, grout consumption, and operation time. Digital twins achieve real-time transparency of aquifer status, with water channel positioning accuracy of ±1m, an order of magnitude improvement over the meter-level accuracy of traditional post-drilling logging. Reinforcement learning decision-making enables adaptive optimization of grouting parameters, reducing average grouting material per borehole by 25% and increasing sealing success rate by 17%.
[0046] The communication transmission module 44 is used for bidirectional data transmission between the underground and the surface monitoring center. The communication transmission module 44 adopts mining fiber optic transmission, with a transmission rate of ≥100Mbps and a transmission distance of ≥10km, ensuring real-time uploading of underground data and real-time downloading of surface commands.
[0047] The drill string assembly 1 can quickly switch between three modes: drilling, exploration, and grouting, completing exploration, decision-making, and grouting closed-loop operations without lifting the drill string. The switching between the three modes is uniformly controlled by the collaborative control platform 4: In drilling mode, the drill bit 12 can be switched to retract, and the inner tube 111 can be switched to deliver flushing fluid; in exploration mode, the drilling-while-drilling exploration system 2 activates all sensors to collect data; in grouting mode, the drill bit 12 can be switched to open, and the annulus 113 can be switched to deliver grout. The total switching time for the three modes does not exceed 30 seconds.
[0048] The aforementioned device integrates the drilling exploration system into the drill string assembly, using the hollow drill pipe as a grouting channel, achieving real-time coordination of the "drilling-exploration-grouting" three-in-one system downhole. This significantly reduces process connection time and equipment replacement frequency, and can improve treatment efficiency by more than 50%.
[0049] Example 2 This application also provides an integrated drilling and injection method for treating aquifers in the downhole roof, based on the apparatus described in Example 1. The integrated treatment method specifically includes the following steps: Step S1: Downhole drilling site setup and equipment placement Select a drilling site location within the underground roadway. The drilling site should be chosen in a section with an intact roof and good roadway support, with dimensions of not less than 15m × 5m × 4m. Deploy an integrated drilling tool assembly 1, a drilling exploration system 2, an underground grouting system 3, and a collaborative control platform 4, and establish a communication link with the ground monitoring center. Specifically, this includes: installing the directional drilling rig in the center of the drilling site and adjusting the rig's inclination angle to align it with the designed borehole orientation; placing a micro-grouting station 31 on one side of the drilling site and connecting it to water pipes and power supply; placing a high-pressure grouting pump 32 next to the micro-grouting station 31 and connecting it to the annular gap 113 of the hollow drill pipe 11 via a high-pressure hose; placing the edge computing node 41 of the collaborative control platform 4 in a safe area of the drilling site and connecting it to the ground monitoring center via mining fiber optic cable; and conducting communication link testing to confirm normal bidirectional data transmission between the underground and surface.
[0050] Step S2: Directional drilling and exploration while drilling are carried out simultaneously. The integrated drilling assembly 1 is started, and directional drilling into the top aquifer is initiated in drilling mode. Drilling parameters are: drilling pressure 60–120 kN, rotation speed 40–80 r / min, and flushing fluid flow rate 200–400 L / min. During drilling, the azimuth, dip, and tool face angle of the borehole trajectory are monitored in real time using a measurement-while-drilling system. The trajectory control accuracy is set at less than 1% of the hole depth for horizontal displacement and less than 0.5% of the hole depth for vertical depth, ensuring the borehole extends along the designed trajectory.
[0051] The drilling exploration system 2 collects natural gamma, multi-frequency resistivity, temperature, and pressure data in real time. The sampling frequencies are: natural gamma 10Hz, multi-frequency resistivity (four-frequency synchronous) 1Hz, and temperature and pressure 10Hz. Edge computing nodes 41 process the data in real time, with a data processing latency of less than 50ms. The digital twin engine 42 updates the aquifer 3D model every 10 seconds.
[0052] In step S2, the natural gamma detector 21 identifies changes in lithology ahead of the drill bit in real time. When a significant change in gamma value occurs, it indicates the entry into an aquifer interface. The multi-frequency resistivity detector 22 simultaneously detects the resistivity of strata at different depths around the borehole at four frequencies. The four-frequency data are fused using a least-squares inversion algorithm to obtain a resistivity profile of the strata within a range of 0.5–8 m around the borehole. If mud loss occurs during drilling, the location and amount of loss are recorded in real time.
[0053] Step S3: Intelligent identification and positioning of water diversion channels Based on multi-frequency resistivity inversion results and mud leakage analysis, the spatial location of water-conducting channels is identified. The specific criteria are: when an abnormal resistivity gradient greater than 50%·m or a mud leakage rate greater than 3 m³ / h is detected, it is identified as a water-conducting channel.
[0054] The digital twin engine 42 outputs water channel parameters through the following sub-steps: The data input layer receives drilling gamma, multi-frequency resistivity, temperature, and pressure data; The geological modeling layer uses Kriging interpolation to construct an initial formation resistivity model around the borehole; The real-time correction layer uses drilling data as a constraint and updates the model parameters through ensemble Kalman filtering to make the model gradually approximate the real formation state. The channel identification layer makes a comprehensive judgment based on resistivity gradient anomaly and mud loss. When a low resistivity anomaly band appears in the horizontal direction and the anomaly band coincides with the mud loss location, it is confirmed that the location is a water guiding channel. The dynamic output layer outputs the three-dimensional coordinates, opening degree, and water pressure parameters of the water guiding channel.
[0055] For example, in a real-world remediation case, drilling revealed that the resistivity at a depth of 120m dropped sharply from 85Ω·m to 32Ω·m, a gradient change of 62%·m. At the same time, the mud loss increased abruptly from 0.5m³ / h to 4.2m³ / h. The digital twin engine 42 determined that this was a water channel, outputting coordinates, an opening of approximately 3mm, and a water pressure of 2.8MPa.
[0056] Step S4: Drill-Injection Mode Switching and Targeted Grouting Without needing to lift the drill bit, a mode switching command is issued via the collaborative control platform 4. The hydraulic switch can switch the drill bit 12 to the open state, and the opening angle of the three-wing scraper body 121 is adjusted to 15-30° according to the grouting requirements. The drill assembly 1 then switches to the grouting mode. The entire switching process takes no more than 30 seconds.
[0057] The intelligent decision-making module 43 calculates the optimal grouting pressure and grout mix ratio based on the water guiding channel parameters. The specific determination method is as follows: Determination of the optimal grouting pressure: For porous aquifers, the grouting pressure is 1.5 to 2.5 times the hydrostatic pressure of the aquifer; for fractured aquifers, the grouting pressure is 2.0 to 3.0 times the hydrostatic pressure, but not exceeding 80% of the fracture pressure of the overlying strata; for karst aquifers, the low-pressure slow grouting method is adopted, the initial pressure is 1.2 times the hydrostatic pressure, which is gradually increased according to the formation absorption rate, and each increment does not exceed 0.2MPa.
[0058] Determination of slurry ratio: When the aquifer permeability coefficient K>10m / d, cement slurry with a water-cement ratio of 0.8:1 is adopted; when 1m / d<K≤10m / d, cement-sodium silicate two-fluid slurry with a water-cement ratio of 1:1 is adopted; when K≤1m / d, ultra-fine cement slurry or chemical slurry with a water-cement ratio of 1.5:1 is adopted.
[0059] The mini slurry making station 31 prepares the slurry immediately according to the ratio instruction output by the intelligent decision module 43. The bin A 311 heats water to the set temperature, the bin B 312 supplies dry materials according to the ratio through the screw feeder, and the mixing stirrer 313 stirs for 2 to 5 minutes at a rotation speed of 150 to 250r / min to prepare the slurry that meets the requirements. The on-line slurry monitor 33 detects the density, viscosity and setting time of the slurry in real time, and sends the qualified slurry to the high-pressure grouting pump 32 after confirmation.
[0060] The high-pressure grouting pump 32 injects the slurry into the target horizon through the annulus 113 of the hollow drill rod 11. The slurry is transported to the switchable drill bit 12 through the annulus 113, and diffuses uniformly to the aquifer through the diffusion head formed by the expanded three-wing scraper body 121, so as to improve the diffusion uniformity of the slurry in the aquifer.
[0061] For example, in the treatment of the water-conducting channel at the above 120m position, the calculated hydrostatic pressure is 2.8MPa, this position is a fractured aquifer, the intelligent decision module 43 determines that the grouting pressure is 2.5 times the hydrostatic pressure, that is, 7.0MPa, the permeability coefficient K=5.3m / d, and determines to adopt the cement-sodium silicate two-fluid slurry with a water-cement ratio of 1:1.
[0062] Step S5. Dynamic regulation of grouting process and real-time monitoring of effect During the grouting process, the on-line slurry monitor 33 feeds back the density, viscosity and setting time of the slurry in real time. When the deviation of any parameter is greater than 5%, the discharging ratio of bin A 311 and bin B 312 is automatically adjusted to correct the ratio.
[0063] The grouting pressure is dynamically adjusted by PID + feedforward compound control, and the grouting pressure follows the dynamic formula for real-time adjustment; in the formula is the hydrostatic pressure, is the formation coefficient, A penalty coefficient for channel expansion is applied and adjusted in real time to prevent excessive grout diffusion. The drilling observation system 2 monitors resistivity changes after grouting to determine the grout diffusion range and filling degree; the feedback control cycle is 100ms. A PID controller is used to eliminate steady-state pressure errors, with a proportional gain Kp = 0.5, integral time Ti = 2s, and derivative time Td = 0.2s; a feedforward controller predicts compensation based on grout viscosity changes and formation absorbance, with a feedforward coefficient Kf = 0.3. When the measured pressure exceeds 110% of the set value, a safety relief valve is automatically triggered to prevent formation fracturing.
[0064] The drilling exploration system 2 continuously monitors the resistivity change after grouting during the grouting process to determine the grout diffusion range and filling degree. During the grouting process, grouting is stopped when the grouting pressure reaches the design final pressure and remains stable for 15-30 minutes, or when the grouting volume reaches 1.2 times the design grouting volume.
[0065] For example, in the above-mentioned 7.0MPa grouting process, the initial grouting pressure is 3.0MPa. As the grout fills, the formation absorption rate gradually decreases from the initial 120L / min to 40L / min. The grouting pressure is gradually increased to 7.0MPa and stabilized for 20 minutes. The cumulative grouting volume is 3.6m³, which meets the design requirements, and grouting is stopped.
[0066] Step S6: Grouting effect verification and closed-loop decision-making After grouting is completed, the grouting effect is verified using a three-parameter combined judgment method of "resistivity-water pressure-temperature". Resistivity determination: After grouting, the resistivity at the water guiding channel increases by more than 200% and remains stable for more than 30 minutes; Water pressure determination: The water pressure at the water guide channel drops by more than 50% or drops to less than 1.2 times the static water pressure; Temperature determination: The temperature in the grouting area returns to within ±2℃ of the original formation temperature.
[0067] When all three indicators are met, the sealing is considered successful; when two indicators are met, it is considered basically successful, and the inspection cycle should be shortened and monitoring intensified; when only one indicator is met, it is considered suspected success, and supplementary grouting and re-verification must be carried out.
[0068] If the standard is not met, the intelligent decision module 43 automatically optimizes the parameters and performs supplementary grouting. Once the standard is met, a switching command is issued through the collaborative control platform 4, which can switch the drill bit 12 to retract and reset, and the drill assembly 1 switches back to drilling mode to continue the next stage of operation.
[0069] For example, in the above treatment case, after grouting was completed, the resistivity increased from 32 Ω·m to 118 Ω·m, the water pressure decreased from 2.8 MPa to 0.5 MPa, and the temperature returned to the original formation temperature of 24℃. All three indicators met the requirements, and the sealing was deemed successful.
[0070] Step S7: Repeat the cycle until treatment is complete. Repeat steps S2 to S6 until all designed boreholes have been explored and grouted. The construction sequence for each branch hole is as follows: directional drilling to the target location → exploration while drilling to identify water channels → switching to grouting mode for targeted grouting → effect verification → switching back to drilling mode to continue. The entire process does not require lifting the drill, achieving continuous operation of "drilling and exploring simultaneously, and grouting immediately upon exploration".
[0071] After all treatments are completed, a digital archive of aquifer treatment for the entire region will be generated, including: a three-dimensional model of the aquifer, spatial coordinates and treatment records of all water-conducting channels, grouting parameters of each grouting section, and effect verification data.
[0072] After the treatment was completed, the grouting pipelines and grouting pumps were cleaned, the downhole equipment was dismantled, and the drilling site was evacuated.
[0073] The above method, through alternating "drilling-exploration-grouting" operations, enables exploration, drilling and grouting to share the same channel and the same drilling tool combination, eliminating the need for separate construction of inspection holes and shortening the treatment cycle by more than 20%.
[0074] Example 3 This embodiment takes the treatment of sandstone aquifers in the roof of a coal mine as an example to further illustrate the method of this application.
[0075] The main coal seam mined in this mine is Coal Seam No. 3, with an average thickness of 6.5m and a burial depth of approximately 650m. A thick sandstone aquifer, 25-40m thick, with a porosity of 12%-18%, a permeability coefficient of 2.5-8.7m / d, and a hydrostatic pressure of 4.2-5.6MPa, is developed 50-80m above the coal seam roof. The working face has a strike length of 1200m and a dip length of 240m. Before mining, the roof aquifer needs to be explored and treated.
[0076] The drilling site was selected in the underground transport roadway, and the treatment was carried out according to the steps of Example 2. A total of one main borehole and six branch boreholes were designed and constructed, with a total drilling footage of 1860m. During drilling, the drilling-while-drilling system identified nine water-conducting channels, of which seven had an abnormal resistivity gradient greater than 50%·m, and two had a mud loss greater than 3m³ / h. The intelligent decision-making module calculated the optimal grouting parameters for each of the nine water-conducting channels, injecting a total of 186m³ of cement-water glass dual-liquid grout and 42m³ of ultrafine cement grout.
[0077] Verification of the treatment effect shows that: after treatment, the water inflow of the roof aquifer decreased from 185 m³ / h to 4.2 m³ / h, a reduction of 97.7%; the resistivity of the nine water diversion channels increased by an average of 245%, and the water pressure decreased by an average of 76%; no abnormal roof water inflow occurred during the working face mining, achieving the goal of "zero water outflow".
[0078] Regarding the treatment cycle, the method described in this application took a total of 42 days from drilling site layout to completion of all treatment, which is 35.4% shorter than the traditional step-by-step implementation method. In terms of grouting material utilization, due to the implementation of targeted grouting, the effective utilization rate of grout reached 92%, which is 27 percentage points higher than the 65% of the traditional method.
[0079] The above application examples fully demonstrate the effectiveness and superiority of the technical solution proposed in this application.
[0080] The technical effects of this application compared to the prior art In summary, the present application has at least the following technical effects: 1. Achieve real-time collaborative drilling-exploration-grouting in the well: The exploration system is integrated into the drill string assembly, and the hollow drill pipe is used as the grouting channel. Exploration, drilling and grouting share the same channel and the same drill string assembly. The three modes can be quickly switched without lifting the drill, which greatly reduces the process connection time and the number of equipment replacements, and improves the treatment efficiency by more than 50%.
[0081] 2. Dynamic grouting control driven by drilling exploration: Grouting parameters are dynamically adjusted based on the aquifer porosity, permeability coefficient and water pressure data obtained from real-time drilling exploration, so as to achieve precise targeted grouting, avoid ineffective grouting and grout waste, and improve the utilization rate of grouting materials by more than 30%.
[0082] 3. Improved detection accuracy through four-frequency resistivity fusion detection: Simultaneous detection at four frequencies of 0.5kHz, 2kHz, 8kHz, and 32kHz is adopted. Data is fused through least squares inversion algorithm to eliminate the influence of mud intrusion, thereby improving detection accuracy by more than 30%.
[0083] 4. Intelligent decision-making driven by digital twins: Based on drilling exploration data, a three-dimensional model of the aquifer is constructed in real time. The grouting parameters are autonomously optimized through deep reinforcement learning algorithms to achieve intelligent decision-making and automated control of the grouting process.
[0084] 5. Real-time verification of grouting effect during drilling: The three-parameter joint judgment method of "resistivity-water pressure-temperature" is adopted to verify the grouting effect in real time during the continued drilling process, eliminating the need for separate construction of inspection holes and shortening the treatment cycle by more than 20%.
[0085] 6. Underground full-process operation: The entire set of equipment and methods is completed underground, without being limited by surface site conditions. The drilling depth is short and the cost is low. It is suitable for all types of underground mines, especially mines where surface construction conditions are not available.
[0086] 7. Significant treatment effect: After treatment, the water inflow of the roof aquifer can be reduced to below 5m³ / h, the water diversion channel has a high success rate of sealing, and the target aquifer can achieve "zero water outflow" during the working face mining period.
[0087] Of course, the above embodiments are not intended to limit this application, and this application is not limited to the examples given above. Any changes, modifications, additions or substitutions made by those skilled in the art within the scope of this application should also fall within the protection scope of this application.
Claims
1. A coordinated treatment device for exploring, drilling, and grouting aquifers in the well roof, characterized in that: include: The drill assembly (1) includes a drill pipe (11), a switchable drill bit (12), and a measurement-while-drilling sub (13). The switchable drill bit (12) is located at the front end of the drill pipe (11), and the measurement-while-drilling sub (13) is integrated and installed at the rear of the switchable drill bit (12) to carry the measurement-while-drilling sensor. The drilling exploration system (2) is integrated into the drilling measurement sub (13); The downhole grouting system (3) is used to transport grouting slurry; The collaborative control platform (4) includes an edge computing node (41), a digital twin engine (42), an intelligent decision-making module (43), and a communication transmission module (44).
2. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 1, characterized in that: The drill rod (11) is a multi-inner-wall drill rod, which includes an inner tube (111), an inner tube (112), and an outer tube (113). The inner tube (111) is located in the innermost layer, and the inner tube (112) is embedded outside the inner tube (112). The outer tube (113) is embedded outside the inner tube (112). The first annular gap (115) between the outer tube (113) and the inner tube (112) serves as a grouting channel. The second annular gap (116) between the inner tube (111) and the inner tube (112) is connected to the switchable drill bit (12).
3. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 2, characterized in that: The switchable drill bit (12) includes a three-wing scraper body (121), a hydraulic opening mechanism (122), a spray nozzle (123) and an opening wing (124), wherein the leading edge of the wing of the three-wing scraper body (121) is inlaid with a polycrystalline diamond composite sheet (127). One end of the opening wing (124) is hinged to the three-wing scraper body (121), and the middle section is hinged to the hydraulic opening mechanism (122). The hydraulic opening mechanism (122) is connected to the second annular gap (116). A plurality of grouting holes (126) are provided on the outer side of the opening wing (124), and a grouting joint (125) is provided between the opening wing (124) and the outer tube (113). One end of the grouting joint (125) is connected to the first annular gap (115), and the other end is connected to the grouting hole (126).
4. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 3, characterized in that: A sealing mechanism (117) is provided at the end of the inner tube (111). The sealing mechanism (117) includes a top plate (171), a top rod (172), and a spring (173). The top plate (171) is fixed to the end of the top rod (172) for sealing the spray nozzle (123). The top rod (172) is piston-connected to the inner tube (111). The spring (173) is located between the end of the top rod (172) and the inner tube (111) for driving the top rod (172) to move.
5. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 3, characterized in that: The grouting section (125) includes a cavity tube (151) and a piston tube (152). The piston tube (152) is inserted into the cavity tube (151) and is movably connected to the cavity tube (151). The other end of the piston tube (152) is hinged to the ball head of the opening wing (124). The other end of the cavity tube (151) is hinged to the wall of the outer tube (113). A connecting hole (153) is provided on the side wall of the cavity tube (151). The connecting hole (153) is connected to the first annular gap (115) through a pipeline. When the piston tube (152) moves to the connecting hole (153) and blocks it, the grouting hole (126) is not connected to the first annular gap (115). When the piston tube (152) moves away from the connecting hole (153), the grouting hole (126) is connected to the first annular gap (115).
6. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 1, characterized in that: The downhole grouting system (3) includes a micro grouting station (31) and a high-pressure grouting pump (32). The micro grouting station (31) is equipped with a dual-combination structure for preparing grout in real time according to instructions. The high-pressure grouting pump (32) is connected to the first annular gap (115) of the drill pipe (11) for injecting grout into the target layer.
7. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 1, characterized in that: The operation process of the digital twin engine (42) includes: The data input layer receives drilling gamma, resistivity, temperature, and pressure data. Geological modeling layer: Kriging interpolation is used to construct the initial stratigraphic model; The real-time correction layer updates the model parameters using ensemble Kalman filtering, constrained by drilling data. The channel identification layer determines the location, direction, and opening of the water guiding channel based on resistivity gradient anomalies and mud leakage. The dynamic output layer updates the three-dimensional model of the aquifer and the spatial coordinates of the water-conducting channel every 10 seconds, with a positioning accuracy of ±1m.
8. The well top aquifer exploration-drilling-grouting coordinated treatment device according to claim 1, characterized in that: The intelligent decision-making module (43) employs a proximal policy optimization (PPO) reinforcement learning algorithm, and its state space includes: Location, opening, and water pressure of the water diversion channel; Current slurry density, viscosity, and setting time; Grouting volume, grouting pressure, and formation absorption rate; The action space includes the grouting pressure setting value and the grout ratio adjustment amount.
9. A method for coordinated treatment of aquifer exploration, drilling, and grouting in the well top plate, implemented based on the coordinated treatment device for aquifer exploration, drilling, and grouting in the well top plate as described in any one of claims 1-8, characterized in that: Includes the following steps: Step S1: Downhole drilling site setup and equipment placement Select the drilling site location in the underground roadway, deploy the integrated drilling tool assembly (1), drilling exploration system (2), underground grouting system (3) and collaborative control platform (4), and establish a communication link with the ground monitoring center; Step S2: Directional drilling and exploration while drilling are carried out simultaneously. Start the integrated drilling assembly (1) and directionally drill towards the top aquifer in drilling mode; The drilling exploration system (2) collects natural gamma, multi-frequency resistivity, temperature and pressure data in real time; Edge computing nodes (41) process data in real time, and the digital twin engine (42) dynamically updates the three-dimensional model of the aquifer. Step S3: Intelligent identification and positioning of water diversion channels Based on the multi-frequency resistivity inversion results and mud loss analysis, the spatial location of the water diversion channel was identified. When an abnormal resistivity gradient >50%·m or mud loss >3m³ / h is detected, it is determined to be a water guiding channel; the digital twin engine (42) outputs the three-dimensional coordinates, opening and water pressure parameters of the water guiding channel; Step S4: Drill-Injection Mode Switching and Targeted Grouting Without lifting the drill bit, the hydraulic switch can switch the drill bit (12) to the open state, and the drill assembly can be switched to the grouting mode. The intelligent decision-making module (43) calculates the optimal grouting pressure and grout mix ratio based on the parameters of the water guiding channel; The micro-slurry preparation station (31) prepares slurry on the spot, and the high-pressure grouting pump (32) injects it into the target layer through the annular gap; Step S5: Dynamic control and real-time monitoring of the grouting process The online slurry monitoring instrument provides real-time feedback on slurry performance and automatically adjusts the mix ratio when the deviation exceeds 5%. Grouting pressure is calculated using a dynamic formula. Real-time adjustment; The drilling exploration system (2) monitors the resistivity change after grouting to determine the grout diffusion range and filling degree; Step S6: Grouting effect verification and closed-loop decision-making When the resistivity at the water guide channel increases by more than 200% or the water pressure decreases by more than 50% after grouting, the sealing is considered successful. If the standard is not met, the intelligent decision module (43) automatically optimizes the parameters and performs supplementary grouting; Once the target is met, switch back to drilling mode and continue to the next stage of work; Step S7: Repeat the cycle until treatment is complete. Repeat steps S2 to S6 until all designed borehole exploration and grouting operations are completed, generating a digital archive of aquifer treatment for the entire area, including a 3D model, grouting parameters, and effect verification data.