A shotcrete system for synchronous support during shaft boring machine tunneling.
By designing a hydraulic synchronous control and rotation device, the instability and synchronous control problems of the vertical shaft synchronous support device were solved, enabling efficient support operations in vertical shafts with small diameters and improving construction stability and efficiency.
Patent Information
- Application Number
- CN202611394526.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-09
- Publication Date
- 2026-11-17
AI Technical Summary
Existing shaft synchronous support devices suffer from instability and synchronization control issues during the lifting and lowering process, resulting in poor stability of support operations and making them unsuitable for effective implementation in shafts with smaller diameters.
A shotcrete and anchor system was designed, including a support platform, an anchor drilling rig, a shotcrete robot, and a hydraulic lifting device. The hydraulic system enables synchronous control of the lifting cylinders, and the combination of a rotating device and a central support cylinder ensures the smooth lifting and coaxial synchronous operation of the support platform.
It improves the stability and efficiency of support operations, enables the use of longer anchor bolts for support in shafts with smaller diameters, expands the scope of application, and allows support operations to be carried out simultaneously with drilling.
Smart Images

Figure CN123109670A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a synchronous support device for vertical shafts, and more particularly to a shotcrete system for synchronous support during tunneling in vertical shaft boring machines. Background Technology
[0002] The synchronous support shotcrete system during shaft tunneling is a core technology to ensure the safe and efficient construction of deep shafts in complex strata. It aims to reinforce the surrounding rock immediately after the tunneling machine has started tunneling, preventing it from deforming or collapsing due to stress release.
[0003] In the field of mechanized and intelligent shaft construction, especially in the construction technology of full-face hard rock shaft tunneling machines, support operations have become a major challenge. Existing shaft support systems typically consist of independent shotcrete equipment, anchor drilling rigs, steel mesh laying mechanisms, and auxiliary devices. When the tunneling machine reaches its destination, the cutterhead stops, the rear support is lowered, the support shoe retracts and moves forward one stroke to prepare for the next tunneling cycle. At this point, the support system begins to support the section that has just been excavated. First, a thin layer of shotcrete is applied to the newly exposed rock surface to seal surface cracks and prevent weathering. A steel mesh is then laid on the initial shotcrete surface and connected to subsequent anchor bolts or steel arches. Holes are drilled at designated locations using an anchor drilling rig, and then anchor bolts are installed and grouted for anchoring. Finally, a second shotcrete layer is applied to completely cover the steel mesh and anchor bolts to achieve the designed thickness and form a complete shotcrete layer.
[0004] Although this type of shaft synchronous support device can effectively provide active support for the surrounding rock of deep shafts, it still has the following drawbacks:
[0005] 1. The lifting and lowering action of the support platform relies on the coordinated operation of multiple hydraulic cylinders. However, due to the lack of an effective synchronization control mechanism, it is difficult for the cylinders to achieve precise synchronization during operation, resulting in tilting, shaking or instability of the platform during lifting and lowering, which seriously affects the stability of the support operation.
[0006] 2. The integration of existing equipment and mainstream construction solutions is low, making it impossible to carry out support operations while tunneling, resulting in low work efficiency.
[0007] 3. In conventional shaft environments, the shaft diameter is often several times the length of the anchor bolt, resulting in a relatively large diameter for the support device and ample space for its arrangement. For shafts with smaller diameters, conventional arrangement schemes cannot be implemented.
[0008] In one embodiment of this design, the diameter of the tunnel wall excavated by the shaft boring machine is 6.97 meters, the working stroke of the anchor drilling rig 11 is 3 meters, and the total length of the anchor drilling rig 11 is 4.7 meters. Since the total length of the anchor drilling rig 11 exceeds two-thirds of the diameter of the tunnel wall, this design cannot use the conventional layout in the prior art.
[0009] An arc-shaped platform 14 is provided on the outer edge of the support platform 1; the middle part of the arc-shaped platform 14 is located near the drill bit of the anchor drilling rig 11; the arc-shaped platform 14 is the maintenance area of the anchor drilling rig 11. The arc of the arc-shaped platform 14 is 70 to 110 degrees.
[0010] The information disclosed in this background section is intended only to enhance the understanding of the overall background of this application and should not be construed as an admission or in any way implying that the information constitutes a shaft synchronous support device known to those skilled in the art. Summary of the Invention
[0011] The purpose of this invention is to overcome the shortcomings of poor stability and low working efficiency in the synchronous support device for vertical shafts, and to provide a shotcrete system with high stability and high working efficiency for synchronous support of vertical shaft tunneling machines.
[0012] To achieve the above objectives, the technical solution of the present invention is:
[0013] A shotcrete and anchor system for synchronous support during shaft boring machine (TBM) operation, wherein the shotcrete and anchor system is positioned directly above the TBM, and the shotcrete and anchor system comprises:
[0014] The support platform is equipped with an anchor drilling machine and a shotcrete robot, and has a central hole in the middle.
[0015] A rotating device is fixedly installed at the bottom of the support platform, and its power output end is fixedly connected to the support platform to drive the support platform to rotate. The rotating device of the shotcrete system is coaxially arranged with the shaft tunneling machine.
[0016] A hydraulic lifting device is installed in the central hole and includes multiple lifting cylinders. The multiple lifting cylinders are arranged along the circumference of the support platform. The telescopic rods of each lifting cylinder are fixedly connected to the rotating device to drive the support platform to lift.
[0017] The hydraulic system has its outlet connected to the inlet of the hydraulic lifting device, and is used to drive each lifting cylinder to work synchronously.
[0018] The hydraulic lifting device includes:
[0019] A central support cylinder is vertically installed in a central hole to support the support platform. The cylinder seats of the plurality of lifting cylinders are all fixedly connected to the central support cylinder. The central support cylinder is the main shaft of the shaft boring machine. The middle part of the anchor drilling rig is located near the central support cylinder.
[0020] Multiple slides are evenly distributed vertically on the outer wall of the central support cylinder, and the slides are slidably engaged with the rotating device.
[0021] The rotating device includes:
[0022] A connecting ring is horizontally fitted onto the central support cylinder, and the connecting ring is fixedly connected to the outer surface of the central support cylinder.
[0023] A slewing bearing is coaxially arranged with the support platform. The outer ring of the slewing bearing is fixedly connected to the bottom of the support platform. A toothed ring is coaxially fixedly arranged on the outer ring of the slewing bearing. The inner ring of the slewing bearing is fixedly connected to the connecting ring. The inner ring of the slewing bearing is in sliding fit with the slide rail.
[0024] A drive motor is fixedly mounted on the connecting ring, and the power output end of the drive motor is engaged with the gear ring transmission.
[0025] The hydraulic system includes two multi-way directional valves, a gear flow distributor, multiple pilot-operated check valves, and multiple relief valves.
[0026] The pilot-operated check valve and the relief valve are respectively provided with the lifting cylinder, and the number of the pilot-operated check valve and the relief valve is the same as the number of the lifting cylinder;
[0027] The A outlets of both multi-way directional valves are connected to the rodless chambers of each lifting cylinder; the B outlets of both multi-way directional valves are connected to the inlets of each gear flow distributor; the outlet of each gear flow distributor is connected to the inlet of its corresponding pilot-operated check valve; the outlet of each pilot-operated check valve is connected to its corresponding rod chamber; and the discharge port of each pilot-operated check valve is connected to the main drain circuit.
[0028] Each of the multiple relief valves has one port connected to the inlet of its corresponding pilot-operated check valve, and the other port of the relief valve is connected to the oil tank.
[0029] The hydraulic lifting device includes three lifting cylinders;
[0030] The hydraulic system includes three gear flow distributors and three pilot-operated check valves.
[0031] An angle α is formed between the central axis of the anchor drilling rig and the diameter of the support platform. The vertex of the angle α is located at the intersection of the central axis of the anchor drilling rig and the tunnel wall. The angle α is 21 to 25 degrees.
[0032] The central axis of the shotcrete robot is set perpendicular to the tunnel wall.
[0033] The outer edge of the support platform is provided with an arc-shaped platform;
[0034] The arc-shaped platform is positioned near the drill bit of the anchor drilling rig in the middle.
[0035] The arc-shaped platform serves as the maintenance area for the anchor drilling rig.
[0036] The arc of the arc platform is 70 to 110 degrees.
[0037] Compared with the synchronous support device for vertical shafts, the beneficial effects of the present invention are as follows:
[0038] 1. This invention relates to a shotcrete system for synchronous support during shaft boring machine (TBM) operation. A central hole is provided in the middle of the support platform, and multiple lifting cylinders are housed within this central hole and arranged along the circumference of the support platform. The extension rods of each lifting cylinder are fixedly connected to a rotating device at the bottom of the support platform. A hydraulic system drives the lifting cylinders to work synchronously, ensuring smooth lifting and lowering of the support platform and providing stability for the support operation. Therefore, this design utilizes multiple synchronously operating lifting cylinders to ensure smooth lifting and lowering of the support platform, effectively improving stability.
[0039] 2. This invention relates to a shotcrete and anchor system for synchronous support during shaft boring machine (TBM) operation. The shotcrete and anchor system is positioned directly above the TBM, and its central support cylinder is identical in structure to the TBM's main shaft. This ensures that the TBM and the shotcrete and anchor system work synchronously while maintaining coaxiality during operation. The shotcrete and anchor system provides support to the excavated tunnel wall directly above the TBM. Therefore, this design allows for simultaneous support operations during drilling, effectively improving work efficiency.
[0040] 3. In a shotcrete and bolt system for synchronous support during shaft boring machine (TBM) operation, the bolt drill is positioned near the central support cylinder. The central axis of the bolt drill forms an angle α with the diameter of the support platform, ranging from 21 to 25 degrees. This allows the bolt drill to fully utilize the space of the support platform, enabling the use of longer bolts for support operations in shafts with smaller diameters. Therefore, this design allows for the use of longer bolts for support operations in shafts with smaller diameters, effectively expanding its application range. Attached Figure Description
[0041] Figure 1 This is a schematic diagram of the structure of the present invention.
[0042] Figure 2 This is a top view of the present invention.
[0043] Figure 3 yes Figure 1 A schematic diagram of the hydraulic system.
[0044] Figure 4 This is a schematic diagram of the included angle of the anchor drilling rig in Example 3.
[0045] In the diagram: 1. Support platform; 11. Anchor drilling rig; 12. Shotcrete robot; 13. Center hole; 14. Arc platform; 2. Rotating device; 21. Connecting ring; 22. Slewing bearing; 23. Drive motor; 24. Gear ring; 3. Hydraulic lifting device; 31. Center support cylinder; 32. Slide rail; 33. Lifting cylinder; 4. Hydraulic system; 41. Multi-way directional valve; 42. Gear flow distributor; 43. Pilot-operated check valve; 44. Overflow valve. Detailed Implementation
[0046] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0047] Example 1:
[0048] See Figure 1 and Figure 2 A shotcrete system for synchronous support during shaft boring machine (TBM) operation, wherein the shotcrete system is positioned directly above the TBM, and the shotcrete system comprises:
[0049] Support platform 1, on which anchor drilling machine 11 and shotcrete robot 12 are installed, and a central hole 13 is opened in the middle.
[0050] Rotating device 2 is fixedly installed at the bottom of support platform 1, and its power output end is fixedly connected to support platform 1 to drive support platform 1 to rotate. The rotating device 2 of the shotcrete system is coaxially arranged with the shaft tunneling machine.
[0051] The hydraulic lifting device 3 is installed in the central hole 13 and includes multiple lifting cylinders 33. The multiple lifting cylinders 33 are arranged along the circumferential direction of the support platform 1. The telescopic rods of each lifting cylinder 33 are fixedly connected to the rotating device 2 to drive the support platform 1 to lift.
[0052] The hydraulic system 4 has its oil outlet connected to the oil inlet of the hydraulic lifting device 3, and is used to drive each lifting cylinder 33 to work synchronously.
[0053] The principle of this embodiment is as follows: When it is necessary to adjust the height of the support platform 1 to adapt to the tunneling depth or to carry out cyclic advance, the operator starts the hydraulic system 4. The high-pressure oil output by the hydraulic system 4 enters the rodless chamber of each lifting cylinder 33 at the same time. Since the hydraulic system 4 has a synchronous control function, the flow rate allocated to each lifting cylinder 33 can be kept consistent.
[0054] Therefore, driven by the hydraulic system 4, multiple circumferentially distributed lifting cylinders 33 can extend and retract at the same speed and stroke. The extension rods of the lifting cylinders 33 push the rotating device 2, thereby driving the entire support platform 1 to rise and fall smoothly in the vertical direction.
[0055] When full-section support is required, the rotating device 2 is activated, which drives the support platform 1 to rotate, so that the anchor drilling rig 11 and the shotcrete manipulator 12 can cover a 360-degree range of the well wall.
[0056] The hydraulic lifting device 3 includes:
[0057] A central support cylinder 31 is vertically disposed within a central hole 13 to support the support platform 1. The cylinder seats of the plurality of lifting cylinders 33 are all fixedly connected to the central support cylinder 31. The central support cylinder 31 is the main shaft of the shaft boring machine. The middle part of the anchor drilling rig 11 is disposed near the central support cylinder 31. A plurality of slide rails 32 are evenly distributed on the outer wall of the central support cylinder 31 in the vertical direction. The slide rails 32 are slidably engaged with the rotating device 2.
[0058] The principle of this embodiment is as follows: By setting slide rails 32 evenly distributed in the vertical direction on the outer wall of the central support cylinder 31, and slidingly engaging with the rotating device 2, a multi-point guiding mechanism is formed. This structure can effectively resist the overturning moment generated by eccentric loading, such as the unilateral force of the anchor drilling rig 11, during the lifting and lowering process of the support platform 1, preventing the platform from tilting or jamming, and ensuring the verticality and stability of the lifting and lowering process.
[0059] The cylinder seat of the lifting cylinder 33 is fixed on the central support cylinder 31, which serves as a reaction support, making the transmission path of the lifting force short and direct. At the same time, the slide rail 32 is integrated into the central support cylinder 31, realizing the integration of guiding and supporting functions, greatly saving installation space, making the structure of the entire shotcrete system more compact, and facilitating its layout in narrow vertical shaft environments.
[0060] The rotating device 2 includes:
[0061] A connecting ring 21 is sleeved on the central support cylinder 31 in a horizontal direction, and the connecting ring 21 is fixedly connected to the outer surface of the central support cylinder 31.
[0062] A slewing bearing 22 is coaxially arranged with the support platform 1. The outer ring of the slewing bearing 22 is fixedly connected to the bottom of the support platform 1. A toothed ring 24 is coaxially fixedly arranged on the outer ring of the slewing bearing 22. The inner ring of the slewing bearing 22 is fixedly connected to the connecting ring 21. The inner ring of the slewing bearing 22 is slidably engaged with the slide rail 32.
[0063] The drive motor 23 is fixedly mounted on the connecting ring 21, and the power output end of the drive motor 23 is in transmission cooperation with the gear ring 24.
[0064] Example 2:
[0065] Example 2 is basically the same as Example 1, except that:
[0066] See Figure 3 The hydraulic system 4 includes two multi-way directional valves 41, a gear flow distributor 42, multiple pilot-operated check valves 43, and multiple relief valves 44. The pilot-operated check valves 43 and relief valves 44 are correspondingly arranged with the lifting cylinders 33, and the number of pilot-operated check valves 43 and relief valves 44 is the same as the number of lifting cylinders 33. The A outlet of each of the two multi-way directional valves 41 is connected to the rodless chamber of each lifting cylinder 33, and the B outlet of each of the two multi-way directional valves 41 is connected to the gear flow distributor 42. The oil inlets of each gear flow distributor 42 are connected to the oil outlet of its corresponding pilot-operated check valve 43. The oil outlet of each pilot-operated check valve 43 is connected to its corresponding rod chamber. The oil discharge port of each pilot-operated check valve 43 is connected to the main oil drain circuit. One oil port of each of the multiple overflow valves 44 is connected to the oil inlet of its corresponding pilot-operated check valve 43, and the other oil port of the overflow valve 44 is connected to the connecting oil tank.
[0067] The system uses two multi-way directional valves 41 connected in parallel. Port A is connected to the rodless chamber of all lifting cylinders 33, while port B is connected to the inlet of each gear flow distributor 42. The outlet of each gear flow distributor 42 corresponds to the inlet of a pilot-operated check valve 43, and the outlet of this pilot-operated check valve 43 is connected to the rod chamber of the corresponding lifting cylinder 33. Notably, the discharge port of each pilot-operated check valve 43 is connected to a separate main drain circuit, not directly back to the oil tank, providing an independent channel for back pressure control of the pilot valve core. Furthermore, an overflow valve 44 is connected in parallel to the inlet of each pilot-operated check valve 43, with its other side directly connected to the oil tank.
[0068] When both multi-way directional valves 41 are simultaneously switched to the A-port supply and B-port return positions, pressurized oil flows directly into the rodless chambers of all lifting cylinders 33 through port A. Since the rodless chambers are parallel pathways, the pressure in each chamber naturally tends to be equal, relying on the load's own weight or mechanical structure to balance the slight asynchrony during the extension process. At this time, the hydraulic oil in the rod chamber of the lifting cylinder 33 needs to be discharged, and the return path must flow back to port B via the pilot-operated check valve 43. Crucially, the pressure built up in the rodless chamber acts as a pilot signal on the control piston of the pilot-operated check valve 43, overcoming the spring force of the main valve core and opening it, allowing the oil in the rod chamber to flow back through the pilot-operated check valve 43, and then through the gear flow distributor 42 into the return tank at port B. The discharge port of the pilot-operated check valve 43 is connected to a separate drain circuit, ensuring that the pressure in the back chamber of the control piston is always close to zero, preventing pilot valve core vibration or accidental closure due to back pressure fluctuations.
[0069] When the multi-way directional valve 41 returns to the neutral position, both ports A and B are shut off. The pressure oil in the rodless chamber is locked between port A and the lifting cylinder 33. At the same time, the control signal of the pilot-operated check valve 43 disappears, and its main valve core is tightly closed under the action of spring force and residual pressure in the rod chamber, cutting off the external discharge passage of the rod chamber. Since the rod chamber cannot be replenished or discharged, and the rodless chamber is also closed, even if the external load fluctuates, the cylinder stroke is locked in both directions. The independent oil return design of the unloading port of the pilot-operated check valve 43 is particularly important at this stage. It can promptly guide away any internal leakage that may exist at the pilot piston, preventing the pilot-operated check valve 43 from being accidentally opened due to gradual pressure build-up in the control chamber, thereby improving the reliability of long-term pressure holding.
[0070] The multi-way directional valve 41 switches to the position of supplying oil at port B and returning oil at port A. Pressurized oil enters the inlet of the gear flow distributor 42 through port B. This gear flow distributor 42 has an internal equal-displacement gear pair structure, which proportionally distributes the total inlet flow to each outlet, ensuring that the flow to the inlet of each pilot-operated check valve 43 is essentially consistent. The oil flows forward from the inlet to the outlet of the pilot-operated check valve 43, directly entering the rod chamber of each lifting cylinder 33. Because the flow into each chamber is equal, the retraction speed of the cylinder piston rod is forced to synchronize. Simultaneously, the oil in the rodless chamber of the lifting cylinder 33 flows smoothly back to the oil tank through port A without back pressure interference. At this time, there is no pressure signal at the pilot port of the pilot-operated check valve 43; its forward conduction relies on the inlet oil pressure to push open the valve core, while the discharge port continuously drains the small amount of leaked oil from the pilot chamber, ensuring stable forward opening resistance.
[0071] During descent, if the pressure in the rod chamber of a lifting cylinder 33 abnormally spikes due to mechanical obstruction, uneven loading, or external impact, the inlet of the corresponding relief valve 44 will sense the high pressure. Once the pressure exceeds the set value of the relief valve 44, the valve core opens, allowing the high-pressure oil in the rod chamber to overflow directly into the oil tank, quickly relieving the peak pressure and preventing the cylinder seal or pipeline from rupturing. This relief valve 44 only limits pressure on the rod chamber side, while pressure protection on the rodless chamber side relies on the main relief valve inside the multi-way directional valve 41 or the system's main safety valve.
[0072] The hydraulic lifting device 3 includes three lifting cylinders 33; the hydraulic system 4 includes three gear flow distributors 42 and three pilot-operated check valves 43.
[0073] Example 3:
[0074] Example 3 is basically the same as Example 2, except that:
[0075] See Figure 4An angle α is formed between the central axis of the anchor drilling rig 11 and the diameter of the support platform 1. The vertex of the angle α is located at the intersection of the central axis of the anchor drilling rig 11 and the tunnel wall. The angle α is 21 to 25 degrees. The central axis of the shotcrete manipulator 12 is set perpendicular to the tunnel wall.
[0076] In one embodiment of this design, the diameter of the tunnel wall excavated by the shaft boring machine is 6.97 meters, the working stroke of the anchor drilling rig 11 is 3 meters, and the total length of the anchor drilling rig 11 is 4.7 meters. Since the total length of the anchor drilling rig 11 exceeds two-thirds of the diameter of the tunnel wall, this design cannot use the conventional layout in the prior art.
[0077] An arc-shaped platform 14 is provided on the outer edge of the support platform 1; the middle part of the arc-shaped platform 14 is located near the drill bit of the anchor drilling rig 11; the arc-shaped platform 14 is the maintenance area of the anchor drilling rig 11. The arc of the arc-shaped platform 14 is 70 to 110 degrees.
[0078] The above description is only a preferred embodiment of the present invention. The scope of protection of the present invention is not limited to the above embodiments. Any equivalent modifications or changes made by those skilled in the art based on the content disclosed in the present invention should be included within the scope of protection set forth in the claims.
Claims
1. A shot-and-anchor system applied to the driving and synchronous support of a shaft driving machine, characterized in that, The shotcrete system is positioned directly above the shaft boring machine, and the shotcrete system includes: The support platform (1) is equipped with an anchor drilling machine (11) and a shotcrete robot (12), and a central hole (13) is opened in the middle. The rotating device (2) is fixedly installed at the bottom of the support platform (1), and its power output end is fixedly connected to the support platform (1) for driving the support platform (1) to rotate. The rotating device (2) of the shotcrete system is coaxially installed with the shaft tunneling machine. The hydraulic lifting device (3) is set in the center hole (13) and includes multiple lifting cylinders (33). The multiple lifting cylinders (33) are arranged along the circumferential direction of the support platform (1). The telescopic rods of each lifting cylinder (33) are fixedly connected to the rotating device (2) to drive the support platform (1) to lift. The hydraulic system (4) has an oil outlet connected to the oil inlet of the hydraulic lifting device (3) to drive each lifting cylinder (33) to work synchronously.
2. The shot-and-anchor system for simultaneous support of the excavation of a raise boring machine according to claim 1, characterized in that, The hydraulic lifting device (3) includes: The central support cylinder (31) is set vertically in the central hole (13) to support the support platform (1). The cylinder seats of the plurality of lifting cylinders (33) are all fixedly connected to the central support cylinder (31). The central support cylinder (31) is the main shaft of the shaft boring machine. The middle part of the anchor drilling machine (11) is set close to the central support cylinder (31). Multiple slides (32) are evenly distributed on the outer wall of the central support cylinder (31) in a vertical direction, and the slides (32) are in sliding cooperation with the rotating device (2).
3. The shotcrete and anchor system for synchronous support during shaft boring machine excavation as described in claim 2, characterized in that, The rotating device (2) includes: A connecting ring (21) is sleeved on the central support cylinder (31) in the horizontal direction, and the connecting ring (21) is fixedly connected to the outer surface of the central support cylinder (31); A slewing bearing (22) is coaxially arranged with the support platform (1). The outer ring of the slewing bearing (22) is fixedly connected to the bottom of the support platform (1). A gear ring (24) is coaxially fixedly arranged on the outer ring of the slewing bearing (22). The inner ring of the slewing bearing (22) is fixedly connected to the connecting ring (21). The inner ring of the slewing bearing (22) is slidably engaged with the slide rail (32). The drive motor (23) is fixedly mounted on the connecting ring (21), and the power output end of the drive motor (23) is in transmission cooperation with the gear ring (24).
4. The shotcrete and anchor system for synchronous support during shaft boring machine excavation as described in claim 1, characterized in that, The hydraulic system (4) includes two multi-way directional valves (41), a gear flow distributor (42), multiple pilot-operated check valves (43) and multiple relief valves (44). The pilot-operated check valve (43) and relief valve (44) are correspondingly provided with the lifting cylinder (33), and the number of the pilot-operated check valve (43) and relief valve (44) is the same as the number of the lifting cylinder (33); The A outlet of each of the two multi-way directional valves (41) is connected to the rodless chamber of each lifting cylinder (33), the B outlet of each of the two multi-way directional valves (41) is connected to the inlet of each gear flow distributor (42), the outlet of each gear flow distributor (42) is connected to the inlet of its corresponding pilot-operated check valve (43), the outlet of each pilot-operated check valve (43) is connected to its corresponding rod chamber, and the discharge port of each pilot-operated check valve (43) is connected to the main drain circuit. One of the oil ports of the plurality of relief valves (44) is connected to the oil inlet of its corresponding pilot-operated check valve (43), and the other oil port of the relief valve (44) is connected to the connecting oil tank.
5. A shotcrete and anchor system for synchronous support during shaft boring machine excavation as described in claim 4, characterized in that, The hydraulic lifting device (3) includes three lifting cylinders (33); The hydraulic system (4) includes three gear flow distributors (42) and three pilot-operated check valves (43).
6. A shotcrete and anchor system for synchronous support during shaft boring machine tunneling, as described in any one of claims 1 to 5, characterized in that, An angle α is formed between the central axis of the anchor drilling rig (11) and the diameter of the support platform (1), and the vertex of the angle α is located at the intersection of the central axis of the anchor drilling rig (11) and the tunnel wall. The angle α is (21) to (25) degrees. The central axis of the shotcrete manipulator (12) is set perpendicular to the tunnel wall.
7. A shotcrete and anchor system for synchronous support during shaft boring machine excavation as described in claim 1, characterized in that, An arc-shaped platform (14) is provided on the outer edge of the support platform (1). The arc-shaped platform (14) is located near the drill bit of the anchor drilling rig (11) in the middle. The arc-shaped platform (14) is the maintenance area for the anchor drilling rig (11).
8. A shotcrete and anchor system for synchronous support during shaft boring machine excavation as described in claim 7, characterized in that, The arc of the arc platform (14) is (70) to (110) degrees.