An Isolation Method for Segmented Filling of Bags in Underground Coal Mines
By constructing a composite isolation wall using flexible filling bags and I-beam isolation beams, and by filling in sections and switching units one by one, the reliability and efficiency issues of isolation and filling technology in underground goaf areas of coal mines have been solved, achieving efficient and safe isolation and filling effects.
Patent Information
- Application Number
- CN202611287589.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-24
- Publication Date
- 2026-11-17
AI Technical Summary
Existing coal mine goaf isolation and backfilling technologies suffer from poor reliability and low efficiency. Especially under conditions of high mining height and longwall working face, traditional isolation schemes involve cumbersome procedures, high labor intensity, and sealing failure can easily lead to slurry leakage accidents. Furthermore, the backfill material is difficult to distribute evenly, affecting production efficiency and safety.
A composite isolation wall is constructed by using flexible filling bags, I-beam isolation beams, and isolation plates. The filling is carried out in sections and switched unit by unit. Pressure sensors are used to monitor the pressure of the bags to achieve adaptive connection to the top, forming an independent filling chamber. Grout is injected gradually, and the injection volume and switching time are controlled.
It improved the reliability of isolation, reduced slurry leakage accidents, enhanced the early support capacity of the backfill, reduced labor intensity and safety risks, and improved mine production efficiency.
Smart Images

Figure CN123109767A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the technical field of the coal mining industry, and in particular to an isolation method for segmented filling of underground coal mine bags. Background Technology
[0002] Paste backfilling mining, as a green mining technology, can effectively control overburden movement and surface subsidence, and is a key means to achieve safe and efficient recovery of coal under buildings, railways, and water bodies (i.e., "three-under"). Among these, forward backfilling mining, because it eliminates the need for pre-excavating a large number of mining roadways, can significantly reduce roadway excavation rates and maintenance costs, and has received widespread attention and is gradually being applied in engineering practice in recent years. However, when implementing forward backfilling under conditions of high mining height and longwall faces, existing technologies generally use isolation supports combined with flexible isolation fabric to perform a one-time overall isolation of the goaf. This traditional isolation scheme has revealed several inherent defects in practical applications: First, the isolation operation involves a large amount of manual labor, including laying, fixing, and adjusting the isolation cloth, as well as coordinating with the support frame. The process is complicated and extremely labor-intensive, which seriously affects the efficiency and safety of the operation.
[0003] Secondly, due to the large volume of the enclosed space formed by the one-time isolation, the paste is highly fluid during the pumping process and it is difficult to distribute evenly throughout the entire area. Once the local seal fails (such as the isolation cloth is damaged or the grout leaks at the overlap), it is very easy to cause a large-scale grout leakage accident, which not only wastes materials, but may also pollute the tunnel environment and even threaten the safety of equipment.
[0004] Furthermore, due to geological conditions, the roof of the working face is often uneven, and the paste is difficult to completely fill the sunken areas of the roof under the action of gravity, resulting in a void between the filling material and the roof, which weakens the early support capacity of the filling material and poses a hidden danger to subsequent support.
[0005] In addition, the hardening of paste filling slurry requires a certain amount of time. If the amount of filling at one time is too large, the hardening cycle will be extended accordingly, which directly restricts the circulation and advancement speed of adjacent coal mining faces and reduces the overall production efficiency of the mine. Summary of the Invention
[0006] This application provides a method for isolating underground coal mines using a bag-type segmented filling system, in order to solve the problems of poor reliability and low efficiency of existing goaf isolation and filling technologies.
[0007] The method includes: Based on the lithology of the working face roof, mining height, design strength of the backfill body, and capacity of the backfill system, determine the length of a single backfill segment along the dip of the working face and the width along the advancing direction of the working face, and prepare flexible backfill bags, I-beam isolation beams, and isolation plates. Behind the hydraulic support at the working face, along the dip and according to the designed segment length, the top of the first flexible filling bag is suspended and fixed to the tail beam of the hydraulic support or the support anchor, so that its bottom naturally hangs down to the bottom plate, and its front end is in close contact with the hydraulic support shield beam or the filling body of the previous cycle; at the junction of two adjacent flexible filling bags, one end of multiple I-beam isolation beams is inserted into the filling body formed in the previous cycle by not less than 500mm, and the other end is erected in the gap between two adjacent hydraulic supports or on a special support leg, and the isolation plate is laid on the side of the I-beam isolation beam facing the goaf, so that it is in close contact with the side walls of the flexible filling bags on both sides to form a composite isolation wall. This composite isolation wall and the flexible filling bags on both sides together form a closed independent filling chamber; Starting from the lowest-lying independent filling chamber of the working face, paste slurry is injected. The paste slurry enters the flexible filling bag through the distribution valve, causing it to expand until it is in close contact with the roof and coal and rock walls, achieving adaptive roof connection. After the grouting volume of the current independent filling chamber reaches the design value or the bag pressure reaches the predetermined threshold, the distribution valve of the next adjacent independent filling chamber is opened, the distribution valve of the current independent filling chamber is closed, and the process switches to the next unit for filling. The switching time between adjacent units is controlled within 20-30 minutes. This process is repeated until all segmented units are filled. After filling all segmented units is completed, the filling pipeline is cleaned. Once the filling material solidifies and reaches initial setting strength within the flexible filling bag, the hydraulic support is moved forward to begin the next round of coal mining and filling cycle.
[0008] In some embodiments, the flexible filling bag is made of high-strength polyester filament fabric.
[0009] In some embodiments, the I-beam isolation beam is a No. 9 I-beam with a length of 3.5m, and the isolation plate has dimensions of 1.2m × 1.4m.
[0010] In some embodiments, the filling sequence of the paste slurry starts from the lower end of the working surface and alternately fills each of the flexible filling bags in sequence upwards.
[0011] In some implementations, the switching time between adjacent units is 25 minutes.
[0012] In some embodiments, the width of the filling segment is 3m along the working face advancing direction.
[0013] In some embodiments, the construction of the composite isolation wall also includes setting a sealing gasket layer between the I-beam isolation beam and the isolation plate.
[0014] In some embodiments, real-time monitoring of the bag pressure is achieved by a pressure sensor installed at the fabric valve, which automatically triggers a switching signal when the pressure reaches a predetermined threshold.
[0015] As can be seen from the above, this application provides an isolation method for segmented filling of coal mines using a bag-type structure. The method includes determining the length of a single filling segment along the dip direction and the width along the advancing direction of the working face based on the lithology of the working face roof, mining height, design strength of the filling body, and the capacity of the filling system; preparing flexible filling bags, I-beam isolation beams, and isolation plates; behind the hydraulic supports of the working face, along the dip and according to the designed segment length, suspending and fixing the top of the first flexible filling bag to the tail beam of the hydraulic support or the support anchor, allowing its bottom to naturally hang down to the bottom plate, with its front end tightly fitted to the hydraulic support shield beam or the filling body of the previous cycle; at the junction of two adjacent flexible filling bags, inserting one end of multiple I-beam isolation beams into the filling body formed in the previous cycle by at least 500mm, and placing the other end on the gap between two adjacent hydraulic supports or on a dedicated support leg; and laying the isolation plate on the side of the I-beam isolation beam closest to the goaf, so that it is flush with the two... The side walls of the flexible filling bags are tightly overlapped to form a composite isolation wall. This composite isolation wall, together with the flexible filling bags on both sides, forms a closed independent filling chamber. Grout is injected starting from the independent filling chamber at the lowest point of the working face. The grout enters the flexible filling bag through a distribution valve, causing it to expand until it is in close contact with the roof and coal seam, achieving adaptive roof contact. After the grouting volume of the current independent filling chamber reaches the design value or the bag pressure reaches a predetermined threshold, the distribution valve of the next adjacent independent filling chamber is opened, and the distribution valve of the current independent filling chamber is closed, switching to the next unit for filling. The switching time between adjacent units is controlled within 20-30 minutes. This process is repeated until all segmented units are filled. After all segmented units are filled, the filling pipeline is cleaned. Once the filling material solidifies in the flexible filling bag and reaches initial setting strength, the hydraulic support is moved forward, and the next round of coal mining and filling cycle begins. This application solves the problems of poor reliability and low efficiency of existing goaf isolation and backfilling technologies through the above methods. Attached Figure Description
[0016] To more clearly illustrate the technical solution of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a flowchart illustrating a method for isolating underground coal mines using segmented, bag-type filling, as described in this application. Figure 2 This is a plan view of the layout of the work surface in this application.
[0018] In the diagram: 1-filling pipe; 2-railway isolation support; 3-filling hydraulic support; 4-coal mining machine; 5-material placing valve; 6-scraper conveyor; 7-railway isolation support; 8-upper circulating filling body; 9-first filling unit; 10-interlocking I-beam frame between filling units; 11-filling port; 12-second filling unit; 13-third filling unit; 14-fourth filling unit. Detailed Implementation
[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] It should be noted that the brief descriptions of terms in this application are only for the convenience of understanding the embodiments described below, and are not intended to limit the embodiments of this application. Unless otherwise stated, these terms should be understood in their ordinary and common meaning.
[0021] It should be noted that, in this application, the terms "exemplary" or "for example" are used to indicate that something is being described as an example, illustration, or illustration. Any embodiment or design described as "exemplary" or "for example" in this application should not be construed as being more preferred or advantageous than other embodiments or design solutions. Specifically, the use of terms such as "exemplary" or "for example" is intended to present the relevant concepts in a concrete manner.
[0022] See Figure 1 as well as Figure 2 As can be seen, this embodiment provides an isolation method for segmented filling of bags in underground coal mines. It should be noted that... Figure 2 This is merely a schematic diagram to aid in understanding the solution, and is not the only one. Figure 2 The structure is suitable for this solution, and the method includes: S100, based on the lithology of the working face roof, mining height, design strength of the filling body, and capacity of the filling system, determines the length of a single filling segment along the dip of the working face and the width along the advancing direction of the working face, and prepares flexible filling bags, I-beam isolation beams, and isolation plates.
[0023] Specifically, in this embodiment, firstly, based on the specific geological conditions and mining technical parameters of the working face, the length of a single backfilling segment along the dip of the working face and the width along the advancing direction of the working face are determined. Specifically, based on the roof lithology, mining height, design strength of the backfill body, and pumping capacity of the backfilling system, the backfilling units are rationally divided. In a preferred embodiment, for a longwall fully mechanized mining face with a mining height of 3.8 meters and a dip length of 114 meters, the working face is divided into 8 independent backfilling units along the dip, each unit being 14 meters wide, corresponding to the width of 2 to 3 hydraulic supports; while the segment width along the advancing direction is set to 3 meters, precisely corresponding to one backfilling cycle step.
[0024] Meanwhile, the necessary materials and components are prepared. The flexible filling bag is made of high-strength polyester filament fabric to ensure sufficient tensile strength, abrasion resistance, and deformation capacity, enabling it to withstand the injection pressure of the paste slurry and achieve self-adaptive connection when the top plate is uneven. In addition, I-beam isolation beams and isolation plates for constructing the isolation wall also need to be prepared. In this embodiment, the I-beam isolation beams are made of #9 I-beams with a length of 3.5 meters; the isolation plates are 1.2 meters × 1.4 meters in size.
[0025] The method further includes: S200, behind the hydraulic support at the working face, along the dip and according to the designed segment length, the top of the first flexible filling bag is suspended and fixed to the tail beam of the hydraulic support or the support anchor, so that its bottom naturally hangs down to the bottom plate, and its front end is in close contact with the hydraulic support shield beam or the filling body of the previous cycle; at the junction of two adjacent flexible filling bags, one end of multiple I-beam isolation beams is inserted into the filling body formed in the previous cycle by not less than 500mm, and the other end is erected in the gap between two adjacent hydraulic supports or on a dedicated support leg, and the isolation plate is laid on the side of the I-beam isolation beam facing the goaf, so that it is in close contact with the side walls of the flexible filling bags on both sides to form a composite isolation wall. This composite isolation wall and the flexible filling bags on both sides together form a closed independent filling chamber.
[0026] Specifically, in this embodiment, behind the hydraulic support at the working face, along the designed segment length, the top of the first flexible filling bag is suspended and fixed to the tail beam of the hydraulic support or the pre-installed support anchor, so that the bottom of the bag naturally falls to the bottom plate, and its front end is closely fitted with the hydraulic support shield beam or the filling body formed in the previous cycle, thereby ensuring the initial seal.
[0027] Subsequently, a composite isolation wall is constructed at the junction of two adjacent flexible filling bags. The specific operation involves inserting one end of multiple I-beam isolation beams into the filling body formed in the previous cycle, with an insertion depth of no less than 500 mm to ensure secure anchoring; the other end is placed on the gap between two adjacent hydraulic supports or on a dedicated outrigger. On the side of the I-beam isolation beams facing the goaf, an isolation plate is laid, ensuring a tight overlap between the isolation plate and the side walls of the flexible filling bags on both sides. To further enhance sealing performance, a sealing gasket can be added between the I-beam isolation beams and the isolation plate. The resulting composite isolation wall combines the dual functions of rigid support and flexible sealing, forming, together with the flexible filling bags on both sides, an independent filling chamber that is sealed at the top, bottom, sides, and rear.
[0028] The method further includes: S300: Starting from the independent filling chamber at the lowest inclination of the working face, paste slurry is injected. The paste slurry enters the flexible filling bag through the distribution valve, causing it to expand until it is in close contact with the roof and coal and rock walls, achieving adaptive roof connection. After the grouting volume of the current independent filling chamber reaches the design value or the bag pressure reaches the predetermined threshold, the distribution valve of the next adjacent independent filling chamber is opened, the distribution valve of the current independent filling chamber is closed, and the process switches to the next unit for filling. The switching time between adjacent units is controlled within 20-30 minutes. This process is repeated until all segmented units are filled.
[0029] Specifically, in this embodiment, the paste filling system is activated, and paste slurry is injected starting from the independent filling chamber at the lowest point of the working face. The paste slurry enters the flexible filling bag through the distribution valve. Under the pressure of the slurry, the bag gradually expands until its top and sides are in close contact with the roof and coal and rock walls, achieving active adaptive roof contact. During the filling process, the pressure inside the bag is monitored in real time by a pressure sensor installed at the distribution valve.
[0030] After the grouting volume in the current independent filling chamber reaches the design value or the bag pressure reaches the predetermined threshold, the material distribution valve of the next adjacent independent filling chamber is opened, while the material distribution valve of the current unit is closed, completing the switching of filling units. The switching time between adjacent units is controlled between 20 and 30 minutes, preferably 25 minutes, to prevent the grout in the pipeline from solidifying. The filling sequence strictly follows the principle of from low to high, that is, starting from the lower end of the working face, each flexible filling bag is alternately filled upwards. The above switching process is repeated until all segmented units are filled. When filling the lower unit, the isolation wall already constructed above bears the lateral pressure of the grout, ensuring the stability of the entire system.
[0031] The method further includes: After S400 completes the filling of all segmented units, the filling pipeline is cleaned. After the filling material solidifies in the flexible filling bag and reaches the initial setting strength, the hydraulic support is moved forward to start the next round of coal mining and filling cycle.
[0032] Specifically, in this embodiment, after filling all segmented units, the filling pipelines are immediately cleaned to prevent residual slurry from solidifying and clogging the pipelines. Only after the filling material has solidified within the flexible filling bag and reached its initial setting strength can the hydraulic support be moved forward to begin the next round of coal mining and filling cycle. Typically, the 28-day strength of the filling material after solidification within the bag must meet the design support requirements to ensure long-term stable support. The solidified bag filling material forms a stable support structure behind the unit and connects with adjacent units through isolation walls, constituting a continuous and dense goaf support system, thereby achieving effective control over the movement of the roof strata.
[0033] This embodiment has the following advantages: Significantly improves isolation reliability: The composite isolation wall, consisting of flexible filling bags, I-beam isolation beams, and isolation plates, forms multiple closed and independent filling chambers, effectively avoiding large-area slurry leakage accidents caused by local sealing failures in traditional one-time overall isolation.
[0034] Achieving adaptive roof connection: The flexible filling bag expands after the paste slurry is injected, which can actively adapt to the uneven shape of the roof and make close contact with the roof and coal and rock walls, eliminating the empty roof area commonly found in traditional methods and enhancing the early support capacity of the filling body.
[0035] Significantly improves operational efficiency: By adopting a segmented filling and unit-by-unit switching method, the switching time between adjacent units is controlled within 20-30 minutes, which shortens the hardening waiting time for a single filling, accelerates the cycle of coal mining and filling, and improves the overall production efficiency of the mine.
[0036] Reduced labor intensity and operational risks: The tedious process of manually laying, fixing and adjusting the isolation cloth is reduced, thus reducing the labor intensity and safety hazards for workers.
[0037] Optimized filling quality control: The pressure of the grouting bag is monitored in real time by a pressure sensor, which enables precise control and automatic switching of the grouting volume, ensuring the uniformity and compactness of filling in each section.
[0038] For ease of explanation, the above description has been provided in conjunction with specific embodiments. However, the discussion in some embodiments is not intended to be exhaustive or to limit the embodiments to the specific forms disclosed above. Various modifications and variations can be obtained based on the above teachings. The selection and description of the above embodiments are for the purpose of better explaining the contents of this disclosure, thereby enabling those skilled in the art to better utilize the embodiments.
Claims
1. A method for isolating underground coal mines using segmented, bag-type filling, characterized in that... The method includes: Based on the lithology of the working face roof, mining height, design strength of the backfill body, and capacity of the backfill system, determine the length of a single backfill segment along the dip of the working face and the width along the advancing direction of the working face, and prepare flexible backfill bags, I-beam isolation beams, and isolation plates. Behind the hydraulic support at the working face, along the dip and according to the designed segment length, the top of the first flexible filling bag is suspended and fixed to the tail beam of the hydraulic support or the support anchor, so that its bottom naturally hangs down to the bottom plate, and its front end is in close contact with the hydraulic support shield beam or the filling body of the previous cycle; at the junction of two adjacent flexible filling bags, one end of multiple I-beam isolation beams is inserted into the filling body formed in the previous cycle by not less than 500mm, and the other end is erected in the gap between two adjacent hydraulic supports or on a special support leg, and the isolation plate is laid on the side of the I-beam isolation beam facing the goaf, so that it is in close contact with the side walls of the flexible filling bags on both sides to form a composite isolation wall. This composite isolation wall and the flexible filling bags on both sides together form a closed independent filling chamber; Starting from the lowest-lying independent filling chamber of the working face, paste slurry is injected. The paste slurry enters the flexible filling bag through the distribution valve, causing it to expand until it is in close contact with the roof and coal and rock walls, achieving adaptive roof connection. After the grouting volume of the current independent filling chamber reaches the design value or the bag pressure reaches the predetermined threshold, the distribution valve of the next adjacent independent filling chamber is opened, the distribution valve of the current independent filling chamber is closed, and the process switches to the next unit for filling. The switching time between adjacent units is controlled within 20-30 minutes. This process is repeated until all segmented units are filled. After filling all segmented units is completed, the filling pipeline is cleaned. Once the filling material solidifies and reaches initial setting strength within the flexible filling bag, the hydraulic support is moved forward to begin the next round of coal mining and filling cycle.
2. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The flexible filling bag is made of high-strength polyester filament fabric.
3. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The I-beam isolation beam is a No. 9 I-beam with a length of 3.5m, and the isolation plate has a size of 1.2m × 1.4m.
4. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The filling sequence of the paste slurry starts from the lower end of the working surface and proceeds upwards, alternately filling each of the flexible filling bags.
5. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The switching time between adjacent units is 25 minutes.
6. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The width of the filling section is 3m along the working face advancing direction.
7. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The construction of the composite isolation wall also includes setting a sealing gasket layer between the I-beam isolation beam and the isolation plate.
8. The isolation method of segmented filling with bag-type filling in underground coal mines according to claim 1, characterized in that, The real-time monitoring of the bag pressure is achieved by a pressure sensor installed at the fabric valve, and a switching signal is automatically triggered when the pressure reaches a predetermined threshold.