Improved turbine housing alignment structure and initial clearance determination method for turbochargers, and turbochargers.

By adding an alignment structure to the turbocharger, automatic alignment at high temperatures is achieved by utilizing the thermal expansion difference between the turbine housing and the bearing housing. This solves the problem of bearing housing movement caused by thermal expansion differences and improves the reliability and lifespan of the turbocharger.

CN123109800APending Publication Date: 2026-11-17NINGBO WEIFU TIANLI TURBOCHARGING TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611429925.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In turbochargers, the difference in thermal expansion coefficients between the turbine housing and bearing housing materials leads to an increase in the clearance at high temperatures, causing bearing housing movement and rubbing against the housing, which affects turbine efficiency and connection reliability.

Method used

An alignment structure is added to the inner side of the conventional mating surface between the turbine housing and the bearing housing. The difference in thermal expansion of the materials is used to achieve automatic alignment at high temperatures. The initial clearance is determined through scientific calculation to avoid stress concentration and ensure structural safety.

Benefits of technology

This achieves reliable centering of the bearing housing at high temperatures, avoids rubbing, improves the reliability and service life of the turbocharger, and reduces the fatigue risk of bolted connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109800A_ABST
    Figure CN123109800A_ABST
Patent Text Reader

Abstract

An improved turbine housing alignment structure and initial clearance determination method for a turbocharger, along with the turbocharger itself, are disclosed. The alignment structure is located inside the conventional mating surface between the turbine housing and the bearing housing. It includes a turbine housing alignment structure protruding radially inward from the inner side of the turbine housing and a corresponding bearing housing alignment structure located on the outer side of the bearing housing. The axial positioning surface of the bearing housing alignment structure abuts against the axial surface of the turbine housing alignment structure, and an initial clearance exists between their radial alignment mating surfaces at room temperature. The linear expansion coefficient of the turbine housing material is greater than that of the bearing housing material. When the operating temperature rises to the design alignment temperature, the additional radial expansion of the turbine housing eliminates the initial clearance and brings the alignment mating surfaces into contact, forming a radial positioning pair and automatically centering the bearing housing. This invention automatically compensates for the clearance at high temperatures and self-centers without the need for an external control mechanism, solving the problem of radial runout and rubbing against the housing, thus improving reliability and service life.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of turbocharger technology, and more specifically to an improved turbine housing centering structure for turbochargers, suitable for turbocharger components that require automatic centering compensation due to differences in the thermal expansion coefficients of materials under high-temperature conditions. Background Technology

[0002] When a turbocharger is operating, the turbine housing must withstand the high-temperature exhaust gases from the engine (typically 400℃~980℃), sometimes even exceeding 1000℃, making the working environment extremely harsh. In a conventional turbocharger structure, the turbine housing and bearing housing are made of different materials: the turbine housing is often made of high-temperature resistant nickel-based, chromium-based, or silicon-based alloys, while the bearing housing is made of chromium-molybdenum alloy. The difference in material composition results in a significant difference in their coefficients of thermal expansion; typically, the turbine housing has a higher coefficient of thermal expansion than the bearing housing.

[0003] In a conventional structure, the turbine housing is located radially outside the bearing housing, and the two are fixed together by bolts, with the inner wall of the turbine housing and the outer wall of the bearing housing forming a mating surface. Under normal temperature assembly conditions, they maintain the design-required clearance. However, when the turbocharger enters a high-temperature operating state, because the turbine housing's coefficient of expansion is greater than that of the bearing housing, the radial expansion rate of the turbine housing is higher than that of the bearing housing, causing the clearance between them to continuously increase with rising temperature.

[0004] The increased clearance results in a larger radial movement space for the bearing housing within the turbine housing. Under high-speed rotation and vibration conditions, the bearing housing may deviate from its central position, causing the inner side of the turbine housing to come into contact with the rotating turbine blades, resulting in a "scuffing" phenomenon. Scuffing not only reduces turbine efficiency but can also cause turbine blade wear or even breakage in severe cases, affecting turbocharger life and engine performance. Simultaneously, the bolted connection structure will experience additional thermal stress at high temperatures due to differences in thermal expansion, further deteriorating connection reliability.

[0005] Currently, there is no effective solution to address the problem of increased clearance and bearing housing movement caused by differences in thermal expansion. Therefore, there is an urgent need for a novel structure that can automatically compensate for the clearance and achieve bearing housing alignment at high temperatures by utilizing the thermal expansion characteristics of the material itself. Summary of the Invention

[0006] This invention addresses the technical problem in existing conventional turbine housing and bearing housing structures where the turbine housing's thermal expansion coefficient is greater than that of the bearing housing, leading to increased clearance at high temperatures, radial movement of the bearing housing, and consequently, rubbing against the housing. The invention provides a centering structure for the turbine housing. This structure, without altering the original bolted connection method, adds a centering structure to the inner side of the mating surface, utilizing the difference in thermal expansion to achieve automatic centering at high temperatures. Simultaneously, a rationally designed initial clearance prevents stress concentration from damaging the structure.

[0007] The present invention adopts the following technical solution.

[0008] On one hand, the present invention provides an improved turbine housing centering structure for a turbocharger, the turbocharger including a turbine housing and a bearing housing, the turbine housing being located radially outward of the bearing housing, the two being fixedly connected by bolts, and a conventional mating surface being formed between the inner wall of the turbine housing and the outer wall of the bearing housing; the centering structure is disposed on the inner side of the conventional mating surface, i.e., the side near the turbine blades, and includes: a turbine housing centering structure protruding radially inward from the inner side of the turbine housing; a bearing housing centering structure correspondingly disposed on the outer side of the bearing housing and located radially outward of the turbine housing centering structure; the bearing housing centering structure and the bearing housing are connected by bolts. The turbine housing centering structure is axially abutted for positioning; the linear expansion coefficient of the turbine housing material is greater than that of the bearing housing material; under normal temperature assembly conditions, there is an initial gap between the radial centering mating surfaces of the turbine housing centering structure and the bearing housing centering structure, and the two do not contact each other; when the operating temperature rises, the radial expansion of the turbine housing centering structure is greater than that of the bearing housing centering structure. When the temperature rises to the design centering temperature T1, the radial centering mating surfaces contact each other to form a radial positioning pair, centering the bearing housing; when the temperature continues to rise, the gap of the conventional mating surfaces increases and only serves as free expansion space.

[0009] Furthermore, the turbine housing centering structure has an axial turbine housing surface one, and the bearing housing centering structure has a bearing housing surface one. The bearing housing surface one abuts against the turbine housing surface one, thereby achieving axial abutment positioning between the bearing housing centering structure and the turbine housing centering structure. The turbocharger also includes a bolt washer, and the bearing housing centering structure has a bearing housing surface three, which abuts against the bolt washer.

[0010] Furthermore, the turbine housing centering structure is composed of two protrusions, an inner one and an outer one, extending from the inner side of the turbine housing, with an inner cavity between the two protrusions; the outer protrusion has a turbine housing surface two, the inner protrusion has a turbine housing surface four, and the structure between the two protrusions has an axial turbine housing surface one; the bearing body centering structure has a bearing body surface two that radially corresponds to the turbine housing surface two, and a bearing body surface four that radially corresponds to the turbine housing surface four; the radial centering mating surface is composed of the turbine housing surface four and the bearing body surface four, and the initial gap is the gap between the two.

[0011] Furthermore, the contact area of ​​the radially aligned mating surface is provided with a rounded corner structure, which includes a bearing housing rounded corner structure disposed on the bearing body and a turbine housing rounded corner structure disposed on the turbine housing; as the temperature continues to rise from the design alignment temperature T1 to the maximum operating temperature T2, the contact force at the radially aligned mating surface increases gradually, and the stress at the rounded corner structure remains within a safe range. Preferably, the rounded corner radius of the turbine housing rounded corner structure is not less than 1 mm, and the rounded corner radius of the bearing body rounded corner structure is not less than 2.8 mm.

[0012] Furthermore, the initial clearance δ satisfies: δmin < δ < (α1-α2)×R×(T2-T0); where α1 is the linear expansion coefficient of the turbine housing material, α2 is the linear expansion coefficient of the bearing housing material, and α1 > α2; R is the characteristic radius at the radial alignment mating surface; T2 is the maximum operating temperature; T0 is the room temperature assembly temperature; δmin is the minimum safe clearance value determined by the thermomechanical fatigue analysis of the turbine housing and the bearing housing, to ensure that the cumulative equivalent plastic strain at the fillet structure is less than the evaluation value throughout the entire thermal shock cycle.

[0013] Furthermore, the bolt only bears axial connection load; at high temperatures, the clearance of the conventional mating surfaces increases and no longer serves a centering function, and the bolt does not bear additional bending moment due to centering offset.

[0014] Furthermore, the turbine housing alignment structure is an annular boss machined on the inner side of the turbine housing, and the bearing housing alignment structure is an annular groove machined on the outer side of the bearing housing; during assembly, the initial clearance is controlled according to the room temperature dimensional chain, and the clearance value of the initial clearance is detected using a gauge.

[0015] On the other hand, the present invention also provides a method for determining the initial clearance of the improved turbine housing alignment structure for a turbocharger, wherein the initial clearance is determined according to the following steps: Step 1: Obtain the linear expansion coefficient α1 of the turbine housing material and the linear expansion coefficient α2 of the bearing housing material, where α1 > α2, and the characteristic radius R at the mating surface of the alignment structure; Step 2: Determine the highest operating temperature T2 and the room temperature assembly temperature T0 of the turbocharger; Step 3: Calculate the maximum allowable clearance value Δmax = (α1 - α2) × R × (T2 - T0); Step 4: Through finite element thermomechanical fatigue analysis, simulate different initial clearance values ​​to determine the minimum safe clearance value δmin that satisfies the requirement that the cumulative equivalent plastic strain at the fillet is less than the evaluation value under thermal shock cycle conditions; Step 5: Select the initial clearance δ within the interval (δmin, Δmax); Step 6: Verify the contact state and stress level of the selected initial clearance δ in the full temperature range from room temperature to the highest operating temperature through finite element simulation to ensure that the alignment function is realized and the structure is safe.

[0016] In another aspect, the present invention also provides a turbocharger, including a turbine housing, a bearing housing and a compressor, wherein the improved turbine housing centering structure for the turbocharger described above is provided between the turbine housing and the bearing housing.

[0017] Compared with the prior art, the present invention has the following beneficial effects: (1) A centering structure is added to the inner side of the conventional mating surface, which is compatible with the original bolt connection method. It is easy to upgrade and apply to existing products with small modifications and low cost; (2) Automatic centering at high temperature is achieved by utilizing the thermal expansion difference between the turbine housing and the bearing body. No external control mechanism or active adjustment device is required, and the structure is simple and reliable; (3) The optimal value of the initial gap is determined by scientific calculation, which takes into account both the realization of the centering function and the structural strength safety, and avoids the dual risks of centering failure due to excessive gap and stress damage due to insufficient gap; (4) The rounded corner structure combined with the reasonable gap design makes the contact force build up slowly within the safe range, avoiding fatigue cracks caused by stress concentration; (5) After the gap of the original conventional mating surface is increased, it only serves as an expansion compensation space and no longer undertakes the centering function. This completely solves the problem of high temperature movement of the bearing body and significantly improves the working reliability and service life of the turbocharger. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of a turbocharger according to this application.

[0019] Figure 2 This is a cross-sectional view of a turbocharger according to this application.

[0020] Figure 3 for Figure 2 A magnified view of region A in the middle.

[0021] Figure 4 for Figure 3 A magnified view of region B in the middle.

[0022] Figure 5 This is a schematic diagram of the radial fit of the turbine housing centering structure in the initial state at room temperature in this invention.

[0023] Figure 6 This is a schematic diagram of the radial fit of the turbine housing centering structure in the present invention under high-temperature operating conditions.

[0024] Figure 7 A schematic diagram of the initial gap design window.

[0025] The meanings of the markings in the diagram are as follows: 1-Turbine housing; 2-Bearing body; 3-Compressor; 11-Bolt; 12-Bolt washer; 14-Turbine housing centering structure; 24-Bearing body centering structure; 8-Bearing body rounded corner structure; 9-Turbine housing rounded corner structure.

[0026] 141 - Turbine shell surface one; 142 - Turbine shell surface two; 144 - Turbine shell surface four.

[0027] 241 - Bearing surface one; 242 - Bearing surface two; 243 - Bearing surface three; 244 - Bearing surface four.

[0028] δ - Initial gap value; T0 - Normal temperature; T1 - Initial contact temperature (design alignment temperature); T2 - Maximum operating temperature; Δmax - Maximum allowable gap value; δmin - Minimum safe gap value.

[0029] Initial clearance: The clearance between turbine housing surface 4.144 and bearing housing surface 4.244.

[0030] Standard mating surface clearance: the clearance between turbine housing surface 2142 and bearing housing surface 242. Detailed Implementation

[0031] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0032] In the following embodiments, the same or similar reference numerals denote the same or similar originals or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0033] In the description of this invention, it should be understood that terms such as center, longitudinal, transverse, length, width, thickness, upper, lower, front, rear, left, right, vertical, horizontal, top, bottom, inner, outer, clockwise, counterclockwise, etc., indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings and are only for the convenience of describing and simplifying the description of this invention; therefore, they should not be construed as limiting this invention. Furthermore, terms such as first, second, etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features shown. In the description of this invention, unless otherwise expressly specified and limited, terms such as installation, connection, linking, etc., should be interpreted broadly, and those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0034] See Figures 1 to 7 A turbocharger according to this application includes a turbine housing 1; a bearing housing 2; and a compressor 3, specifically the turbine housing centering assembly structure.

[0035] In the conventional structure, the turbine housing 1 is located on the radial outer side of the bearing body 2, and the two are fixedly connected by bolts 11 and bolt washers 12. The clearance between the mating surfaces remains at the design value at room temperature, but increases at high temperature.

[0036] like Figures 4 to 7As shown, the present invention adds a centering structure to the inner side (near the turbine blade side) of the conventional mating surface. The centering structure includes: (1) two bosses extending from the inner side of the turbine housing 1 to form a turbine housing centering structure 14, and there is an inner cavity between the two bosses, and a turbine housing rounded corner structure 9. Specifically, the inner boss has a turbine housing surface four 144, the outer boss has a turbine housing surface two 142, and the structure between the two bosses has an axial turbine housing surface one 141. (2) The bearing body centering structure 24 is provided on the outer side of the bearing body 2. Specifically, the bearing body centering structure 24 has a bearing body surface 1 241, a bearing body surface 242, a bearing body surface 3 243, and a bearing body surface 4 244. Among them, the bearing body surface 1 241 abuts against the turbine housing surface 1 141, the bearing body surface 3 243 abuts against the bolt washer 12, the bearing body surface 2 242 corresponds to the turbine housing surface 2 142, and the bearing body surface 4 244 corresponds to the turbine housing surface 4 144 (there is an initial gap between the two at room temperature).

[0037] At the aforementioned centering structure, the turbine housing centering structure 14 is located on the radial inner side, and the bearing housing centering structure 24 is located on the radial outer side. That is, the inner and outer positional relationship of this radial positioning pair is opposite to the inner and outer positional relationship of the conventional mating surface.

[0038] The initial gap in this application is determined according to the following steps: Step 1: Obtain the linear expansion coefficient α1 of the turbine housing material and the linear expansion coefficient α2 of the bearing housing material (α1 > α2), as well as the characteristic radius R at the mating surface of the centering structure; Step 2: Determine the turbocharger's maximum operating temperature T2 and room temperature assembly temperature T0; Step 3: Calculate the theoretical maximum expansion difference Δmax = (α1-α2) × R × (T2-T0), which is the maximum allowable gap value to ensure the centering function; Step 4: Through finite element thermomechanical fatigue analysis, simulations are performed for different initial gap values ​​to determine the minimum safe gap value δmin that satisfies the requirement that the cumulative equivalent plastic strain at the fillet is less than the evaluation value under thermal shock cyclic conditions. Step 5: Select an initial gap δ within the interval (δmin, Δmax), prioritizing values ​​closer to the middle of the interval to balance functional margin and strength margin; Step 6: Verify the contact state and stress level of the selected δ value in the full temperature range from room temperature to the highest operating temperature through finite element simulation to ensure that the centering function is realized and the structure is safe.

[0039] The following are specific implementation examples: Taking a certain type of turbocharger as an example, the turbine housing material is manganese steel, and the coefficient of linear expansion is α1 = 19.6 × 10⁻⁶. -6 / K; The bearing housing material is medium silicon molybdenum, with a linear expansion coefficient of α2 = 13.9 × 10⁻⁶. -6 / K. The difference in their coefficients of thermal expansion is Δα = 5.7 × 10⁻⁶. -6 / K. The characteristic radius at the mating surface of the centering structure is R=53.25mm (located inside the conventional mating surface, with a smaller radius than the conventional mating surface), the maximum operating temperature is T2=650℃, and the normal temperature is T0=20℃.

[0040] The radial expansion of the turbine housing at the centering structure is: ΔL1 = α1 × R × (T2-T0) = 19.6×10 -6 × 53.25 × (650-20) = 0.658mm The radial expansion of the bearing housing at the centering structure is: ΔL2 = α2 × R × (T2-T0) = 13.9×10 -6 × 53.25 × (650-20) = 0.466mm The difference in expansion between the two is Δmax = ΔL1 - ΔL2 = 0.192mm. That is, the maximum allowable initial gap is 0.192mm. If the initial gap exceeds this value, the two parts of the centering structure will still not contact each other at the highest operating temperature, and the centering function will fail.

[0041] Finite element thermomechanical fatigue analysis showed that when the initial clearance δ was 0.1 mm, the cumulative equivalent plastic strain between the turbine housing and the bearing body under thermal shock conditions exceeded the limit. When the initial clearance δ was 0.12 mm, the requirement was met, therefore δmin = 0.12 mm. Taking a margin of 20%~30%, the initial clearance δ = 0.15 mm.

[0042] In this embodiment, the initial clearance δ is set to 0.15 mm, falling within the range of (0.12, 0.192) mm. At an operating temperature of 650°C, the additional expansion of the turbine housing relative to the bearing housing is 0.192 mm, sufficient to eliminate the 0.15 mm initial clearance and generate an equivalent interference fit of 0.042 mm, achieving reliable alignment. Simultaneously, the cumulative equivalent plastic strain at the fillet is 80% of the limit, meeting the long-term service life requirements.

[0043] In this application, the treatment of conventional mating surfaces is as follows: After adding the centering structure, the clearance between the conventional mating surfaces no longer serves a centering function. At high temperatures, this clearance increases and serves only as free expansion space between the turbine housing and the bearing body, preventing additional contact between the two in the non-centering structure area. Bolt 11 is only used to bear axial connection loads and no longer bears additional bending moments due to centering offset. The stress state of the bolt is improved, which is beneficial to improving the fatigue life of the bolt connection.

[0044] In this application, the structural machining and assembly requirements are as follows: the centering structure can be achieved by machining an annular boss on the inner side of the turbine housing and an annular groove on the outer side of the bearing body. The specific machining process should meet the following requirements: The fillets of the centering structure contact surfaces should have a smooth transition, and the fillet radius should not be too small (the recommended fillet radius for the centering structure of the turbine housing is r≥1mm, and for the centering structure of the bearing housing is r≥2.8mm) in order to reduce local stress concentration. During assembly, the initial clearance should be controlled according to the dimensional chain at room temperature. After assembly, the clearance value should be checked with a special inspection tool to ensure that it meets the design requirements.

[0045] The technical solution in this application works as follows: Under normal temperature assembly conditions, there is an initial gap between the turbine housing surface 144 and the bearing housing surface 244 of the centering structure, and the two do not contact each other. The clearance of the conventional mating surfaces remains at the design value, and bolt 11 completes the axial fixation.

[0046] After the turbocharger starts, high-temperature exhaust gas enters the turbine housing 1, and the temperature gradually increases. Since the thermal expansion coefficient of the turbine housing 1 is greater than that of the bearing housing 2, the radial expansion rate of the turbine housing centering structure 14 located on the radial inner side (specifically at the turbine housing surface 144 structure) is higher than that of the bearing housing centering structure 24 located on the radial outer side, and the gap between the two (initial gap) gradually decreases.

[0047] When the temperature reaches the design alignment temperature T1 (approximately 510°C in this embodiment), the turbine housing surface 144 and the bearing housing surface 244 of the alignment structure are just in contact (e.g., Figure 6 As shown in the figure, a radial positioning constraint is formed, which restricts the bearing body 2 to the center position, realizing automatic alignment. Thereafter, the temperature continues to rise to the maximum operating temperature T2 (650℃), and the contact force increases gradually, but the stress at the rounded corner structure 8 of the bearing body and the rounded corner structure 9 of the turbine housing is always controlled within a safe range until a thermal equilibrium state is reached.

[0048] Throughout the entire operating temperature range, the bearing housing is reliably centered due to the constraints of the centering structure, preventing radial movement. Although the clearance between the conventional mating surfaces (the clearance between turbine housing surface 142 and bearing housing surface 242) increases with temperature, it no longer affects the centering accuracy, thus completely avoiding turbine rubbing problems caused by bearing housing movement.

[0049] The beneficial effects of the technical solution in this application are summarized as follows.

[0050] A centering structure for a turbine housing is disposed on the inner side (i.e., the side closer to the turbine blades) of the mating contact surface between a conventional turbine housing and a bearing housing. The centering structure is a radially locating pair, and its structural relationship is the opposite of that of the conventional mating surfaces: at the centering structure, the turbine housing is located radially inner, and the bearing housing is located radially outer. In the initial state at room temperature, there is an initial gap between the mating surfaces of the centering structure, and the two are in a non-contact state.

[0051] The initial clearance value is calculated and determined based on the difference in thermal expansion coefficients between the turbine housing and the bearing housing, as well as the operating temperature range. Its design must simultaneously meet the following dual constraints: (a) Upper limit constraint on gap (centering function constraint): The initial clearance must not be too large; otherwise, when the operating temperature reaches its maximum, the radial thermal expansion of the turbine housing will still be insufficient to eliminate the clearance. The outer wall of the turbine housing in the centering structure will never contact the inner wall of the bearing housing, rendering the centering structure ineffective. The bearing housing will still have room for movement, and the risk of rubbing against the housing will remain. In other words, the following must be met: δ < (α1-α2) × R × (T2-T0) Where δ is the initial clearance, α1 is the linear expansion coefficient of the turbine housing material, α2 is the linear expansion coefficient of the bearing housing material (α1>α2), R is the characteristic radius of the mating surface of the centering structure (i.e., the radius at 144 on the turbine housing surface), T2 is the maximum operating temperature, and T0 is the room temperature assembly temperature.

[0052] (ii) Lower limit constraint of clearance (structural strength constraint): The initial clearance must not be too small; otherwise, the turbine housing of the aligned structure will prematurely contact the bearing housing before the design operating temperature is reached. The contact area is usually surrounded by machined fillets. Premature contact will cause excessive contact stress in the fillet area, resulting in stress concentration, which may lead to structural fatigue failure under long-term repeated thermal cycling loads. In other words, the following must be met: δ > δmin δmin is determined by the thermomechanical fatigue analysis of the turbine housing and bearing housing to ensure that the cumulative equivalent plastic strain at the fillet is less than the evaluation value throughout the entire thermal shock cycle.

[0053] As the operating temperature increases, the radial expansion of the turbine housing (which has a larger coefficient of thermal expansion) located on the radially inner side gradually increases. When the temperature reaches the design alignment temperature T1, the turbine housing surface 144 and the bearing housing surface 244 at the alignment structure come into contact, forming a radial positioning constraint that confines the bearing housing to the center position, achieving an automatic alignment effect. As the temperature continues to rise to the maximum operating temperature T2, the contact force gradually increases, but remains within the allowable range of structural strength. Throughout the process, due to the constraint of the alignment structure, the bearing housing is reliably centered and cannot experience radial movement, thus preventing casing rubbing.

[0054] Meanwhile, although the original conventional mating surface clearance also increases with temperature, it no longer serves as a centering function, but only as a free expansion space. The bolt connection only transmits axial loads and no longer bears the additional bending moment caused by centering offset, thus improving the stress state of the bolt.

[0055] The scope of protection of this invention includes, but is not limited to, the above embodiments. The scope of protection of this invention is defined by the claims. Any substitutions, modifications, or improvements to this technology that are easily conceived by those skilled in the art fall within the scope of protection of this invention.

Claims

1. An improved turbine housing centering structure for a turbocharger, the turbocharger comprising a turbine housing (1) and a bearing body (2), the turbine housing (1) being located radially outside the bearing body (2), the two being fixedly connected by bolts (11), and a conventional mating surface being formed between the inner wall of the turbine housing (1) and the outer wall of the bearing body (2); Its features are: The centering structure is located on the inner side of the conventional mating surface, i.e. the side close to the turbine blade, and includes: a turbine housing centering structure (14) that protrudes radially inward from the inner side of the turbine housing (1); The bearing body centering structure (24) is correspondingly disposed on the outer side of the bearing body (2) and located on the radial outer side of the turbine housing centering structure (14); the bearing body centering structure (24) and the turbine housing centering structure (14) are axially abutted and positioned. The linear expansion coefficient of the turbine housing (1) material is greater than that of the bearing body (2) material; Under normal temperature assembly conditions, there is an initial gap between the radial centering mating surfaces of the turbine housing centering structure (14) and the bearing housing centering structure (24), and the two do not contact each other. When the operating temperature rises, the radial expansion of the turbine housing centering structure (14) is greater than the radial expansion of the bearing housing centering structure (24). When the temperature rises to the design centering temperature, the radial centering mating surfaces contact each other to form a radial positioning pair, which centers the bearing housing (2). When the temperature continues to rise, the gap of the conventional mating surfaces increases and only serves as free expansion space.

2. The improved turbine housing alignment structure for a turbocharger according to claim 1, characterized in that, The turbine housing centering structure (14) has an axial turbine housing surface one (141), and the bearing body centering structure (24) has a bearing body surface one (241). The bearing body surface one (241) abuts against the turbine housing surface one (141), thereby achieving axial abutment positioning between the bearing body centering structure (24) and the turbine housing centering structure (14). The turbocharger also includes a bolt washer (12), and the bearing body centering structure (24) has a bearing body surface three (243), which abuts against the bolt washer (12).

3. The improved turbine housing alignment structure for a turbocharger according to claim 1, characterized in that, The turbine housing centering structure (14) is composed of two inner and outer bosses extending from the inner side of the turbine housing (1), with an inner cavity between the two bosses; the outer boss has a turbine housing surface two (142), the inner boss has a turbine housing surface four (144), and the structure between the two bosses has an axial turbine housing surface one (141); the bearing body centering structure (24) has a bearing body surface two (242) radially corresponding to the turbine housing surface two (142), and a bearing body surface four (244) radially corresponding to the turbine housing surface four (144); the radial centering mating surface is composed of the turbine housing surface four (144) and the bearing body surface four (244), and the initial gap is the gap between the two.

4. The improved turbine housing centering structure for a turbocharger according to any one of claims 1 to 3, characterized in that, The contact area of ​​the radial centering mating surface is provided with a rounded corner structure. The rounded corner structure includes a bearing body rounded corner structure (8) provided on the bearing body (2) and a turbine housing rounded corner structure (9) provided on the turbine housing (1). As the temperature continues to rise from the design centering temperature (T1) to the maximum operating temperature (T2), the contact force at the radial centering mating surface increases gradually, and the stress at the rounded corner structure remains within a safe range.

5. The improved turbine housing alignment structure for a turbocharger according to claim 4, characterized in that, The radius of the rounded corners of the turbine housing (9) is not less than 1 mm, and the radius of the rounded corners of the bearing housing (8) is not less than 2.8 mm.

6. The improved turbine housing centering structure for a turbocharger according to any one of claims 1 to 3, characterized in that, The initial clearance δ satisfies: δmin<δ<(α1-α2)×R×(T2-T0); where α1 is the linear expansion coefficient of the turbine housing (1) material, α2 is the linear expansion coefficient of the bearing body (2) material, and α1>α2; R is the characteristic radius at the radial centering mating surface; T2 is the highest operating temperature; T0 is the room temperature assembly temperature; δmin is the minimum safe clearance value determined by the thermomechanical fatigue analysis of the turbine housing (1) and the bearing body (2) to ensure that the cumulative equivalent plastic strain at the rounded corner structure is less than the evaluation value during the entire thermal shock cycle.

7. The improved turbine housing centering structure for a turbocharger according to any one of claims 1 to 3, characterized in that, The bolt (11) only bears axial connection load; after the gap of the conventional mating surface increases at high temperature, it no longer bears the centering function, and the bolt (11) does not bear additional bending moment due to centering offset.

8. The improved turbine housing centering structure for a turbocharger according to any one of claims 1 to 3, characterized in that, The turbine housing centering structure (14) is an annular boss machined on the inner side of the turbine housing (1), and the bearing body centering structure (24) is an annular groove machined on the outer side of the bearing body (2). During assembly, the initial gap is controlled according to the normal temperature dimensional chain, and the gap value of the initial gap is detected by a gauge.

9. A method for determining the initial clearance of an improved turbine housing alignment structure for a turbocharger as described in any one of claims 1 to 8, characterized in that, The initial clearance is determined according to the following steps: Step 1: Obtain the linear expansion coefficient α1 of the turbine housing material and the linear expansion coefficient α2 of the bearing housing material, where α1 > α2, and the characteristic radius R at the mating surface of the alignment structure; Step 2: Determine the highest operating temperature T2 and the room temperature assembly temperature T0 of the turbocharger; Step 3: Calculate the maximum allowable clearance value Δmax = (α1 - α2) × R × (T2 - T0); Step 4: Through finite element thermomechanical fatigue analysis, simulate different initial clearance values ​​to determine the minimum safe clearance value δmin that satisfies the requirement that the cumulative equivalent plastic strain at the fillet is less than the evaluation value under thermal shock cycle conditions; Step 5: Select the initial clearance δ within the interval (δmin, Δmax); Step 6: Verify the contact state and stress level of the selected initial clearance δ in the full temperature range from room temperature to the highest operating temperature through finite element simulation to ensure that the alignment function is realized and the structure is safe.

10. A turbocharger, comprising a turbine housing (1), a bearing housing (2), and a compressor (3), characterized in that, An improved turbine housing centering structure for a turbocharger, as described in any one of claims 1 to 8, is provided between the turbine housing (1) and the bearing body (2).