A method, system, equipment and medium for emergency shutdown control of a hydro-generator unit
By acquiring and verifying the surge tank water level signal and the tailrace outlet pressure signal, and combining the signal measurement point quality, a combination of delay and trip command was used to solve the reliability problem of emergency shutdown of the hydro-generator unit, reduce the frequency of erroneous shutdowns, and stabilize the power grid frequency.
Patent Information
- Application Number
- CN202611378266.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-07
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies rely on sensor signals to determine when a hydro-generator unit needs to be shut down in an emergency. However, sensor malfunctions can easily lead to false trips or failures to operate, making it impossible to guarantee the reliability of the shutdown process.
By acquiring the surge tank water level signal, the tailrace outlet pressure signal, and the quality of the signal measuring points, and by combining parallel signals and delay commands with trip unit commands, emergency shutdown control of the hydro-generator unit can be achieved.
This effectively reduced the frequency of erroneous unit shutdowns, avoided grid frequency fluctuations caused by the simultaneous tripping of multiple hydro-generator units, and improved the reliability of the shutdown process.
Smart Images

Figure CN123109934A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of industrial control technology, and more specifically, to an emergency shutdown control method, system, equipment, and medium for a hydro-generator unit. Background Technology
[0002] In the hydropower industry, turbine generator sets are key power equipment for energy conversion in hydropower plants, and their procurement cost accounts for a large proportion of the power plant's equipment investment. Therefore, ensuring the safe and stable operation of turbine generator sets is of paramount importance in the daily production management of hydropower plants. With the development of automation and computer network technologies, hydropower plants typically rely on local control units to automatically monitor and control turbine generator sets, thereby realizing the daily start-up, shutdown, and operating condition adjustment of the units. If the local control unit malfunctions and shuts down during operation, or if there is a sudden abnormality in the unit's auxiliary equipment, the control system must be able to execute emergency shutdown actions in a timely and safe manner to prevent the accident from escalating and to protect the safety of the equipment.
[0003] Chinese invention patent CN113339183A discloses an emergency shutdown control method, device, and equipment for a hydro-generator unit, specifically disclosing the following technical solution: acquiring the status signals of the hydro-generator unit and its auxiliary equipment, and determining whether the status signals meet the pre-set predetermined shutdown logic; the predetermined shutdown logic includes signal combinations of status signals recorded in a progressive relationship, and action commands corresponding to the signal combinations. This prior art, by designing a shutdown logic with a multi-level progressive relationship, realizes an automatic sequential shutdown process for the auxiliary equipment of the hydro-generator unit, thereby reducing the workload of manual programming during testing; however, this method relies entirely on the output of sensors at each level. Once a sensor experiences signal drift, disconnection, or outputs a bad quality signal, the entire shutdown process will produce incorrect judgments, ultimately leading to false tripping or failure to operate in a real accident. Therefore, the reliability of triggering the hydro-generator unit shutdown process cannot be guaranteed. Summary of the Invention
[0004] The purpose of this invention is to provide an emergency shutdown control method, system, equipment, and medium for hydro-generator units to solve the technical problems pointed out in the background art.
[0005] This invention is achieved through the following technical solution: an emergency shutdown control method for a hydro-generator unit, comprising the following steps: Identify the target hydro-generator unit; Acquire the surge chamber water level signal, tailrace outlet pressure signal, and measurement quality of the signal measuring points corresponding to the target hydro-generator unit; The fault level of the target hydro-generator unit is determined based on the pressure regulating chamber water level signal, and it is determined whether the predetermined shutdown logic corresponding to the fault level is met. The predetermined shutdown logic includes a combination of tailrace outlet pressure signal and measuring point quality signal recorded in parallel, and an action command corresponding to the signal combination. The action command is a combination of a delay command and a trip unit command. If so, a control signal is sent to the controlled equipment corresponding to the target hydro-generator unit according to the established shutdown logic to perform emergency shutdown control on the target hydro-generator unit.
[0006] According to a preferred embodiment, the target hydro-generator unit is a hydro-generator unit that is currently in normal power generation and has not undergone a shutdown procedure.
[0007] According to a preferred embodiment, the step of determining whether the predetermined shutdown logic corresponding to the fault level is met specifically includes: Determine whether the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point simultaneously satisfy the parallel relationship corresponding to the signal combination; If so, determine that the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point meet the predetermined shutdown logic corresponding to the fault level.
[0008] According to a preferred embodiment, a control signal is sent to the controlled equipment corresponding to the target hydro-generator unit according to the predetermined shutdown logic, specifically including: When the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point meet the predetermined shutdown logic corresponding to the fault level, the action command corresponding to the signal combination is obtained. Based on the action command, a corresponding control signal is generated and the control signal is sent to the controlled equipment corresponding to each target hydro-generator unit.
[0009] According to a preferred embodiment, the fault level is divided into three levels from low to high based on the pressure regulating chamber water level signal: Level 1 over-limit, Level 2 over-limit, and Severe over-limit. The predetermined shutdown logic includes Level 1 water level over-limit logic corresponding to Level 1 over-limit, Level 2 water level over-limit logic corresponding to Level 2 over-limit, and Severe water level over-limit logic corresponding to Severe over-limit.
[0010] According to a preferred embodiment, the method further includes: determining a preset priority based on the load, equipment operating status, and maintenance calculations of each target hydro-generator unit.
[0011] According to a preferred embodiment, the signal combination corresponding to the first-level water level over-limit logic is: the tailrace pipe outlet pressure signal is greater than the first preset pressure threshold and the measurement point quality is normal; the action command corresponding to the first-level water level over-limit logic is: after a delay of the first preset time period, start the first priority hydro-turbine generator unit for emergency shutdown. The signal combination corresponding to the secondary water level over-limit logic is: the tailrace pipe outlet pressure signal is greater than the second preset pressure threshold and the measuring point quality is normal; the action command corresponding to the secondary water level over-limit logic is: after a delay of the second preset time period, the first priority and second priority hydro-turbine generator units are started to shut down in sequence, the second preset pressure threshold is greater than the first preset pressure threshold, and the second preset time period is less than the first preset time period. The action command corresponding to the severe water level exceeding the limit logic is: after a second preset time period, sequentially start all target hydro-generator units for emergency shutdown.
[0012] The present invention also provides an emergency shutdown control system for a hydro-generator unit, which applies the above-mentioned emergency shutdown control method for a hydro-generator unit. The system includes: The data acquisition unit is used to determine the target hydro-turbine generator set and acquire the surge tank water level signal, tailrace outlet pressure signal, and measurement quality of the signal measuring points corresponding to the target hydro-turbine generator set. The fault determination unit is used to determine the fault level of the target hydro-generator unit based on the pressure regulating chamber water level signal, and to determine whether the predetermined shutdown logic corresponding to the fault level is met. The predetermined shutdown logic includes a combination of tailrace outlet pressure signal and measuring point quality signal recorded in parallel, and an action command corresponding to the signal combination. The action command is a combination of a delay command and a trip unit command. The control unit is used to send a control signal to the controlled equipment corresponding to the target hydro-generator unit in accordance with the predetermined shutdown logic corresponding to the fault level when the predetermined shutdown logic is met, so as to perform emergency shutdown control on the target hydro-generator unit.
[0013] The present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the above-described emergency shutdown control method for a hydro-generator unit.
[0014] The present invention also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the above-described emergency shutdown control method for a hydro-generator unit.
[0015] The technical solution of the emergency shutdown control method, system, equipment and medium for hydro-generator units provided by the present invention has at least the following advantages and beneficial effects: by acquiring and verifying the surge tank water level signal, the tailrace outlet pressure signal and the quality of the measuring points, it is possible to identify abnormal signals, thereby effectively reducing the frequency of erroneous unit shutdowns; by combining the delay command and the tripping unit command as the action output, it is possible to effectively avoid grid frequency fluctuations caused by the simultaneous tripping of multiple hydro-generator units. Attached Figure Description
[0016] Figure 1 This is a flowchart illustrating the emergency shutdown control method for a hydro-generator unit provided in Embodiment 1 of the present invention. Figure 2 This is a structural block diagram of the emergency shutdown control system for a hydro-generator unit provided in Embodiment 1 of the present invention. Detailed Implementation
[0017] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. The components of the embodiments of the present invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0018] Example 1 This invention provides an emergency shutdown control method for a hydro-generator unit. Figure 1 This is a schematic diagram of the overall process of the emergency shutdown control method, as follows: Figure 1 As shown, the emergency shutdown control method includes the following steps: Step S101: Determine the target hydro-generator unit; In this embodiment, the target hydro-generator unit is a hydro-generator unit that is currently in normal power generation and has not executed a shutdown procedure; this status verification can effectively avoid conflicts between emergency shutdown due to accidents and ongoing normal shutdown or commissioning procedures.
[0019] Step S102: Obtain the surge tank water level signal, tailrace outlet pressure signal, and measurement quality of the signal measuring points corresponding to the target hydro-generator unit; in addition, auxiliary measuring points such as unit vibration, sway, and flow rate can be added to further improve reliability, and no specific restrictions are imposed here. The pressure level signal in the pressure regulating chamber can be acquired by an ultrasonic level gauge or a submersible pressure level gauge installed on the top of the pressure regulating chamber; the pressure signal at the tailrace pipe outlet can be acquired by a pressure transmitter installed at the outlet section of the tailrace pipe cone; the measurement quality of the signal measurement point refers to the data quality status bit in the programmable logic controller of the sensor acquisition channel. This status bit can reflect whether the acquisition channel has experienced faults such as disconnection, short circuit, exceeding the maximum range, or signal freezing; when the acquisition channel is working normally, the measurement quality is marked as normal, while when the acquisition channel is abnormal, the measurement quality is marked as abnormal.
[0020] Step S103: Determine the fault level of the target hydro-generator unit based on the pressure regulating chamber water level signal, and determine whether the predetermined shutdown logic corresponding to the fault level is met. Specifically, the correspondence between different water level heights and fault levels can be preset. When the water level signal in the pressure regulating chamber exceeds the set limit, it is determined to be the corresponding fault level.
[0021] In this embodiment of the invention, the predetermined shutdown logic includes a combination of tailrace pipe outlet pressure signal and measuring point quality signal recorded in parallel, as well as the action command corresponding to the signal combination. In the determination, the amplitude range determination of tailrace pipe outlet pressure signal and the determination of whether the measuring point quality is normal are logically ANDed. If both determination conditions are met at the same time, it means that the tailrace pipe outlet pressure has indeed increased abnormally, and the sensor signal quality is normal and not a false signal. At this time, it is determined that the current operating condition meets the predetermined shutdown logic.
[0022] The action command is a combination of a delay command and a trip unit command; the delay command indicates waiting for a preset time period before tripping to mitigate the impact of transient hydraulic fluctuations; the trip unit command indicates the tripping action of a specified hydro-generator unit.
[0023] Step S104: If the judgment result of step S103 satisfies the predetermined shutdown logic, then a control signal is sent to the controlled equipment corresponding to the target hydro-generator unit in accordance with the predetermined shutdown logic to perform emergency shutdown control on the target hydro-generator unit.
[0024] Specifically, a level trip signal can be sent to the turbine governor, excitation system switch, and generator outlet circuit breaker via passive relay contacts or high-frequency industrial bus. Emergency shutdown can be implemented by quickly closing the guide vanes and disconnecting the main switch, thereby protecting the safety of the water intake system and the turbine generator set.
[0025] In some preferred embodiments, the specific process for determining whether the predetermined shutdown logic corresponding to the fault level is met is as follows: It is determined whether the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point simultaneously satisfy the parallel relationship corresponding to the signal combination; if so, it is determined that the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point satisfy the predetermined shutdown logic corresponding to the fault level. This dual verification can achieve the discrimination of abnormal signals, thereby effectively reducing the frequency of erroneous unit shutdowns.
[0026] In some preferred embodiments, control signals are sent to the controlled equipment corresponding to the target hydro-generator unit according to the predetermined shutdown logic. Specifically, this includes: when the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point meet the predetermined shutdown logic corresponding to the fault level, obtaining the action command corresponding to the signal combination; generating the corresponding control signal based on the action command, and sending the control signal to the controlled equipment corresponding to each target hydro-generator unit.
[0027] In some preferred embodiments, the fault levels are classified into three levels—Level 1 Over-limit, Level 2 Over-limit, and Severe Over-limit—based on the surge tank water level signal from low to high. The predetermined shutdown logic includes Level 1 over-limit logic corresponding to Level 1 over-limit, Level 2 over-limit logic corresponding to Level 2 over-limit, and Severe over-limit logic corresponding to Severe over-limit. Furthermore, preset priorities are determined based on the load, equipment operating status, and maintenance calculations of each target hydro-generator unit. For example, the target hydro-generator units with the longest operating time, lower active power load, or planned maintenance in the near future are designated as first priority, while those bearing important grid loads, newly replaced equipment, or high active power loads are designated as lower second or third priority. This reduces the impact on grid power and unit equipment lifespan when some target hydro-generator units need to be shut down urgently to stabilize the water level.
[0028] In some preferred embodiments, the signal combination corresponding to the first-level water level over-limit logic is: the tailrace outlet pressure signal is greater than a first preset pressure threshold and the measuring point quality is normal; the action command corresponding to the first-level water level over-limit logic is: after a delay of a first preset time period, the first-priority turbine generator unit is initiated for emergency shutdown; the signal combination corresponding to the second-level water level over-limit logic is: the tailrace outlet pressure signal is greater than a second preset pressure threshold and the measuring point quality is normal; the action command corresponding to the second-level water level over-limit logic is: after a delay of a second preset time period, the first-priority and second-priority units are sequentially activated. In the emergency shutdown of the hydro-generator units, the second preset pressure threshold is greater than the first preset pressure threshold, for example, the second preset pressure threshold is 0.39 MPa and the first preset pressure threshold is 0.35 MPa; the second preset duration is less than the first preset duration, for example, the second preset duration is 4 cycles and the first preset duration is 2 cycles, so that the protection can respond more quickly when the water level continues to rise; the action instruction corresponding to the severe water level over-limit logic is: after a delay of the second preset duration, all target hydro-generator units are started in sequence for emergency shutdown, thereby preventing flooding of the surge tank by shutting down the entire plant.
[0029] In summary, this embodiment effectively avoids grid frequency fluctuations caused by the simultaneous tripping of multiple hydro-generator units by combining the delay command and the tripping unit command as the action output.
[0030] Example 2 This embodiment, based on the technical solution provided in Embodiment 1, provides an emergency shutdown control system for a hydro-generator unit, which is applied to the emergency shutdown control method for hydro-generator units as described in Embodiment 1. Figure 2 As shown, the system includes: The data acquisition unit is used to determine the target hydro-generator unit and acquire the surge tank water level signal, tailrace outlet pressure signal, and measurement quality of the signal measuring points corresponding to the target hydro-generator unit. The fault determination unit is used to determine the fault level of the target hydro-generator unit based on the pressure regulating chamber water level signal, and to determine whether the predetermined shutdown logic corresponding to the fault level is met. The predetermined shutdown logic includes the combination of the tailrace outlet pressure signal and the measurement point quality signal recorded in parallel, as well as the action command corresponding to the signal combination. The action command is a combination of the delay command and the trip unit command. The control unit is used to send control signals to the controlled equipment corresponding to the target hydro-generator unit in accordance with the predetermined shutdown logic when the fault level is met, so as to perform emergency shutdown control on the target hydro-generator unit.
[0031] The functions of each unit of the emergency shutdown control system for hydro-generator units in this embodiment are the same as those in the embodiment of the emergency shutdown control method for hydro-generator units, and the technical effects are the same. Therefore, they will not be repeated here.
[0032] Example 3 This embodiment is based on the technical solution provided in Embodiment 1, and provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, it implements the emergency shutdown control method for a hydro-generator set as described in Embodiment 1.
[0033] The electronic device provided in this embodiment has the same function and technical effect as the computer program running on the processor as the embodiment of the emergency shutdown control method for hydro-generator sets, and will not be repeated here.
[0034] Example 4 This embodiment is based on the technical solution provided in Embodiment 1, and provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, it implements the emergency shutdown control method for a hydro-generator unit as described in Embodiment 1.
[0035] The computer-readable storage medium provided in this embodiment, when the computer program is executed by the processor, has the same function and technical effect as the embodiment of the emergency shutdown control method for hydro-generator units, and will not be repeated here.
[0036] The above are merely preferred embodiments of the present invention and are not intended to limit the present invention. Various modifications and variations can be made to the present invention by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.
Claims
1. A method for emergency shutdown control of a hydro-generator unit, characterized in that, Includes the following steps: Identify the target hydro-generator unit; Acquire the current tailrace surge chamber water level signal, tailrace pipe outlet pressure signal, and the measurement quality of the signal measuring points; The fault level of the target turbine generator unit is determined based on the current tailrace surge chamber water level signal, and it is determined whether the predetermined shutdown logic corresponding to the fault level is met. The predetermined shutdown logic includes the combination of tailrace outlet pressure signal and measuring point quality signal recorded in parallel, and the action command corresponding to the signal combination. The action command is a combination of delay command and trip unit command. If so, a control signal is sent to the controlled equipment corresponding to the target hydro-generator unit according to the established shutdown logic to perform emergency shutdown control on the target hydro-generator unit.
2. The emergency shutdown control method for a hydro-generator unit as described in claim 1, characterized in that, The target hydro-turbine generator unit is a hydro-turbine generator unit that is currently generating electricity normally and has not undergone a shutdown procedure.
3. The emergency shutdown control method for a hydro-generator unit as described in claim 2, characterized in that, The determination of whether the predetermined shutdown logic corresponding to the fault level is met specifically includes: Determine whether the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point simultaneously satisfy the parallel relationship corresponding to the signal combination; If so, determine that the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point meet the predetermined shutdown logic corresponding to the fault level.
4. The emergency shutdown control method for a hydro-generator unit as described in claim 3, characterized in that, According to the established shutdown logic, control signals are sent to the controlled equipment corresponding to the target hydro-generator unit, specifically including: When the tailrace outlet pressure signal of the target hydro-generator unit and the measurement quality of the signal measuring point meet the predetermined shutdown logic corresponding to the fault level, the action command corresponding to the signal combination is obtained. Based on the action command, a corresponding control signal is generated and the control signal is sent to the controlled equipment corresponding to each target hydro-generator unit.
5. The emergency shutdown control method for a hydro-generator unit as described in claim 4, characterized in that, The fault levels are divided into three levels from low to high based on the pressure regulating chamber water level signal: Level 1 over-limit, Level 2 over-limit, and Severe over-limit. The predetermined shutdown logic includes Level 1 water level over-limit logic corresponding to Level 1 over-limit, Level 2 water level over-limit logic corresponding to Level 2 over-limit, and Severe water level over-limit logic corresponding to Severe over-limit.
6. The emergency shutdown control method for a hydro-generator unit as described in claim 5, characterized in that, The method also includes determining a preset priority based on the load, equipment operating status, and maintenance calculations of each target hydro-generator unit.
7. The emergency shutdown control method for a hydro-generator unit as described in claim 6, characterized in that, The signal combination corresponding to the first-level water level over-limit logic is: the tailrace pipe outlet pressure signal is greater than the first preset pressure threshold and the measurement point quality is normal; the action command corresponding to the first-level water level over-limit logic is: after a delay of the first preset time period, start the first priority hydro turbine generator unit for emergency shutdown. The signal combination corresponding to the secondary water level over-limit logic is: the tailwater pipe outlet pressure signal is greater than the second preset pressure threshold and the measurement point quality is normal. The action command corresponding to the secondary water level over-limit logic is: after a delay of a second preset time period, the first priority and second priority hydro-generator units are activated for emergency shutdown in sequence, the second preset pressure threshold is greater than the first preset pressure threshold, and the second preset time period is less than the first preset time period; The action command corresponding to the severe water level exceeding the limit logic is: after a second preset time period, start all target hydro-generator units in sequence for emergency shutdown.
8. An emergency shutdown control system for a hydro-generator unit, characterized in that, The system, applied to the emergency shutdown control method for a hydro-generator unit as described in any one of claims 1 to 7, comprises: The data acquisition unit is used to determine the target hydro-turbine generator set and acquire the surge tank water level signal, tailrace outlet pressure signal, and measurement quality of the signal measuring points corresponding to the target hydro-turbine generator set. The fault determination unit is used to determine the fault level of the target hydro-generator unit based on the pressure regulating chamber water level signal, and to determine whether the predetermined shutdown logic corresponding to the fault level is met. The predetermined shutdown logic includes a combination of tailrace outlet pressure signal and measuring point quality signal recorded in parallel, and an action command corresponding to the signal combination. The action command is a combination of a delay command and a trip unit command. The control unit is used to send a control signal to the controlled equipment corresponding to the target hydro-generator unit in accordance with the predetermined shutdown logic corresponding to the fault level when the predetermined shutdown logic is met, so as to perform emergency shutdown control on the target hydro-generator unit.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the processor executes the computer program, it implements the emergency shutdown control method for a hydro-generator unit as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that, A computer program is stored on the computer-readable storage medium, which, when executed by a processor, implements the emergency shutdown control method for a hydro-generator unit as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Shutdown control method and device for water-turbine generator set and shutdown control equipment
CN113339183A