A tunnel-type fiber optic network monitoring system and method

By concealing optical fibers within the geotextile and waterproof membrane interlayer, and combining DAS, DTS, and BOTDA technologies, the problems of easy damage to tunnel optical fibers, monitoring blind spots, and the inability to monitor the entire process have been solved, enabling safety assessment of the entire life cycle of the tunnel.

CN123111450APending Publication Date: 2026-11-17CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611536547.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-30
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing tunnel fiber optic monitoring technology is prone to breakage, damages the waterproofing system, has many blind spots, and cannot achieve continuous monitoring throughout the entire process from construction to operation, making it difficult to meet the needs of tunnel life cycle safety assessment.

Method used

The optical fiber is concealed within the interlayer of geotextile and waterproof membrane, and the optical fiber is held together by the geotextile and waterproof membrane. Combined with DAS, DTS and BOTDA technologies, multi-stage continuous monitoring is achieved, which enhances the protection of optical fibers and monitoring coverage.

Benefits of technology

To prevent fiber optic cable breakage, maintain the integrity of the waterproof membrane, eliminate potential water leakage hazards, enhance monitoring sensitivity in high-risk areas, achieve continuous monitoring throughout the entire process from construction to operation, and improve the accuracy and reliability of tunnel safety monitoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123111450A_ABST
    Figure CN123111450A_ABST
Patent Text Reader

Abstract

This invention belongs to the field of tunnel engineering safety monitoring technology, and specifically relates to a tunnel sandwich-type fiber optic network monitoring system and method. The system includes an initial support layer, geotextile, optical fibers, a waterproof membrane, and a secondary lining concrete layer, arranged sequentially from the outside to the inside of the tunnel surrounding rock. Along the circumferential direction of the tunnel, the optical fibers include a first arch foot straight optical fiber, a first arch waist straight optical fiber, an arch crown centerline optical fiber, a second arch waist straight optical fiber, and a second arch foot straight optical fiber, arranged sequentially parallel to the tunnel axial direction from the arch foot of one side wall to the arch foot of the other side wall. The optical fibers also include curved optical fibers, which are sequentially connected in series with the first arch foot straight optical fiber, the first arch waist straight optical fiber, the arch crown centerline optical fiber, the second arch waist straight optical fiber, and the second arch foot straight optical fiber. This invention can improve the survival rate of optical fibers, protect the waterproof system, eliminate monitoring blind spots, and achieve continuous monitoring throughout the entire process from construction to operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of tunnel engineering safety monitoring technology, and in particular relates to a tunnel interlayer fiber optic network monitoring system and method. Background Technology

[0002] With the in-depth development of tunnel engineering, distributed fiber optic sensing technologies (such as distributed temperature sensing (DTS), distributed acoustic sensing (DAS), and Brillouin optical time-domain analysis (BOTDA)) have gradually become an important means of tunnel safety monitoring due to their advantages of long-distance continuous sensing.

[0003] However, existing tunnel fiber optic monitoring technologies still face numerous challenges in engineering implementation: When fibers are directly buried in concrete or tied to reinforcing mesh, they are easily broken by the impact of pumped fluids in the secondary lining and high-frequency vibration. Traditional methods of fixing them to the initial support with bolts or nails can puncture the waterproofing membrane, damaging the drainage system and leaving potential leakage hazards. Simultaneously, the conventional method of laying fibers in a straight line along the tunnel axis results in low spatial coverage and limited monitoring indicators, making it difficult to effectively monitor high-risk areas such as voids or incomplete compaction of the secondary lining arch, leading to monitoring blind spots in critical areas. Furthermore, existing monitoring is mostly limited to the construction phase or key areas, failing to cover the tunnel's operational period and hindering continuous monitoring throughout the entire process from construction to operation, thus failing to meet the needs of full life-cycle safety assessments for tunnels. These problems make it difficult for existing technologies to simultaneously ensure fiber survival rate, waterproofing system integrity, comprehensive monitoring, and multi-stage coverage. Summary of the Invention

[0004] In view of this, the present invention aims to provide a tunnel-interlayer fiber optic network monitoring system and method, which aims to overcome at least one of the problems in the background art.

[0005] To achieve the above objectives, the technical solution of the present invention is implemented as follows: In a first aspect, embodiments of the present invention provide a tunnel interlayer fiber optic network monitoring system. The system includes an initial support layer, geotextile, optical fiber, waterproof membrane, and secondary lining concrete layer arranged sequentially from the outside to the inside of the tunnel surrounding rock. Along the circumferential direction of the tunnel, the optical fiber includes a first arch foot straight optical fiber, a first arch waist straight optical fiber, an arch crown centerline optical fiber, a second arch waist straight optical fiber, and a second arch foot straight optical fiber, arranged sequentially from the arch foot of one side wall of the tunnel to the arch foot of the other side wall, all parallel to the tunnel axial direction. The optical fiber also includes a curved optical fiber extending from the arch foot of one side wall of the tunnel at one end along the tunnel axial direction to the other end. The curved optical fiber is connected in series with the first arch foot straight optical fiber, the first arch waist straight optical fiber, the arch crown centerline optical fiber, the second arch waist straight optical fiber, and the second arch foot straight optical fiber.

[0006] Secondly, embodiments of the present invention provide a monitoring method using the tunnel sandwich fiber optic network monitoring system described in the above embodiments, the method comprising: The optical fiber is integrated into the surface of the geotextile by braiding or hot-melting, so that the optical fiber is laid on the surface of the geotextile along a preset extension trajectory, and redundant optical fibers are reserved at the starting and ending points of the geotextile. The geotextile is laid out on the surface of the initial support layer. The hidden nails with hot melt washers are driven into the initial support in the blank area between the optical fiber's preset extension trajectory to fix the geotextile. Then the main waterproof membrane is laid. The waterproof membrane and the hot melt washers of the hidden nails are fused and fixed using the hot melt welding process, so that the optical fiber is clamped between the geotextile and the waterproof membrane. During the pouring of the secondary lining concrete layer, optical fiber is used to capture the vibration signal generated by the concrete slurry flowing and impacting the waterproof membrane in real time, and the filling front and rising height of the concrete slurry are dynamically traced by spatiotemporal frequency domain spectral analysis. During the hydration heat release period after the secondary lining concrete layer is poured, the temperature evolution field of the optical fiber segment at the tunnel arch is continuously collected. By comparing the measured spatial temperature gradient between the normal dense area and the abnormal void area, when the temperature difference exceeds the calibrated safety threshold, it is determined that there is an air interlayer in the corresponding spatial location. After the secondary lining concrete layer hardens and enters a stable operation period, routine BOTDA distributed strain monitoring is carried out based on optical fiber.

[0007] Compared with existing technologies, the tunnel sandwich-type fiber optic network monitoring system and method described in this invention have the following advantages: (1) The tunnel sandwich fiber optic network monitoring system and method of the present invention, by concealing the fiber optic network in the micro-environment sandwich between geotextile and waterproof board, the waterproof board and geotextile together hold the fiber optic and protect the fiber optic, which can block the direct rigid impact of the vibrator during construction and the sharp cutting of the coarse aggregate of concrete, and avoid the fiber optic from being pulled apart.

[0008] (2) The tunnel sandwich fiber optic network monitoring system and method of the present invention integrates or heat-fused the fiber optic cable to the surface of the geotextile and completes the on-site laying simultaneously with the geotextile installation. It does not require nailing or penetration on the main waterproofing board, thus maintaining the integrity of the waterproofing board and helping to eliminate the risk of water leakage.

[0009] (3) The tunnel sandwich fiber optic network monitoring system and method described in this invention, by setting up a densified measurement area, is conducive to increasing the fiber capture density on the three-dimensional curved surface, and can upgrade the traditional one-dimensional axial linear scanning to two-dimensional surface domain high-sensitivity thermal field diagnosis, improve the sensitivity to early small local voids, and help eliminate monitoring blind spots in high-risk areas.

[0010] (4) The tunnel interlayer fiber optic network monitoring system and method described in this invention utilizes the same continuous fiber optic network and combines DAS, DTS and BOTDA technologies to realize dynamic tracing of secondary lining pouring, thermodynamic inversion of crown void, and monitoring of surrounding rock pressure evolution during operation. It can cover the entire process from construction to operation, realize multi-stage continuous monitoring, and help to grasp the safe life of the tunnel. Attached Figure Description

[0011] The accompanying drawings, which form part of this invention, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. In the drawings: Figure 1 This is a schematic diagram of the structure of a tunnel-interlayer fiber optic network monitoring system according to Embodiment 1 of the present invention; Figure 2 This is a partial cross-sectional schematic diagram of a tunnel sandwich fiber optic network monitoring system according to Embodiment 1 of the present invention; Figure 3 This is a three-dimensional structural diagram of a curved optical fiber in a tunnel sandwich optical fiber network monitoring system according to Embodiment 1 of the present invention; Figure 4 This is a schematic diagram of the planar structure of geotextile in a tunnel sandwich fiber optic network monitoring system according to Embodiment 1 of the present invention; Figure 5 This is a schematic diagram of the redundant cable splice box in a tunnel sandwich fiber optic network monitoring system according to Embodiment 1 of the present invention. Figure 6 This is a flowchart of a tunnel-interlayer fiber optic network monitoring method according to Embodiment 2 of the present invention.

[0012] Explanation of reference numerals in the attached figures: 1. Initial support layer; 2. Geotextile; 3. Curved optical fiber; 4. Waterproof membrane; 5. Secondary lining concrete layer; 6. Straight optical fiber at the first arch foot; 7. Straight optical fiber at the first arch waist; 8. Optical fiber at the arch crown centerline; 9. Straight optical fiber at the second arch waist; 10. Straight optical fiber at the second arch foot; 11. Ordinary survey area; 12. Densified survey area; 13. Guide head; 14. Redundant cable splice box; 15. Heat shrinkable protective tube; 16. Redundant optical fiber coiled ring. Detailed Implementation

[0013] The present invention will now be described in further detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. Furthermore, it should be noted that, for ease of description, the accompanying drawings show only the parts relevant to the present invention, and not all of the structures.

[0014] Example 1 Figure 1 This is a schematic diagram of the tunnel-sandwich type fiber optic network monitoring system according to Embodiment 1 of the present invention. Please refer to... Figures 1 to 5 The system includes an initial support layer 1, geotextile 2, optical fiber, waterproof membrane 4, and secondary lining concrete layer 5, which are installed sequentially from the outside to the inside of the tunnel surrounding rock. Along the circumferential direction of the tunnel, the optical fiber includes a first arch foot straight optical fiber 6, a first arch waist straight optical fiber 7, an arch crown centerline optical fiber 8, a second arch waist straight optical fiber 9, and a second arch foot straight optical fiber 10, which are installed sequentially from the arch foot of one side wall of the tunnel to the arch foot of the other side wall, and are parallel to the tunnel axial direction. The optical fiber also includes a curved optical fiber 3 that extends from the arch foot of one side wall of the tunnel to the other end along the tunnel axial direction. The curved optical fiber 3 is connected in series with the first arch foot straight optical fiber 6, the first arch waist straight optical fiber 7, the arch crown centerline optical fiber 8, the second arch waist straight optical fiber 9, and the second arch foot straight optical fiber 10.

[0015] Specifically, the waterproof membrane 4 can be a tunnel-specific waterproof membrane, such as an EVA waterproof membrane. The optical fiber is located between two layers of soft material (i.e., between the waterproof membrane 4 and the geotextile 2), avoiding direct damage during concrete pouring and also avoiding damage to the optical fiber due to concrete solidification shrinkage stress, thus effectively increasing the survival rate of the optical fiber.

[0016] In practical applications, the fiber optic cable, positioned at the interlayer location, can simultaneously monitor the compactness, voids, and subsequent deformation of the concrete pouring. Because the fiber optic cable is positioned at the interlayer interface between the initial support layer 1 and the secondary lining concrete layer 5, the influence of the structural stiffness of the secondary lining concrete layer 5 on the early deformation transmission of the surrounding rock can be reduced. This allows the monitoring information to more closely approximate the stress state of the initial support layer. Thus, before significant damage occurs to the secondary lining concrete layer 5, the fiber optic cable can monitor changes in the initial support layer 1 and the surrounding rock, providing data reference for operation.

[0017] By extending curved fiber 3 from the arch foot of one side wall of the tunnel along the tunnel axis to the other end, and by sequentially connecting the curved fiber 3 with the first arch foot straight fiber 6, the first arch waist straight fiber 7, the arch crown center line fiber 8, the second arch waist straight fiber 9, and the second arch foot straight fiber 10, a complex distributed fiber optic network is formed in the tunnel. This distributed fiber optic network adopts a single-channel routing structure with a single cable reciprocating fully serialized connection throughout the entire tunnel space. All straight fibers within a single compartment are connected by a single continuous, seamless long curved fiber 3, thereby realizing a three-dimensional single-cable reciprocating serialized loop layout with longitudinal and transverse coordination throughout the tunnel and encryption of sensitive areas.

[0018] For example, in the longitudinal macroscopic layout of the entire tunnel, five longitudinal main straight optical fibers are installed throughout the tunnel. These five straight optical fibers are spatially symmetrically distributed across the tunnel cross-section as follows: left arch foot straight optical fiber, left arch waist straight optical fiber, arch crown centerline optical fiber, right arch waist straight optical fiber, and right arch foot straight optical fiber. Among them, the four straight optical fibers located at the left arch waist, left arch foot, right arch waist, and right arch foot maintain a straight and horizontal alignment along the tunnel axis in the conventional section, used to monitor longitudinal uneven settlement and cracks in the tunnel.

[0019] Using the above setup, and employing a loop structure of a single curved optical fiber 3 reciprocatingly connected to multiple straight optical fibers, a single width of geotextile 2, during factory prefabrication, uses only one continuous, seamless long curved optical fiber 3. The curved optical fiber 3 is introduced from the straight optical fiber at the left arch foot, forming a sinusoidal wavy line that extends in a curved path to the end of the single compartment. This sinusoidal series connection, together with five straight optical fibers, forms a surface topology structure, enabling three-dimensional tunnel monitoring. It covers construction-sensitive areas and traditional deformation monitoring blind spots in the form of a dense surface network. The five straight optical fibers and the single wavy curved optical fiber 3 mutually reinforce each other, effectively increasing defect coverage and accuracy.

[0020] In one embodiment of this example, along the axial direction of the tunnel, the curved optical fiber 3 has a normal test area 11 and a dense test area 12, and the density of the curved optical fiber 3 in the dense test area 12 is greater than the density of the curved optical fiber 3 in the normal test area 11.

[0021] Specifically, in the ordinary survey area 11, the curved optical fiber 3 is laid out in a straight line along the trajectory with a spacing of 1m / fiber; the densified survey area 12 is set in the tunnel arch area corresponding to the curved optical fiber 3 of the arch center line (i.e., within 1m on both sides of the curved optical fiber 3 of the arch center line). The curved optical fiber 3 adopts a sinusoidal wave-shaped routing with a spacing of 0.5m / fiber. By increasing the spatial coverage, the monitoring sensitivity of high-risk defects such as arch voids and cracks is improved.

[0022] In one embodiment of this invention, the optical fiber is positioned or fixed to the geotextile 2. Specifically, the optical fiber can be positioned or fixed to the geotextile 2 through integrated braiding, thermal fusion bonding, or other methods. For example, the optical fiber is a single-mode strain-temperature composite optical fiber with a 2mm thick polyurethane explosion-proof sheath. During the factory prefabrication stage, five skeleton lines are projected onto the surface of the geotextile 2 using laser positioning lines. Then, a thermal fusion bonding machine is used to lay the optical fiber along these lines, with a thermal fusion bonding point every 20cm. This ensures deep interlocking between the optical fiber and the fiber matrix of the geotextile 2, preventing displacement of the optical fiber during construction and operation.

[0023] In one embodiment of this invention, the system includes a guide head 13, which has an arcuate portion for guiding the curved optical fiber 3 to bend and turn, and the guide head 13 is limited or fixed to the geotextile 2.

[0024] Specifically, the guide head 13 can also be limited or fixed to the geotextile 2 by means of integrated weaving, hot-melt consolidation, etc. For example, the guide head 13 is made of high-temperature resistant plastic material (such as polycarbonate), with an arc radius of 5cm. It is installed at the transition position of the curved optical fiber 3 from the straight optical fiber 7 of the first arch waist to the optical fiber 8 of the center line of the arch top (i.e., the junction of the arch waist and the arch top), or from the straight optical fiber of the arch waist to the straight optical fiber of the arch foot. It is fixed to the surface of the geotextile 2 by stitching to avoid micro-bending loss (micro-bending loss ≤0.01dB) of the curved optical fiber 3 at the turning point.

[0025] By fixing the guide head 13 to the geotextile 2 and making the arc-shaped part of the guide head 13 fit with the curved optical fiber 3, the curved optical fiber 3 can be bent along the arc-shaped part. The guide head 13 can not only guide and limit the curved optical fiber 3 to prevent the curved optical fiber 3 from moving, but also play a good protective role for the curved optical fiber 3, preventing the curved optical fiber 3 from being excessively bent and avoiding damage to the curved optical fiber 3.

[0026] In one embodiment of this invention, the system further includes a redundant cable splice box 14 for housing redundant optical fibers. The redundant cable splice box 14 is located at the edge of the seam of the geotextile 2, and is positioned or fixed to the geotextile 2. The redundant cable splice box 14 includes a box body and a box cover, which are detachably connected. A sealing element is provided between the box body and the box cover to seal the connection between them. The redundant cable splice box 14 includes a heat-shrinkable protective tube 15 for protecting the optical fiber splice, which is detachably connected to the box body. The box body has a redundant optical fiber winding ring 16 for winding the optical fiber, and the redundant optical fiber winding ring 16 is fixed inside the box body. The redundant cable splice box 14 is made of high-temperature resistant silicone material.

[0027] Specifically, the redundant cable splice box 14 is sewn to the longitudinal edge of the geotextile 2 (along the tunnel axis) to accommodate the excess optical fibers reserved on both sides of the construction joint, enabling continuous optical fiber splicing across construction joints. The box body is made of flat, high-temperature resistant silicone material, with dimensions of 20cm in length, 10cm in width, and 5cm in height. The box cover is connected to the box body by a snap fastener, and the sealing element is a double-layer waterproof strip (1mm thick), which fills the gap between the box body and the box cover to prevent moisture from entering. The heat-shrinkable protective tube 15 is steel wire reinforced (0.5mm diameter, 1mm wall thickness), with a diameter of 2cm. It is fitted onto the fusion splice of the optical fiber and cured by heat (150℃, 30s) to enhance the mechanical strength and waterproof performance of the joint. The heat-shrinkable protective tube 15 is inserted through a special fixing groove inside the box to prevent loosening. The fiber optic redundant winding ring 16 is made of circular high-temperature resistant plastic with a diameter of 15cm. It is used to neatly wind the reserved excess fiber (2m in length) into a 15cm diameter ring to avoid damage to the fiber optic cable.

[0028] In practical applications, the high-temperature resistant silicone material has a temperature range of -40℃ to 200℃, which can adapt to the high temperature (such as the heat during concrete pouring) and vibration conditions in the tunnel construction environment, ensuring the stability and durability of the redundant cable splice box 14.

[0029] For example, in the connection mechanism of cross-section construction joints, a flat redundant cable splice box 14 can be prefabricated at the longitudinal edge of the geotextile 2 in each section (i.e., at the end template of the trolley). The excess sections of single-section optical fibers reserved at both ends of the loop are coiled and stored in the redundant cable splice box 14. When the first formwork concrete is poured and the trolley moves to the next section, the construction personnel perform on-site optical fiber splicing between the two redundant cable splice boxes 14, and reseal the heat-shrinkable protective tube 15 and the excess redundant optical fibers into the box. This structure relies on the flexible deformation of the silicone box to absorb the rigid pulling during the trolley's formwork movement, ensuring the link continuity of the distributed optical fiber network in long-distance tunnels as it moves, splices, and is connected.

[0030] Example 2 Figure 6 This is a flowchart of a tunnel-type fiber optic network monitoring method according to Embodiment 2 of the present invention. See also... Figure 6 This second embodiment is based on the application of the tunnel sandwich fiber optic network monitoring system in the first embodiment above. This method specifically includes the following steps: Step 101: Integrate or heat-fused the optical fiber to the surface of the geotextile, so that the optical fiber is laid on the surface of the geotextile along a preset extension trajectory, and reserve redundant optical fibers at the starting and ending points of the geotextile.

[0031] Specifically, in the cleanroom of the factory, a 12m long geotextile with an arc length of 18m is laid flat on an automated workbench. Five skeleton lines are projected using laser positioning red lines (straight fiber for the first arch foot, straight fiber for the first arch waist, fiber for the center line of the arch top, straight fiber for the second arch waist, and straight fiber for the second arch foot). The optical fibers are laid along the lines using a hot melt hot stamping machine, with hot melt fixing points every 20cm. 2m of spare optical fiber is reserved at the start and end points of the geotextile. The spare optical fiber is coiled into a redundant cable splice box, the box cover is fastened, polyurethane building sealant is applied, and the roll is transported to the construction site.

[0032] Step 102: Unfold the geotextile on the surface of the initial support layer, drive the concealed nails with hot melt washers into the blank area between the optical fiber's preset extension trajectory in the initial support layer to fix the geotextile, then lay the main waterproofing membrane, and use hot melt welding process to fuse and fix the waterproofing membrane and the hot melt washers of the concealed nails, so that the optical fiber is clamped between the geotextile and the waterproofing membrane.

[0033] Specifically, on the surface of the initial support layer of the tunnel, a multi-functional work trolley is used to lay the smart geotextile from the arch to the two side walls. Workers use a manual nail gun to drive concealed nails with hot melt washers into the blank areas between the optical fiber tracks (spacing ≥ 30cm). Then, an electric soldering iron is used to weld and fix the smart geotextile to the washers. The main waterproofing membrane is laid, and the waterproofing membrane and the washers are fused together by hot melt welding, so that the optical fiber is sandwiched in the microenvironment interlayer composed of the geotextile and the waterproofing membrane (interlayer thickness ≤ 2cm).

[0034] Once the intelligent geotextile and waterproof membrane of the Nth compartment are laid and the hydraulic lining trolley is positioned and closed, the construction workers stand outside the end baffle of the trolley, open the redundant cable splice box at the end of the Nth compartment, and take out 2m of spare optical fiber; at the same time, they open the redundant cable splice box at the starting point of the N+1th compartment, take out its starting optical fiber, and use a handheld precision optical fiber fusion splicer to perform on-site fusion splicing (fusion loss ≤0.02dB), put on heat shrink protective tubes and heat to cure, and insert the fusion joint and heat shrink tubes into the special fixing groove in the redundant cable splice box. The remaining optical fiber is re-coiled into the box, the box cover is fastened and polyurethane building sealant is applied to avoid damage from the pressure of the steel formwork at the end of the trolley.

[0035] Step 103: During the pouring of the secondary lining concrete layer, the vibration signal generated by the concrete slurry flowing and impacting the waterproof membrane is captured in real time using optical fiber, and the filling front and rising height of the concrete slurry are dynamically traced through spatiotemporal frequency domain spectral analysis.

[0036] Specifically, after the trolley is sealed and the grouting pipe is installed, the secondary lining concrete is pumped. The monitoring center activates the distributed acoustic sensor (DAS) demodulator to capture the vibration signal generated by the concrete slurry flowing and impacting the waterproof membrane in real time. Through spatiotemporal frequency domain spectrum analysis, the front of the slurry filling and the rising height are dynamically traced to guide the on-site pouring to maintain the lateral pressure balance on both sides.

[0037] In practical applications, as the concrete slurry fills upwards from the bottom of both sides of the tunnel, the intense high-frequency vibration signals generated by the slurry tumbling and the impact of coarse aggregate on the waterproof membrane are instantly transmitted through the waterproof membrane to the cross-shaped orthogonal fiber optic network in the interlayer. Real-time monitoring renders a cascade waterfall diagram of vibration energy distribution along the circumferential height of the tunnel. On-site dispatchers can guide on-site pouring based on the height and speed of the vibration signal activation, maintaining balanced lateral pressure on both sides and avoiding uneven loading of the trolley or formwork bursting.

[0038] Step 104: During the hydration heat release period after the secondary lining concrete layer is poured, the temperature evolution field of the optical fiber segment at the tunnel arch is continuously collected. By comparing the measured spatial temperature gradient between the normal dense area and the abnormal void area, when the temperature difference exceeds the calibrated safety threshold, it is determined that there is an air gap at the corresponding spatial location.

[0039] Specifically, after the secondary lining concrete layer is poured, during the hydration heat release period (within 72 hours), the temperature evolution field of the fiber optic segment at the top of the arch is continuously collected. By comparing the measured spatial temperature gradient between the normal dense area and the abnormal void area (a void is determined when the temperature difference is greater than 5℃), the boundary and area of ​​the void area are located.

[0040] For example, within 24 to 48 hours after the concrete pumping is completed and the pouring is finished, a large amount of heat of hydration is released inside the secondary lining concrete layer. By switching to Distributed Temperature Sensing (DTS) mode, the temperature evolution trajectory of the optical cable segment in the arch is continuously and uninterruptedly scanned with a spatial sampling resolution of 0.1m. Due to the high thermal conductivity of the dense concrete area, the temperature curve measured in direct contact with the optical cable shows a uniformly rising high-temperature characteristic. However, in some areas of the arch, due to self-weight settlement or water shrinkage, a local void is formed, and the extremely high thermal resistance of the air blocks the transfer of heat of hydration to the interlayer. The DTS system can capture that the temperature of this optical fiber segment is lower than that of the adjacent area. The irregular void shadow area of ​​the arch is directly rendered, providing a reference for subsequent grouting with formwork or minimally invasive grouting.

[0041] Step 105: After the secondary lining concrete layer has hardened and entered a stable operation period, routine BOTDA distributed strain monitoring is carried out based on optical fiber.

[0042] Specifically, after the secondary lining concrete hardens and enters a stable operation period, Brillouin Optical Time Domain Analysis (BOTDA) monitoring is initiated. Based on distributed strain data from optical fibers, the evolution of surrounding rock pressure and the health status of the lining structure are monitored to achieve a full life-cycle safety assessment of the tunnel.

[0043] Influenced by surrounding geological stress rheology and fault compression, the deep surrounding rock undergoes extremely slow convergent deformation, with stress compressing the interlayer structure through the initial support layer. Since the optical fiber network is located at the interlayer interface between the initial support and the secondary lining—two core support structures—interlayer shear and compressive stresses directly cause abrupt strain changes in the interlayered optical fibers. After capturing the strain signal, the system automatically incorporates pre-calibrated interface slip empirical compensation coefficients and temperature correction terms to fully reconstruct the true circumferential convergent deformation and local stress concentration areas of the lining structure.

[0044] This embodiment, through the above-described structural design and method, realizes continuous monitoring of optical fibers throughout the entire process of tunnel construction and operation, solving the problems of low optical fiber survival rate, damage to waterproof system, monitoring blind spots, and insufficient multi-stage coverage in the existing technology, thereby improving the accuracy and reliability of tunnel safety monitoring.

[0045] The following explanation uses specific scenarios as examples: In terms of simplified data inversion and engineering applications, during the curing period, the system continuously collects the spatiotemporal temperature field and strain of the corrugated fiber optic segment at the arch. A characteristic value for the cooling rate gradient is defined within a specific time period. Defects are identified by the difference between the measured cooling rate characteristic value and the standard compaction cooling characteristic value. If the absolute value of the temperature difference gradient exceeds the calibrated threshold, it is directly determined that a void layer exists within the concrete at that spatial location. Based on the spatial parameter equation of a sine wave, the geometric boundary and area of ​​the void are directly projected and rendered on the monitoring interface.

[0046] The significant release of heat from concrete hydration means that the secondary lining concrete will generate heat within 24 to 72 hours after pouring due to the cement hydration reaction. If the concrete is poured very densely, the concrete slurry will penetrate the waterproofing membrane and tightly compress the geotextile interlayer. Heat is rapidly and directly transferred to the optical fiber through the solid material, and the measured temperature at this point is... It will be very close to high heat. .

[0047] At this point, the difference between the two is... Approaching 0. If certain areas of the arch are not fully poured, the concrete settles under its own weight or shrinks due to bleeding, creating a localized air barrier (air gap). In this case, an air layer will be trapped between the geotextile, waterproofing membrane, and secondary lining concrete. Air has an extremely low thermal conductivity, blocking heat from effectively penetrating and transferring to the temperature-measuring optical fiber within the gap. This results in the measured temperature of the optical fiber in the voided area being... It will be significantly lower than the normal dense section.

[0048] Using this formula, a normal high-temperature reference standard is used. Subtract this abnormally low temperature value caused by air heat resistance. This will yield a significant temperature difference curve. Once the monitoring system detects a certain spatial coordinate... Temperature difference value at the location If the temperature exceeds the safety threshold specified according to the on-site working conditions (such as 5.0℃ to 12.0℃), it can be directly determined that there is an air gap (vacuum or looseness) at that location, and the specific area and precise boundary of this hidden cavity can be projected back based on the distribution of the temperature difference field on the spatial axis.

[0049] Based on the aforementioned unique sandwich structure, this invention provides a solution covering four key stages of a tunnel: The first stage is the decoupling of the baseline state from the environmental field (pre-construction state): Before the secondary lining concrete is poured, the initial baseline data caused by environmental temperature fluctuations and primary branch rheology is collected using the DAS, DTS and BOTDA in the main control room, which serves as the zero-point reference for subsequent analysis.

[0050] The second stage involves dynamic tracking of the secondary lining concrete pouring: During concrete pumping, distributed acoustic sensing (DAS) is used to capture in real time the intense high-frequency vibration signals generated by the slurry flow impacting the waterproof membrane. Simultaneously, BOTDA is used to monitor local instantaneous strain changes caused by pressure on the interlayer. Through spatiotemporal frequency domain spectral analysis, the filling front and rising height of the concrete slurry within the tunnel wall interlayer are dynamically tracked, preventing localized pressure buildup or uneven lateral pressure caused by indiscriminate pumping.

[0051] The third stage involves precise thermodynamic inversion of the arch crown voids: Within 24 to 72 hours after the secondary lining is poured, a large amount of hydration heat is released from the concrete. The system initiates continuous DTS acquisition of the temperature evolution field of the fiber optic segment in the single-cable reciprocating series loop layout of the arch crown. The inversion logic formula is as follows: [Insert formula here]. The rate of temperature change over time at that location is: By comparing the measured spatial temperature gradients between normal dense zones and abnormal zones, a voiding criterion index is defined. : If a segment of optical fiber has a significantly lower temperature rise rate in the time domain than the normal average, and its temperature difference is at the peak of hydration heat... (This threshold is typically set between 5.0℃ and 12.0℃ based on the concrete mix design and thickness). Therefore, it is determined that an air gap exists within the concrete at that spatial location (i.e., a void in the arch). Using the spatial parameter equations of the serpentine optical fiber, the precise boundary, geometric centroid, and defect area of ​​the voided region are calculated directly by back-projection.

[0052] Phase 4: Surrounding Rock Pressure Evolution and Structural Health Monitoring: After the secondary lining structure hardens and enters a stable operation period, the system automatically switches to routine high-resolution distributed surrounding rock pressure monitoring. Once creep occurs in the surrounding rock, shallow-buried sections are disturbed by surface loads, or the initial support undergoes large deformation, the compressive pressure will act directly on the optical fiber through the geotextile, causing axial tensile and compressive strain. The abrupt change points in the strain curve demodulated by BOTDA can directly locate the hidden strain concentration areas behind the tunnel secondary lining. Because the optical fiber is closely attached to the initial support layer and extremely close to the external surrounding rock, when the tunnel faces earthquakes, fault displacements, or other sudden external disasters during its service operation, the early, minute deformations of the surrounding rock will act on the initial support first and be directly transmitted to the interlayer optical fiber. This invention utilizes the high sensitivity of optical fibers to capture interlayer strain anomalies before significant damage or cracking occurs in the secondary lining concrete structure, achieving real-time monitoring of the tunnel's surrounding rock condition during operation.

[0053] The core technology of this invention is not simply to protect optical fibers with flexible materials, but to address the problems of optical fibers being difficult to survive for a long time, being unable to be continuously deployed, and being difficult to monitor throughout the construction and operation process during the secondary lining construction of tunnels. It proposes a continuous sensing network structure and a multi-stage monitoring method that is integrated into the tunnel drainage system.

[0054] Note that the above description is merely a preferred embodiment of the present invention and the technical principles employed. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and various obvious changes, readjustments, and substitutions can be made without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in detail through the above embodiments, the present invention is not limited to the above embodiments, and may include many other equivalent embodiments without departing from the concept of the present invention, the scope of which is determined by the scope of the appended claims.

Claims

1. A tunnel-jacketed fiber optic network monitoring system, characterized by: The system includes an initial support layer (1), geotextile (2), optical fiber, waterproof membrane (4), and secondary lining concrete layer (5) arranged sequentially from the outside to the inside of the tunnel surrounding rock. Along the circumferential direction of the tunnel, the optical fiber includes a first arch foot straight optical fiber (6), a first arch waist straight optical fiber (7), an arch crown center line optical fiber (8), a second arch waist straight optical fiber (9), and a second arch foot straight optical fiber (10) arranged sequentially from the arch foot of one side wall of the tunnel to the arch foot of the other side wall, which are parallel to the axial direction of the tunnel. The optical fiber also includes a curved optical fiber (3) extending from the arch foot of one side wall of the tunnel along the axial direction of the tunnel to the other end. The curved optical fiber (3) is connected in series with the first arch foot straight optical fiber (6), the first arch waist straight optical fiber (7), the arch crown center line optical fiber (8), the second arch waist straight optical fiber (9), and the second arch foot straight optical fiber (10).

2. The tunnel sandwiched optical fiber network monitoring system according to claim 1, characterized in that: Along the axial direction of the tunnel, the curved optical fiber (3) has a normal test area (11) and a dense test area (12), and the density of the curved optical fiber (3) in the dense test area (12) is greater than the density of the curved optical fiber (3) in the normal test area (11).

3. The tunnel sandwiched optical fiber network monitoring system according to claim 1, characterized in that: The optical fiber is limited or fixed to the geotextile (2).

4. The tunnel sandwiched optical fiber network monitoring system according to claim 1, characterized in that: The system includes a guide head (13) having an arcuate portion for guiding the curved optical fiber (3) to bend and turn, and the guide head (13) being positioned or fixed to the geotextile (2).

5. The tunnel sandwiched optical fiber network monitoring system of claim 1, wherein: The system also includes a redundant cable splice box (14) for storing redundant optical fibers. The redundant cable splice box (14) is located at the edge of the seam of the geotextile (2), and the redundant cable splice box (14) is positioned or fixed to the geotextile (2).

6. The tunnel-jacked fiber optic network monitoring system of claim 5, wherein: The redundant cable splice box (14) includes a box body and a box cover. The box body and the box cover are detachably disposed, and a sealing element for sealing the connection between the box body and the box cover is provided.

7. The tunnel-jacked fiber optic network monitoring system of claim 6, wherein: The redundant cable splice box (14) includes a heat-shrinkable protective tube (15) for protecting the optical fiber splice, and the heat-shrinkable protective tube (15) is detachably disposed from the box body.

8. The tunnel sandwiched optical fiber network monitoring system according to claim 6, characterized in that: The housing contains a redundant fiber winding ring (16) for winding optical fibers.

9. The tunnel sandwiched optical fiber network monitoring system of claim 5, wherein: The redundant cable splice box (14) is made of high-temperature resistant silicone material.

10. A monitoring method using the tunnel sandwiched optical fiber network monitoring system according to any one of claims 1 to 9, characterized by, The method includes: The optical fiber is integrated into the surface of the geotextile (2) by braiding or hot-melting, so that the optical fiber is laid on the surface of the geotextile (2) along a preset extension trajectory, and redundant optical fibers are reserved at the starting point and ending point of the geotextile (2). Geotextile (2) is laid on the surface of the initial support layer (1). A hidden nail with a hot melt washer is driven into the initial support layer (1) in the blank area between the optical fiber's preset extension trajectory to fix the geotextile (2). Then the main waterproofing plate (4) is laid. The waterproofing plate (4) and the hot melt washer of the hidden nail are fused and fixed by hot melt welding process, so that the optical fiber is clamped between the geotextile (2) and the waterproofing plate (4). During the pouring of the secondary lining concrete layer (5), the vibration signal generated by the concrete slurry flowing and impacting the waterproof membrane (4) is captured in real time using optical fiber, and the filling front and rising height of the concrete slurry are dynamically traced through spatiotemporal frequency domain spectrum analysis. During the hydration heat release period after the secondary lining concrete layer (5) is poured, the temperature evolution field of the optical fiber segment at the tunnel arch is continuously collected. By comparing the measured spatial temperature gradient between the normal dense area and the abnormal void area, when the temperature difference exceeds the calibrated safety threshold, it is determined that there is an air interlayer in the corresponding spatial location. After the secondary lining concrete layer (5) hardens and enters a stable operation period, routine BOTDA distributed strain monitoring is carried out based on optical fiber.