By separating the tooling plate from the testing tooling and using the medium loading method of the transfer robot, the testing problem of explosion-proof balance valves was solved, realizing the automation of explosion-proof, balance and watertight testing and the continuous operation of the production line.
Patent Information
- Application Number
- CN202611313724.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-17
AI Technical Summary
Existing technologies make it difficult to perform explosion-proof, balancing, and watertight testing on explosion-proof balance valves on continuously flowing conveyor lines, and cannot guarantee the continuous operation of the production line.
An explosion-proof balance valve assembly and testing production line was designed. It adopts a structure in which the tooling plate and the testing tooling are separated. The medium loading and external sealing are realized by the transfer robot. Combined with the connection between the first and last of the upper and lower conveying components, the workpiece circulation and the automated execution of the testing process are realized.
It enables the automatic completion of explosion-proof, balance, and watertight testing during continuous workpiece flow, improving testing compatibility and production efficiency, and ensuring the continuous operation of the production line.
Smart Images

Figure CN123111682A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of explosion-proof balance valve production equipment technology, specifically to an explosion-proof balance valve assembly and testing production line and its testing method. Background Technology
[0002] An explosion-proof balancing valve is a safety device that automatically opens to relieve pressure when the pressure in a system exceeds a set value. Its explosion-proof performance, the pressure resistance between the valve and the outside air, and its watertightness directly affect the operational safety of the system. Before leaving the factory, explosion-proof balancing valves must undergo explosion-proof testing, balancing testing, bottom cover heat fusion fixing, and watertightness testing in sequence. Watertightness testing can only be performed after the bottom cover heat fusion fixing is completed. Explosion-proof testing requires applying air pressure after the valve is tightly sealed and measuring the leakage rate. Balancing testing requires applying bidirectional positive and negative pressure to the valve and measuring the leakage flow rate. Watertightness testing requires passing water through the valve after it is tightly sealed and measuring the water pressure drop. After the bottom cover heat fusion fixing is completed, the quality of the heat fusion fixing must also be tested. An explosion-proof balancing valve that fails any of these tests is considered a defective product and should not proceed to subsequent processes.
[0003] In the prior art, the utility model patent with authorization announcement number CN223106883U discloses an automatic valve body assembly and testing line. This testing line includes a control host and a plunger paper testing machine, a spring housing testing machine, a finished product assembly testing machine, and a finished product tray-loading machine, all connected sequentially under the control of the control host. Each testing machine has an independent circulating conveyor line with a platform for carrying workpieces. Material transfer is achieved between adjacent circulating conveyor lines via a transfer device. Workpieces are carried by the platforms within the circulating conveyor lines of each testing machine. During inter-machine transfer, the transfer device grabs the workpiece and transfers it to the platform of the next testing machine. The testing components of each testing machine are arranged around the circulating conveyor line, with testing fixtures placed alongside the platforms. The finished product assembly testing machine performs airtightness and liquid leakage testing on the valve by inflating the valve cavity with air and injecting liquid. During testing, the valve body is fixed by a sealing clamp. For valves that fail the test, the control host stops the conveyor line and issues an alarm, awaiting manual intervention.
[0004] The automatic valve assembly and testing line primarily targets visual inspection and media injection into the valve cavity. Its testing components are arranged around the conveyor line, with testing fixtures and transfer platforms placed side-by-side. This architecture relies on the premise that no external sealing is required for each testing step. The sealing fixtures used for airtightness and liquid leakage testing are only used to fix the valve sleeve. However, explosion-proof, balancing, and watertightness testing of explosion-proof balanced valves all require clamping and fixing the valve and establishing an external sealing. Furthermore, the loading methods for each step differ, making it difficult for the flowing platform to maintain a tight seal with the sealing clamping device and media loading device. Therefore, the existing testing architecture cannot complete the aforementioned tests for explosion-proof balanced valves.
[0005] Therefore, existing technologies struggle to sequentially perform explosion-proof and balancing valve internal and external pressure and watertightness testing processes requiring different media and sealing loading methods on a continuously flowing conveyor line, while simultaneously ensuring continuous production line operation. Thus, how to automatically and sequentially complete these processes, under conditions of continuous workpiece flow and continuous production line operation, is a pressing technical problem that needs to be solved in this field. Summary of the Invention
[0006] To address the aforementioned problems, this invention provides an explosion-proof balance valve assembly and testing production line and its testing method. The specific technical solution is as follows: An explosion-proof balance valve assembly and testing production line includes: a conveying assembly, various testing components arranged sequentially along the conveying direction of the conveying assembly, a tooling plate for carrying the explosion-proof balance valve, a transfer robot, and a control center; the testing components include a valve assembly assembly, an explosion-proof testing component, a balance testing component, a bottom cover heat-melt testing component, a watertight testing component, and an encoder assembly; the conveying assembly includes an upper conveyor and a lower conveyor connected end-to-end and in opposite directions, so that the tooling plate circulates through each testing component; the explosion-proof testing component, the balance testing component, the watertight testing component, and the bottom cover heat-melt testing component all include testing tooling separately arranged from the tooling plate; the explosion-proof testing component, the balance testing component, and the watertight testing component all include a sealing testing mechanism, which can respectively interact with the testing tooling or the explosion-proof balance valve carrying the explosion-proof valve. An explosion-proof balance valve is engaged to establish an external seal. The detection medium is then introduced into the valve via a seal detection mechanism to detect the high-pressure leakage rate, low-pressure leakage rate, and water pressure drop rate. A bottom cover heat-fusion detection assembly secures the bottom cover to the detection fixture and checks the heat-fusion fixation quality of the bottom cover. A transfer robot spans the upper conveyor to move the explosion-proof balance valve between the fixture plate and the detection fixture. The explosion-proof balance valve is moved from the fixture plate to the encoder assembly via the transfer robot. The empty fixture plate flows to the lower conveyor and then back to the upper conveyor. The empty fixture plate is the one without the explosion-proof balance valve. The control center is signal-connected to the conveyor assembly, the transfer robot, and each detection assembly to control the sequential detection of the explosion-proof balance valve.
[0007] Furthermore, the conveying assembly includes a return elevator, with the two ends of the upper and lower conveying components connected by the return elevator. The empty tooling plate flows to the lower conveying component via the return elevator at one end, and is then lifted back to the upper conveying component via the return elevator at the other end.
[0008] Furthermore, the upper conveyor is formed by sequentially connecting the upper part of the conveyor, which is located in the valve assembly assembly, explosion-proof detection assembly, balance detection assembly, bottom cover hot melt detection assembly, watertight detection assembly and code disk assembly, along the conveying direction.
[0009] Preferably, it also includes several positioning components, each of which includes a swing buckle and a telescopic claw spaced apart from the swing buckle, the distance between the swing buckle and the telescopic claw being equal to the length of the tooling plate along the conveying direction; When the tooling plate moves with the upper conveyor and presses down and passes the swinging buckle, the telescopic claw extends, and the swinging buckle resets and lifts under the action of the elastic element, together with the telescopic claw, to position the tooling plate along the conveying direction.
[0010] Preferably, the conveying assembly includes a lifting platform located below the positioning assembly to lift the tooling plate that has been positioned.
[0011] Preferably, the tooling plate is provided with a gas detector plug placement slot, in which a gas detector plug is placed, so that the gas detector plug is inserted into the gas outlet of the explosion-proof balance valve before the explosion-proof test, and the gas detector plug is removed and placed in the gas detector plug placement slot after the explosion-proof test is completed.
[0012] Preferably, the sealing detection mechanism of the explosion-proof detection component includes a second lifting cylinder and a second sealing head disposed at the telescopic end of the second lifting cylinder. The second sealing head descends and abuts against the top surface of the explosion-proof detection fixture or the explosion-proof balance valve carrying the explosion-proof balance valve to form a sealed cavity. The explosion-proof detection assembly also includes a second pressure detector, which introduces detection gas above the explosion-proof balance valve through a second sealing head.
[0013] Preferably, the balance detection assembly further includes a detection turntable, and the balance detection fixtures of the plurality of balance detection assemblies are evenly arranged along the circumference of the detection turntable; When the test turntable rotates intermittently, each balancing test fixture switches between below the transfer robot and below the sealing test mechanism of the balancing test assembly.
[0014] Preferably, the sealing detection mechanism of the balance detection assembly includes a third lifting cylinder and a third sealing head disposed at the telescopic end of the third lifting cylinder. The third sealing head descends and abuts against the top surface of the balance detection fixture or the explosion-proof balance valve to form a sealed cavity. The balance detection assembly also includes a third pressure detector, which introduces gas into the top of the explosion-proof balance valve through a third sealing head.
[0015] Preferably, the third air pressure detector applies a bidirectional load of positive and negative pressure to the explosion-proof balance valve, and the incoming air pressure is less than the detection air pressure introduced by the explosion-proof detection component.
[0016] Preferably, the bottom cover hot melt detection assembly includes a fourth industrial camera. The detection fixture of the bottom cover hot melt detection assembly is a hot melt fixture. The hot melt fixture can move the explosion-proof balance valve after hot melt fixing to the bottom of the fourth industrial camera. The fourth industrial camera can take pictures of the hot melt fixing part of the bottom cover directly below and compare the captured image with a preset template to screen out qualified products whose comparison results exceed the threshold by 90%.
[0017] Preferably, the sealing detection mechanism of the watertight detection component includes a fifth lifting cylinder and a fifth sealing head disposed at the telescopic end of the fifth lifting cylinder, wherein the fifth lifting cylinder and the fifth sealing head are capable of lateral movement; When the fifth lifting cylinder and the fifth sealing head move laterally to directly above the watertightness testing fixture of the watertightness testing component, the fifth lifting cylinder can drive the fifth sealing head to descend, so as to seal the upper part of the explosion-proof balance valve and connect the upper part of the testing fixture with the water pressure tester.
[0018] Preferably, it also includes a defective product collection box, which contains explosion-proof balance valves that have failed the test. The explosion-proof balance valves that have failed the test are transferred into the defective product collection box by a transfer robot from the testing fixture.
[0019] Preferably, the control center is connected to the sensor signals located at each detection component to control the actions of the conveying component, the transfer robot, and each detection component in sequence according to a preset program.
[0020] A detection method comprising the following steps: At the valve assembly assembly, an explosion-proof balance valve is assembled on the tooling plate; The assembled explosion-proof balance valve is then transferred to the explosion-proof testing station. An external seal is established for the explosion-proof balance valve located at the explosion-proof testing station. The preset test gas is introduced into the explosion-proof balance valve, the high-pressure gas leakage rate of the explosion-proof balance valve is measured, and the explosion-proof performance of the explosion-proof balance valve is judged based on the high-pressure gas leakage rate. The explosion-proof balance valve that has passed the explosion-proof test is transferred to the balance test station; An external seal is established for the explosion-proof balance valve located at the balance testing station. The preset test gas is introduced into the explosion-proof balance valve, the low-pressure leakage rate of the explosion-proof balance valve is measured, and the internal and external pressure performance of the explosion-proof balance valve is judged based on the low-pressure leakage rate. The explosion-proof balance valve that has passed the internal and external air pressure performance test is transferred to the bottom cover heat fusion station. The bottom cover is heat-fused and fixed to the explosion-proof balance valve located at the bottom cover heat-fusion station. The heat-fusion fixing quality of the bottom cover is detected, and the heat-fusion fixing quality is used to determine whether the bottom cover heat-fusion fixing is qualified. The explosion-proof balance valve with its bottom cover heat-fused and secured is then transferred to the watertightness testing station. An external seal is established for the explosion-proof balance valve located at the watertightness testing station. A preset water flow is introduced into the explosion-proof balance valve, the water pressure drop rate of the explosion-proof balance valve is measured, and the watertightness performance of the explosion-proof balance valve is judged based on the water pressure drop rate. The explosion-proof balance valve that has passed the watertightness test is transferred to the encoder station for encoder processing.
[0021] As can be seen from the above technical solution, the present invention has the following beneficial effects: This invention separates the testing fixture from the fixture plate, and uses a transfer robot to move the valve body between the fixture plate and the testing fixture. This allows explosion-proof, balance, and watertight testing to establish an external seal and media loading on the static testing fixture that matches the process, avoiding the problem of the mobile platform being unable to maintain a sealed fit. The conveying components that connect the upper and lower layers allow empty fixture plates to flow back through the lower layer, achieving continuous feeding of fixture plates. The control center coordinates with each testing component to automatically complete testing processes requiring different media and different sealing loading methods in sequence under continuous production line operation, improving testing compatibility, automation, and production efficiency. Attached Figure Description
[0022] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present invention; Figure 2 This is a schematic diagram of the structure of an embodiment of the positioning component; Figure 3 This is a schematic diagram of an embodiment of the spring detection assembly; Figure 4 This is a schematic diagram of the structure of an embodiment of the valve assembly; Figure 5 This is a schematic diagram of the structure of an embodiment of the explosion-proof detection component; Figure 6 for Figure 5 Enlarged view of section A in the image; Figure 7 A schematic diagram of the structure of an embodiment of the balance detection component; Figure 8 for Figure 7 Enlarged view of section B in the image; Figure 9 This is a schematic diagram of the structure of an embodiment of the bottom cover hot melt detection component; Figure 10 for Figure 9 Enlarged view of section C in the image; Figure 11 This is a schematic diagram of the structure of an embodiment of the watertightness detection component; Figure 12 for Figure 11 Enlarged view of section D in the image; Figure 13 This is a schematic diagram of the structure of an embodiment of the return flow elevator; Figure 14 This is a top view of the encoder assembly.
[0023] In the diagram: 10. Control Center; 11. Conveying Components; 113. Return Lift; 114. Transfer Manipulator; 12. Positioning Components; 121. Swing Buckle; 122. Telescopic Claw; 13. Spring Detection Components; 131. Vibratory Feeder; 132. Discharge Pipe; 133. Spring Detection Fixture; 14. Valve Assembly Components; 141. First Conveyor; 15. Explosion-proof Detection Components; 151. Second Conveyor; 152. Explosion-proof Detection Fixture; 153. Second Lifting Cylinder; 154. Second Sealing Head; 155. Second Air Pressure Detector; 16. Balance Detection Components; 161. Third Conveyor; 162. Detection Rotary Unit 163. Balance detection fixture; 164. Third lifting cylinder; 165. Third sealing head; 166. Third air pressure detector; 17. Bottom cover hot melt detection assembly; 171. Fourth conveyor; 172. Valve sleeve gripper; 173. Bottom cover suction cup; 174. Hot melt fixture; 175. Fourth lifting cylinder; 176. Fourth hot melt head; 177. Fourth industrial camera; 18. Water tightness detection assembly; 181. Fifth conveyor; 182. Water tightness detection fixture; 183. Fifth lifting cylinder; 184. Fifth sealing head; 185. Water pressure tester; 19. Encoder assembly; 191. Sixth conveyor; 192. Pallet. Detailed Implementation
[0024] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0025] In the description of the embodiments of the present invention, it should be noted that the terms "inner", "outer", "upper", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limiting the present invention.
[0026] Example 1 like Figures 1 to 13As shown, this embodiment provides an explosion-proof balance valve assembly and testing production line, including a conveying assembly 11, multiple testing components arranged sequentially along the conveying direction of the conveying assembly 11, a tooling plate for supporting the explosion-proof balance valve, a transfer robot 114, and a control center 10. The testing components include a valve assembly assembly 14, an explosion-proof testing component 15, a balance testing component 16, a bottom cover heat-melting testing component 17, a watertight testing component 18, and an encoder assembly 19 arranged sequentially.
[0027] The explosion-proof balance valve tested in this embodiment is an existing product, comprising a valve sleeve with an internal cavity. The top of the valve sleeve is connected to the battery pack, and the cavity of the valve sleeve communicates with the internal space of the battery pack. A slidable valve core is installed inside the valve sleeve, and a venting channel is formed inside the valve core. The top of the venting channel is close to the battery pack, and its bottom is away from the battery pack. A slidable internal and external pressure-relieving component is placed at the top of the venting channel inside the valve core, and a valve cover is fixedly connected to the bottom of the internal venting channel. The valve cover is located at the bottom of the valve sleeve, and a bottom cover is fixedly installed at the top of the valve sleeve to confine the valve core within the cavity of the valve sleeve. When the pressure inside the battery pack suddenly increases, the air pressure pushes the valve cover away from the bottom of the valve sleeve to open the explosion-proof vent for pressure relief. When the pressure relief is complete, the valve cover resets under the push of the elastic component. Secondly, a breathable membrane is installed at the end of the valve core near the valve cover to prevent external moisture from entering the battery pack. When the air pressure at the top of the valve core is greater than the air pressure at the bottom, the positive pressure difference pushes the air pressure component inside the balance valve towards the breathable membrane, thereby opening the venting channel inside the valve core to discharge the atmosphere inside the battery pack to the outside through the breathable membrane. When the air pressure at the bottom of the valve core is greater than the air pressure at the top, the negative pressure difference pushes the air pressure component inside the balance valve towards the battery pack, thereby opening the venting channel inside the valve core to discharge the atmosphere inside the battery pack through the breathable membrane, thus achieving a uniform pressure difference inside and outside the battery pack. The valve sleeve, bottom cover, and valve core are all made of plastic.
[0028] Furthermore, the conveying assembly 11 includes an upper conveyor and a lower conveyor arranged vertically, with the upper and lower conveyors connected end-to-end and conveying in opposite directions. Specifically, the upper conveyor conveys from the valve assembly assembly 14 to the encoder assembly 19, while the lower conveyor conveys in the opposite direction. The assembled explosion-proof balance valve is placed on a tooling plate, and the tooling plate, on the upper conveyor, flows sequentially from the valve assembly assembly 14 through the explosion-proof detection assembly 15, the balance detection assembly 16, the bottom cover heat-melt detection assembly 17, and the watertightness detection assembly 18 to the encoder assembly 19. After the explosion-proof balance valve leaves the tooling plate at the encoder assembly 19, the tooling plate that does not support the explosion-proof balance valve becomes an empty tooling plate. The empty tooling plate is transferred to the lower conveyor at the connection between the upper and lower conveyors at one end of the encoder assembly 19. It is then transported in reverse by the lower conveyor to the connection between the upper and lower conveyors at one end of the valve assembly assembly 14. After that, it is transferred back to the upper conveyor via the return elevator 113 for assembly at the valve assembly assembly 14, thus circulating through each detection assembly.
[0029] like Figure 4 As shown, the valve assembly assembly 14 includes a first conveyor 141 on which an assembly tooling plate is placed. The first conveyor 141 has two layers: the upper layer transports tooling plates that are ready for assembly or have already been assembled; its left end connects to the outlet of the return elevator 113, and its right end connects to the second conveyor 151 of the explosion-proof detection assembly 15. This allows the tooling plate to move intermittently from the return elevator 113 to the explosion-proof detection assembly. During the stopping process, manual assembly is performed on the tooling plate, which has several grooves to accommodate the various components of the two explosion-proof balance valves to be assembled, thus forming a complete explosion-proof balance valve. Secondly, the inlet of the first conveyor 141 is located below its outlet. The outlet is connected to the right end of the upper first conveyor 141, and the inlet is connected to the left end of the lower first conveyor 141. Its inlet is connected to the lower layer of the second conveyor 151 of the explosion-proof detection component 15, so that the returned empty tooling plate is transported by the lower first conveyor 141 and then raised to the upper first conveyor 141 by the return elevator 113 for assembly.
[0030] Secondly, another embodiment of the first conveyor 141 includes a lifting platform located below the tooling plate, which is raised by a lifting cylinder to lift the tooling plate and separate it from the belt of the first conveyor 141. Thus, while ensuring the normal operation of the first conveyor 141, the tooling plate can be fixed in place, and the explosion-proof balance valve can be manually assembled on the tooling plate. This facilitates the continued forward conveying of the next tooling plate, ensuring the continuity of manual assembly. Furthermore, it facilitates the continued conveying of the assembled explosion-proof balance valve to the second conveyor 151.
[0031] like Figure 3As shown, a spring detection assembly 13 is also provided on one side of the first conveyor 141. This assembly includes a vibratory feeder 131 for storing springs. The vibratory feeder 131 forms an outlet, which connects to a discharge pipe 132. The discharged springs are fitted onto a positioning shaft at the discharge end of the discharge pipe 132. An infrared sensor detects the springs in position. Subsequently, the positioning shaft, driven by a horizontally placed cylinder, moves away from the discharge pipe 132, thus preventing interference between the transfer robot 114 and the discharge pipe 132. This allows the transfer robot 114 to move the spring-grabbing gripper to grasp the springs from the positioning shaft and place them in the spring detection fixture 135. Then, the transfer robot 114 moves the spring detection block next to the spring-grabbing gripper downwards, causing the spring detection pressure... The spring in the spring detection fixture 135 is compressed by the block. The spring is placed between the valve core and the valve sleeve to reset the valve cover (the compression force is related to the spring's elastic coefficient; for example, when the elastic coefficient is 0.5, the compression force on the spring is 10.2N, and the specific correspondence is determined by actual production data). A pressure sensor is placed below the spring. The pressure change rate is the spring's elastic coefficient, which is used to detect whether the spring is normal (for example, for the above spring, when the compression force is 10.2N, its pressure change rate does not change abruptly and is 0.5, indicating that the spring's elastic coefficient meets the requirements). Springs with a pressure change rate that meets the requirements are transferred to the fixture plate of the valve assembly assembly 14 by the spring gripper, and are manually assembled into the valve sleeve. In addition, the gas detector plug is manually inserted into the venting channel of the valve core to seal it and prevent the next process of explosion-proof testing from proceeding. When a pressure difference occurs at both ends of the valve core, it pushes the internal and external air pressure components of the balancing valve to move, so that only the valve cover moves relative to the valve sleeve, ensuring the accuracy of the explosion-proof test results. After the explosion-proof test is completed, the gas detector plug is manually removed and placed in the gas detector plug placement slot on the tooling plate for subsequent balancing tests.
[0032] like Figure 5 , 6 As shown in Figures 7, 8, 9, 10, 11, and 12, the explosion-proof detection assembly 15, the balance detection assembly 16, the bottom cover hot-melt detection assembly 17, and the watertight detection assembly 18 are all equipped with detection fixtures. These fixtures are respectively explosion-proof detection fixture 152, balance detection fixture 163, hot-melt fixture 174, and watertight detection fixture 182. Each detection fixture is separately installed from the fixture plate flowing on the upper conveyor, meaning the fixture is fixed at its corresponding station and does not move with the fixture plate. Specifically, explosion-proof detection fixture 152 is placed at the explosion-proof detection station of explosion-proof detection assembly 15, balance detection fixture 163 is placed at the balance detection station of balance detection assembly 16, hot-melt fixture 174 is placed at the bottom cover hot-melt detection station of bottom cover hot-melt detection assembly 17, and watertight detection fixture 182 is placed at the watertight detection station of watertight detection assembly 17. The workstations are located on multiple working platforms on one side of the conveying component 11. Each workstation includes the working area of the testing component and the area where the upper conveyor feeds the material to the testing component.
[0033] The transfer robot 114 is a gantry robot, which includes a horizontal slide and a vertical cylinder mounted on the horizontal slide. The telescopic end of the vertical cylinder is equipped with a gripper, which spans across the upper conveyor and is fixedly installed on the work platform. In this embodiment, each inspection station is equipped with a transfer robot 114 spanning above the inspection station. When the fixture plate stops at the corresponding inspection station of the upper conveyor, the transfer robot 114 grabs the explosion-proof balance valve from the fixture plate and places it on the inspection fixture located at the inspection station. After the inspection is completed, the explosion-proof balance valve is moved back from the inspection fixture to the fixture plate and flows with the fixture plate to the next station.
[0034] Secondly, the explosion-proof detection component 15, the balance detection component 16, and the watertight detection component 18 are all equipped with a sealing detection mechanism. This sealing detection mechanism includes a lifting cylinder and a sealing head installed at the extension end of the lifting cylinder. The lifting cylinder drives the sealing head to rise and fall, so as to abut against the top surface of the detection fixture carrying the explosion-proof balance valve or the explosion-proof balance valve itself. Specifically, the sealing head descends and abuts against the top surface of the detection fixture, creating an external seal for the explosion-proof balance valve and forming a sealed space. Alternatively, another embodiment of the sealed space is as follows: the sealing head descends and fits over the valve sleeve of the explosion-proof balance valve, abutting against the edge of the top surface of the explosion-proof balance valve. This creates an external seal between the valve sleeve and the valve core of the explosion-proof balance valve. For example, the rubber ring at the bottom of the sealing head forms a seal with the edge of the top surface of the explosion-proof balance valve, thus both the valve sleeve and the valve core of the explosion-proof balance valve are located within the formed sealed space. Secondly, the detection medium (such as airflow or waterflow) is introduced into the explosion-proof balance valve through the internal channel of the sealing head to detect the high-pressure leakage rate, low-pressure leakage rate, and water pressure drop rate of the explosion-proof balance valve. The external seal refers to the sealing head being fitted with the valve sleeve of the explosion-proof balance valve, which abuts against the top edge of the explosion-proof balance valve, pressing its top surface tightly and sealing it so that the detection medium introduced through the sealing head can only escape through the pressure relief section of the explosion-proof balance valve.
[0035] Secondly, the sealing detection mechanism of the explosion-proof detection component 15 includes a second lifting cylinder 153 and a second sealing head 154; the sealing detection mechanism of the balance detection component 16 includes a third lifting cylinder 164 and a third sealing head 165; and the sealing detection mechanism of the watertight detection component 18 includes a fifth lifting cylinder 183 and a fifth sealing head 184. Furthermore, the detection medium for explosion-proof and balance detection is detection gas, while the detection medium for watertight detection is water flow. Specifically, the explosion-proof detection component 15 is used to detect the high-pressure leakage rate of the explosion-proof balance valve, the balance detection component 16 is used to detect the low-pressure leakage rate of the explosion-proof balance valve, and the watertight detection component 18 is used to detect the water pressure drop rate of the explosion-proof balance valve. This allows the explosion-proof and balance valve internal and external air pressure and watertight detection processes, which require different sealing loading methods and different detection media, to be automatically completed sequentially during continuous workpiece flow.
[0036] The specific values for the high-pressure test, low-pressure test, test time, and preset water pressure are set according to the specifications of the explosion-proof balance valve. Specific qualification standards are as follows: For the high-pressure test, use 6 kPa (positive pressure), with a test time of 30 seconds. When the high-pressure gas leakage rate exceeds 200 mL / min, the explosion-proof performance of the valve cover of the explosion-proof balance valve is qualified, i.e., the explosion-proof test is qualified. The low-pressure test has various specifications, including 2.5 kPa under positive pressure when the leakage rate exceeds 300 mL / min, or 4 kPa under negative pressure when the leakage rate exceeds 5 mL / min. When n is the test time, the test time is 30s. The balancing air pressure performance of the internal and external air pressure components of the explosion-proof balancing valve is qualified. There are various specifications of low air pressure for testing, including 1Kpa under positive pressure when the leakage rate is less than 1mL / min, or 2Kpa under negative pressure when the leakage rate is less than 1mL / min. The test time is 30s. The sealing performance between the internal and external air pressure components and the valve core of the explosion-proof balancing valve is qualified. The preset water pressure is 15Kpa, the test time is 30s, and the pressure drop is less than 0.08Kpa. The water tightness test of the explosion-proof balancing valve is qualified.
[0037] When the explosion-proof balance valve moves to the bottom cover heat-melting station with the upper conveyor, the transfer robot 114 places it in the groove on the heat-melting fixture 174. The internal heating element of the bottom cover heat-melting detection component 17 heats the bottom cover of the explosion-proof balance valve and heat-melts it to the top of the valve sleeve. After the bottom cover heat-melting is completed, the bottom cover heat-melting detection component 17 moves and places the explosion-proof balance valve with the completed bottom cover heat-melting below the camera for photo inspection to see if the heat-melting effect of the bottom cover is qualified.
[0038] like Figure 14 As shown, the encoder assembly 19 forms the encoder station, located at the last station of the conveyor assembly 11. Next, the transfer robot 114 spans the encoder station of the upper conveyor, and the transfer robot 114 and the encoder assembly 19 are fixedly installed on the work platform. When the explosion-proof balance valve moves to the encoder station with the upper conveyor, the transfer robot 114 removes the explosion-proof balance valve from the tooling plate and places it on the tray 192 of the encoder assembly 19 for stacking. The stacked explosion-proof balance valves are then manually removed. All stacked explosion-proof balance valves are qualified products. When the tooling plate at the encoder station of the upper conveyor fails to support the explosion-proof balance valve, an empty tooling plate is formed, which flows to the lower conveyor and then back to the upper conveyor for recycling. The empty tooling plate then automatically returns, allowing the production line to operate continuously without stopping to wait for carrier recovery.
[0039] The control center 10 (in this embodiment, an industrial computer) is connected to the conveying component 11, the transfer robot 114, and each detection component via wired or wireless connection. In turn, it controls each detection component to operate in coordination according to the action sequence of the above-mentioned detection components, so that the explosion-proof balance valve can automatically complete the detection at each detection component, thereby improving the automation level of the explosion-proof balance valve detection.
[0040] like Figure 13 As shown, the upper and lower conveyor components are connected at both ends by a return lift 113, which includes a support platform that is lifted by a cylinder. After descending a fixed distance (e.g., 50cm), the support platform docks with the lower conveyor component, and after rising a fixed distance (the same distance as the descent), it docks with the upper conveyor component. After the explosion-proof balance valve leaves the tooling plate and enters the encoder station of the upper conveyor component, the empty tooling plate enters the return lift 113 at the right end of the encoder assembly 19. After descending a fixed distance, it docks with the lower conveyor component, and the empty tooling plate is transferred to the lower conveyor component. The lower conveyor component transports the empty tooling plate to the return lift 113 at the left end of the valve assembly assembly 14. After rising a fixed distance with the support platform, the support platform docks with the upper conveyor component, and the empty tooling plate is transferred back to the upper conveyor component for assembly at the valve assembly assembly 14. Thus, the tooling plate can be recycled without manual handling, and the production line can operate continuously.
[0041] Furthermore, the upper conveyor components are formed by sequentially connecting conveyors located at each of the detection components along the conveying direction. Specifically, the valve assembly component 14 includes a first conveyor 141, the explosion-proof detection component 15 includes a second conveyor 151, the balance detection component 16 includes a third conveyor 161, the bottom cover heat-melting detection component 17 includes a fourth conveyor 171, the watertight detection component 18 includes a fifth conveyor 181, and the encoder component 19 includes a sixth conveyor 191. The conveying surfaces of adjacent conveyors are connected, and the tooling plate can slide from the upper conveyor to the lower conveyor. Each conveyor is driven independently (in this embodiment, each conveyor is a belt conveyor, but chain conveyors, etc., can also be used), rather than a continuous belt running through all workstations. Each conveyor is intermittently conveyed under the control of the control center 10. The tooling plate stops at the inspection station of the conveyor for the transfer robot 114 to grasp and for each inspection process to be executed. This makes it easier for the transfer robot 114 to accurately grasp the explosion-proof balance valve. Moreover, the conveying rhythm of each inspection component is independently controllable, and a single section of conveyor failure does not affect the operation of the entire line.
[0042] Each conveyor includes two narrow belts spaced apart, with the distance between the narrow belts being the width of the conveyor (the width direction is perpendicular to the conveying direction). The two ends of the tooling plate are placed on the two narrow belts respectively, and the middle area of the tooling plate is suspended in the air, which facilitates the installation of the positioning component 12 to fix the tooling plate in the designated position.
[0043] Secondly, in another embodiment of the conveyor, a lifting platform (a conventional structure, including a horizontal plate and a lifting cylinder, not shown in the figure) is located below the positioning component 12. When the tooling plate stops at the inspection station of the conveyor, the lifting platform lifts the tooling plate, separating it from the conveyor belt or chain plate, thereby allowing the tooling plate to stop stably at the stopping position, and the conveyor continues to rotate, which facilitates the continued conveying of other tooling plates on the conveyor, thereby shortening the time for adjacent tooling plates to enter the stopping position, and thus improving the detection efficiency of the explosion-proof balance valve.
[0044] like Figure 2 As shown, multiple positioning components 12 are respectively installed at the intersection of the working range of each conveyor and the transfer robot 114, and are respectively installed on the working platform of each conveyor by bolts (conventional structure, not shown in the figure).
[0045] The positioning assembly 12 includes a swing latch 121 and a telescopic claw 122 spaced apart from the swing latch 121. The swing latch 121 and the telescopic claw 122 are spaced apart along the conveying direction, and the distance between them is equal to the length of the tooling plate, with the length direction being the conveying direction. The swing latch 121 is hinged to the work platform and positioned between parallel narrow belts, and is held in an upward posture by an elastic element (a spring in this embodiment). The telescopic claw 122 is driven to extend and retract by a cylinder. The positioning process is as follows: The tooling plate moves forward with the upper conveyor to each station. Its front end first presses down on the swing latch 121, causing the swing latch 121 to swing down around the hinge. The tooling plate continues to move forward and passes over the swing latch 121. At this time, the telescopic claw 122 extends and abuts against the front end of the tooling plate. After the tooling plate has passed over the swing latch 121, the swing latch 121 resets and rises under the action of the spring force, abutting against the rear end of the tooling plate. The swing latch 121 and the telescopic claw 122 clamp the tooling plate from front to back, forming a positioning of the tooling plate along the conveying direction. This ensures that the explosion-proof balance valve on the tooling plate stops within the working range of the transfer robot 114, resulting in high positioning accuracy of the tooling plate. The transfer robot 114's gripping and positioning are accurate and reliable, and the positioning process is automatically completed with the conveyor without the need for additional power or control commands. After the inspection is completed, the telescopic claw 122 retracts, and the tooling plate continues to move forward with the conveyor.
[0046] Secondly, an infrared sensor is also provided at the positioning component 12 to detect whether there is an explosion-proof balance valve on the tooling plate after positioning. Its detection signal is transmitted to the control center 10 for judgment. When the detection light path of the infrared sensor is blocked, it can be determined that there is an explosion-proof balance valve on the tooling plate, and then the transfer robot 114 is controlled to move and grasp, so as to avoid the transfer robot 114 grasping empty.
[0047] Furthermore, the tooling plate is equipped with a gas detector plug placement slot, which is located on one side of the groove for placing the explosion-proof balance valve. The gas detector plug is cylindrical, and the gas detector plug placement slot matches the gas detector plug, fixing the gas detector plug (the gas detector plug and the gas detector plug placement slot are not shown in the figure). The explosion-proof balance valve includes a sliding internal and external pressure component. When the pressure difference between the inside and outside of the system exceeds a set value, the internal and external pressure component moves automatically to open the ventilation channel inside the valve core. If the ventilation channel is not closed during explosion-proof testing, it will open automatically when the detection pressure reaches the set value, interfering with the detection of the high-pressure leakage rate. Therefore, before explosion-proof testing, the gas detection plug needs to be inserted into the ventilation channel (in this embodiment, it is inserted manually at the valve assembly station) to keep it closed under the test pressure. This allows the high-pressure leakage rate test to accurately reflect the explosion-proof performance of the explosion-proof balance valve. After the explosion-proof test is completed, the gas detection plug is removed and placed in the gas detection plug placement slot on the tooling plate. The gas detection plug is transferred with the tooling plate for use in the next cycle.
[0048] Furthermore, the sealing detection mechanism of the explosion-proof detection assembly 15 specifically includes a second lifting cylinder 153 and a second sealing head 154 installed at the telescopic end of the second lifting cylinder 153. The second lifting cylinder 153 is fixedly installed on the frame above the explosion-proof detection fixture 152, and the second sealing head 154 is located directly above the explosion-proof detection fixture 152.
[0049] Specifically, the explosion-proof testing fixture 152 is provided with a positioning cavity for carrying the explosion-proof balance valve. The interior of the second sealing head 154 forms an internal cavity for housing the explosion-proof balance valve and is provided with an air passage connected to the second air pressure detector 155. The air outlet of the air passage is located above the explosion-proof balance valve.
[0050] The explosion-proof testing process is as follows: After the tooling plate stops at the explosion-proof testing station of the second conveyor 151, the transfer robot 114 transfers the explosion-proof balance valve from the tooling plate to the explosion-proof testing tooling 152. The explosion-proof testing tooling 152 is driven by a transverse mechanism, which consists of a cylinder and a slide rail. The explosion-proof testing tooling 152 moves transversely along a direction parallel to the conveying direction to receive the explosion-proof balance valve directly below the transfer robot 114. An infrared sensor is fixedly installed on the frame above the explosion-proof testing tooling 152. Its light direction is consistent with the transverse direction of the explosion-proof testing tooling 152 and intersects with the top of the explosion-proof testing tooling 152. When the explosion-proof balance valve is in place, the explosion-proof balance valve blocks the light, allowing the control center 10 to sense that the explosion-proof balance valve is in place. Then, the explosion-proof testing tooling 152 moves transversely and resets to directly below the second sealing head 154. Next, the second lifting cylinder 153 drives the second sealing head 154 to descend, and the second sealing head 154... A sealing ring is installed at the bottom of the head 154. Its internal cavity and the sealing ring together abut against the top of the explosion-proof testing fixture 152, which carries the explosion-proof balance valve, or abut against the top edge of the explosion-proof balance valve, forming a sealed cavity surrounding the upper part of the valve sleeve and valve core. Next, the second pressure detector 155 introduces test gas from above the explosion-proof balance valve through the gas path in the second sealing head 154 to push the valve cover away from the valve sleeve, open the gas outlet, and then detect the high-pressure gas leakage rate of the explosion-proof balance valve to determine whether the explosion-proof performance is qualified. If 6 kPa under positive pressure is selected, the detection time is 30 seconds. When the high-pressure gas leakage rate is higher than 200 mL / min, the control center 10 then determines that the explosion-proof performance of the valve cover of the explosion-proof balance valve is qualified. Subsequently, the second sealing head 154 rises and resets, and the explosion-proof testing fixture 152 moves horizontally to directly below the transfer robot 114. The transfer robot 114 moves the tested explosion-proof balance valve back to the fixture plate.
[0051] Furthermore, the balance detection assembly 16 includes a third conveyor 161 and a detection turntable 162. The detection turntable 162 can rotate intermittently about a vertical axis, driven by a motor and in conjunction with a divider to achieve a fixed angle of rotation. Several balance detection fixtures 163 are evenly fixedly installed along the circumference of the detection turntable 162 by bolts, and each balance detection fixture 163 can support an explosion-proof balance valve on its top.
[0052] When the inspection turntable 162 rotates intermittently at a fixed angle, each balancing inspection fixture 163 switches between being directly below the transfer robot 114 (load / unload position) and being directly below the sealing inspection mechanism of several balancing inspection components 16 (inspection position). The balancing inspection fixture 163 located at the load / unload position receives the explosion-proof balancing valve transferred from the fixture plate by the transfer robot 114. Then, the inspection turntable 162 rotates at a fixed angle (e.g., 45°), and the balancing inspection fixture 163 rotates to the adjacent inspection position to perform balancing inspection. It passes through the third sealing head 165 at five positions in sequence, and applies five different low-pressure inspection gases to the explosion-proof balancing valve in sequence. After one explosion-proof balancing valve completes the balancing inspection of five different specifications, it rotates back to the load / unload position with the inspection turntable 162. The transfer robot 114 then moves the explosion-proof balancing valve back to the fixture plate. Thus, the loading / unloading operation of the transfer robot 114 and the sealing inspection are carried out in parallel at different fixture positions, eliminating the waiting time for loading / unloading and improving the cycle time of balancing inspection and the overall production capacity of the line.
[0053] The five different low-pressure tests correspond to five different balance tests, specifically: 1. 2.5 kPa under positive pressure, with a test time of 30 seconds. If the leakage rate is higher than 300 mL / min, the explosion-proof balance valve's balance pressure performance is qualified; otherwise, it is unqualified. 2. 4 kPa under negative pressure, with a test time of 30 seconds. If the leakage rate is greater than 5 mL / min, the explosion-proof balance valve's balance pressure performance is qualified; otherwise, it is unqualified. 3. 0.2 kPa under positive pressure, with a test time of 30 seconds. If the leakage rate is not greater than 1 mL / min, the explosion-proof balance valve's airtightness is qualified; otherwise, it is unqualified. 4. 1 kPa under positive pressure, with a test time of 30 seconds. If the leakage rate is not greater than 1 mL / min, the explosion-proof balance valve's airtightness is qualified; otherwise, it is unqualified. 5. 2 kPa under negative pressure, with a test time of 30 seconds. If the leakage rate is not higher than 1 mL / min, the explosion-proof balance valve's airtightness is qualified; otherwise, it is unqualified.
[0054] Furthermore, the sealing detection mechanism of the balance detection assembly 16 specifically includes a third lifting cylinder 164 and a third sealing head 165 installed at the telescopic end of the third lifting cylinder 164. The third lifting cylinder 164 is fixedly installed above the detection position, and the third sealing head 165 is located between the telescopic end of the third lifting cylinder 164 and the detection position. The third sealing head 165 has an air passage connected to the third air pressure detector 166, and the air outlet of the air passage is located above the explosion-proof balance valve.
[0055] During testing, the balance testing fixture 163 carrying the explosion-proof balance valve rotates to the testing position with the testing turntable 162. The third lifting cylinder 164 drives the third sealing head 165 to descend to the lowest point of its stroke. The internal cavity of the third sealing head 165 and the sealing ring at the bottom end abut against the top surface of the balance testing fixture 163 or the top edge of the explosion-proof balance valve to form a sealed cavity. That is, the third sealing head 165 seals the upper part of the valve sleeve and valve core. The third air pressure detector 166 passes through the air passage in the third sealing head 165 to the upper part of the explosion-proof balance valve to detect the low air pressure leakage rate of the explosion-proof balance valve and determine whether the performance of the internal and external air pressure of the balance valve is qualified.
[0056] Furthermore, the third pressure gauge 166 applies bidirectional loading of positive and negative pressure to the explosion-proof balance valve: first, positive pressure gas is introduced from the top of the explosion-proof balance valve to detect the positive leakage flow rate; then, negative pressure is formed by suction through the gas path in the third sealing head 165 to detect the negative leakage flow rate, thus simulating the sealing state of the explosion-proof balance valve under both positive and negative pressure conditions within the system, comprehensively testing its internal and external pressure performance. Secondly, the pressure provided by the third pressure gauge 166 is lower than the detection pressure provided by the second pressure gauge 155, thereby preventing the valve cover from being pushed away from the bottom of the valve sleeve to open the explosion-proof outlet for pressure relief, thus improving the detection accuracy of its internal and external pressure performance and preventing high pressure damage to the internal structure of the explosion-proof balance valve.
[0057] Furthermore, the detection fixture of the bottom cover hot-melt detection assembly 17 is a hot-melt fixture 174, which also includes a fourth lifting cylinder 175, a fourth hot-melt head 176 installed at the telescopic end of the fourth lifting cylinder 175, and a fourth industrial camera 177. Specifically, the fourth hot-melt head 176 includes four heating heads, which are used to heat the bottom cover and valve sleeve at the location where the bottom cover has a recess, thereby hot-melting and fixing the bottom cover to the valve sleeve; the fourth industrial camera 177 is fixed above the transverse trajectory of the hot-melt fixture 174, and is fixedly installed on the work platform by a bracket, the work platform being a mounting base.
[0058] The transfer robot 114 is equipped with a valve sleeve gripper 172 for grasping the explosion-proof balance valve and a bottom cover suction cup 173 for grasping the bottom cover. When the tooling plate containing the explosion-proof balance valve and the bottom cover is conveyed along the fourth conveyor 171 until it is positioned by the positioning component 12 located at the bottom cover heat-melting station, the transfer robot 114 simultaneously grasps the explosion-proof balance valve and the bottom cover, transfers the explosion-proof balance valve to the heat-melting tooling 174, and places the bottom cover on the top of the valve sleeve of the explosion-proof balance valve. The heat-melting tooling 174 is driven by a lateral movement mechanism, first moving laterally a fixed distance to directly below the transfer robot 114 to receive the explosion-proof balance valve and the bottom cover, and then moving laterally a fixed distance to the left to directly below the fourth industrial camera 175. Secondly, the fourth industrial camera 175 takes a picture of the bottom cover and determines the angles of the four recesses on the bottom cover that need to be heat-fused based on its own installation position. This angle is then compared with the angle of the fourth heat-fusion head 176 relative to it. If a deviation occurs, the servo motor inside the heat-fusion fixture 174 rotates by the angle difference, ensuring that the angles of the four recesses on the bottom cover and the four heat-fusion heads of the fourth heat-fusion head 176 are the same relative to the fourth industrial camera 175. Then, the heat-fusion fixture 174 moves laterally a fixed distance to directly below the fourth heat-fusion head 176, and the fourth lifting cylinder 175 drives the fourth heat-fusion head 176 to descend, thus... The four recesses of the bottom cover are heated and melted to fix the bottom cover to the valve sleeve. Then, the fourth lifting cylinder 175 rises and resets, and the hot-melt fixture 174 moves horizontally to below the fourth industrial camera 177. The fourth industrial camera 177 takes a picture of the hot-melt fixed part of the bottom cover and compares the picture with the preset template (in this embodiment, the preset template is the outline template of the hot-melt part of the qualified product, and the overlap of the outlines of the two is compared). When the comparison result exceeds the threshold of 90%, it is judged as qualified, thereby making the detection objective and consistent, replacing manual visual inspection, and ensuring that the hot-melt quality of the explosion-proof balance valve flowing into the watertightness detection process is qualified.
[0059] Furthermore, the sealing detection mechanism of the watertight detection assembly 18 specifically includes a fifth lifting cylinder 183 and a fifth sealing head 184 fixedly installed at the telescopic end of the fifth lifting cylinder 183. The fifth lifting cylinder 183 and the fifth sealing head 184 are fixedly installed on the transverse sliding table. The fifth sealing head 184 has a water passage connected to the water pressure tester 185, and the outlet of the water passage is located above the explosion-proof balance valve.
[0060] During testing, the transfer robot 114 first raises the explosion-proof balance valve on the tooling plate at the watertightness testing station, then moves it laterally a fixed distance to place it directly above the watertightness testing tooling 182. Next, the fifth lifting cylinder 183 and the fifth sealing head 184 move laterally a fixed distance to directly above the watertightness testing tooling 182. The fifth lifting cylinder 183 drives the fifth sealing head 184 to descend a fixed distance. The internal cavity of the fifth sealing head 184, together with the sealing ring on its bottom surface, abuts against the top surface of the watertightness testing tooling 182 or the edge of the top surface of the explosion-proof balance valve to form a sealed cavity. The upper part of the explosion-proof balance valve is connected to the water pressure tester 185 via the fifth sealing head 184. Then, the water pressure tester 185 introduces a fixed water pressure into the explosion-proof balance valve to test the water pressure drop rate. After testing, the fifth sealing head 184 rises to reset and moves laterally to allow the transfer robot 114 to grasp the tested explosion-proof balance valve. In one embodiment, the water pressure can be 15 kPa and the testing time can be 30 s. If the pressure drop exceeds 0.08 kPa within the testing time, it indicates that the explosion-proof balance valve is unqualified. The transfer robot 114 moves it to the unqualified product collection box. If it does not exceed 0.08 kPa, it indicates that it is qualified. The transfer robot 114 moves it to the tooling plate located at the watertightness testing station so that it can continue to be transported.
[0061] Furthermore, the production line also includes defective product collection boxes, which are set up at each inspection station. Explosion-proof balance valves that fail inspection at each inspection component are transferred from the inspection fixture to the defective product collection box by the transfer robot 114, and do not enter subsequent inspection components. This differs from the existing method of manual handling after a shutdown alarm, ensuring continuous operation of the production line. Explosion-proof balance valves that pass inspection are transferred back to the fixture plate by the transfer robot 114, and then flow with the fixture plate to the next inspection component.
[0062] Furthermore, the control center 10 is connected to the sensor signals located at each detection component (such as the infrared sensor at the positioning component 12, the infrared sensor at the explosion-proof detection fixture 152, the pressure sensor below the spring detection fixture 135, the air pressure detector or water pressure tester, and the proximity switch of each cylinder), receives the arrival signals of the cylinder, the fixture plate and the explosion-proof balance valve, and controls the operation of the conveying component 11, the transfer robot 114 and each detection component in sequence according to the arrival signals and a preset program. Taking the explosion-proof detection component 15 as an example: the positioning component 12 sends the signal that the tooling plate has been positioned to the control center 10. The control center 10 controls the transfer robot 114 to grab the explosion-proof balance valve along a fixed trajectory, and at the same time controls the explosion-proof detection tooling 152 to move laterally to its right end point, that is, directly below the transfer robot 114. The transfer robot 114 places the explosion-proof balance valve on the explosion-proof detection tooling 152 along the fixed trajectory. After the infrared sensor detects that the explosion-proof balance valve has been placed in place, the control center 10 controls the explosion-proof detection tooling 152 to move laterally a fixed distance to directly below the second sealing head 154. Then, it controls the second lifting cylinder 153 to drive the second sealing head 154 to descend a fixed distance to establish an external seal. After a fixed detection time, the mechanisms are reset in reverse order. The actions of each station are triggered by the arrival signal or the time taken to move a fixed distance, and are executed sequentially according to a preset program. Thus, each detection process is automatically connected without manual intervention, and the timing is reliable and the cycle is stable.
[0063] Example 2 This embodiment provides a testing method based on the explosion-proof balance valve assembly and testing production line in Embodiment 1, which is controlled and executed by the control center 10 according to a preset program, and includes the following steps: At the valve assembly station, the explosion-proof balance valve is manually assembled on the tooling plate on the first conveyor 141. The springs used for assembly are first tested by the spring testing assembly 13, and only springs that meet the requirements are used for assembly.
[0064] The assembled explosion-proof balance valve, supported by the tooling plate, flows along the first conveyor 141 to the second conveyor 151 for further transport, and is then positioned and stopped by the positioning component 12 located at the explosion-proof testing station.
[0065] The transfer robot 114 transfers the explosion-proof balance valve located at the positioning component 12 of the explosion-proof testing station to the explosion-proof testing fixture 152. The second sealing head 154 abuts against the explosion-proof testing fixture 152 or the explosion-proof balance valve to form a sealed cavity. The second air pressure detector 155 introduces testing gas from above the explosion-proof balance valve to detect the high-pressure gas leakage rate and determine whether the explosion-proof performance is qualified.
[0066] The transfer robot 114 places the explosion-proof balance valve that has passed the explosion-proof test back onto the tooling plate located at the positioning component 12 of the explosion-proof test station. The second conveyor 151 continues to transport the tooling plate to the third conveyor 161, where it is then positioned and stopped by the positioning component 12 at the balance test station. The transfer robot 114 places the explosion-proof balance valve that has failed the explosion-proof test into the defective product collection box.
[0067] The transfer robot 114 moves the explosion-proof balance valve on the tooling plate located at the balance detection station to the balance detection tooling 163. The third lifting cylinder 164 and the third sealing head 165 establish an external seal for the explosion-proof balance valve located at the balance detection tooling 163. The third air pressure detector 166 introduces the preset detection gas into the explosion-proof balance valve, measures the low air pressure leakage rate of the explosion-proof balance valve, and judges whether the internal and external air pressure performance of the explosion-proof balance valve is qualified based on the low air pressure leakage rate.
[0068] The transfer robot 114 places the explosion-proof balance valve that has passed the balance test back onto the tooling plate located at the balance test station. The third conveyor 161 transfers it to the fourth conveyor 171 for further transport, and then the positioning component 12 located at the bottom cover heat fusion station positions and stops it. The transfer robot 114 places the explosion-proof balance valve that has failed the balance test into the defective product collection box.
[0069] The transfer robot 114 moves the explosion-proof balance valve on the tooling plate located at the bottom cover heat-melting station to the heat-melting tooling 174. The fourth lifting cylinder 175 and the fourth heat-melting head 176 heat-melt and fix the bottom cover to the explosion-proof balance valve located at the heat-melting tooling 174. Then, the heat-melting tooling 174 is moved horizontally, and the fourth industrial camera 177 takes a picture of the bottom cover after heat-melting and compares it with the preset template. Based on the heat-melting fixation quality, it is determined whether the heat-melting fixation of the bottom cover is qualified.
[0070] The transfer robot 114 places the explosion-proof balance valve with the bottom cover heat-melted and qualified back onto the tooling plate located at the watertightness testing station. The fourth conveyor 171 transfers it to the fifth conveyor 181 for continued transport, and then the positioning component 12 located at the watertightness testing station positions and stops it. The transfer robot 114 places the explosion-proof balance valve with the bottom cover heat-melted and unqualified into the unqualified product collection box.
[0071] The transfer robot 114 moves the explosion-proof balance valve on the tooling located at the watertightness testing station to the watertightness testing tooling 182. The fifth lifting cylinder 183 and the fifth sealing head 184 establish an external seal on the explosion-proof balance valve located at the watertightness testing station. The water pressure tester 185 introduces a preset water flow into the explosion-proof balance valve and measures the water pressure drop rate of the explosion-proof balance valve. Based on the water pressure drop rate, it judges whether the watertightness performance of the explosion-proof balance valve is qualified.
[0072] The transfer robot 114 places the explosion-proof balance valve that has passed the watertightness test back onto the tooling plate located at the watertightness test station. The fifth conveyor 181 transfers it to the sixth conveyor 191 for continued transport, and then the positioning component 12 located at the pallet station positions and stops it. The transfer robot 114 places the explosion-proof balance valve that has failed the watertightness test into the defective product collection box.
[0073] The transfer robot 114 moves the explosion-proof balance valve on the tooling located at the stacking station to the pallet 192 for stacking.
[0074] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
[0075] The technologies, shapes, and structures not described in detail in this invention are all known technologies.
Claims
1. A production line for assembling and testing explosion-proof balance valves, characterized in that, include: The conveying assembly (11), the various detection components arranged sequentially along the conveying direction of the conveying assembly (11), the tooling plate for carrying the explosion-proof balance valve, the transfer robot (114), and the control center (10); The detection components include a valve assembly assembly (14), an explosion-proof detection assembly (15), a balance detection assembly (16), a bottom cover hot melt detection assembly (17), a watertight detection assembly (18), and a code disk assembly (19); The conveying assembly (11) includes an upper conveying component and a lower conveying component that are connected end to end and have opposite conveying directions, so that the tooling plate circulates through each of the detection assemblies; The explosion-proof detection component (15), the balance detection component (16), the watertight detection component (18), and the bottom cover hot melt detection component (17) all include detection fixtures that are separately disposed from the tooling plate; The explosion-proof detection component (15), the balance detection component (16), and the watertight detection component (18) all include a sealing detection mechanism. The sealing detection mechanism can respectively abut against the detection fixture or the explosion-proof balance valve carrying the explosion-proof balance valve to establish an external seal on the explosion-proof balance valve. Then, the detection medium is introduced into the explosion-proof balance valve through the sealing detection mechanism to detect the high-pressure leakage rate, low-pressure leakage rate, and water pressure drop rate of the explosion-proof balance valve respectively. The bottom cover hot melt detection assembly (17) can fix the bottom cover to the explosion-proof balance valve on the detection fixture by hot melt and detect the hot melt fixing quality of the bottom cover; The transfer manipulator (114) spans the upper conveyor to move the explosion-proof balance valve between the tooling plate and the testing tooling; The explosion-proof balance valve is moved from the tooling plate into the encoder assembly (19) by the transfer robot (114), and the empty tooling plate flows to the lower conveyor to return to the upper conveyor. The empty tooling plate is the tooling plate that does not carry the explosion-proof balance valve. The control center (10) is connected to the conveying assembly (11), the transfer robot (114), and each of the detection components to control each of the detection components to detect the explosion-proof balance valve in sequence.
2. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The conveying assembly (11) includes a return elevator (113). The two ends of the upper conveyor and the lower conveyor are connected by the return elevator (113). The empty tooling plate flows to the lower conveyor through the return elevator (113) at one end and is lifted back to the upper conveyor through the return elevator (113) at the other end.
3. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The upper conveyor is formed by sequentially connecting the upper part of the conveyor of the valve assembly assembly (14), the explosion-proof detection assembly (15), the balance detection assembly (16), the bottom cover hot melt detection assembly (17), the watertight detection assembly (18), and the code disk assembly (19) along the conveying direction.
4. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that, It also includes several positioning components (12), each of which includes a swing buckle (121) and a telescopic claw (122) spaced apart from the swing buckle (121). The distance between the swing buckle (121) and the telescopic claw (122) is equal to the length of the tooling plate along the conveying direction. When the tooling plate moves with the upper conveyor and presses down and passes the swing latch (121), the telescopic claw (122) extends, and the swing latch (121) is reset and lifted under the action of the elastic element, together with the telescopic claw (122) to position the tooling plate along the conveying direction.
5. The explosion-proof balance valve assembly and testing production line according to claim 4, characterized in that: The conveying assembly (11) includes a lifting platform located below the positioning assembly (12) to lift the tooling plate after positioning.
6. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The tooling plate is provided with a gas detector plug placement slot, in which a gas detector plug is placed, so that the gas detector plug is inserted into the gas outlet of the explosion-proof balance valve before the explosion-proof test, and the gas detector plug is removed and placed in the gas detector plug placement slot after the explosion-proof test is completed.
7. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The sealing detection mechanism of the explosion-proof detection component (15) includes a second lifting cylinder (153) and a second sealing head (154) disposed at the telescopic end of the second lifting cylinder (153). The second sealing head (154) descends and abuts against the explosion-proof detection fixture (152) carrying the explosion-proof balance valve or the top surface of the explosion-proof balance valve to form a sealed cavity. The explosion-proof detection assembly (15) also includes a second pressure detector (155), which introduces detection gas above the explosion-proof balance valve through the second sealing head (154).
8. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The balance detection component (16) further includes a detection turntable (162), and the balance detection fixtures (163) of a plurality of the balance detection components (16) are evenly arranged along the circumference of the detection turntable (162); When the detection turntable (162) rotates intermittently, each of the balance detection fixtures (163) switches between below the transfer manipulator (114) and below the sealing detection mechanism of the balance detection assembly (16).
9. The explosion-proof balance valve assembly and testing production line according to claim 8, characterized in that: The sealing detection mechanism of the balance detection assembly (16) includes a third lifting cylinder (164) and a third sealing head (165) disposed at the telescopic end of the third lifting cylinder (164). The third sealing head (165) descends and abuts against the top surface of the balance detection fixture (163) or the explosion-proof balance valve to form a sealed cavity. The balance detection assembly (16) also includes a third pressure detector (166), which introduces gas into the upper part of the explosion-proof balance valve through the third sealing head (165).
10. The explosion-proof balance valve assembly and testing production line according to claim 9, characterized in that: The third air pressure detector (166) applies a bidirectional load of positive and negative pressure to the explosion-proof balance valve, and the incoming air pressure is less than the detection air pressure introduced by the explosion-proof detection component (15).
11. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The bottom cover hot melt detection assembly (17) includes a fourth industrial camera (177). The detection fixture of the bottom cover hot melt detection assembly (17) is a hot melt fixture (174). The hot melt fixture (174) can move the explosion-proof balance valve after hot melt fixing to below the fourth industrial camera (177). The fourth industrial camera (177) can take pictures of the hot melt fixing part of the bottom cover directly below and compare the captured image with a preset template to screen out qualified products whose comparison results exceed the threshold by 90%.
12. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The sealing detection mechanism of the watertight detection component (18) includes a fifth lifting cylinder (183) and a fifth sealing head (184) disposed at the telescopic end of the fifth lifting cylinder (183). The fifth lifting cylinder (183) and the fifth sealing head (184) are laterally movable. When the fifth lifting cylinder (183) and the fifth sealing head (184) move laterally to directly above the watertightness testing fixture (182) of the watertightness testing assembly (18), the fifth lifting cylinder (183) can drive the fifth sealing head (184) to descend, so as to seal the upper part of the explosion-proof balance valve and connect the upper part of the testing fixture with the water pressure tester (185).
13. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: It also includes a defective product collection box, which contains explosion-proof balance valves that have failed the test. The explosion-proof balance valves that have failed the test are moved from the test fixture into the defective product collection box by the transfer robot (114).
14. The explosion-proof balance valve assembly and testing production line according to claim 1, characterized in that: The control center (10) is connected to the sensor signals located at each of the detection components to control the actions of the conveying component (11), the transfer robot (114) and each of the detection components in sequence according to a preset program.
15. A testing method based on the explosion-proof balance valve assembly and testing production line according to any one of claims 1 to 14, characterized in that, Includes the following steps: At the valve assembly assembly, an explosion-proof balance valve is assembled on the tooling plate; The assembled explosion-proof balance valve is then transferred to the explosion-proof testing station. An external seal is established for the explosion-proof balance valve located at the explosion-proof testing station. A preset test gas is introduced into the explosion-proof balance valve, the high-pressure gas leakage rate of the explosion-proof balance valve is measured, and the explosion-proof performance of the explosion-proof balance valve is judged based on the high-pressure gas leakage rate. The explosion-proof balance valve that has passed the explosion-proof test is transferred to the balance test station; An external seal is established for the explosion-proof balance valve located at the balance detection station. A preset detection gas is introduced into the explosion-proof balance valve, the low-pressure leakage rate of the explosion-proof balance valve is measured, and the internal and external pressure performance of the explosion-proof balance valve is judged based on the low-pressure leakage rate. The explosion-proof balance valve that has passed the internal and external air pressure performance test is transferred to the bottom cover heat fusion station. The bottom cover is heat-fused and fixed to the explosion-proof balance valve located at the bottom cover heat-fusion station. The heat-fusion fixing quality of the bottom cover is detected, and the heat-fusion fixing quality is used to determine whether the bottom cover heat-fusion fixing is qualified. The explosion-proof balance valve with its bottom cover heat-fused and secured in a qualified manner is then transferred to the watertightness testing station. An external seal is established for the explosion-proof balance valve located at the watertightness testing station. A preset water flow is introduced into the explosion-proof balance valve, the water pressure drop rate of the explosion-proof balance valve is measured, and the watertightness performance of the explosion-proof balance valve is judged based on the water pressure drop rate. The explosion-proof balance valve that has passed the watertightness test is transferred to the encoder station for encoder operation.