A path planning method for a water tank dredging robot

By acquiring multi-source data from the water tank to calculate the silt characteristic parameters, constructing an interaction model between the dredging head and the silt, and optimizing the dredging operation parameters and path, the problem of the dredging robot being unable to accurately acquire silt characteristics and adapt to the dynamic environment in the high turbidity environment of the water tank was solved, and efficient and stable dredging operations were achieved.

CN123113873APending Publication Date: 2026-11-17SHENHUA XINJIANG ENERGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611396561.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing dredging robots cannot accurately acquire the characteristics of silt in high-turbidity, dark environments in water tanks, and cannot adapt to dynamic environmental changes during the dredging process, resulting in low dredging efficiency, high probability of pump blockage, and poor operational stability.

Method used

By acquiring multi-source data from the water tank, calculating the characteristic parameters of the silt, constructing an interaction model between the dredging head and the silt, determining the evaluation parameters of the dredging operation, optimizing the dredging operation parameters and path, and generating dredging control commands, the robot can achieve efficient dredging in a high-turbidity environment.

Benefits of technology

It improved the efficiency of dredging operations, reduced pumping load and the risk of pump blockage, and enhanced the robot's operational stability and path planning adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123113873A_ABST
    Figure CN123113873A_ABST
Patent Text Reader

Abstract

This application discloses a path planning method for a water tank dredging robot. By acquiring multi-source data from the water tank and the mechanical power parameters of the dredging robot, it calculates silt characteristic parameters representing the silt state and constructs an interaction model between the dredging head and the silt based on the mechanical power parameters. This yields evaluation parameters reflecting the current dredging conditions, which are then used to determine dredging operation parameters. Based on these parameters, a dredging path is determined, and finally, corresponding dredging control commands are generated according to the dredging operation parameters and the dredging path. This method addresses the challenges of accurately acquiring silt characteristics in high-turbidity, dark environments, and the dynamic changes in operating conditions during dredging. It ensures that the dredging path and operation parameters match the actual silt state and the robot's power state, improving dredging efficiency while reducing pumping load and pump blockage risk, and enhancing the operational stability and path planning adaptability of the dredging robot.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of robot path planning, and in particular to a path planning method for a water tank dredging robot. Background Technology

[0002] The underground water sump in a coal mine is the core of the mine's drainage system, directly impacting mine safety. Traditional water sump dredging operations mostly rely on manual or semi-mechanized methods, which are labor-intensive, inefficient, and carry high safety risks, such as toxic gas hazards, roof falls, water damage, and equipment damage. Furthermore, they have drawbacks such as long operation cycles and disruption to normal mine drainage.

[0003] In environments with high turbidity and no light in water tanks, existing dredging robots cannot utilize traditional optical sensors. Existing sonar technology lacks sufficient differentiation of silt deposition media and cannot accurately analyze the rheological properties and spatial distribution of silt. Furthermore, existing robot path planning relies heavily on static maps, which cannot adapt to dynamic environmental changes during the dredging process. This makes it difficult to achieve coordination between obstacle avoidance, environment construction, and dredging operations, easily leading to problems such as low dredging efficiency, high probability of pump blockage, and poor operational stability. Summary of the Invention

[0004] The purpose of this application is to overcome the above problems and provide a path planning method for a water tank dredging robot.

[0005] The technical solution of this application provides a path planning method for a water tank dredging robot, including: Acquire multi-source data of the water tank and the mechanical power parameters of the water tank dredging robot; Calculate the silt characteristic parameters based on the multi-source data from the water tank; A model of the interaction between the sludge dredging head and the sludge is constructed based on the sludge characteristic parameters and the mechanical dynamic parameters. The evaluation parameters for dredging conditions are determined based on the interaction model between the dredging head and the silt. The dredging operation parameters are determined based on the dredging condition evaluation parameters, and the dredging path is determined based on the dredging operation parameters; Based on the dredging operation parameters and the dredging path, a dredging control command is generated to control the water tank dredging robot to perform the dredging operation.

[0006] Furthermore, the multi-source data of the water tank includes sonar characteristic parameters, dielectric constant characteristic parameters, vertical hydrostatic pressure characteristic parameters, and turbidity characteristic parameters; The calculation of silt characteristic parameters based on the multi-source data from the water tank specifically includes: Calculate the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters; Calculate the silt yield stress based on the dielectric constant characteristic parameters; Calculate the dynamic viscosity of the sludge based on the vertical static pressure characteristic parameters; The critical suction velocity of sludge is calculated based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge. The real-time bulk density of the mud-water mixture, the yield stress of the silt, the dynamic viscosity of the silt, and the critical suction velocity of the silt are used as the characteristic parameters of the silt.

[0007] Furthermore, the calculation of the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters specifically includes: Wavelet decomposition and threshold denoising are performed on the echo time-domain signals of different preset frequency bands corresponding to the sonar characteristic parameters to obtain the purified echo time-domain sequence. The echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient are extracted from the purified echo time-domain sequence. The acoustic impedance of the medium corresponding to each preset frequency band is determined based on the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient. The real-time volumetric density of the mud-water mixture is calculated based on the acoustic impedance of the medium corresponding to each preset frequency band.

[0008] Furthermore, the calculation of the sludge yield stress based on the dielectric constant characteristic parameter specifically includes: Extract the real part of the complex permittivity corresponding to the dielectric constant characteristic parameters; The real part of the complex dielectric constant is input into a preset dispersion model for fitting to obtain the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time. The yield stress of the silt is calculated based on the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time.

[0009] Furthermore, the calculation of the sludge dynamic viscosity based on the vertical static pressure characteristic parameters specifically includes: The vertical static pressure gradient is determined based on the vertical static pressure characteristic parameters. The vertical gradient of slurry density is calculated based on the vertical static pressure gradient and gravitational acceleration. The vertical gradient of the slurry density is grouped, and the corresponding adaptive weighting coefficient is determined based on the variance of the gradient data of each group. Weighted calculations are performed based on the vertical gradient of the slurry density of each group and the corresponding adaptive weighting coefficients; The dynamic viscosity of the sludge is calculated based on the weighted calculation results and the real-time bulk density of the mud-water mixture.

[0010] Furthermore, the calculation of the critical suction velocity of the sludge based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the sludge-water mixture, and the dynamic viscosity of the sludge specifically includes: Extract the turbidity time-domain sequence from the turbidity feature parameters; The turbidity time-domain sequence is input into a preset time-series model for processing to obtain the purified turbidity time-domain sequence. Calculate the average turbidity change rate over time based on the purified turbidity time-domain sequence; The critical suction velocity of the sludge is calculated based on the time-domain average change rate of turbidity, the yield stress of the sludge, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge.

[0011] Furthermore, the construction of the interaction model between the dredging head and the silt based on the silt characteristic parameters and the mechanical dynamic parameters includes: Based on the relationship between each parameter in the sludge characteristic parameters and the corresponding standard reference value, a coupling calculation is performed to obtain the core coupling coefficient used to characterize the difficulty of sludge treatment. Based on the core coupling coefficient and the mechanical power parameters, a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model are constructed respectively. By associating the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model, the interaction model between the dredging head and the sludge is obtained.

[0012] Furthermore, the interaction model between the dredging head and the sludge includes a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model; The determination of dredging operation evaluation parameters based on the interaction model between the dredging head and the silt specifically includes: The pumping load rate corresponding to the current dredging condition is calculated using the pumping load rate model. The effective dredging efficiency is calculated based on the effective dredging efficiency model for the current dredging condition. The pump blockage risk coefficient corresponding to the current dredging condition is calculated using the aforementioned pump blockage risk coefficient model. The pumping load rate, the effective dredging efficiency, and the pump blockage risk coefficient are used as evaluation parameters for the dredging operation.

[0013] Furthermore, determining the dredging operation parameters based on the dredging condition evaluation parameters specifically includes: Obtain the preset upper limit of pumping load rate and the upper limit of pump blockage risk coefficient; With effective dredging efficiency as the optimization objective, and constrained by the pumping load rate not exceeding the upper limit of the pumping load rate and the pump blockage risk coefficient not exceeding the upper limit of the pump blockage risk coefficient, the dredging operation parameters are determined. The dredging operation parameters include travel speed, dredging head cutting speed, and absolute value of suction negative pressure.

[0014] Furthermore, determining the dredging path based on the dredging operation parameters includes: With the goal of maximizing the effective dredging efficiency, the dredging area is planned based on the dredging operation parameters to obtain the dredging path.

[0015] The above technical solution has the following beneficial effects: This application discloses a path planning method for a sludge dredging robot. By acquiring multi-source data from the sludge reservoir and the mechanical power parameters of the dredging robot, it calculates sludge characteristic parameters representing the sludge state. Combined with the mechanical power parameters, it constructs an interaction model between the dredging head and the sludge, thereby obtaining evaluation parameters reflecting the current dredging conditions. Based on these parameters, it determines the dredging operation parameters, determines the dredging path, and finally generates corresponding dredging control commands according to the dredging operation parameters and the dredging path. This method addresses the challenges of accurately acquiring sludge characteristics in high-turbidity, dark environments, and the dynamic changes in operating conditions during dredging. It ensures that the dredging path and operation parameters match the actual sludge state and the robot's power state, improving dredging efficiency while reducing pumping load and pump blockage risk, and enhancing the operational stability and path planning adaptability of the dredging robot. Attached Figure Description

[0016] The disclosure of this application will become more readily understood with reference to the accompanying drawings. It should be understood that these drawings are for illustrative purposes only and are not intended to limit the scope of protection of this application. In the drawings: Figure 1 This is a flowchart of the path planning method for a water tank dredging robot in one embodiment of this application; Figure 2 This is a flowchart illustrating the process of calculating the real-time bulk density of mud-water mixture in one embodiment of this application; Figure 3 This is a flowchart illustrating the calculation of sludge yield stress in one embodiment of this application; Figure 4 This is a flowchart illustrating the process of calculating the dynamic viscosity of sludge in one embodiment of this application; Figure 5 This is a flowchart illustrating the calculation of the critical suction velocity of sludge in one embodiment of this application. Figure 6 This is a flowchart of a path planning method for a water tank dredging robot according to one embodiment of this application; Figure 7 This is a schematic diagram of the hardware structure of an electronic device in one embodiment of this application. Detailed Implementation

[0017] The specific embodiments of this application will be further described below with reference to the accompanying drawings.

[0018] It is readily understood that, based on the technical solution of this application, various structural and implementation methods can be interchanged by those skilled in the art without altering the essential spirit of this application. Therefore, the following detailed embodiments and accompanying drawings are merely illustrative examples of the technical solution of this application and should not be considered as the entirety of this application or as limitations or restrictions on the technical solution of the application.

[0019] The directional terms such as up, down, left, right, front, back, front, back, top, and bottom mentioned or possibly used in this specification are defined relative to the structures shown in the accompanying drawings. These are relative concepts and may therefore vary depending on their location and usage. Therefore, these or other directional terms should not be interpreted as restrictive. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0020] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal connection between two components. Those skilled in the art can understand the specific meanings of the above in this application according to the specific circumstances.

[0021] like Figure 1 As shown, a flowchart of a path planning method for a water tank dredging robot according to an embodiment of this application is presented, including: Step S101: Obtain multi-source data of the water tank and the mechanical power parameters of the water tank dredging robot; Step S102: Calculate the silt characteristic parameters based on the multi-source data from the water tank; Step S103: Construct an interaction model between the sludge dredging head and the sludge based on the sludge characteristic parameters and the mechanical dynamic parameters; Step S104: Determine the evaluation parameters for dredging conditions based on the interaction model between the dredging head and the silt. Step S105: Determine the dredging operation parameters based on the dredging condition evaluation parameters, and determine the dredging path based on the dredging operation parameters; Step S106: Generate dredging control instructions based on the dredging operation parameters and the dredging path to control the water tank dredging robot to perform dredging operations.

[0022] Specifically, in step S101, multi-source data of the water tank and the mechanical power parameters of the water tank dredging robot are acquired. The water tank environment is collected through a multi-source sensing structure installed on the water tank dredging robot to obtain the multi-source data of the water tank. The multi-source sensing structure includes at least an active sonar module, a dielectric constant sensing array, a diffused silicon hydrostatic sensor group, and a turbidimeter. Since underground water tanks in coal mines are usually in high turbidity, low illumination, or even no-light environments, they do not rely on traditional optical visual information, but instead characterize the water tank environment and sludge state through different physical quantities such as acoustics, electricity, pressure, and turbidity.

[0023] In step S102, sludge characteristic parameters are calculated based on the multi-source data from the water tank. First, the multi-source data from the water tank is identified to obtain sonar characteristic parameters, dielectric constant characteristic parameters, vertical static pressure characteristic parameters, and turbidity characteristic parameters. Then, the corresponding sludge characteristic parameters are calculated based on each type of characteristic parameter. The sludge characteristic parameters include the real-time bulk density of the mud-water mixture, the sludge yield stress, the sludge dynamic viscosity, and the critical suction velocity of the sludge.

[0024] In step S103, an interaction model between the sludge removal head and the sludge is constructed based on the sludge characteristic parameters and the mechanical dynamic parameters. The real-time bulk density of the sludge-water mixture, the sludge yield stress, the sludge dynamic viscosity, and the critical sludge suction velocity are normalized to their corresponding standard reference values. Coupled calculations are then performed based on these normalized sludge characteristic parameters to obtain a core coupling coefficient characterizing the current difficulty of sludge treatment. The standard reference values ​​can correspond to the sludge yield stress reference value, the sludge dynamic viscosity reference value, the critical suction velocity reference value, and the standard density of clean water, respectively.

[0025] Then, the core coupling coefficient was correlated with the mechanical dynamic parameters to establish a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model. These three models were then correlated to obtain a model of the interaction between the dredging head and the sludge. Specifically, the pumping load rate characterizes the load level of the pumping system under the current dredging conditions; the effective dredging efficiency characterizes the effective dredging capacity under the current sludge characteristics and operating parameters; and the pump blockage risk coefficient characterizes the risk of pump or pipe blockage during the current sludge transport process.

[0026] In step S104, the evaluation parameters for the dredging operation are determined based on the interaction model between the dredging head and the sludge. These parameters can be calculated using a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model, respectively, and are then used as the evaluation parameters for the dredging operation. Specifically, the effective dredging efficiency is used to evaluate the dredging effect under the current operating parameters; the pumping load rate is used to determine whether the current suction and conveying conditions are close to the load capacity of the pumping system; and the pump blockage risk coefficient is used to determine whether there is a risk of pump blockage due to the current sludge characteristics and suction status.

[0027] In step S105, dredging operation parameters are determined based on the dredging condition evaluation parameters, and a dredging path is determined based on these parameters. Specifically, the core optimization objective is effective dredging efficiency, and preset upper limits for pump load rate and pump blockage risk coefficient are obtained. These upper limits are used as constraints in the optimization process of dredging operation parameters. For example, the upper limit for pump load rate can be set to 85%, and the upper limit for pump blockage risk coefficient can be set to 0.8. Under these constraints, the travel speed, dredging head cutting speed, and absolute value of suction negative pressure are adjusted to determine the dredging operation parameters that achieve higher dredging efficiency from multiple candidate parameter combinations.

[0028] Global dredging path planning is performed based on defined dredging operation parameters. According to the operational status of the dredging area and the corresponding dredging operation parameters, the robot's movement path within the dredging area is planned, enabling the robot to perform dredging operations on the target area according to the planned path. By linking dredging operation parameters with path planning, path planning is no longer based solely on spatial distance or static maps, but can combine actual sludge processing capacity and current operational status to determine an appropriate dredging path, thereby improving the adaptability of path planning to the dynamic dredging process of the dredging tank.

[0029] In step S106, a dredging control command is generated based on the dredging operation parameters and the dredging path to control the water tank dredging robot to perform dredging operations. A dredging power control command is also generated based on the dredging operation parameters determined in step S105. This power control command controls at least the robot's travel speed, the dredging head's cutting speed, and the absolute value of the suction negative pressure. Simultaneously, the global dredging path is converted into corresponding travel control information for the robot, and this travel control information is associated with the dredging power control command to obtain the dredging control command. The robot moves along the planned dredging path according to the dredging control command and performs dredging operations according to the determined travel speed, dredging head cutting speed, and suction negative pressure.

[0030] During the dredging process, the robot can reacquire multi-source data from the water tank at preset time intervals and recalculate silt characteristic parameters and dredging condition evaluation parameters. When the pumping load rate is detected to be close to or exceed the preset upper limit, or the pump blockage risk factor is detected to be close to or exceed the preset upper limit, the robot can readjust its travel speed, dredging head cutting speed, and absolute value of suction negative pressure, and update the corresponding dredging control commands. This allows the robot to dynamically adjust its operating status according to changes in the silt state during the dredging process. This reduces problems such as excessive pumping load, pump blockage, and decreased dredging efficiency caused by changes in silt characteristics, improving the continuous operation capability and operational stability of the water tank dredging robot.

[0031] This embodiment presents a path planning method for a water tank dredging robot. By acquiring multi-source data from the water tank and the mechanical power parameters of the dredging robot, it calculates silt characteristic parameters representing the silt state. Combined with the mechanical power parameters, it constructs an interaction model between the dredging head and the silt, thereby obtaining evaluation parameters reflecting the current dredging conditions. Based on these parameters, it determines the dredging operation parameters, determines the dredging path, and finally generates corresponding dredging control commands according to the dredging operation parameters and the dredging path. This method addresses the challenges of accurately acquiring silt characteristics in high-turbidity water tanks and under no-light conditions, as well as the dynamic changes in operating conditions during dredging. It ensures that the dredging path and operation parameters match the actual silt state and the robot's power state, improving dredging efficiency while reducing pumping load and pump blockage risk, and enhancing the operational stability and path planning adaptability of the dredging robot.

[0032] In one embodiment, the active sonar module includes a vertical array transducer. The transducer synchronously transmits continuous sound waves in multiple preset frequency bands within the acquisition range and receives the echo signals corresponding to each preset frequency band to obtain sonar characteristic parameters. In one embodiment, the preset frequency bands may include low frequency, mid frequency, and high frequency, such as 25kHz low frequency, 120kHz mid frequency, and 600kHz high frequency. Since mud-water mixtures with different densities, particle compositions, and water content exhibit different absorption, scattering, and reflection characteristics for sound waves in different frequency bands, synchronously acquiring echo information across multiple frequency bands can yield multi-frequency acoustic information reflecting the characteristics of the sludge medium.

[0033] The dielectric constant sensing array is used to detect the electrical properties of the measured medium within the acquisition range. Specifically, a preset logarithmic sweep alternating voltage is applied to the measured medium, and the response current and phase difference at different frequencies are measured simultaneously. Based on the parallel plate capacitance principle, the complex dielectric constant corresponding to different frequencies is obtained, and the spectral curve formed by the change of the real part of the complex dielectric constant with frequency is extracted as a characteristic parameter of the dielectric constant. This allows for the acquisition of dielectric dispersion information related to the sludge particle content, particle distribution, and flocculation structure, providing a data foundation for subsequent calculation of the sludge yield stress.

[0034] The diffused silicon hydrostatic sensor array comprises multiple hydrostatic probes mounted in a vertical array. Each probe synchronously acquires the net water pressure value at its corresponding location. The vertical spacing between adjacent probes is used as spatial compensation for the pressure difference. Differential calculations are performed on the net water pressure values ​​of adjacent probes to obtain a vertical distribution sequence of pressure gradients, which serves as a vertical hydrostatic characteristic parameter. Six hydrostatic probes can be evenly spaced along the robot's vertical direction, with the spacing between adjacent probes set to 4 cm, to obtain pressure gradient data at multiple different vertical locations.

[0035] The turbidimeter is used to continuously collect the intensity of scattered light in the water body within the collection range and convert the collected scattered light intensity into a real-time turbidity time-domain sequence. It can continuously collect data according to a preset collection frequency, for example, a single collection time of 1 second, and output 100 continuous turbidity values ​​to form a turbidity time-domain sequence. Further, the turbidity time-domain sequence is subjected to first-order difference calculation to obtain a turbidity change rate sequence, which is used as a turbidity characteristic parameter to reflect the dispersion and flow changes of sludge caused by shearing, disturbance and suction of the sludge head.

[0036] In another embodiment, acquiring multi-source data from the water tank specifically includes: dividing and aggregating sonar characteristic parameters, dielectric constant characteristic parameters, vertical hydrostatic pressure characteristic parameters, and turbidity characteristic parameters according to a preset time interval, so that the data from different sensors within the corresponding acquisition unit time period form a time correspondence, thereby obtaining the multi-source data from the water tank.

[0037] In this embodiment, the preset time interval can be set according to the acquisition frequency of each sensor and the rate of change of silt state during the dredging process of the water tank. This ensures that the sonar characteristic parameters, dielectric constant characteristic parameters, vertical static pressure characteristic parameters, and turbidity characteristic parameters within the same acquisition unit time period can characterize the water tank environment and silt state at similar times. Specifically, the characteristic parameters acquired by each sensor within the corresponding acquisition unit time period are matched according to timestamps, and the acquisition times of different sensors are time-aligned. When the sampling frequencies of different sensors are inconsistent, the acquired data can be resampled or time windows matched according to the preset time interval, thereby forming multi-source data of the water tank with a unified time reference. This establishes a time correspondence between different physical quantities, reduces characteristic deviations caused by inconsistent sensor sampling times, and provides a unified data input for subsequent calculation of silt characteristic parameters based on multi-source data.

[0038] In another embodiment, the mechanical power parameters include equipment structural parameters and controllable power parameters; Obtain the mechanical power parameters of the water tank dredging robot, specifically including: The pre-calibrated effective cutting area of ​​the sludge removal head and the effective flow area of ​​the suction port are obtained as the structural parameters of the equipment; The travel speed, sludge head cutting speed, and absolute value of suction negative pressure of the water tank dredging robot under the current working state are obtained as the controllable power parameters.

[0039] In this embodiment, the structural parameters are used to characterize the cutting capability of the dredging head and the flow capacity of the suction channel of the water tank dredging robot, and the controllable power parameters are used to characterize the current motion and dredging power state of the robot, and are used to adjust the dredging operation parameters in the future.

[0040] In one embodiment, the multi-source data of the water tank includes sonar characteristic parameters, dielectric constant characteristic parameters, vertical hydrostatic pressure characteristic parameters, and turbidity characteristic parameters; The calculation of silt characteristic parameters based on the multi-source data from the water tank specifically includes: Calculate the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters; Calculate the silt yield stress based on the dielectric constant characteristic parameters; Calculate the dynamic viscosity of the sludge based on the vertical static pressure characteristic parameters; The critical suction velocity of sludge is calculated based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge. The real-time bulk density of the mud-water mixture, the yield stress of the silt, the dynamic viscosity of the silt, and the critical suction velocity of the silt are used as the characteristic parameters of the silt.

[0041] In this embodiment, the sonar characteristic parameters are parameters acquired and processed by the sonar module to characterize the acoustic response characteristics of the medium in the water tank; the dielectric constant characteristic parameters are parameters acquired by the dielectric constant sensing array to characterize the electrical dielectric properties of the measured medium; the vertical static pressure characteristic parameters are parameters acquired and processed by the vertically arranged static pressure probes to characterize the pressure change characteristics of the medium in the water tank along the vertical direction; and the turbidity characteristic parameters are parameters acquired and processed by the turbidity meter to characterize the content and change state of suspended particles in the water.

[0042] The real-time bulk density of the mud-water mixture is used to characterize the mass characteristics per unit volume of the mud-water mixture within the current data collection area; the yield stress of the silt is used to characterize the stress level that the silt needs to overcome to begin continuous flow. The higher the yield stress, the less likely the silt is to flow; the dynamic viscosity of the silt is used to characterize the degree of viscous resistance to motion during the flow process. The higher the dynamic viscosity, the greater the viscous resistance the silt experiences during flow; the critical suction velocity of the silt is the critical velocity required to maintain continuous flow during the suction and transportation process, reflecting the difficulty of suction and transportation under the current silt condition.

[0043] In this embodiment, sonar characteristic parameters are first used to reflect the propagation, reflection, and attenuation characteristics of the mud-water mixture to sound waves, and the real-time bulk density of the mud-water mixture is calculated accordingly to obtain the current density state of the mud-water mixture. Dielectric constant characteristic parameters are used to reflect the response of the sludge's dielectric properties to changes in detection conditions, and the sludge yield stress is calculated accordingly to obtain the sludge's ability to resist initial flow. Vertical hydrostatic pressure characteristic parameters are used to reflect pressure changes at different vertical positions, and the sludge dynamic viscosity is calculated accordingly to obtain the viscous characteristics of the sludge during flow. Based on this, turbidity characteristic parameters are used to characterize the dispersion and change state of sludge particles in the water body, and the critical suction velocity of the sludge is calculated by combining the obtained sludge yield stress, real-time bulk density of the mud-water mixture, and sludge dynamic viscosity, thus obtaining multiple sludge characteristic parameters that comprehensively reflect the current state of the sludge.

[0044] This embodiment converts the physical properties of silt that are difficult to obtain directly into calculable and quantifiable silt characteristic parameters such as real-time bulk density of sludge-water mixture, silt yield stress, silt dynamic viscosity, and silt critical suction velocity. This avoids the lack of information caused by judging the state of silt based solely on turbidity or single acoustic information, and enables the obtained silt characteristic parameters to more comprehensively reflect the silt state of the actual dredging area.

[0045] In one embodiment, calculating the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters specifically includes: Wavelet decomposition and threshold denoising are performed on the echo time-domain signals of different preset frequency bands corresponding to the sonar characteristic parameters to obtain the purified echo time-domain sequence. The echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient are extracted from the purified echo time-domain sequence. The acoustic impedance of the medium corresponding to each preset frequency band is determined based on the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient. The real-time volumetric density of the mud-water mixture is calculated based on the acoustic impedance of the medium corresponding to each preset frequency band.

[0046] In this embodiment, the echo time-domain signal is the echo signal formed by reflection and scattering of sound waves emitted by the sonar and received by the transducer. The changes in the echo signal are recorded in chronological order. Wavelet decomposition decomposes the echo time-domain signal into signal components at multiple frequency and time scales, thereby distinguishing signal changes at different scales. Threshold denoising processes the wavelet coefficients obtained from wavelet decomposition according to a preset threshold, weakening signal components with small amplitudes that are usually related to noise, while retaining signal components that reflect effective echo characteristics. The purified echo time-domain sequence is the echo sequence obtained after wavelet decomposition, threshold denoising, and reconstruction of the echo time-domain signal, used for subsequent echo feature extraction.

[0047] The echo sound pressure amplitude is used to characterize the intensity of the received echo sound pressure. The medium detection distance characterizes the propagation distance between the sonar transducer and the measured medium, and can be determined based on the time difference between the emitted sound wave and the corresponding echo, combined with the propagation speed. The echo attenuation coefficient characterizes the degree of attenuation of the echo signal with propagation distance during sound wave propagation in the measured medium. The medium acoustic impedance characterizes the resistance characteristics of the medium to sound wave propagation during propagation in the measured medium, and is related to the density of the medium and the sound wave propagation characteristics.

[0048] This embodiment first processes the echo time-domain signals of different preset frequency bands. This is because factors such as equipment operation, bubbles, particle disturbance, and the sensor itself in the water tank environment can all cause noise in the echo signal. If the sound pressure amplitude, propagation distance, and attenuation characteristics are directly extracted from the original echo, the noise may change the echo amplitude or affect the echo arrival time, thus affecting the subsequent judgment of the medium characteristics. Therefore, wavelet decomposition is first performed on the echo time-domain signals of different preset frequency bands to convert the original signal into wavelet coefficients at different scales. Then, threshold denoising is used to weaken the signal components corresponding to the noise, and the processed wavelet coefficients are reconstructed to obtain the purified echo time-domain sequence.

[0049] The echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient are then extracted from the purified echo time-domain sequence. The echo sound pressure amplitude reflects the strength of the echo signal, the medium detection distance reflects the propagation path length of the sound wave in the medium, and the echo attenuation coefficient reflects the degree of energy attenuation during propagation. Since mud-water mixtures of different densities produce varying degrees of reflection, propagation, and attenuation of sound waves, these three parameters can collectively characterize the acoustic response of the medium under different preset frequency bands.

[0050] Then, based on the echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient, the medium acoustic impedance corresponding to each preset frequency band is determined. Finally, the real-time volumetric density of the mud-water mixture is calculated using the medium acoustic impedance obtained from each preset frequency band, so that the acoustic information of different preset frequency bands can participate in the density calculation.

[0051] This embodiment reduces the impact of noise in the complex environment of the water tank on the echo sound pressure amplitude and propagation time by first performing wavelet decomposition and threshold denoising before extracting echo features, thus making the subsequently obtained medium acoustic impedance more stable. Furthermore, by simultaneously using the echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient to determine the medium acoustic impedance, it can comprehensively reflect the propagation characteristics of sound waves in the mud-water mixture. Then, by using the medium acoustic impedance corresponding to different preset frequency bands to calculate the real-time volumetric density of the mud-water mixture, it can take advantage of the different responses of different frequency bands to the medium, reducing density judgment errors caused by insufficient acoustic information in a single frequency band. Even in the environment of high turbidity and strong particle disturbance in the water tank, a relatively stable real-time volumetric density of the mud-water mixture can be obtained.

[0052] In one embodiment, wavelet decomposition and threshold denoising are performed on the echo time-domain signals corresponding to different preset frequency bands of the sonar feature parameters to obtain a purified echo time-domain sequence, specifically including: The echo time-domain signal was decomposed into five levels of wavelet coefficients to obtain the wavelet coefficients at each scale. The wavelet coefficients corresponding to each scale are input into a preset wavelet threshold denoising function for calculation to obtain the denoised wavelet coefficients. The denoised wavelet coefficients are subjected to inverse wavelet transform to reconstruct the time-domain sequences of the purified echoes corresponding to each preset frequency band.

[0053] In this embodiment, the echo time-domain signal is decomposed into five levels of wavelet coefficients to obtain the wavelet coefficients corresponding to each scale, and the k-th wavelet coefficient of the j-th scale is obtained according to the wavelet decomposition process: .

[0054] in, is the k-th wavelet coefficient at the j-th scale; j is the scale index of the wavelet decomposition; k is the sampling point index of the wavelet coefficient at each scale, and its value is the total number of coefficients at that scale, corresponding to different sampling positions of the original echo time-domain signal on the preset acquisition time axis.

[0055] The specific formula for the wavelet thresholding denoising function is as follows: ; in, The k-th wavelet coefficients at the j-th scale after wavelet thresholding denoising; The set wavelet threshold is used to distinguish between effective signal components and noise components in wavelet coefficients; This is a threshold shrinkage adjustment parameter used to adjust the degree of shrinkage of wavelet coefficients after they exceed the wavelet threshold; This is a sign function used to preserve the positive and negative signs of wavelet coefficients after thresholding.

[0056] The wavelet coefficients at each scale are filtered and shrunk using a wavelet thresholding denoising function, so that their absolute values ​​are less than the wavelet threshold. The wavelet coefficients are set to 0, and the absolute values ​​are not less than the wavelet threshold. The wavelet coefficients are shrunk to obtain the denoised wavelet coefficients.

[0057] The specific values ​​that the symbolic function can take are as follows: ; Subsequently, the denoised wavelet coefficients are reconstructed through inverse wavelet transform to obtain clean echo time-domain sequences for the low, medium, and high frequency bands. Based on these sequences, the echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient are extracted.

[0058] In one embodiment, the acoustic impedance of the medium corresponding to each preset frequency band is determined based on the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient, as shown in the following formula: ; in, The acoustic impedance of the medium; , , These are the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient, respectively. is the transmitted acoustic power of the sonar device; f is the acoustic frequency, corresponding to each preset frequency band.

[0059] In one embodiment, the real-time bulk density of the mud-water mixture is calculated based on the acoustic impedance of the medium corresponding to each preset frequency band, using the following specific formula: ; in, Let be the acoustic impedance of the medium in the i-th preset frequency band; Let be the standard propagation speed of sound waves in water for the i-th preset frequency band; This refers to the real-time volumetric density of the mud-water mixture.

[0060] In another embodiment, calculating the sludge yield stress based on the dielectric constant characteristic parameter specifically includes: Extract the real part of the complex permittivity corresponding to the dielectric constant characteristic parameters; The real part of the complex dielectric constant is input into a preset dispersion model for fitting to obtain the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time. The yield stress of the silt is calculated based on the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time.

[0061] In this embodiment, the real part of the complex permittivity is used to characterize the energy storage characteristics of the dielectric response of the sludge medium under different frequency electric fields. This is because sludge typically contains solid particles, water, and other components, and its dielectric response varies with the frequency of the applied electric field. Therefore, the dispersion characteristics of the sludge medium can be reflected by the real part of the complex permittivity at different frequencies. The preset dispersion model is a mathematical model used to describe the variation of the real part of the complex permittivity with frequency. Based on the real part of the complex permittivity obtained at different frequencies, the dielectric dispersion variation law of the sludge is fitted to obtain parameters that can characterize this dispersion law, which can be the Cole-Cole model.

[0062] The high-frequency limiting dielectric constant refers to the dielectric constant level at which the dielectric response of a medium tends to stabilize at higher frequencies. It can be used to characterize the dielectric response characteristics of sludge media under high-frequency conditions. The low-frequency static dielectric constant refers to the dielectric constant level at which the dielectric response tends to stabilize at lower frequencies. It is used to characterize the dielectric response characteristics of sludge media under low-frequency conditions. The dielectric relaxation time is used to characterize the characteristic time required for the dielectric response inside the sludge medium to adjust in response to changes in the applied electric field. This parameter reflects how quickly the dielectric response of the medium changes with frequency and is an important parameter describing dielectric dispersion characteristics. The sludge yield stress is the stress index required for sludge to transition from a basically stable state to continuous flow.

[0063] In this embodiment, the real part of the complex dielectric constant corresponding to the characteristic parameters of the dielectric constant is first extracted to obtain dielectric response data under different frequency conditions. Then, these real parts of the complex dielectric constant are input into a preset dispersion model. The preset dispersion model fits the law of variation of the real part of the complex dielectric constant with frequency, transforming the dielectric response data originally dispersed at different frequencies into three parameters that can characterize the dispersion law: the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time. The high-frequency limiting dielectric constant and the low-frequency static dielectric constant reflect the dielectric response level under higher and lower frequency conditions, respectively, while the dielectric relaxation time reflects the characteristics of the dielectric response changing with frequency.

[0064] The obtained high-frequency limiting dielectric constant, low-frequency static dielectric constant, and dielectric relaxation time are then used to characterize the sludge state, and the sludge yield stress is obtained accordingly. This transforms the calculation basis of the sludge yield stress from a single dielectric measurement value to multiple parameters that can reflect the frequency response characteristics of the medium, thereby improving the effectiveness of using dielectric response to characterize the mechanical state of sludge.

[0065] In one embodiment, the formula for the preset dispersion model is as follows: ; in, Preset angular frequency The corresponding real part of the complex permittivity, It is the high-frequency limiting dielectric constant. The low-frequency static dielectric constant is For dielectric relaxation time, To pre-calibrate the relaxation time distribution coefficient for the suitable sludge medium in the experiment, It is the imaginary unit.

[0066] The real part of the complex dielectric constant at each preset detection point is obtained by extracting the characteristic parameters of the dielectric constant, and then input into the Cole-Cole dispersion model formula for fitting analysis. By adjusting the high-frequency limiting dielectric constant, low-frequency static dielectric constant, dielectric relaxation time, and relaxation time distribution coefficient, the real part of the complex dielectric constant output by the model is matched with the real part of the measured complex dielectric constant at each preset detection point, thereby obtaining the high-frequency limiting dielectric constant corresponding to the current sludge medium. Low-frequency static dielectric constant and dielectric relaxation time .

[0067] Furthermore, the yield stress of the silt is calculated based on the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time, using the following formula: ; in, For the yield stress of silt, , All of these are preset stress fitting coefficients.

[0068] This embodiment uses the low-frequency static dielectric constant With high-frequency limiting dielectric constant The differences between them and the dielectric relaxation time The yield stress calculation process is introduced together so that the calculated silt yield stress can comprehensively reflect the dispersion of the silt dielectric response and the characteristics of dielectric response change.

[0069] In another embodiment, calculating the dynamic viscosity of the sludge based on the vertical static pressure characteristic parameters specifically includes: The vertical static pressure gradient is determined based on the vertical static pressure characteristic parameters. The vertical gradient of slurry density is calculated based on the vertical static pressure gradient and gravitational acceleration. The vertical gradient of the slurry density is grouped, and the corresponding adaptive weighting coefficient is determined based on the variance of the gradient data of each group. Weighted calculations are performed based on the vertical gradient of the slurry density of each group and the corresponding adaptive weighting coefficients; The dynamic viscosity of the sludge is calculated based on the weighted calculation results and the real-time bulk density of the mud-water mixture.

[0070] In this embodiment, the vertical static pressure characteristic parameters refer to the static pressure-related parameters obtained at different vertical positions along the sludge, used to reflect the variation of static pressure inside the sludge with vertical position. The vertical static pressure gradient is the rate of pressure change determined based on the static pressure changes at different vertical positions, used to describe the degree of change of static pressure inside the sludge along the vertical direction. The vertical gradient of mud-water density refers to the rate of change of the bulk density of the mud-water mixture along the vertical direction. This is because the change of static pressure along the vertical direction is related to the gravitational force acting on the mud-water mixture; therefore, the vertical static pressure gradient and gravitational acceleration can be used to calculate the vertical gradient of mud-water density.

[0071] Grouping refers to dividing the obtained vertical gradient of mud-water density into multiple data groups according to vertical position or corresponding sampling interval, so that gradient data from different vertical regions can be analyzed separately. Real-time bulk density of mud-water mixture is the mass per unit volume of the mud-water mixture at the current moment, reflecting the density level of the current mud-water mixture state. Dynamic viscosity of silt is used to characterize the degree of resistance to flow when silt is subjected to shear forces; the higher the dynamic viscosity, the greater the viscous resistance experienced by the silt during flow.

[0072] In this embodiment, the vertical static pressure gradient is first determined using vertical static pressure characteristic parameters. That is, based on the static pressure data corresponding to different vertical positions, the variation of static pressure along the vertical direction is analyzed. Since the static pressure variation inside the sludge is affected by the gravity of the mud-water mixture itself, the vertical static pressure gradient is further converted into the vertical gradient of mud-water density by combining gravitational acceleration. Thus, the variation of the density of the mud-water mixture along the vertical direction is obtained from the pressure change information.

[0073] After obtaining the vertical gradient of slurry density, instead of directly averaging all gradient data, the vertical gradients are first grouped according to a preset method, so that gradient data at different vertical positions or in different sampling intervals form corresponding data groups. Then, the variance of each group of gradient data is calculated, and the corresponding adaptive weighting coefficients are determined based on the stability of the gradient data within each data group.

[0074] When a set of gradient data fluctuates little, it indicates that the set of data has good stability, and the possibility of its calculation results being affected by abnormal fluctuations is relatively low. When a set of gradient data fluctuates greatly, it indicates that the set of data has obvious instability. Therefore, the impact of the data on the final calculation results can be reduced by adaptive weighting coefficients.

[0075] After determining the adaptive weighting coefficients for each group, the vertical gradient of the mud-water density for each group is weighted and calculated with the corresponding adaptive weighting coefficients to obtain a weighted calculation result that comprehensively reflects the density changes in multiple vertical regions. Finally, this weighted calculation result is combined with the real-time bulk density of the mud-water mixture to calculate the dynamic viscosity of the sludge.

[0076] This embodiment uses adaptive weighting based on the variance of each set of gradient data, avoiding simple averaging of data from different vertical locations, which would otherwise have the same impact on the dynamic viscosity calculation from data sets with varying degrees of stability. When there are large fluctuations in pressure measurements or density changes in certain vertical regions, the influence of this data on the final calculation result can be reduced, allowing the obtained dynamic viscosity to more stably reflect the actual flow characteristics of the sludge.

[0077] In one embodiment, the vertical gradient of slurry density is calculated based on the vertical hydrostatic pressure gradient and gravitational acceleration, using the following formula: ; Where Δρ / Δh is the vertical gradient value of mud-water density; Δp / Δh is the vertical array static pressure gradient value; and g is the acceleration due to gravity.

[0078] Gradient data are grouped based on the number of static pressure samples corresponding to the vertical static pressure characteristic parameters to obtain the gradient data group index; mathematical calculations are performed on each group of gradient data to obtain the variance of each group of gradient data, and the gradient data variance is input into a set adaptive weighting coefficient formula to calculate the adaptive weighting coefficient of the i-th group of gradient data. The specific formula is as follows: ; in, σ represents the adaptive weighting coefficients for the i-th set of gradient data; i Let be the variance of the i-th gradient data group; i is the index of the gradient data group, with values ​​of 1, 2, ..., cI.

[0079] The vertical gradient values ​​of the sludge density and the corresponding adaptive weighting coefficients of each set of gradient data are input into the set dynamic viscosity calculation formula to obtain the dynamic viscosity of the sludge. The specific formula is as follows: ; Where Dn is the dynamic viscosity of the silt; Δpi / Δh represents the real-time bulk density of the mud-water mixture; Δpi / Δh represents the vertical array static pressure gradient value corresponding to the i-th set of gradient data. The adaptive weighting coefficients are the values ​​corresponding to the i-th set of gradient data. , All of these are preset gradient fitting coefficients.

[0080] In another embodiment, the calculation of the critical suction velocity of the sludge based on the turbidity characteristic parameter, the sludge yield stress, the real-time bulk density of the sludge-water mixture, and the sludge dynamic viscosity specifically includes: Extract the turbidity time-domain sequence from the turbidity feature parameters; The turbidity time-domain sequence is input into a preset time-series model for processing to obtain the purified turbidity time-domain sequence. Calculate the average turbidity change rate over time based on the purified turbidity time-domain sequence; The critical suction velocity of the sludge is calculated based on the time-domain average change rate of turbidity, the yield stress of the sludge, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge.

[0081] In this embodiment, the turbidity characteristic parameters are used to characterize the turbidity of the mud-water mixture and its changes. The turbidity time-domain sequence is a data sequence formed by multiple turbidity measurements arranged in chronological order, used to reflect the change in turbidity over time. The preset time-series model is a model used to analyze and process data with a chronological relationship, used to identify and mitigate the influence of non-target changes such as measurement fluctuations from the turbidity time-domain sequence, and can serve as an ARIMA time-series prediction model.

[0082] The purified turbidity time-domain sequence is a turbidity data sequence obtained by processing the original turbidity time-domain sequence, and can more stably reflect the actual trend of turbidity change over time. The turbidity time-domain average rate of change is used to characterize the average degree of turbidity change over time within a certain time range, reflecting the rate of change of turbidity in the mud-water mixture. The critical suction velocity for sludge refers to the critical flow velocity required for sludge to meet the predetermined transport conditions during sludge suction. When the suction velocity is below this critical value, it may be difficult to maintain a stable transport state for the sludge; when the suction velocity reaches or exceeds this critical value, it can provide the corresponding flow conditions for continuous sludge suction and transport.

[0083] In this embodiment, the turbidity time-domain sequence is first extracted from the turbidity characteristic parameters. This involves forming a continuous data sequence of turbidity measurements at different times, arranged chronologically according to the acquisition time of the turbidity data. A preset time-series model processes the turbidity time-domain sequence based on the continuous change of turbidity data over time, resulting in a purified turbidity time-domain sequence. This reduces unstable fluctuations in the turbidity time-domain sequence, allowing subsequent calculations to focus more on the overall trend of turbidity changes over time, rather than abrupt changes at a specific point in time.

[0084] Subsequently, the average rate of change of turbidity over time is calculated based on the purified turbidity time-domain sequence. By comparing the purified turbidity values ​​at different time positions and their corresponding time intervals, the degree of change of turbidity within the corresponding time range is obtained, and the average rate of change over the entire preset time range is further obtained, which can reflect how fast the turbidity of the mud-water mixture changes over time.

[0085] Finally, the time-domain average rate of change of turbidity, along with the sludge yield stress, the real-time bulk density of the sludge-water mixture, and the dynamic viscosity of the sludge, were used to calculate the critical suction velocity of the sludge. By using these different types of parameters together to calculate the critical suction velocity, the obtained critical suction velocity can simultaneously consider the changes in the state of the sludge-water mixture and the flow characteristics of the sludge itself.

[0086] This embodiment utilizes a preset time series model to process the turbidity time-domain sequence, and then uses the purified turbidity time-domain sequence to calculate the average rate of change. This reduces the impact of instantaneous turbidity fluctuations on the rate of change calculation, allowing the turbidity change trend to be more stably used in the calculation of the critical sludge suction velocity. Simultaneously, combining turbidity change characteristics with sludge yield stress, real-time bulk density of the mud-water mixture, and sludge dynamic viscosity avoids determining the suction velocity based on only a single physical property parameter, enabling the calculated critical suction velocity to more comprehensively reflect the current actual sludge suction state.

[0087] In one embodiment, the turbidity time-domain sequence is input into a preset time-series model for processing to obtain a purified turbidity time-domain sequence, as shown in the following formula: ; in, For autoregressive operators, specifically: ; in, , The values ​​are 0.6 and 0.2 respectively; For a lag operator, satisfying: ; Where D is the preset difference order.

[0088] The moving average operator is as follows: ; in, The value is 0.3; t is a white noise sequence; t is a time index, corresponding to the preset detection point during data acquisition.

[0089] Furthermore, the average change rate of turbidity in the time domain is calculated based on the purified turbidity time domain sequence, using the following specific formula: ; Where N is the preset sequence length for a single data acquisition; The first difference of the turbidity value after denoising at time step 1.

[0090] Furthermore, the critical suction velocity of the sludge is calculated based on the time-domain average change rate of turbidity, the yield stress of the sludge, the real-time bulk density of the sludge-water mixture, and the dynamic viscosity of the sludge, using the following specific formula: ; in, The critical suction velocity for sludge; The yield stress of the silt; Real-time bulk density of mud-water mixture; The dynamic viscosity of the silt; The time-domain average rate of change of turbidity; , , All of these are preset suction fitting coefficients.

[0091] When the current yield stress of the silt is relatively high, it indicates that the silt requires a greater flow driving force to achieve sustained flow. Therefore, through... The critical suction velocity of the sludge increases accordingly; when the dynamic viscosity of the sludge... A larger value indicates greater viscous resistance encountered during the sludge flow, thus hindering the process. The critical suction velocity for sludge is increased; when the time-domain average rate of change of turbidity is... A larger value indicates that the current mud-water mixing state changes significantly over time, therefore, by... The critical suction velocity is adjusted accordingly.

[0092] Finally, based on the comprehensive calculation results of the above parameters, the current critical suction velocity of the sludge is obtained, so that the determination of the critical suction velocity takes into account the sludge's yield characteristics, density characteristics, viscous flow characteristics, and turbidity variation characteristics over time.

[0093] In another embodiment, constructing the interaction model between the dredging head and the silt based on the silt characteristic parameters and the mechanical dynamic parameters includes: Based on the relationship between each parameter in the sludge characteristic parameters and the corresponding standard reference value, a coupling calculation is performed to obtain the core coupling coefficient used to characterize the difficulty of sludge treatment. Based on the core coupling coefficient and the mechanical power parameters, a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model are constructed respectively. By associating the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model, the interaction model between the dredging head and the sludge is obtained.

[0094] In this embodiment, the core coupling coefficient refers to the characterization parameter obtained by comprehensively calculating the relationship between sludge characteristic parameters and corresponding standard reference values. It is used to comprehensively characterize the impact of multiple sludge characteristic parameters on the difficulty of dredging.

[0095] The pumping load rate model describes the impact of current sludge characteristics and mechanical power parameters on the load level of the pumping process. The effective dredging efficiency model describes the actual effective dredging efficiency that the dredging equipment can achieve under current sludge conditions and mechanical power parameters. The pump blockage risk coefficient model characterizes the risk of pump blockage under current sludge characteristics and mechanical power conditions. The dredging head-sludge interaction model is a comprehensive model that links the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model. It reflects the interaction between the dredging head and the sludge during operation from multiple aspects, including dredging load, dredging efficiency, and pump blockage risk.

[0096] In this embodiment, the relationship between each parameter in the sludge characteristic parameters and its corresponding standard reference value is first determined, thereby obtaining the degree of change of each sludge characteristic parameter relative to the corresponding standard state, which is the core coupling coefficient. When multiple sludge characteristic parameters simultaneously exhibit changes that are unfavorable to dredging, the core coupling coefficient can comprehensively reflect this superimposed effect.

[0097] After obtaining the core coupling coefficient, it is combined with the mechanical power parameters to construct the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model. The pumping load rate model reflects the pumping load resulting from the relationship between the current difficulty of sludge treatment and the mechanical power output; the effective dredging efficiency model reflects the degree to which mechanical power is actually converted into effective dredging capacity under the current sludge condition and mechanical power conditions; and the pump blockage risk coefficient model reflects the likelihood of pump blockage under the combined effects of the current sludge condition and mechanical power conditions.

[0098] The three models are then linked together, so that pumping load, effective dredging efficiency, and pump blockage risk are no longer independent evaluation results, but jointly constitute an interaction model between the dredging head and the sludge. Therefore, when the mechanical dynamic parameters of the dredging head change during actual operation, the impact of mechanical dynamics on pumping load, effective dredging efficiency, and pump blockage risk can be analyzed simultaneously by combining the core coupling coefficient corresponding to the current sludge characteristic parameters, thus forming a comprehensive description of the interaction state between the dredging head and the sludge.

[0099] This embodiment couples multiple sludge characteristic parameters to obtain a core coupling coefficient that reflects the overall difficulty of sludge treatment. This coefficient, along with mechanical dynamic parameters, is then used to construct multiple interaction models. This avoids evaluating the dredging status based solely on a single sludge parameter or a single mechanical parameter. It simultaneously considers power consumption, dredging effectiveness, and equipment operational risks during the dredging process, resulting in a more comprehensive characterization of the interaction between the dredging head and the sludge.

[0100] In one embodiment, a coupling calculation is performed based on the relationship between each parameter in the sludge characteristic parameters and its corresponding standard reference value to obtain a core coupling coefficient used to characterize the difficulty of sludge treatment. The specific formula is as follows: ; in, The core coupling coefficient; The yield stress of the silt; The dynamic viscosity of the silt; The critical suction velocity for sludge; The real-time bulk density of the mud-water mixture is given by Yr,ref, Dn,ref, vc,ref, and ρm,ref, which are the preset standard reference values ​​corresponding to each characteristic parameter of the sludge, namely the sludge yield stress reference value, the sludge dynamic viscosity reference value, the critical suction velocity reference value, and the standard density of clear water.

[0101] The formula for the pumping load rate model is as follows: ; Where bF is the pumping load rate; Q s Q represents the effective flow area of ​​the suction port. p Rated power of the pumping system; W p W is the absolute value of the suction negative pressure. v W represents the speed of travel. ns The cutting speed of the sludge removal head; W v,re f and W ns,ref These correspond to the preset standard travel speed and standard cutting speed, respectively; β1 is the preset load calibration coefficient, whose value is based on experimental calibration and ranges from 0.6 to 1.0.

[0102] In the pumping load rate model, the effective flow area of ​​the suction port, the absolute value of the suction negative pressure, the travel speed, and the cutting speed are correlated with the corresponding mechanical dynamic parameters. The core coupling coefficient is used to correct for the difficulty of sludge treatment, thus obtaining the pumping system load level under the current operating conditions. When the difficulty of sludge treatment increases, the core coupling coefficient changes, thereby affecting the pumping load rate; the faster the travel speed, the higher the cutting speed of the sludge removal head, and the greater the suction negative pressure, the greater the workload of the pumping system.

[0103] Furthermore, the formula for the effective dredging efficiency model is as follows: ; Where ηF is the effective dredging efficiency; Q c β2 is the effective cutting area; β2 is a preset efficiency calibration coefficient, whose value is based on experimental calibration and ranges from 0.8 to 1.2; W v W represents the speed of travel. ns The cutting speed of the sludge removal head; W ns,ref The preset standard cutting speed; W p W is the absolute value of the suction negative pressure. p,ref The preset standard suction negative pressure; 3600 is the time conversion factor, used to convert the effective dredging efficiency time unit into hours.

[0104] The effective dredging efficiency model incorporates the core coupling coefficient, effective cutting area, travel speed, cutting speed, and suction negative pressure to comprehensively reflect the impact of current sludge characteristics and mechanical dynamic parameters on actual dredging capacity. When sludge is easier to handle, the core coupling coefficient increases accordingly. Furthermore, with increases in effective cutting area, travel speed, cutting speed, and suction negative pressure, the dredging head can handle more sludge and improve sludge transport capacity, thus increasing the effective dredging efficiency.

[0105] Furthermore, the formula for the pump blockage risk coefficient model is as follows: ; Where dF is the pump blockage risk factor; v c v is the critical suction velocity for sludge. c,ref The preset critical suction flow rate reference value; P ref The preset rated reference suction negative pressure; W p β3 is the absolute value of the suction negative pressure; β3 is the preset pump blockage risk calibration coefficient.

[0106] The critical suction velocity of sludge is correlated with the suction negative pressure. When the critical suction velocity is high, a higher suction velocity is required to bring the sludge into a stable suction state. In this case, under the same mechanical power conditions, insufficient sludge flow is more likely to occur, thus increasing the risk of pump blockage. Conversely, when the absolute value of the suction negative pressure is low, insufficient suction power also leads to a decrease in sludge transport capacity, thus increasing the risk of pump blockage. Furthermore, the risk of pump blockage is corrected using a core coupling coefficient, allowing the risk to be characterized in conjunction with the overall difficulty of sludge treatment.

[0107] In another embodiment, the interaction model between the dredging head and the sludge includes a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model. The determination of dredging operation evaluation parameters based on the interaction model between the dredging head and the silt specifically includes: The pumping load rate corresponding to the current dredging condition is calculated using the pumping load rate model. The effective dredging efficiency is calculated based on the effective dredging efficiency model for the current dredging condition. The pump blockage risk coefficient corresponding to the current dredging condition is calculated using the aforementioned pump blockage risk coefficient model. The pumping load rate, the effective dredging efficiency, and the pump blockage risk coefficient are used as evaluation parameters for the dredging operation.

[0108] In this embodiment, the pumping load rate corresponding to the current dredging condition is calculated using a pumping load rate model, so that the current sludge treatment difficulty corresponds to the actual working state of the pumping system. When the current sludge treatment difficulty changes, or when mechanical power parameters such as travel speed, dredging head cutting speed, and suction negative pressure change, the load on the pumping system will also change accordingly. Therefore, the pumping load rate can reflect the degree of load on the pumping system caused by the current dredging condition.

[0109] Subsequently, the effective dredging efficiency corresponding to the current dredging conditions is calculated using an effective dredging efficiency model. This calculation result reflects the actual dredging capacity generated when the current mechanical power parameters are applied to the current state of the silt. For example, if the silt characteristics remain essentially unchanged, increasing the travel speed, the cutting speed of the dredging head, or the suction negative pressure can alter the dredging head's cutting and conveying capabilities, thereby changing the effective dredging efficiency.

[0110] Then, the pump blockage risk coefficient corresponding to the current dredging condition is calculated using a pump blockage risk coefficient model. This model primarily reflects whether the sludge can maintain stable flow under the existing suction power. When the critical suction velocity of the sludge is high but the actual suction power is insufficient, the sludge is difficult to reach a stable transport state, thus increasing the pump blockage risk coefficient accordingly. Conversely, when the suction power can meet the current sludge flow requirements, the pump blockage risk decreases accordingly.

[0111] In another embodiment, determining the dredging operation parameters based on the dredging condition evaluation parameters specifically includes: Obtain the preset upper limit of pumping load rate and the upper limit of pump blockage risk coefficient; The dredging operation parameters are determined with the effective dredging efficiency as the optimization target and with the pumping load rate not exceeding the upper limit of the pumping load rate and the pump blockage risk coefficient not exceeding the upper limit of the pump blockage risk coefficient as constraints. The dredging operation parameters include travel speed, dredging head cutting speed, and absolute value of suction negative pressure.

[0112] The preset upper limit of the pumping load rate in this embodiment is a parameter pre-set to limit the maximum allowable load of the pumping system. The upper limit of the pump blockage risk coefficient is a parameter pre-set to limit the risk of pump blockage under the current dredging condition. The dredging operation parameters are mechanical power parameters used to control the actual dredging operation state of the dredging robot, including the travel speed, the cutting speed of the dredging head, and the absolute value of the suction negative pressure.

[0113] In this embodiment, the upper limit values ​​of the pre-set pumping load rate and the upper limit value of the pump blockage risk coefficient are first obtained. Then, the travel speed, the cutting speed of the dredging head, and the absolute value of the suction negative pressure are used as the dredging operation parameters to be determined. By changing the values ​​of the above parameters, the corresponding pumping load rate, effective dredging efficiency, and pump blockage risk coefficient are calculated using the interaction model between the dredging head and the sludge.

[0114] Under the conditions that the pumping load rate does not exceed the preset upper limit and the pump blockage risk coefficient does not exceed the preset upper limit, the parameter combination that can achieve a high effective dredging efficiency is determined from the feasible combinations of dredging operation parameters. A synergistic constraint relationship is formed between the travel speed, the cutting speed of the dredging head, and the absolute value of the suction negative pressure, enabling the dredging robot to carry out dredging operations while the equipment load and pump blockage risk are both within the allowable range.

[0115] This embodiment optimizes dredging efficiency while simultaneously constraining it with upper limits for pump load rate and pump blockage risk coefficient. This avoids continuously increasing travel speed, dredging head cutting speed, or absolute suction negative pressure solely to improve dredging efficiency. It prevents the pumping system from being under excessive load due to overly large dredging parameters, and also avoids pushing the current pumping condition into a high-risk blockage zone in order to increase sludge processing speed. A balance is achieved between equipment operational safety and dredging efficiency.

[0116] In one embodiment, determining the dredging path based on the dredging operation parameters includes: With the goal of maximizing the effective dredging efficiency, the dredging area is planned based on the dredging operation parameters to obtain the dredging path.

[0117] In this embodiment, the appropriate travel speed, sludge head cutting speed, and absolute value of suction negative pressure for the dredging robot under the current sludge conditions have been determined. Therefore, during path planning, these dredging operation parameters are used as the current dredging operation conditions to determine the robot's movement route within the dredging area. During path planning, achieving high effective dredging efficiency serves as the basis for path selection, ensuring that the planned dredging path matches the current dredging operation parameters.

[0118] The effectiveness of dredging operations along different paths is considered in conjunction with the current dredging operation parameters. For different locations and paths within the dredging area, the effective dredging efficiency of the dredging robot may vary when traversing the corresponding area according to the current dredging operation parameters. Therefore, by planning the path with the goal of maximizing effective dredging efficiency, the operation path that can achieve a higher effective dredging efficiency can be prioritized.

[0119] This embodiment takes maximizing effective dredging efficiency as the path planning objective and performs path planning based on the already determined dredging operation parameters. This allows the movement route of the dredging robot to be determined not only by the geometric location of the dredging area, but also by the actual dredging capacity under the current dredging operation conditions. This reduces the waste of operational capacity caused by the robot passing through inefficient operation areas or using movement routes that are not conducive to the current dredging state.

[0120] In one specific embodiment, after the dredging robot enters the area to be dredged, it obtains the environmental information of the current dredging area and the dynamic model of the interaction between the dredging head and the silt through the installed path planner, and analyzes the current dredging conditions based on the dynamic model of the interaction between the dredging head and the silt to obtain the pumping load rate, effective dredging efficiency and pump blockage risk coefficient corresponding to the current conditions.

[0121] When planning the path, maximizing effective dredging efficiency is the core objective. Candidate paths for the dredging robot are planned, and these paths are compared based on the dredging operation status corresponding to different paths, ultimately generating a global dredging path. Simultaneously, preset upper limits for pump load rate and pump blockage risk coefficient are obtained. The upper limit for pump load rate is set to 85%, and the upper limit for pump blockage risk coefficient is set to 0.8. These upper limits are used as hard constraints in the adjustment process of dredging power parameters.

[0122] The pumping load rate corresponding to the current dredging condition is compared with the upper limit of 85% for pumping load rate, and the current pump blockage risk coefficient is compared with the upper limit of 0.8 for pump blockage risk coefficient. When the current pumping load rate does not exceed 85% and the current pump blockage risk coefficient does not exceed 0.8, it indicates that the current travel speed, dredging head speed, and suction negative pressure meet the preset safety constraints. At this time, the current dredging power parameters are maintained, and the current dredging power parameters are used as the corresponding dredging power command.

[0123] When the current pumping load rate exceeds 85%, it indicates that the pumping system load corresponding to the current dredging power parameters is high. In this case, the travel speed, dredging head speed, and suction negative pressure are adjusted in a coordinated manner to reduce the pumping system load. When the current pump blockage risk coefficient exceeds 0.8, it indicates a high risk of pump blockage under the current suction and sludge transport conditions. In this case, the aforementioned dredging power parameters are adjusted according to the current dredging conditions to reduce the adjusted pump blockage risk coefficient to no more than 0.8. Using effective dredging efficiency as the optimization criterion, under the premise of satisfying the two hard constraints of pumping load rate and pump blockage risk coefficient, the goal is to maintain as high an effective dredging efficiency as possible, thereby generating corresponding control optimization commands.

[0124] If the path planner calculates that the current pumping load rate is 82% and the pump blockage risk coefficient is 0.75 based on the current dynamic model of the interaction between the dredging head and the sludge, and neither exceeds the corresponding hard constraint upper limit, it indicates that the current dredging dynamic parameters can meet the preset operating constraints. Therefore, the current travel speed, dredging head speed and suction negative pressure are kept unchanged, and the corresponding dredging dynamic command is generated.

[0125] If the current pumping load rate increases to over 85%, the control optimization process is triggered. The path planner recalculates the pumping load rate, effective dredging efficiency, and pump blockage risk coefficient corresponding to different combinations of dredging dynamic parameters based on the current dynamic model of the interaction between the dredging head and the sludge, and makes coordinated adjustments to the travel speed, dredging head rotation speed, and suction negative pressure.

[0126] Under the conditions that the pumping load rate does not exceed 85% and the pump blockage risk coefficient does not exceed 0.8, different parameter combinations are compared, and the parameter combination that can obtain higher effective dredging efficiency is selected as the optimized dredging power parameters, and control optimization instructions are generated.

[0127] Subsequently, the generated global dredging path is associated with the dredging power commands to form dredging control commands. This enables the dredging robot to move along the global dredging path and perform dredging operations according to optimized travel speed, dredging head rotation speed, and suction negative pressure during movement. This ensures that the final output dredging control commands balance dredging efficiency and equipment operational safety. like Figure 2 As shown, a flowchart illustrating the process of calculating the real-time bulk density of mud-water mixture in one embodiment of this application includes: Step S201: Perform wavelet decomposition and threshold denoising on the echo time-domain signals of different preset frequency bands corresponding to the sonar feature parameters to obtain the purified echo time-domain sequence. Step S202: Extract the echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient from the purified echo time-domain sequence; Step S203: Determine the acoustic impedance of the medium corresponding to each preset frequency band based on the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient; Step S204: Calculate the real-time volumetric density of the mud-water mixture based on the acoustic impedance of the medium corresponding to each preset frequency band.

[0128] like Figure 3 As shown, a flowchart illustrating the calculation of sludge yield stress in one embodiment of this application includes: Step S301: Extract the real part of the complex permittivity corresponding to the dielectric constant characteristic parameter; Step S302: Input the real part of the complex dielectric constant into a preset dispersion model for fitting to obtain the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time; Step S303: Calculate the silt yield stress based on the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time.

[0129] like Figure 4 As shown, a flowchart illustrating the calculation of sludge dynamic viscosity in one embodiment of this application includes: Step S401: Determine the vertical static pressure gradient based on the vertical static pressure characteristic parameters; Step S402: Calculate the vertical gradient of slurry density based on the vertical static pressure gradient and gravitational acceleration; Step S403: Group the vertical gradient of the mud-water density and determine the corresponding adaptive weighting coefficients based on the variance of the gradient data of each group; Step S404: Perform weighted calculations based on the vertical gradient of the slurry density of each group and the corresponding adaptive weighting coefficients; Step S405: Calculate the dynamic viscosity of the sludge based on the weighted calculation results and the real-time bulk density of the mud-water mixture.

[0130] like Figure 5 As shown, a flowchart illustrating the calculation of the critical sludge suction velocity in one embodiment of this application includes: Step S501: Extract the turbidity time-domain sequence from the turbidity characteristic parameters; Step S502: Input the turbidity time-domain sequence into a preset time-series model for processing to obtain a purified turbidity time-domain sequence; Step S503: Calculate the average change rate of turbidity over time based on the purified turbidity time-domain sequence; Step S504: Calculate the critical suction velocity of the sludge based on the time-domain average change rate of turbidity, the yield stress of the sludge, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge.

[0131] like Figure 6 As shown, a flowchart of a path planning method for a water tank dredging robot in one embodiment of this application is illustrated, including: Step S601: Obtain multi-source data of the water tank and the mechanical power parameters of the water tank dredging robot; Step S602: Calculate the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters; Step S603: Calculate the silt yield stress based on the dielectric constant characteristic parameters; Step S604: Calculate the dynamic viscosity of the sludge based on the vertical static pressure characteristic parameters; Step S605: Calculate the critical suction velocity of sludge based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the mud-water mixture, and the sludge dynamic viscosity. Step S606: The real-time bulk density of the mud-water mixture, the yield stress of the sludge, the dynamic viscosity of the sludge, and the critical suction velocity of the sludge are used as the characteristic parameters of the sludge. Step S607: Perform coupling calculations based on the relationship between each parameter in the sludge characteristic parameters and the corresponding standard reference values ​​to obtain the core coupling coefficient used to characterize the difficulty of sludge treatment; Step S608: Construct a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model based on the core coupling coefficient and the mechanical power parameters, respectively; Step S609: Correlate the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model to obtain the interaction model between the dredging head and the sludge; Step S610: Calculate the pumping load rate corresponding to the current dredging condition using the pumping load rate model; Step S611: Calculate the effective dredging efficiency corresponding to the current dredging condition using the effective dredging efficiency model; Step S612: Calculate the pump blockage risk coefficient corresponding to the current dredging condition using the pump blockage risk coefficient model; Step S613: Use the pumping load rate, the effective dredging efficiency, and the pump blockage risk coefficient as the evaluation parameters for the dredging working condition. Step S614: Obtain the preset upper limit value of pumping load rate and the upper limit value of pump blockage risk coefficient; Step S615: With effective dredging efficiency as the optimization objective, and constrained by the pumping load rate not exceeding the upper limit of the pumping load rate and the pump blockage risk coefficient not exceeding the upper limit of the pump blockage risk coefficient, the dredging operation parameters are determined; Step S616: Taking the maximization of effective dredging efficiency as the path planning objective, the dredging area is planned based on the dredging operation parameters to obtain the dredging path; Step S617: Generate dredging control instructions based on the dredging operation parameters and the dredging path to control the water tank dredging robot to perform dredging operations.

[0132] Figure 7 An electronic device according to this application is shown, comprising: At least one processor 701; and, A memory 702 is communicatively connected to at least one processor 701; wherein, The memory 702 stores instructions that can be executed by at least one processor 701, which enables the at least one processor 701 to perform all the steps of a path planning method for a water tank dredging robot in any of the foregoing method embodiments.

[0133] Figure 7 Taking a processor 701 as an example: The electronic device may also include an input device 703 and an output device 704.

[0134] The processor 701, memory 702, input device 703 and output device 704 can be connected by a bus or other means. The figure shows an example of connection by bus.

[0135] The memory 702, as a non-volatile computer-readable storage medium, can be used to store non-volatile software programs, non-volatile computer-executable programs, and modules, such as the program instructions / modules corresponding to a path planning method for a water tank dredging robot in an embodiment of this application. Figures 1-6 The method flow is shown. The processor 701 executes various functional applications and data processing by running non-volatile software programs, instructions, and modules stored in the memory 702, thereby implementing a path planning method for a water tank dredging robot in the above embodiment.

[0136] The memory 702 may include a program storage area and a data storage area. The program storage area may store an operating system and an application program required for at least one function. The data storage area may store data created based on the use of a path planning method for a sump dredging robot. Furthermore, the memory 702 may include high-speed random access memory and may also include non-volatile memory, such as at least one disk storage device, flash memory device, or other non-volatile solid-state storage device. In some embodiments, the memory 702 may optionally include memory remotely located relative to the processor 701, and these remote memories may be connected via a network to the apparatus performing the path planning method for a sump dredging robot. Examples of such networks include, but are not limited to, the Internet, intranets, local area networks, mobile communication networks, and combinations thereof.

[0137] The input device 703 can receive user clicks and generate signal inputs related to user settings and function control of the water tank dredging robot path planning method. The output device 704 may include a display screen or other display device.

[0138] One or more modules are stored in memory 702, and when run by one or more processors 701, they execute a path planning method for a water tank dredging robot in any of the above method embodiments.

[0139] Embodiments of this application also provide a computer program product, including a computer program / instructions that, when executed by a processor, implement a path planning method for a water tank dredging robot as described in any of the preceding embodiments.

[0140] As needed, the above technical solutions can be combined to achieve the best technical effect.

[0141] The above description is merely the principle and preferred embodiment of this application. It should be noted that for those skilled in the art, implementation methods obtained by appropriately combining the technical solutions disclosed in different embodiments are also included within the technical scope of this invention. Based on the principle of this application, several other modifications can also be made, which should also be considered within the protection scope of this application.

Claims

1. A path planning method for a water tank dredging robot, characterized in that, include: Acquire multi-source data of the water tank and the mechanical power parameters of the water tank dredging robot; Calculate the silt characteristic parameters based on the multi-source data from the water tank; A model of the interaction between the sludge dredging head and the sludge is constructed based on the sludge characteristic parameters and the mechanical dynamic parameters. The evaluation parameters for dredging conditions are determined based on the interaction model between the dredging head and the silt. The dredging operation parameters are determined based on the dredging condition evaluation parameters, and the dredging path is determined based on the dredging operation parameters; Based on the dredging operation parameters and the dredging path, a dredging control command is generated to control the water tank dredging robot to perform the dredging operation.

2. The path planning method for a water tank dredging robot according to claim 1, characterized in that, The multi-source data of the water tank includes sonar characteristic parameters, dielectric constant characteristic parameters, vertical hydrostatic pressure characteristic parameters, and turbidity characteristic parameters; The calculation of silt characteristic parameters based on the multi-source data from the water tank specifically includes: Calculate the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters; Calculate the silt yield stress based on the dielectric constant characteristic parameters; Calculate the dynamic viscosity of the sludge based on the vertical static pressure characteristic parameters; The critical suction velocity of sludge is calculated based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge. The real-time bulk density of the mud-water mixture, the yield stress of the silt, the dynamic viscosity of the silt, and the critical suction velocity of the silt are used as the characteristic parameters of the silt.

3. The path planning method for a water tank dredging robot according to claim 2, characterized in that, The calculation of the real-time bulk density of the mud-water mixture based on the sonar characteristic parameters specifically includes: Wavelet decomposition and threshold denoising are performed on the echo time-domain signals of different preset frequency bands corresponding to the sonar characteristic parameters to obtain the purified echo time-domain sequence. The echo sound pressure amplitude, medium detection distance, and echo attenuation coefficient are extracted from the purified echo time-domain sequence. The acoustic impedance of the medium corresponding to each preset frequency band is determined based on the echo sound pressure amplitude, the medium detection distance, and the echo attenuation coefficient. The real-time volumetric density of the mud-water mixture is calculated based on the acoustic impedance of the medium corresponding to each preset frequency band.

4. The path planning method for a water tank dredging robot according to claim 2, characterized in that, The calculation of the silt yield stress based on the dielectric constant characteristic parameter specifically includes: Extract the real part of the complex permittivity corresponding to the dielectric constant characteristic parameters; The real part of the complex dielectric constant is input into a preset dispersion model for fitting to obtain the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time. The yield stress of the silt is calculated based on the high-frequency limiting dielectric constant, the low-frequency static dielectric constant, and the dielectric relaxation time.

5. The path planning method for a water tank dredging robot according to claim 2, characterized in that, The calculation of the sludge dynamic viscosity based on the vertical static pressure characteristic parameters specifically includes: The vertical static pressure gradient is determined based on the vertical static pressure characteristic parameters. The vertical gradient of slurry density is calculated based on the vertical static pressure gradient and gravitational acceleration. The vertical gradient of the slurry density is grouped, and the corresponding adaptive weighting coefficient is determined based on the variance of the gradient data of each group. Weighted calculations are performed based on the vertical gradient of the slurry density of each group and the corresponding adaptive weighting coefficients; The dynamic viscosity of the sludge is calculated based on the weighted calculation results and the real-time bulk density of the mud-water mixture.

6. The path planning method for a water tank dredging robot according to claim 2, characterized in that, The calculation of the critical suction velocity of sludge based on the turbidity characteristic parameters, the sludge yield stress, the real-time bulk density of the sludge-water mixture, and the dynamic viscosity of the sludge specifically includes: Extract the turbidity time-domain sequence from the turbidity feature parameters; The turbidity time-domain sequence is input into a preset time-series model for processing to obtain the purified turbidity time-domain sequence. Calculate the average turbidity change rate over time based on the purified turbidity time-domain sequence; The critical suction velocity of the sludge is calculated based on the time-domain average change rate of turbidity, the yield stress of the sludge, the real-time bulk density of the mud-water mixture, and the dynamic viscosity of the sludge.

7. The path planning method for a water tank dredging robot according to claim 1, characterized in that, The construction of the interaction model between the dredging head and the silt based on the silt characteristic parameters and the mechanical dynamic parameters includes: Based on the relationship between each parameter in the sludge characteristic parameters and the corresponding standard reference value, a coupling calculation is performed to obtain the core coupling coefficient used to characterize the difficulty of sludge treatment. Based on the core coupling coefficient and the mechanical power parameters, a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model are constructed respectively. By associating the pumping load rate model, the effective dredging efficiency model, and the pump blockage risk coefficient model, the interaction model between the dredging head and the sludge is obtained.

8. The path planning method for a water tank dredging robot according to claim 1, characterized in that, The interaction model between the dredging head and the sludge includes a pumping load rate model, an effective dredging efficiency model, and a pump blockage risk coefficient model. The determination of dredging operation evaluation parameters based on the interaction model between the dredging head and the silt specifically includes: The pumping load rate corresponding to the current dredging condition is calculated using the pumping load rate model. The effective dredging efficiency is calculated based on the effective dredging efficiency model for the current dredging condition. The pump blockage risk coefficient corresponding to the current dredging condition is calculated using the aforementioned pump blockage risk coefficient model. The pumping load rate, the effective dredging efficiency, and the pump blockage risk coefficient are used as evaluation parameters for the dredging operation.

9. The path planning method for a water tank dredging robot according to claim 1, characterized in that, The step of determining the dredging operation parameters based on the dredging condition evaluation parameters specifically includes: Obtain the preset upper limit of pumping load rate and the upper limit of pump blockage risk coefficient; With effective dredging efficiency as the optimization objective, and constrained by the pumping load rate not exceeding the upper limit of the pumping load rate and the pump blockage risk coefficient not exceeding the upper limit of the pump blockage risk coefficient, the dredging operation parameters are determined. The dredging operation parameters include travel speed, dredging head cutting speed, and absolute value of suction negative pressure.

10. The path planning method for a water tank dredging robot according to claim 9, characterized in that, Determining the dredging path based on the dredging operation parameters includes: With the goal of maximizing the effective dredging efficiency, the dredging area is planned based on the dredging operation parameters to obtain the dredging path.