A control method for a template temperature control system

By using the control method of the template temperature control system, the status of the temperature probe is detected in real time, the probe set is dynamically updated, an event chain is generated, and the degradation monitoring of the drive components is combined, the problems of false shutdown caused by abnormal temperature probes and difficulty in assessing the health status of drive components are solved, thereby improving the reliability and efficiency of the maintenance process.

CN123114162APending Publication Date: 2026-11-17SICHUAN EAST SPRING MACHINERY EQUIP MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611588429.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-10-14
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

During the steam curing of concrete formwork, temperature probes are prone to communication interruptions, numerical jumps, and other abnormalities, leading to accidental shutdowns. The health status of drive components is difficult to assess, affecting the quality and efficiency of curing. Furthermore, the cooling period after the equipment shuts down due to overheating is included in the curing time, causing inaccurate switching timing.

Method used

The control method of the template temperature control system is adopted. By detecting the status of temperature probes in real time, it distinguishes between sensor failure and overheating of the controlled object, dynamically updates the probe set, generates an event chain, and combines the degradation monitoring and health management of drive components to achieve hierarchical linkage control, ensuring the reliability and accuracy of the maintenance process.

Benefits of technology

It effectively avoids accidental shutdowns caused by probe malfunctions, ensures the continuity of the maintenance process, improves the accuracy of health status assessment of drive components, ensures the accuracy and efficiency of maintenance timing, and realizes the transformation from shutdown after a fault to intelligent maintenance mode with trend warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123114162A_ABST
    Figure CN123114162A_ABST
Patent Text Reader

Abstract

This invention discloses a control method for a template temperature control system, relating to the field of temperature control system management. This invention achieves this by automatically cutting off abnormal probes and triggering alarm linkage, performing downgraded maintenance on probe-deficient areas, eliminating and extending shutdown cooling periods, and conducting degradation assessment and anchor point correction of drive component vibration under operating conditions. This ensures that temperature control and alarms are based solely on reliable data, maintenance is continuous and uninterrupted, stage switching timing is accurate, variable operating condition interference is suppressed, and lifespan prediction accuracy is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of temperature control system management, specifically a control method for a template temperature control system. Background Technology

[0002] During the steam curing of concrete formwork, the temperature control system detects the formwork temperature using temperature probes distributed in each temperature control zone and controls the opening of the air inlet control valve to automatically switch between heating, heat preservation, and other curing stages. The following problems exist in actual operation: Firstly, the curing site environment is harsh, and temperature probes are prone to communication interruptions, value jumps, and other abnormalities. If the abnormal probe is directly treated as an overheating problem, it will lead to an accidental shutdown, interrupting the curing process and affecting the quality of concrete curing. Secondly, the switching of maintenance stages and the adjustment of the intake valve opening will cause fluctuations in steam pressure and flow, which in turn will cause airflow impact and valve body vibration. The wear and degradation of the bearings of drive components such as circulating fans and feed water pumps will also manifest as increased vibration. The two are mixed together, making it difficult to distinguish between transient vibration under changing operating conditions and degradation trend vibration. As a result, the health status of drive components cannot be accurately assessed, and maintenance can only rely on periodic inspections or repairs after failures, which can easily lead to unplanned shutdowns.

[0003] Third, if the cooling period after the equipment shuts down due to overheating is included in the maintenance time, it will lead to inaccurate timing of the maintenance phase switching and affect the maintenance effect.

[0004] In the existing technology, temperature control and health management of drive components are independent of each other. The operating condition information of the temperature control system itself (maintenance stage, intake valve opening, effective timing) is not used to constrain and correct the vibration degradation observation, nor is the degradation assessment result linked in reverse to the degradation maintenance and maintenance timing system of the temperature control circuit. Summary of the Invention

[0005] To address the aforementioned issues, this invention provides a control method for a template temperature control system, which integrates temperature probe deployment / removal management, zone temperature fusion, degradation maintenance, over-temperature shutdown, effective timeout elimination and extension with drive component degradation monitoring, anchor point correction, remaining life prediction, and hierarchical linkage control into a single control framework.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: A control method for a template temperature control system, characterized by comprising the following steps: S1. Set the input or cut-off status for each temperature probe, monitor the acquisition status of each temperature probe in real time, and automatically switch abnormal temperature probes to the cut-off status based on the detection results. Specifically, the system sets the activation or deactivation status for each temperature probe, monitors the acquisition status of each probe in real time, and automatically switches to deactivation for probes exhibiting abnormal temperatures based on the detection results. Probe malfunction and actual temperature exceeding limits are two completely different events. Treating them all as over-temperature without differentiation would misjudge sensor failure as an abnormality in the controlled object, leading to unwarranted shutdowns. By setting independently switchable activation / deactivation statuses for each probe and automatically deactivating it upon detecting communication interruptions, out-of-limit values, or abnormal temperature jumps, the system effectively isolates suspected measurement channels from the control and alarm circuits. This ensures that subsequent temperature fusion and alarm judgment are based solely on reliable data sources, thereby guaranteeing the reliability of control signals without interrupting the maintenance process.

[0007] S2. The area temperature value is obtained by fusing the temperature data of probes in the activated state, and the set of probes participating in the fusion is updated according to the change in the activated state; when the number of activated probes is lower than the preset lower limit, the corresponding air inlet control valve is controlled to enter the degraded maintenance mode with limited opening instead of stopping maintenance. Specifically, the regional temperature value is obtained by fusing temperature data from probes in operation. The set of probes involved in the fusion is updated according to changes in their operation status. When the number of probes in operation falls below a preset lower limit, the corresponding air inlet control valve is controlled to enter a degraded curing mode with limited opening, rather than stopping curing. Multiple probes are set up within the same temperature control area. The failure of any single probe should not cause the entire area to lose temperature information. Therefore, only the data from probes in operation is fused, and the fusion set is dynamically updated with probe removal events, ensuring that the regional temperature value is always derived from the currently available probes. When the number of available probes falls below the lower limit, it indicates that the measurement reliability of the area has significantly decreased. If the original opening adjustment range is maintained, the last line of defense will be lost if the remaining probes malfunction again. Therefore, the air inlet control valve is restricted to a degraded curing mode with limited opening. By sacrificing some temperature adjustment rate, a safety margin in the control process is obtained, avoiding early freezing or strength loss of concrete caused by directly stopping curing.

[0008] S3. Set the alarm activation status associated with each temperature probe; process the alarm exit criteria for its over-temperature alarm channel based on the probe disconnection result; when the temperature of a probe in the activation state exceeds the corresponding alarm temperature value, control the corresponding air inlet control valve to close and stop the machine and trigger the alarm. Specifically, the alarm activation status associated with each temperature probe is set; the alarm exit criteria for its over-temperature alarm channel are processed based on the probe's disconnection result; when the temperature of a probe in the activation state exceeds the corresponding alarm temperature value, the corresponding air inlet control valve is controlled to close and shut down the system, triggering an alarm. The alarm criteria and temperature use the same activation / disconnection status to ensure consistency that probes involved in temperature calculation will necessarily participate in the alarm, and disconnected probes will necessarily exit the alarm, preventing isolated faulty probes from repeatedly triggering false alarms; the trigger condition for over-temperature shutdown is limited to probes in the activation state, which physically means that the reliable measurement channel confirms that the formwork temperature has truly exceeded the limit. At this time, closing the air inlet control valve to cut off the heat source is a necessary means to protect the equipment and concrete structure.

[0009] S4. By effectively timing the total maintenance time, the period from equipment overheating shutdown to cooling and restart is removed from the effective time and made up after restarting. The heating and heat preservation work process stages are switched according to the effective cumulative time. Specifically, in step S4, by effectively timing the total curing time, the period from equipment shutdown due to overheating to cooling and restarting is removed from the effective time and then added back after restarting. The switching between heating and insulation stages is based on the effective cumulative time. The strength gain of concrete depends on the cumulative time actually spent within the specified temperature range. During the cooling period after shutdown due to overheating, the concrete does not receive effective curing. If the time is based on wall clock time, the effective curing amount will be overestimated, the stage switching will be premature, and insufficient insulation will result. Removing the shutdown cooling period from the effective time and adding it back after restarting ensures that the timing benchmark is consistent with the actual curing effect obtained by the concrete, guaranteeing accurate timing of the switching between heating and insulation stages.

[0010] S5. Combine probe removal, shutdown, cooling time, restart events and corresponding temperature data to generate an event chain, write the event chain into the maintenance report and store it by date; Specifically, the event chain is generated by combining probe removal events, shutdown events, cooling duration, restart events, and corresponding temperature data. This event chain is then written into maintenance reports and stored by date. A single isolated event record can only reflect the instantaneous state, but by associating probe removal, shutdown, cooling, restart, and corresponding temperature data with a unified time stamp into an event chain, the complete causal sequence of anomaly occurrence—system response—process recovery can be reconstructed.

[0011] S6. Determine the operating condition constraints based on the opening degree of the inlet control valve and the maintenance stage. During the maintenance period with consistent constraints, extract the degradation observation sequence by synchronously collecting data on the vibration, speed, current and temperature of the drive components. Calibrate the degradation rate benchmark based on the ratio of the observation increment to the effective running time in paired time periods, and update the anchor point and correction coefficient based on the deviation between the observation increment and the cumulative amount of the benchmark. Generate a dynamic degradation factor sequence based on the update results. Perform feature fusion on this sequence and the synchronously collected data, and output the remaining effective running time based on the regression model trained by historical life data. Perform graded linkage control on the inlet control valve and alarm unit based on the remaining effective running time.

[0012] Specifically, operating condition constraints are determined based on the opening degree of the inlet control valve and the maintenance stage. During the maintenance period with consistent constraints, degradation observation sequences are extracted by synchronously collecting data on vibration, speed, current, and temperature of the drive components. The degradation rate benchmark is calibrated based on the ratio of the observed increment to the effective running time of paired reference periods. The anchor point and correction coefficient are updated based on the deviation between the observed increment and the cumulative amount of the benchmark. A dynamic degradation factor sequence is generated based on the update results. Feature fusion is performed on this sequence and the synchronously collected data. The remaining effective running time is output by combining the regression model trained with historical life data. The inlet control valve and alarm unit are then subjected to graded linkage control based on the remaining effective running time. The vibration of the drive components comprises two parts: one part is caused by variable operating conditions, namely airflow impact and load fluctuations resulting from maintenance phase switching and intake valve opening adjustment, which are reversible transient disturbances; the other part is caused by bearing wear and lubrication deterioration, which are irreversible monotonic degradation trends. If degradation is directly assessed based on the vibration of the entire operating period, the variable operating condition disturbances will overwhelm the degradation signal. Therefore, reference periods with consistent operating conditions are first selected using the opening and maintenance phase as constraints, and degradation observation sequences are extracted only under comparable operating conditions to eliminate the influence of operating condition factors on the observations. The degradation rate benchmark is calibrated by the ratio of the observation increment of paired reference periods to the effective operating time, and the effective operating time is taken from the effective timing of the shutdown period excluded in step S4, so that the degradation measurement is consistent with the maintenance period. The actual operating volume of the maintenance process is consistent; since the reference rate is derived from a limited sample, there is a deviation from the actual degradation trajectory of the individual. Through the mechanism of dual threshold triggering of the observed increment and the cumulative amount of the reference, updating the correction coefficient by the ratio of the two, and resetting the anchor point by the subsequent observation, whenever the actual observation deviates significantly from the reference prediction, the latest observation is used as the starting point for recalibration, so that the degradation factor sequence retains historical cumulative information and continuously absorbs new information, avoiding long-term accumulation of errors; finally, the degradation factor sequence is integrated with the operating condition characteristics such as speed, current, and temperature and then input into the life regression model to output the remaining effective operating time. The intake control valve and alarm unit are linked in a graded manner according to their levels, realizing the transformation from shutdown after failure to trend warning - degradation maintenance - planned maintenance. Attached Figure Description

[0013] Figure 1 This is a flowchart of a control method for a template temperature control system proposed in an embodiment of the present invention. Detailed Implementation

[0014] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings, but the scope of protection of the present invention is not limited to the following description.

[0015] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention; that is, the described embodiments are only a part of the embodiments of the invention, and not all of them. The components of the embodiments of the invention described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0016] Therefore, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the invention without inventive effort are within the scope of protection of the invention. It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations.

[0017] Furthermore, the terms include, encompass, or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or machine that includes a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or machine. Without further limitation, an element defined by the phrase "includes a…" does not exclude the presence of other identical elements in the process, method, article, or machine that includes said element.

[0018] The features and performance of the present invention will be further described in detail below with reference to embodiments.

[0019] Example 1 This embodiment proposes a control method for a template temperature control system, such as... Figure 1 This includes the following steps: S1. Set the input or cut-off status for each temperature probe, monitor the acquisition status of each temperature probe in real time, and automatically switch abnormal temperature probes to the cut-off status based on the detection results. Specifically, this step addresses the issue of distinguishing between sensor malfunctions and actual overheating of the controlled object. Temperature probes operate under high humidity and high vibration conditions during curing processes, leading to frequent anomalies such as communication interruptions, numerical drift, and jumps. Treating probe anomalies directly as overheating would cause unintended shutdowns, interrupting the curing process and resulting in premature freezing and strength loss of the concrete. Therefore, each probe is configured with an independently switchable active / off state. The core control unit monitors the acquisition status of each probe in real time. Upon detecting an anomaly, it automatically switches the probe to off state, effectively isolating the suspected measurement channel from the control loop. In practice, each probe is configured with active and off flags written to non-volatile memory, maintaining the status after power failure and restart. The communication status and numerical validity of each probe are polled every 2 seconds. If any of the following occurs: communication interruption, measured value exceeding the -40℃ to 250℃ range, or a jump in adjacent sampling periods exceeding 8℃ / s, the probe is deemed abnormal. Simultaneously, a prompt is output on the human-machine interface and the event is recorded. For example, the first temperature control zone probe T2 experienced periodic communication interruptions due to signal line vibration and loosening. After three consecutive sampling cycles, the system automatically disconnected it, while the maintenance process was not interrupted.

[0020] S2. The area temperature value is obtained by fusing the temperature data of probes in the activated state, and the set of probes participating in the fusion is updated according to the change in the activated state; when the number of activated probes is lower than the preset lower limit, the corresponding air inlet control valve is controlled to enter the degraded maintenance mode with limited opening instead of stopping maintenance. Specifically, this step addresses the issue that the failure of a single probe should not lead to the loss of control over the entire temperature control zone. Multiple probes are set up for each temperature control zone. Even if one probe fails, the remaining probes can still provide temperature information. Therefore, only the data from probes currently in operation is fused to obtain the zone temperature value. The set of probes participating in the fusion is updated in real time as the operational status changes, ensuring that the zone temperature value is always derived from the currently available probes. In practice, when more than two probes are in operation, the reading with the largest deviation from the average value can be removed, and the arithmetic mean is taken to further improve anti-interference capabilities. When the number of probes in operation falls below a preset lower limit, it indicates that the measurement reliability of that zone has significantly decreased. If the original opening adjustment range is maintained, the last line of defense will be lost if the remaining probes malfunction again. Therefore, the corresponding air inlet control valve is controlled to enter a degraded maintenance mode with limited opening, rather than stopping maintenance: the maximum allowable opening is limited to 60% of the current maintenance stage's baseline opening, and closed-loop PID adjustment is performed within the limited opening range based on the deviation between the zone temperature value and the target temperature. For example, the baseline opening during the heating stage is 50%, and the maximum opening after degrading is 30%. The principle is to sacrifice a portion of the temperature adjustment rate in exchange for a safety margin in control, so as to avoid quality loss caused by directly stopping maintenance.

[0021] S3. Set the alarm activation status associated with each temperature probe; process the alarm exit criteria for its over-temperature alarm channel based on the probe disconnection result; when the temperature of a probe in the activation state exceeds the corresponding alarm temperature value, control the corresponding air inlet control valve to close and stop the machine and trigger the alarm. Specifically, this step addresses the reliability issue of the alarm system. Alarm criteria and temperature are integrated using the same set of active / off states, ensuring consistency in that probes involved in temperature calculations always trigger alarms, and probes that are disconnected always exit the alarm process. This prevents isolated faulty probes from repeatedly triggering false alarms. In practice, each probe is configured with an independent alarm active state bit and alarm temperature value, set separately for heating stages (e.g., 85℃) and heat preservation stages (e.g., 65℃). When a probe is disconnected, its associated over-temperature alarm channel is removed from the alarm criterion set, and the probe's temperature data no longer participates in subsequent alarm judgments. When the temperature of a probe in active state with a valid alarm active state exceeds the corresponding alarm temperature value, the core control unit controls the air inlet control valve of the corresponding temperature control area to close, shutting down the equipment and outputting an alarm signal to the alarm unit. At this point, the physical meaning of the over-temperature signal is that the reliable measurement channel confirms the template temperature has truly exceeded the limit; closing the air inlet valve to cut off the heat source is a necessary means to protect the equipment and concrete structure.

[0022] S4. By effectively timing the total maintenance time, the period from equipment overheating shutdown to cooling and restart is removed from the effective time and made up after restarting. The heating and heat preservation work process stages are switched according to the effective cumulative time. Specifically, this step addresses the discrepancy between the curing time benchmark and the actual curing effect achieved by the concrete. The strength gain of concrete depends on the cumulative time spent within the specified temperature range. During the cooling period after equipment shutdown due to overheating, the concrete does not receive effective curing. If time is based on wall clock time, the effective curing amount will be overestimated, stage switching will be premature, and insulation will be insufficient. Therefore, the total curing time is effectively timed, and the period from overheating shutdown to cooling and restarting is removed from the effective time. After restarting, the corresponding curing stage is added back, and the heating and insulation workflow stages are switched based on the effective cumulative time. In practice, the cumulative time and effective time for the heating and insulation stages can be recorded separately. The corresponding stage time is paused during shutdown, and the removed time is automatically added back after restarting. Stage switching is triggered when the effective cumulative time for the heating stage reaches a set duration (e.g., 12 hours). For example, if a shutdown and cooling lasts 2.5 hours, the end time of the insulation stage is shifted back by 2.5 hours accordingly.

[0023] S5. Combine probe removal, shutdown, cooling time, restart events and corresponding temperature data to generate an event chain, write the event chain into the maintenance report and store it by date; Specifically, this step addresses the problem of post-event tracing only revealing fragments and not causal relationships. Individual, isolated event records only reflect instantaneous states. By combining probe disconnection events, shutdown events, cooling durations, restart events, and corresponding temperature data to generate event chains, a complete causal sequence of anomaly occurrence—system response—process recovery can be reconstructed. This allows post-event tracing to not only see what happened but also the chronological relationships between events and the data context. In practice, a unified timescale is used to correlate various events and their corresponding regional temperature values ​​with the temperature data of each probe. After generating event chains, they are written into maintenance reports and stored in non-volatile memory. The maintenance reports are indexed by date, allowing operators to query event chains for any batch by date.

[0024] S6. Determine the operating condition constraints based on the opening degree of the inlet control valve and the maintenance stage. During the maintenance period with consistent constraints, extract the degradation observation sequence by synchronously collecting data on the vibration, speed, current and temperature of the drive components. Calibrate the degradation rate benchmark based on the ratio of the observation increment to the effective running time in paired time periods, and update the anchor point and correction coefficient based on the deviation between the observation increment and the cumulative amount of the benchmark. Generate a dynamic degradation factor sequence based on the update results. Perform feature fusion on this sequence and the synchronously collected data, and output the remaining effective running time based on the regression model trained by historical life data. Perform graded linkage control on the inlet control valve and alarm unit based on the remaining effective running time.

[0025] Specifically, this step addresses the difficulty in distinguishing between vibration changes caused by airflow impact under varying operating conditions and vibration changes caused by bearing degradation in drive components. Switching between maintenance phases and adjusting the intake valve opening can cause fluctuations in steam pressure and flow, leading to airflow impacts and load fluctuations. The vibration of drive components includes both these reversible transient disturbances and the irreversible degradation trend caused by bearing wear and lubrication deterioration. If degradation is directly assessed based on vibration across the entire operating period, the variable operating condition disturbances will overwhelm the degradation signal. Therefore, operating condition constraints are determined based on the opening degree of the intake control valve and the maintenance stage. Degradation observation sequences are extracted only within the consistent maintenance period based on synchronously collected data of drive component vibration, speed, current, and temperature, eliminating the influence of operating condition factors on the observations. The degradation rate benchmark is calibrated by the ratio of the observed increment to the effective running time in paired time periods, with the effective running time taken from the effective timing of S4 after excluding downtime periods, ensuring consistency between degradation measurement and the actual operating volume during the maintenance process. Since the benchmark rate originates from a limited sample and deviates from individual actual trajectories, a dual-threshold triggering method using the observed increment and the cumulative benchmark amount is employed, with the ratio of the two updating the correction coefficient. The mechanism of resetting the anchor point based on subsequent observations ensures that whenever the actual observation deviates significantly from the baseline prediction, the latest observation is used as the starting point for recalibration, generating a dynamic degradation factor sequence to avoid long-term error accumulation. Finally, this sequence is fused with concurrently collected data, and a regression model trained on historical lifespan data outputs the remaining effective operating time. This time is then used to trigger graded linkage between the intake control valve and alarm unit: normal maintenance occurs when the time exceeds the warning value; when it falls below the warning value, a degraded maintenance mode with limited opening is switched to, generating a predictive maintenance alarm that does not trigger a shutdown; and when it falls below the critical value, the expected maintenance period embedded in the S4 timing system is removed and subsequently extended. This achieves a shift from post-fault shutdown to a trend warning—degraded maintenance—planned maintenance mode, ensuring uninterrupted production and maintenance throughout the entire process.

[0026] Furthermore, step S1 includes the following sub-steps: S101. Configure an activation flag and a deactivation flag for each temperature probe, and write the flag status into a non-volatile memory through the core control unit, which is retained after power failure and restart; S102. Poll the communication status and numerical validity of each temperature probe at a preset sampling period. If any of the following occurs: communication interruption, numerical value exceeding the limit, or the jump value of adjacent sampling periods exceeds the jump threshold, the temperature probe is determined to be abnormal. S103. Automatically switch the abnormal temperature probe to the cut-off state, output a cut-off prompt through the human-machine interface, and trigger step S5 to record the probe cut-off event.

[0027] Specifically, in the probe engagement / disengagement management, each temperature probe is configured with an engagement flag and a disengagement flag. The flag status is written to non-volatile memory through the core control unit, and the flag status is retained after power failure and restart. This design enables the probe status to be retained after power failure, eliminating the need for manual reconfirmation of the probe status after system restart and avoiding the misuse of abnormal probes due to status loss during restart. The communication status and numerical validity of each temperature probe are polled at a preset sampling period (e.g., 2 seconds). When any of the following occurs, such as communication interruption, numerical out-of-bounds, or the jump variable of adjacent sampling periods exceeding the jump threshold (e.g., 8℃ / s), the temperature probe is determined to be abnormal. The three criteria are respectively for line and communication faults, sensor damage, and instantaneous spikes caused by signal interference, covering the main abnormal modes on site. Abnormal temperature probes are automatically switched to disengagement status, and disengagement prompts are output through the human-machine interface. The event chain is triggered to record the probe disengagement event, so that operators know which probe has been disengaged and the reason immediately.

[0028] Furthermore, step S2 includes the following sub-steps: S201. Read the temperature data of the temperature probes that are currently in operation. When there are two or more temperature probes in operation, remove the largest deviation value and take the arithmetic mean of the remaining temperature data as the area temperature value. S202. When the activation or deactivation status of any temperature probe changes, the set of probes participating in the fusion is re-determined, and the regional temperature value is updated in real time according to sub-step S201. S203. Compare the number of probes in the temperature control zone that are in operation with the preset lower limit value, and based on the comparison result, limit the maximum allowable opening of the air inlet control valve in this zone to a preset ratio of the reference opening of the current maintenance stage; S204. Within the limited opening range, the air inlet control valve is adjusted in a closed loop according to the temperature deviation between the area temperature value and the target maintenance temperature to maintain the maintenance process without interruption.

[0029] Specifically, in the regional temperature fusion and degradation maintenance, temperature data from currently operational temperature probes are read. When there are two or more operational temperature probes, the largest deviation value is removed, and the remaining temperature data are averaged to obtain the regional temperature value. The principle is that the readings of multiple normal probes are distributed around the true temperature, while the reading of a single interfered probe is an outlier. Removing the largest deviation value and then averaging can suppress single-point interference without reducing the normal resolution. The fusion rules adaptively degrade when the number of probes decreases. When the operational or deactivated status of any temperature probe changes, the set of probes participating in the fusion is redefined, and the regional temperature is adjusted according to the above rules. The temperature value of the zone is updated in real time to ensure that the fusion set is strictly synchronized with the actual state of the probes, and there is no blind spot in the state switching. The number of probes in the temperature control zone in the active state is compared with the preset lower limit (e.g., 2 probes). Based on the comparison result, the maximum allowable opening of the air inlet control valve of the zone is limited to a preset proportion of the current maintenance stage benchmark opening (e.g., 60%), so that the degradation range can be parameterized and tuned. Within the limited opening range, the air inlet control valve is adjusted in a closed loop according to the temperature deviation between the zone temperature value and the target maintenance temperature to maintain the maintenance process without interruption. That is, what is degraded is the adjustment capability rather than the control function. The zone temperature is still maintained near the target, only the rate of heating and cooling is slowed down.

[0030] Furthermore, step S3 includes the following sub-steps: S301. Each temperature probe is configured with an independent alarm activation status bit and alarm temperature value, and the alarm temperature value is set separately according to the heating stage and the heat preservation stage; S302. When a temperature probe is disconnected, its associated over-temperature alarm channel is removed from the alarm criterion set, so that the temperature data of the probe is no longer involved in subsequent alarm judgment; S303. For temperature probes that are in operation and whose alarm activation status is valid, when their temperature exceeds the alarm temperature value set for the corresponding stage, the core control unit controls the air inlet control valve of the corresponding temperature control area to close, thereby stopping the equipment and outputting an alarm signal to the alarm unit.

[0031] Specifically, in over-temperature alarm and shutdown control, each temperature probe is configured with an independent alarm activation status bit and alarm temperature value. The alarm temperature value is set separately for the heating stage and the heat preservation stage (e.g., 85℃ and 65℃). This is because the target temperatures for the two stages are different. If the same alarm value is used, either the alarm margin in the heating stage will be too large and lose its protective function, or there will be frequent false alarms in the heat preservation stage. Setting the alarm value in stages ensures that it always matches the danger threshold of the current stage. The independent alarm activation status bit also allows maintenance personnel to temporarily disable alarms for specific probes, providing flexibility. When a temperature probe is disconnected, its alarm status is adjusted accordingly. The associated over-temperature alarm channel is removed from the alarm criterion set, so that the temperature data of the probe no longer participates in the subsequent alarm judgment, thus eliminating the logical loophole of "the probe being removed but still participating in the alarm" from the mechanism. For temperature probes that are in the active state and whose alarm active state is valid, when their temperature exceeds the alarm temperature value set for the corresponding stage, the core control unit controls the air inlet control valve of the corresponding temperature control area to close, thereby shutting down the equipment and outputting an alarm signal to the alarm unit. The dual limiting conditions for shutdown ensure that every shutdown is an active protection action based on the reliable measurement channel, rather than a false signal from the data link.

[0032] Specifically, in maintenance time management, the total maintenance time is timed, with cumulative time and effective time recorded for both the heating and insulation stages. Stage time reflects the progress of the maintenance cycle, while effective time reflects the actual maintenance effect. The difference between the two is the total amount of downtime that has been removed, allowing operators to intuitively grasp batch progress. During the period from equipment shutdown due to overheating to cooling and restarting, the timing of the corresponding maintenance stage is paused, and the duration of that period (e.g., 2.5 hours) is removed from the effective time. This "pause + removal" dual operation avoids timing errors caused by clock source drift during the pause, and also ensures accurate timing during shutdown and cooling. The concrete in the section did not receive effective curing. After being removed, the timing benchmark was consistent with the actual curing effect of the concrete. After the equipment was restarted, the removed time was automatically extended to make up for the corresponding curing stage. This make-up process does not require manual modification of the batch plan, eliminating the risk of insufficient curing due to human error in making up for the missed time. The process of switching from the heating stage to the heat preservation stage is triggered when the effective cumulative time reaches the set time of the heating stage (e.g., 12 hours). The principle of "based on effective curing amount" is solidified in the control logic. When combined with the degraded curing mode, the timing of the stage switching is still accurate even when operating in the degraded mode.

[0033] Furthermore, step S4 includes the following sub-steps: S401. The total curing time is timed, and the cumulative time and effective time are timed separately for the heating stage and the heat preservation stage; S402. During the period from when the equipment shuts down due to overheating until it cools down and restarts, the timing of the corresponding maintenance phase during that period shall be paused and the duration of that period shall be removed from the valid timing. S403. After the equipment is restarted, the removed duration will be automatically extended to make up for the corresponding maintenance stage. S404. Trigger the process switch from the heating stage to the heat preservation stage when the effective cumulative time reaches the set time of the heating stage.

[0034] Specifically, in event chain and maintenance report management, a unified timestamp is used to associate probe removal events, shutdown events, cooling durations, restart events, and the corresponding regional temperature values ​​with the temperature data of each temperature probe, generating an event chain. The key is the "unified timestamp": temperature control events and process data were originally generated by different program branches. If each used its own local timestamp, there would be a misalignment of seconds or even minutes between events and data, making accurate alignment impossible during tracing. The unified timestamp ensures that each node in the event chain corresponds to a precise data segment. For example, at the restart event node, the temperature curves for 5 minutes before and after restart can be directly retrieved to verify whether the cooling is sufficient. The event chain restores the complete causal sequence of "abnormal occurrence - system response - process recovery," rather than an isolated instantaneous state record. The event chain is written into maintenance reports and stored in non-volatile memory. Maintenance reports are indexed by date, supporting date-based queries and fault tracing. Non-volatile storage ensures that reports are not lost after power failure, and date-based indexing conforms to the maintenance habit of "retrieving files by batch." The event chain structure is more compact than log entries, and long-term storage has higher retrieval efficiency.

[0035] Furthermore, step S5 includes the following sub-steps: S501. Using a unified time scale, correlate probe cut-off events, shutdown events, cooling durations, restart events, and the corresponding regional temperature values ​​with the temperature data of each temperature probe to generate an event chain; S502. Write the event chain into the maintenance report and store it in non-volatile memory. Index the maintenance report by date and support querying by date and fault tracing.

[0036] Specifically, in the health monitoring of drive components, within the same installation cycle of the drive components, bearing vibration signals, shaft speed, drive current, and bearing housing temperature are synchronously collected. The collection frequency is not less than twice the highest characteristic frequency of the drive components (e.g., 25.6kHz), meeting the requirements of the sampling theorem to ensure that the high-frequency fault characteristics of the bearing are not distorted. The collected data is aligned with the maintenance stage markers and the opening of the air inlet control valve by timestamp. "Within the same installation cycle" defines the time boundary of the data. The bearing life is based on installation, and data across installation cycles are not comparable. The same maintenance stage markers, the air inlet control valve opening within a preset reference range (e.g., reference opening ±10%), and steam pressure fluctuations not exceeding the pressure fluctuation threshold (e.g., 0.05MPa) are used as window screening conditions. Continuous time periods that meet the conditions are divided into reference time periods. Triple screening eliminates operating condition factors layer by layer: the same stage ensures consistent temperature and load levels, the opening reference range ensures consistent airflow impact intensity, and the pressure fluctuation threshold eliminates periods of pipeline disturbance. For each reference time period, at fixed measurement points and fixed frequency bands (e.g., [2kHz, 8kHz]), Within z), bandpass filtering and envelope demodulation are performed on the bearing vibration signal. The normalized mean of the resulting root mean square envelope relative to the initial installation reference value is calculated and used as the degradation observation value to form a degradation observation sequence. The root mean square envelope is sensitive to early wear. Normalization eliminates the difference between the sensor and the installation, and the block averaging suppresses residual fluctuations. The degradation rate reference is calibrated based on the observation increment and effective running time of paired reference time periods. The effective running time adopts the effective timing after excluding the shutdown cooling period, so that maintenance shutdown is not mistakenly counted as life consumption, and it is consistent with the temperature control timing. The mechanism coupling eliminates the need for an additional timing system; the correction coefficients and anchor points are updated based on the comparison between the observed increment and the baseline cumulative amount. The dual threshold triggering mechanism avoids updates triggered by small baseline drift or single observation noise. A dynamic degradation factor sequence is generated by combining the updated anchor points and correction coefficients. Feature extraction and fusion are performed on this sequence and the data collected at the same time to output the remaining effective running time. The intake control valve and alarm unit are then controlled in a graded linkage manner based on the remaining effective running time. The three-level action, the degradation maintenance mode, and the timing elimination and extension mechanism are directly reused and connected.

[0037] Furthermore, step S6 includes the following sub-steps: S601. During the same installation cycle of the drive component, the bearing vibration signal, shaft speed, drive current and bearing housing temperature are collected synchronously. The collection frequency is not less than twice the highest characteristic frequency of the drive component, and the collected data is aligned with the maintenance stage identifier and the opening degree of the air inlet control valve output in step S2 according to the timestamp. S602. Using the same maintenance stage identifier, the opening degree of the air inlet control valve within the preset reference range and the steam pressure fluctuation not exceeding the pressure fluctuation threshold as the window screening conditions, the continuous time periods that meet the conditions are divided to obtain the reference time periods; for each reference time period, the bearing vibration signal is bandpass filtered and envelope demodulated at a fixed measuring point and within a fixed frequency band, and the normalized mean value of the obtained envelope root mean square relative to the initial installation reference value is calculated as the degradation observation value to form a degradation observation sequence; S603. The degradation rate benchmark is calibrated based on the observed increments and effective running time of the paired reference time periods, and the cumulative amount of the benchmark is determined in combination with the effective running time. The effective running time adopts the effective time of the shutdown cooling period that has been removed in step S4. S604. Update the correction coefficients and anchor points based on the comparison results between the observed increments and the baseline cumulative amounts. Generate a dynamic degradation factor sequence by combining the updated anchor points and correction coefficients. Extract and fuse features from the dynamic degradation factor sequence and the data collected at the same time, output the remaining effective running time, and perform hierarchical linkage control of the air inlet control valve and alarm unit based on the remaining effective running time.

[0038] Specifically, in the calibration of the degradation rate benchmark, for paired reference time periods belonging to the same drive component and within the same installation cycle, the difference between the degradation observation values ​​of the later time period and the earlier time period is used as the observation increment. This ensures that the observation increment purely reflects the degradation caused by the passage of time, rather than individual differences. The sum of the effective running time of each maintenance stage between the end times of the two reference time periods is calculated, i.e., each pair of time periods is used as an independent calibration unit. This effective running time adopts the effective timing after excluding the shutdown and cooling periods. Based on the ratio of the observation increment to the sum of the effective running time, the degradation rate benchmark of each pair of reference time periods is calibrated. This ratio is the [missing value]. The average degradation rate of the section; the average value or least squares fitting of the calibration results of multiple pairs of reference time periods is used to obtain a non-negative degradation rate benchmark that remains fixed within the installation period. The observation increment of a single pair of time periods is easily affected by residual operating noise, while the average of multiple pairs improves the robustness of the estimation. The "non-negative" limitation excludes the contamination of the benchmark by physically unreasonable negative degradation, and "remains fixed within the installation period" ensures the stability of the benchmark and avoids the benchmark losing its reference significance due to observation drift. The cumulative amount of the benchmark is summed according to the degradation rate benchmark of each maintenance stage and the corresponding effective running time, reflecting the measurement logic of "segmented rate, time-accumulated".

[0039] Furthermore, step S603 includes the following sub-steps: S6031. For paired reference time periods belonging to the same drive component and within the same installation cycle, the difference between the degradation observation values ​​of the later time period and the earlier time period shall be used as the observation increment. S6032. Calculate the sum of the effective running time of each maintenance stage between the end times of the two reference time periods. The effective running time is the effective time of the shutdown and cooling period that has been removed in step S4. S6033. Based on the ratio of the observed increment to the total effective running time, the degradation rate benchmark for each component pair during the reference period is calibrated; S6034. Take the average or perform least squares fitting on the calibration results of multiple pairs of reference periods to obtain a non-negative degradation rate benchmark that remains fixed during the installation cycle, and sum the cumulative amount of the benchmark based on the degradation rate benchmark of each maintenance stage and the corresponding effective operating time.

[0040] Specifically, in anchor point correction and remaining lifetime output, the observed increment and the baseline cumulative amount are compared with a first preset threshold and a second preset threshold, respectively. The first threshold constrains the absolute change of the observed increment to prevent small deviations in the baseline itself from triggering updates. The second threshold constrains the prediction time accumulation of the baseline cumulative amount to prevent updates due to observation noise when the cumulative amount is still small after recent updates. Meeting both thresholds simultaneously means that "actual degradation has occurred significantly and the baseline prediction has accumulated for a sufficient time," at which point calibration is most meaningful. When both the observed increment and the baseline cumulative amount exceed their respective thresholds, the correction coefficient is updated based on their ratio. This ratio represents the proportion of deviation in the baseline prediction calibrated using actual observations. The anchor point is then updated using the next observation value to ensure continuity of the sequence at the new starting point, avoiding jumps caused by the superposition of old and new cumulative amounts. Otherwise, the original correction coefficient and anchor point remain unchanged, and the effective runtime continues to accumulate, ensuring the smoothness of the sequence. The dynamic degradation factor sequence is generated by combining the updated anchor points and correction coefficients. Feature extraction and fusion are performed on this sequence and the data collected at the same time. The remaining effective operating time is output through a regression model trained with historical life data. The information of a single degradation index is more complete after feature extraction and fusion with the features of the same operating conditions. The regression model trained with historical life data ensures that the output remaining effective operating time has a statistical basis. The intake control valve and alarm unit are controlled in a hierarchical manner according to the remaining effective operating time: when it is higher than the warning value, normal maintenance is maintained; when it is lower than the warning value, it switches to a degraded maintenance mode with limited opening and generates a predictive maintenance alarm that does not trigger a shutdown; when it is lower than the critical value, the expected maintenance period is embedded into the maintenance timing system and removed from the effective timing. It is then extended and added back after the maintenance is completed. At the same time, a planned maintenance alarm is output, realizing the transformation from "shutdown after failure" to "trend warning - degraded maintenance - planned maintenance" maintenance mode.

[0041] Furthermore, step S604 includes the following sub-steps: S6041. Compare the observed increment and the baseline cumulative amount with the first preset threshold and the second preset threshold, respectively; S6042. When both the observation increment and the baseline cumulative amount exceed the corresponding threshold, the correction coefficient is updated according to the ratio of the two, and the anchor point is updated according to the next observation value; otherwise, the original correction coefficient and the original anchor point are kept unchanged, and the effective running time continues to be accumulated. S6043. Generate the dynamic degradation factor sequence by combining the updated anchor points and correction coefficients; S6044. Features are extracted and fused from the dynamic degradation factor sequence and the data collected at the same time. The remaining effective operating time is output through a regression model trained with historical life data. The intake control valve and alarm unit are then controlled in a hierarchical manner based on the remaining effective operating time.

[0042] Furthermore, the specific calculation process for the degradation rate benchmark and the benchmark cumulative amount is as follows: ; ; Among them, the Indicates the maintenance stage The degradation rate benchmark remains constant throughout the installation cycle of the drive component; This represents the logarithm of paired reference time periods participating in the calibration within the same installation cycle; the... Indicates the first The difference between the degraded observations in the later and earlier periods of the reference time period; Indicates the first The sum of the effective running time of each maintenance stage between the end of the reference period, where the effective running time is the timing result after excluding the shutdown and cooling period; This represents the baseline cumulative amount from the anchor point time to the current time; the... This indicates the total number of categories for the maintenance phase; the stated This indicates the maintenance phase from the anchor point time to the current time. Effective runtime.

[0043] Furthermore, the correction coefficients and the dynamic degradation factor sequence are determined according to the following formula: , ; Other situations; ; Among them, the Indicates the first The correction coefficients after the second correction; Indicates the maintenance stage The degradation rate benchmark remains constant throughout the installation cycle of the drive component; Indicates the first The observation increment when the threshold condition is met for the first time; the Indicates and The baseline cumulative amount for the same period; Indicates the first preset threshold; the This represents the second preset threshold; the The anchor point is defined as follows: the subsequent observation value is taken while the correction coefficients are updated, and the value remains unchanged at other times; Represents a dynamic degradation factor sequence; the Indicates the time from the anchor point to time [time missing]. Maintenance stage Effective runtime.

[0044] Specifically, the correction coefficients and the dynamic degradation factor sequence are calculated according to the formula... (when and hour), (Other situations) and Confirmed, among which This represents the correction coefficient after the m-th correction. This represents the observation increment when the threshold condition is met for the mth time. Indicates and The baseline cumulative amount for the same period, , These represent the first and second preset thresholds, respectively. This indicates the anchor point (the value of the next observation is taken while the correction coefficients are updated, and it remains unchanged at other times). Represents a dynamic degradation factor sequence. This represents the effective runtime of maintenance stage k from the anchor point time to time t. The baseline degradation rate is represented by α for maintenance stage k, where K represents the total number of maintenance stage categories. The correction coefficient is the ratio of the actual degradation to the baseline prediction; α greater than 1 indicates that the actual degradation is faster than the baseline prediction, and less than 1 indicates that it is slower than the prediction. This ratio is used to scale the cumulative baseline values ​​for calibration. The branch ensures that when the condition is not met, the correction coefficient continues to use the previous value and the sequence does not jump; the dynamic degradation factor formula consists of two parts: the anchor point (the point of historical accumulation) and the newly added cumulative amount after correction from the anchor point. Re-timing starts from the anchor point and is also based on the effective runtime; combined with numerical values: let At some point The update conditions are met. Anchor point updated to After the anchor point ,but If the value is extrapolated directly without correction to 1.40, the deviation will continue to increase with the running time. It can be seen that the correction mechanism ensures the tracking accuracy of the degradation factor sequence on the individual degradation trajectory.

[0045] Example 2 In this embodiment, the formwork temperature control system is applied to the steam curing station of a precast concrete component production line. The system includes six temperature probes (three in each zone, numbered T1 to T3 and T4 to T6 respectively, using Pt100 resistance thermometers with a temperature range of −40℃ to 250℃) located in the first and second temperature control zones; an inlet control valve (electrically adjustable valve, adjustable from 0% to 100%) connected to the steam supply pipeline; a circulating fan (7.5kW drive motor, p=2 pole pairs) and a water pump as the driving component; a core control unit (using an industrial control computer with non-volatile memory); a human-machine interface; and an audible and visual alarm unit. The curing process is set to two stages: a heating stage (target temperature 80℃, set duration 12 hours) and a heat preservation stage (target temperature 60℃).

[0046] After the system is powered on, the core control unit first configures an on / off flag for each temperature probe. All probes are initially in the on / off state, and the flags are written to non-volatile memory so that the on / off status of the probes is not lost even if the system is powered off and restarted. The control program polls the communication status and numerical validity of the six probes every 2 seconds. When a probe experiences any of the following: communication interruption, detection value exceeding the range, or a jump in adjacent sampling cycles exceeding 8℃ / s, the probe is determined to be abnormal. In a typical operation, probe T2 in the first temperature control zone experienced periodic communication interruptions due to a loose signal line caused by vibration. After the system detected this abnormality for three consecutive sampling cycles, it automatically switched T2 to the off state, displaying a yellow alert indicating that probe T2 in the first temperature control zone was off on the human-machine interface. At the same time, step S5 was triggered to write the off event and the corresponding temperature data of T1 and T3 to the maintenance report.

[0047] After probe T2 is removed, the set of probes participating in temperature fusion in the first temperature control zone is updated in real time from {T1, T2, T3} to {T1, T3}. The temperature value of this zone is obtained by the arithmetic mean of probes T1 and T3. If either probe T1 or T3 is subsequently removed, the number of probes in operation in this zone will fall below the preset lower limit of 2. The system will immediately control the air inlet control valve of the first temperature control zone to enter a degraded maintenance mode: the maximum allowable opening of the valve will be limited to 60% of the reference opening of the current maintenance stage. For example, if the reference opening is 50% during the heating stage, the maximum opening after degrade will be 30%. Within the limited opening range, closed-loop PID adjustment will be performed according to the deviation between the zone temperature value and the target temperature of 80℃ to maintain the maintenance process without interruption. At the same time, a degraded maintenance prompt will be output on the human-machine interface. During the operation of this embodiment, the three probes in the second temperature control zone remained normal. The air inlet control valve in this zone operated in normal mode, which contrasted with the first temperature control zone. This verified that even after the probes were removed, the system could still maintain the continuity of maintenance through the remaining probes and the limited opening.

[0048] In terms of alarm management, the system configures an independent alarm activation status and alarm temperature value for each probe. The alarm temperature value is set to 85℃ during the heating phase and 65℃ during the heat preservation phase. When probe T2 is disconnected, its associated over-temperature alarm channel is automatically removed from the alarm criterion set. Afterward, even if there are residual over-limit records in T2's historical data, no further alarm will be triggered. However, if probes T1 and T3, which are in the activation state, exceed the alarm temperature value for their respective phases, the core control unit immediately closes the air inlet control valve of the first temperature control zone, shutting down the equipment and outputting a red audible and visual alarm signal to the alarm unit. During one heat preservation phase, due to a sudden increase in steam supply pipeline pressure, probe T5 in the second temperature control zone measured a temperature of 66.2℃, exceeding the alarm value of 65℃. The system shuts down accordingly, and this shutdown event, along with the corresponding temperature data for T4 and T6, is recorded in the event chain.

[0049] In terms of timing management, the system keeps track of the total curing time and accumulates the timing and effective timing for the heating and insulation stages separately. After the aforementioned overheating shutdown occurs, the equipment enters the cooling process. The system pauses the timing for the corresponding insulation stage and removes the entire duration from shutdown to restart (2.5 hours in this example) from the effective timing, not including it in the effective portion of the total curing time. After the pipeline fault is resolved on-site and the equipment is restarted, the system automatically extends the removed 2.5 hours back to the insulation stage, and the end time of the insulation stage is shifted back by 2.5 hours accordingly. This ensures that the insulation stage is switched on or ended when the effective accumulated time reaches 24 hours, i.e., based on the actual curing effect achieved by the concrete, rather than the wall clock time. After each maintenance batch is completed, the system will associate all the probe removal events, shutdown events, cooling time, restart events, and corresponding temperature data of this batch with a unified time stamp to generate an event chain, write it into the maintenance report and store it by date index. Operators can retrieve the event chain of any batch by date through the human-machine interface to restore the complete data background before and after the anomaly occurred.

[0050] Example 3 This embodiment illustrates the process of extracting the observation sequence of drive component degradation. In the same system as in Embodiment 1, a vibration acceleration sensor (sensitivity 100mV / g, installed radially on the bearing housing), a current sensor (range 0 to 25A), and a bearing housing temperature probe are configured for the drive end bearing of the circulating fan. A speed sensor (range 0 to 3000r / min) is also installed. The four signals, along with the temperature data from the temperature control system, the maintenance stage indicator, and the inlet control valve opening signal, are uniformly connected to the core control unit. The same clock source timestamps the signals, and the sampling frequency is uniformly set to 25.6kHz, which meets the requirement of being no less than twice the highest characteristic frequency of the bearing (the characteristic frequency of the bearing outer ring fault is approximately 3.2kHz, and its eighth harmonic is 25.6kHz).

[0051] The degradation monitoring procedure first involves screening reference time periods. The screening criteria are threefold: identical curing stage identifiers (both heating or insulation stages); the inlet control valve opening is within a reference range of ±10% of the baseline opening (e.g., if the baseline opening for a batch's heating stage is 50%, then periods with openings between 40% and 60% are considered candidates); and steam pressure fluctuations do not exceed 0.05 MPa. Time periods that simultaneously meet all three criteria and are continuous for at least 10 minutes are designated as reference time periods. The purpose of this screening is to ensure that subsequent comparative observations are generated under comparable operating conditions: consistent template temperature levels within the same curing stage, consistent openings indicating consistent fan load and airflow impact levels, and limited pressure fluctuations excluding pipeline disturbances, thus ensuring that differences in observations primarily reflect degradation rather than operating conditions.

[0052] For each reference time period, the system performs bandpass filtering on the vibration signal at a fixed measurement point within a fixed frequency band [2kHz, 8kHz]. This frequency band covers the resonant demodulation frequency band of the bearing outer ring, inner ring, and rolling element fault characteristic frequencies. After filtering, the signal is demodulated using Hilbert transform to obtain the envelope signal, and its root mean square (RMS) A is calculated. The RMS envelope of the first reference time period after the drive component is installed is used as the baseline value A0 (A0 = 0.35mm / s in this example). The RMS envelope of each subsequent reference time period is normalized by A / A0, and the average of the normalized results for each 1-minute block within the time period is taken as the degradation observation value y for that time period. The degradation observation values ​​of each reference time period are arranged in chronological order to form the degradation observation sequence.

[0053] Taking the actual data within one installation cycle of this circulating fan as an example: the degradation observation value for the reference period on the 10th day after installation was 1.00 (i.e., the same as the baseline), 1.06 on the 30th day, 1.15 on the 50th day, 1.21 on the 68th day, 1.27 on the 80th day, and 1.35 on the 95th day. The rotational speed collected during the same period remained stable between 1470 and 1490 r / min, the drive current between 11.0 and 11.8 A, and the bearing housing temperature gradually increased from 42℃ to 48℃, all within the normal range. This indicates that the increase in the above observation values ​​was not caused by abnormal load or temperature.

[0054] Example 4 This embodiment illustrates the calibration of the degradation rate baseline, the calculation of the baseline cumulative value, and the anchor point correction process. Calibration data from three pairs of reference time periods (Q=3) within the same installation cycle in Embodiment 2 are used: the first pair represents the reference time periods of day 10 and day 30, with degradation observation values ​​of 1.00 and 1.06 for the two time periods, respectively, and the observation increment... The sum of the effective runtime between the end times of the two time periods The first pair of time periods (excluding the 2.5-hour cooling period due to an overheating shutdown, this exclusion is performed according to the effective timing in step S4) is the reference period for days 30 and 50, observing the increment. , Hours; the third pair serves as the reference period for days 50 and 68, observing the increment. This includes a planned maintenance shutdown of 5 hours, after which... Hours. By Calculation of degradation rate benchmark: ; This rate reference remains fixed throughout the drive component installation cycle. Assume the cumulative effective operating time during the heating phase, starting from the calibration start point. Hours, cumulative effective running time during the heat preservation stage Hours, according to the formula Obtain the baseline cumulative amount According to the baseline rate prediction, the cumulative increase in the observed degradation value of the wind turbine should be 0.288 since the calibration start point.

[0055] Anchor point correction is performed continuously during system operation. In this example, the first preset threshold... The second preset threshold When the system reaches the reference period of day 95, it takes the observation increment since the most recent anchor point (the initial anchor point is the baseline observation value 1.00). =1.35−1.00=0.35, corresponding to the baseline cumulative amount accumulated from the baseline rate during the corresponding time period. .because and If the update conditions are met, then according to the formula... Calculate the correction factor Meanwhile, the observation value of 1.35 on day 95 was set as the new anchor point. Afterwards, the baseline cumulative amount is recalculated from that anchor point. If the observed increment or baseline cumulative amount does not exceed the corresponding threshold in a certain comparison, for example, during the middle of the operation... If the original correction coefficient and the original anchor point remain unchanged, the effective running time will continue to be accumulated, thereby avoiding frequent disturbances to the anchor point by minor observation noise.

[0056] After the anchor point is updated, the effective running time of the heating phase is set from the anchor point time on day 95. Hours, heat preservation stage Hours, according to the formula Calculate the current dynamic degradation factor: The system refreshes every hour based on the increment of the effective runtime. This forms a continuous dynamic degradation factor sequence. A comparison shows that if no anchor point correction is performed and extrapolation is directly performed at the baseline rate, the predicted value after 95 days is 1.00 + 0.40 = 1.40. The deviation from the corrected value of 1.42 will continue to amplify over the following hundreds of hours of operation. The anchor point correction mechanism, by continuously incorporating actual observations into the baseline, ensures the accuracy of the degradation factor sequence in tracking individual degradation trajectories.

[0057] Example 5 As an alternative, the shaft speed can be obtained indirectly from the fundamental frequency component of the drive current without using a speed sensor: detecting the fundamental frequency of the drive current. Number of pole pairs of motor To obtain the synchronous speed Then, determine the slip ratio according to the load calibration table corresponding to the current intake control valve opening (the slip ratio is 1.2% when the opening is 80%), and calculate the shaft speed. As an alternative, the valve body vibration response within 30 seconds after the valve opening step adjustment period can be recorded. A transmission characteristic calibration table can be established with the opening step as input and the root mean square increment of the envelope as output. When the vibration envelope increment matches the corresponding value in the calibration table, it is determined to be a transient vibration under changing operating conditions and excluded from the reference period. Otherwise, it is determined to be a degradation trend vibration and included in the observation. In addition, when the cut-off event of a temperature probe and the sudden increase of the degradation factor of the corresponding area drive component occur simultaneously within a 10-minute time coupling window, it can be determined that the probe abnormality is caused by vibration circuit interference. The cut-off state is retained and the alarm temperature value of that area is increased by 3°C margin to avoid false shutdown.

[0058] The above are merely preferred embodiments of the present invention. It should be understood that the present invention is not limited to the forms disclosed herein and should not be construed as excluding other embodiments. It can be used in various other combinations, modifications, and environments, and can be modified within the scope of the present invention through the above teachings or related technologies or knowledge. Modifications and variations made by those skilled in the art that do not depart from the spirit and scope of the present invention should be within the protection scope of the appended claims.

Claims

1. A control method for a template temperature control system, characterized in that, Includes the following steps: S1. Set the input or cut-off status for each temperature probe, monitor the acquisition status of each temperature probe in real time, and automatically switch abnormal temperature probes to the cut-off status based on the detection results. S2. Obtain the regional temperature value by fusing the temperature data of probes in the activated state, and update the set of probes participating in the fusion according to the changes in the activated state; when the number of activated probes is lower than the preset lower limit, control the corresponding air inlet control valve to enter the degraded maintenance mode with limited opening. S3. Set the alarm activation status associated with each temperature probe; process the alarm exit criteria for its over-temperature alarm channel based on the probe disconnection result; when the temperature of a probe in the activation state exceeds the corresponding alarm temperature value, control the corresponding air inlet control valve to close and stop the machine and trigger the alarm. S4. By effectively timing the total maintenance time, the period from equipment overheating shutdown to cooling and restart is removed from the effective time and made up after restarting. The heating and heat preservation work process stages are switched according to the effective cumulative time. S5. Combine probe removal, shutdown, cooling time, restart events and corresponding temperature data to generate an event chain, write the event chain into the maintenance report and store it by date; S6. Determine the operating condition constraints based on the opening degree of the air inlet control valve and the maintenance stage. During the maintenance period with consistent constraints, extract the degradation observation sequence by synchronously collecting data on the vibration, speed, current and temperature of the drive components. Calibrate the degradation rate benchmark based on the ratio of the observation increment to the effective running time of paired time periods. Update the anchor point and correction coefficient based on the deviation between the observation increment and the cumulative amount of the benchmark. Combine the update results to generate a dynamic degradation factor sequence. The sequence is fused with the data collected at the same time, and the remaining effective operating time is output by combining the regression model trained with historical life data. The intake control valve and alarm unit are then controlled in a hierarchical manner based on the remaining effective operating time.

2. The control method of the template temperature control system as described in claim 1, characterized in that, Step S1 includes the following sub-steps: S101. Configure an activation flag and a deactivation flag for each temperature probe, and write the flag status into a non-volatile memory through the core control unit, which is retained after power failure and restart; S102. Poll the communication status and numerical validity of each temperature probe at a preset sampling period. If any of the following occurs: communication interruption, numerical value exceeding the limit, or the jump value of adjacent sampling periods exceeds the jump threshold, the temperature probe is determined to be abnormal. S103. Automatically switch the abnormal temperature probe to the cut-off state, output a cut-off prompt through the human-machine interface, and trigger step S5 to record the probe cut-off event.

3. The control method for a template temperature control system as described in claim 1, characterized in that, Step S2 includes the following sub-steps: S201. Read the temperature data of the temperature probes that are currently in operation. When there are two or more temperature probes in operation, remove the largest deviation value and take the arithmetic mean of the remaining temperature data as the area temperature value. S202. When the activation or deactivation status of any temperature probe changes, the set of probes participating in the fusion is re-determined, and the regional temperature value is updated in real time according to sub-step S201. S203. Compare the number of probes in the temperature control zone that are in operation with the preset lower limit value, and based on the comparison result, limit the maximum allowable opening of the air inlet control valve in this zone to a preset ratio of the reference opening of the current maintenance stage; S204. Within the limited opening range, the air inlet control valve is adjusted in a closed loop according to the temperature deviation between the area temperature value and the target maintenance temperature to maintain the maintenance process without interruption.

4. The control method of the template temperature control system as described in claim 1, characterized in that, Step S3 includes the following sub-steps: S301. Each temperature probe is configured with an independent alarm activation status bit and alarm temperature value, and the alarm temperature value is set separately according to the heating stage and the heat preservation stage; S302. When a temperature probe is disconnected, its associated over-temperature alarm channel is removed from the alarm criterion set, so that the temperature data of the probe will no longer participate in subsequent alarm judgment; S303. For temperature probes that are in operation and whose alarm activation status is valid, when their temperature exceeds the alarm temperature value set for the corresponding stage, the core control unit controls the air inlet control valve of the corresponding temperature control area to close, thereby stopping the equipment and outputting an alarm signal to the alarm unit.

5. The control method of the template temperature control system as described in claim 1, characterized in that, Step S4 includes the following sub-steps: S401. The total curing time is timed, and the cumulative time and effective time are timed separately for the heating stage and the heat preservation stage; S402. During the period from when the equipment shuts down due to overheating to when it cools down and restarts, the timing of the maintenance phase corresponding to that period shall be paused and the duration of that period shall be removed from the valid timing. S403. After the equipment is restarted, the removed duration will be automatically extended to make up for the corresponding maintenance stage; S404. Trigger the process switch from the heating stage to the heat preservation stage when the effective cumulative time reaches the set time of the heating stage.

6. The control method of the template temperature control system as described in claim 1, characterized in that, Step S5 includes the following sub-steps: S501. Using a unified time scale, associate probe cut-off events, shutdown events, cooling durations, restart events, and the corresponding regional temperature values ​​with the temperature data of each temperature probe to generate an event chain; S502. Write the event chain into the maintenance report and store it in non-volatile memory. Index the maintenance report by date and support querying by date and fault tracing.

7. The control method of the template temperature control system as described in claim 1, characterized in that, Step S6 includes the following sub-steps: S601. During the same installation cycle of the drive component, the bearing vibration signal, shaft speed, drive current and bearing housing temperature are collected synchronously. The collection frequency is not less than twice the highest characteristic frequency of the drive component, and the collected data is aligned with the maintenance stage identifier and the opening degree of the air inlet control valve output in step S2 according to the timestamp. S602. Using the same maintenance stage identifier, the opening degree of the air inlet control valve within the preset reference range and the steam pressure fluctuation not exceeding the pressure fluctuation threshold as the window screening conditions, the continuous time periods that meet the conditions are divided to obtain the reference time period. For each reference time period, the bearing vibration signal is bandpass filtered and envelope demodulated at fixed measurement points and within a fixed frequency band. The normalized mean of the obtained root mean square of the envelope relative to the initial installation reference value is calculated and used as the degradation observation value to form a degradation observation sequence. S603. The degradation rate benchmark is calibrated based on the observed increments and effective runtime of the paired reference time periods, and the cumulative amount of the benchmark is determined in combination with the effective runtime. The effective runtime adopts the effective time after excluding the shutdown and cooling periods. S604. Update the correction coefficients and anchor points based on the comparison results between the observed increments and the baseline cumulative amounts. Generate a dynamic degradation factor sequence by combining the updated anchor points and correction coefficients. Extract and fuse features from the dynamic degradation factor sequence and the data collected at the same time, output the remaining effective running time, and perform hierarchical linkage control of the air inlet control valve and alarm unit based on the remaining effective running time.

8. The control method of the template temperature control system as described in claim 7, characterized in that, Step S603 includes the following sub-steps: S6031. For paired reference time periods belonging to the same drive component and within the same installation cycle, the difference between the degradation observation values ​​of the later time period and the earlier time period shall be used as the observation increment. S6032. Calculate the sum of the effective running time of each maintenance stage between the end times of the two reference time periods. The effective running time is the effective time of the shutdown and cooling period that has been removed in step S4. S6033. Based on the ratio of the observed increment to the total effective running time, the degradation rate benchmark for each component pair during the reference period is calibrated; S6034. Take the average or perform least squares fitting on the calibration results of multiple pairs of reference periods to obtain a non-negative degradation rate benchmark that remains fixed during the installation cycle, and sum the cumulative amount of the benchmark based on the degradation rate benchmark of each maintenance stage and the corresponding effective operating time.

9. The control method of the template temperature control system as described in claim 7, characterized in that, Step S604 includes the following sub-steps: S6041. Compare the observed increment and the baseline cumulative amount with the first preset threshold and the second preset threshold, respectively; S6042. When both the observation increment and the baseline cumulative amount exceed the corresponding threshold, the correction coefficient is updated according to the ratio of the two, and the anchor point is updated according to the next observation value; otherwise, the original correction coefficient and the original anchor point are kept unchanged, and the effective running time continues to be accumulated. S6043. Generate the dynamic degradation factor sequence by combining the updated anchor points and correction coefficients; S6044. Features are extracted and fused from the dynamic degradation factor sequence and the data collected at the same time. The remaining effective operating time is output through a regression model trained with historical life data. The intake control valve and alarm unit are then controlled in a hierarchical manner based on the remaining effective operating time.

10. The control method of the template temperature control system as described in claim 8, characterized in that, The specific calculation process for the degradation rate benchmark and benchmark cumulative amount is as follows: ; ; Among them, the Indicates the maintenance stage The degradation rate benchmark remains constant throughout the installation cycle of the drive component; This represents the logarithm of paired reference time periods participating in the calibration within the same installation cycle; the... Indicates the first The difference between the degraded observations in the later and earlier periods of the reference time period; Indicates the first The sum of the effective running time of each maintenance stage between the end of the reference period, where the effective running time is the timing result after excluding the shutdown and cooling period; This represents the baseline cumulative amount from the anchor point time to the current time; the... This indicates the total number of categories for the maintenance phase; the stated This indicates the maintenance phase from the anchor point time to the current time. Effective runtime.

11. The control method of the template temperature control system as described in claim 9, characterized in that, The correction coefficient and the dynamic degradation factor sequence are determined according to the following formula: ; ; ; Among them, the Indicates the first The correction coefficients after the second correction; Indicates the maintenance stage The degradation rate benchmark remains constant throughout the installation cycle of the drive component; Indicates the first The observation increment when the threshold condition is met for the first time; the Indicates and The baseline cumulative amount for the same period; Indicates the first preset threshold; the This represents the second preset threshold; the The anchor point is defined as follows: the subsequent observation value is taken while the correction coefficients are updated, and the value remains unchanged at other times; Represents a dynamic degradation factor sequence; the Indicates the time from the anchor point to time [time missing]. Maintenance stage Effective runtime.