Earthwork Volume Auxiliary Calculation Method Based on High-Precision Topographic Map Analysis

By obtaining the micro-station sequence and cross-sectional area difference, constructing local triangle feature values, iteratively eliminating minor stations, screening out abrupt station numbers, and inserting proposed supplementary stations, the problem of redundant maps in high-precision topographic map calculation is solved, and the accuracy and cost balance of earthwork volume settlement are achieved.

CN123116374APending Publication Date: 2026-11-17MAOMAO (NANTONG) INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611297603.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-25
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

When using high-precision topographic maps to calculate earthwork volume, how to effectively capture hidden topographic distortions to ensure the accuracy of earthwork volume settlement while avoiding the generation of massive redundant drawings solves the mutually exclusive relationship between calculation accuracy and audit cost.

Method used

By acquiring the sequence of micro-station numbers and their cross-sectional area difference sequences, a local triangle is constructed to determine the geometric morphological feature values. Secondary sampling station numbers are iteratively eliminated, and abrupt sampling station numbers are selected. Based on the geometric morphological feature values ​​and the total error of the benchmark settlement interval to which they belong, a dual threshold judgment is performed, and the proposed supplementary station numbers are inserted. Cross-sectional drawings are generated, and the final earthwork volume is calculated.

Benefits of technology

It achieves automatic filtering of measurement noise and locks out core terrain distortion points with large errors while minimizing the increase in drawings, ensuring the accuracy of earthwork settlement and balancing audit costs, and meeting the compliance requirements of cost audit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123116374A_ABST
    Figure CN123116374A_ABST
Patent Text Reader

Abstract

This invention relates to the field of computer-aided design technology, specifically to an auxiliary method for earthwork volume calculation based on high-precision topographic map analysis. The method includes: obtaining a detailed sequence of station numbers and their cross-sectional area differences to expose hidden terrain features missed in low-frequency settlements, providing a calculable data source; determining eigenvalues ​​based on local triangles and iteratively eliminating secondary station numbers to automatically filter measurement noise and identify core terrain distortion points with significant errors; combining geometric eigenvalues ​​and terrain abrupt change clustering for dual threshold judgment to ensure that the finally inserted proposed supplementary station numbers have significant correction value and control drawing increments; generating cross-sectional drawings and calculating the final earthwork volume, achieving strong binding between the quantity calculation results and physical drawing documents, meeting the compliance requirements of data-drawn consistency in cost audits. Therefore, this invention achieves a balance between accuracy and audit costs by minimizing the cost of drawing increments in exchange for improved earthwork settlement accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of computer-aided design technology, specifically to an auxiliary calculation method for earthwork volume based on high-precision topographic map analysis. Background Technology

[0002] In the settlement audit of highway and large-scale earthwork projects, it is mandatory to require "data..." Figure 1 "Confirmation" means that each cross-section data must be accompanied by a cross-sectional drawing. The traditional method of extracting cross-sections at fixed intervals of 20 meters is prone to missing local topographic undulations, leading to inaccurate earthwork costs. With the development of surveying and mapping technology, engineering parties can now obtain high-precision topographic maps based on point clouds. Theoretically, high-frequency sampling calculations based on this high-precision topographic map can significantly improve accuracy. However, existing technologies face contradictions in practice: if high-frequency mapping is generated across the entire line, tens of thousands of drawings will be produced, making manual review by auditors impossible and resulting in extremely high archiving costs, which violates the requirements of auditing practices; while existing 3D design software relies on manual placement of sampling lines, and when faced with massive amounts of high-precision topographic map data, it is difficult for humans to accurately identify all the hidden topographic distortion points with the most correction value, resulting in low efficiency and easy omissions in calculations.

[0003] Therefore, the urgent technical problem to be solved is: how to break the mutually exclusive relationship between calculation accuracy and audit cost when using high-precision topographic maps for earthwork volume calculation, and effectively capture hidden topographic distortions to ensure the accuracy of earthwork volume settlement while avoiding the generation of massive redundant drawings. Summary of the Invention

[0004] To address the technical challenge of effectively capturing hidden terrain distortions to ensure accurate earthwork volume calculations while avoiding the generation of massive amounts of redundant drawings, this invention provides an auxiliary earthwork volume calculation method based on high-precision topographic map analysis, comprising the following steps: Obtain the foundation station sequence with a preset fixed spacing and the micro station sequence with a spatial density higher than the foundation station sequence corresponding to the project to be analyzed, and further obtain the cross-sectional area difference sequence of the micro station sequence; Within the benchmark settlement interval formed by any two adjacent foundation stations, the geometric feature value is determined by a local triangle constructed based on the difference in cross-sectional area between the sampled station and its adjacent station. Secondary sampled stations are then eliminated iteratively using the geometric feature value to select abrupt sampled stations. When the geometric morphological feature value of the mutation sampling station and the terrain mutation clustering degree determined by the total error of the geometric morphological feature value and its corresponding benchmark settlement interval both meet the preset correction threshold condition, the corresponding mutation sampling station is inserted as the proposed supplementary station into the basic station sequence to obtain the mixed settlement station sequence. Generate corresponding cross-sectional drawings for each settlement station in the mixed settlement station sequence, and calculate the final earthwork volume of the project to be analyzed based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area.

[0005] Further, the cross-sectional area difference sequence includes a fill cross-sectional area difference sequence and an cut cross-sectional area difference sequence, and obtaining the cross-sectional area difference sequence of the micro-station sequence includes: Obtain the measured fill cross-sectional area and measured cut cross-sectional area for each sampled station in the micro-station sequence; The predicted fill cross-sectional area of ​​each sampling station is determined by using the measured fill cross-sectional area of ​​each pair of adjacent foundation stations, and the predicted cut cross-sectional area of ​​each sampling station is determined by using the measured cut cross-sectional area of ​​the adjacent foundation stations. For each sampling station, the difference between the measured fill cross-sectional area and the predicted fill cross-sectional area, as well as the difference between the measured cut cross-sectional area and the predicted cut cross-sectional area, are calculated to form the fill cross-sectional area difference sequence and the cut cross-sectional area difference sequence.

[0006] Further, obtaining the measured fill cross-sectional area and measured cut cross-sectional area for each sampled station in the micro-station sequence includes: Acquire measured topographic point cloud data of the project to be analyzed, and determine the three-dimensional spatial coordinates and normal vector of each sampling station on the design center line of the project to be analyzed; Centered on the three-dimensional spatial coordinates, a cross-sectional search zone is constructed in the measured terrain point cloud data based on the normal vector to extract the ground elevation line; The ground elevation line is compared with the design elevation line in the engineering design model. The area where the ground elevation line is lower than the design elevation line is taken as the measured fill section area, and the area where the ground elevation line is higher than the design elevation line is taken as the measured cut section area.

[0007] Furthermore, the geometric morphological feature values ​​include fill morphological feature values ​​and cut morphological feature values. The determination of geometric morphological feature values ​​based on the local triangles constructed from the sampling station number and the cross-sectional area differences corresponding to its adjacent station numbers includes: For each sampling station in the sampling station sequence of the benchmark settlement interval, excluding the first and last endpoints, in a local two-dimensional coordinate system composed of the difference between the mileage value and the fill cross-sectional area, and the difference between the mileage value and the cut cross-sectional area, the sampling station, its preceding adjacent station, and its following adjacent station are regarded as the three vertices of a local triangle. Calculate the area of ​​the local triangle formed by the three vertices respectively to obtain the fill morphology feature value and cut morphology feature value of the corresponding sampling station.

[0008] Further, the step of iteratively eliminating secondary sampling stations through the geometric morphological feature values ​​and filtering out abrupt sampling stations includes: For the fill cross-sectional area difference sequence and the cut cross-sectional area difference sequence, perform the following independent iterative screening steps respectively: In the corresponding sampling station number sequence, find the target sampling station number with the smallest geometric feature value, and remove the target sampling station number from the sampling station number sequence in which it is located; For the preceding and following adjacent chain numbers of the eliminated chain number, the geometric morphological characteristic value is recalculated. Repeat the steps of searching, eliminating, and recalculating until the number of remaining sampling stations in the new sampling station sequence reaches the preset maximum allowable number of additions; The remaining sampling station numbers after independent iterative screening of fill and cut are used as the mutation sampling station numbers.

[0009] Furthermore, the total error includes the total fill error and the total cut error. The total error for each benchmark settlement interval is obtained, including: Extract the difference in fill cross-sectional area and the difference in cut cross-sectional area corresponding to all sampling station numbers within the benchmark settlement interval; Take the absolute value of the difference in cross-sectional area of ​​each fill, and perform a fusion calculation based on the actual mileage difference between two adjacent sampling stations along the mileage distribution direction of the benchmark settlement interval to obtain the total fill error of the benchmark settlement interval. The absolute value of the difference in the cross-sectional area of ​​each excavation is taken, and a fusion calculation based on the actual mileage difference between two adjacent sampling stations is performed along the mileage distribution direction of the benchmark settlement interval to obtain the total excavation error of the benchmark settlement interval.

[0010] Furthermore, after obtaining the total error of the benchmark settlement interval, the method further includes: The total error of the benchmark settlement interval is compared with the preset interval correction trigger threshold: If the total error is not greater than the interval correction trigger threshold, it is determined that there is no significant terrain distortion in the corresponding benchmark settlement interval, and there is no need to generate the proposed supplementary station number. If the total error exceeds the interval correction trigger threshold, the step of determining the terrain abrupt change clustering degree of the abrupt sampling station continues.

[0011] Further, the mixed settlement station number sequence is obtained, including: All the proposed additional chainages are merged with the basic chainage sequence and reordered according to mileage value to generate the mixed settlement chainage sequence.

[0012] Furthermore, the mixed settlement mileage sequence includes micro-settlement intervals consisting of two adjacent settlement mileages; Wherein, if the proposed supplementary station number is not inserted within the benchmark settlement interval, the length of the corresponding micro-settlement interval remains at the preset fixed interval; If a proposed supplementary station number is inserted, the proposed supplementary station number will truncate the original benchmark settlement interval into multiple micro-settlement intervals with a length less than the preset fixed interval.

[0013] Furthermore, the final earthwork volume includes the final total fill volume and the final total excavation volume. The calculation of the final earthwork volume of the project to be analyzed based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area includes: In the mixed settlement chainage sequence, the measured fill cross-sectional area and measured cut cross-sectional area at both ends of the micro-settlement interval formed by every two adjacent settlement chainages are extracted; Calculate the average value of the measured fill cross-sectional area and the average value of the measured cut cross-sectional area at both ends of the micro-settlement interval, and multiply the two average values ​​by the mileage distance of the micro-settlement interval to obtain the single-segment fill volume and single-segment cut volume of the micro-settlement interval. The fill volume of each segment in all micro-settlement intervals is summed to obtain the final total fill volume of the project to be analyzed; and the excavation volume of each segment in all micro-settlement intervals is summed to obtain the final total excavation volume of the project to be analyzed.

[0014] This invention offers the following advantages: It provides an auxiliary method for calculating earthwork volume based on high-precision topographic map analysis. This method establishes a high-density spatial benchmark by acquiring a sequence of fine station numbers and their cross-sectional area differences, which is beneficial for exposing hidden terrain features missed in low-frequency settlements and providing a calculable data source. It determines eigenvalues ​​based on local triangles and iteratively eliminates secondary station numbers, quantifies the contribution of single-point volume errors using geometric area, automatically filters measurement noise, and locks core terrain distortion points with significant errors. It combines geometric eigenvalues ​​and terrain abrupt change clustering for dual threshold judgment, distinguishing between systematic terrain abrupt changes and random oscillations, ensuring that the finally inserted station numbers have significant correction value and controlling the increase in drawing volume. It generates cross-sectional drawings and calculates the final earthwork volume, adaptively reconstructing the settlement interval based on high-value abrupt change station numbers, achieving a strong binding between the quantity calculation results and physical drawing documents, thus meeting the requirements of cost auditing. Figure 1 To meet compliance requirements. In summary, this invention resolves the engineering contradiction of massive amounts of drawings generated by high-precision surveying data that cannot be manually audited. By minimizing the incremental cost of drawings in exchange for improved accuracy in earthwork settlement, it achieves a balance between accuracy and auditing costs to a certain extent. Attached Figure Description

[0015] Figure 1A flowchart illustrating the steps of an auxiliary calculation method for earthwork volume based on high-precision topographic map analysis provided by this invention. Figure 2 This is a flowchart illustrating the steps involved in determining the geometric morphological feature values ​​of a local triangle constructed based on the cross-sectional area difference between the sampling station number and its adjacent station numbers in this invention. Detailed Implementation

[0016] To address the technical problem in the background art of effectively capturing hidden terrain distortions to ensure the accuracy of earthwork volume calculation without generating massive amounts of redundant drawings, this embodiment provides an auxiliary earthwork volume calculation method based on high-precision topographic map analysis, such as... Figure 1 As shown, it includes the following steps: S1, obtain the foundation station sequence with a preset fixed spacing and the micro station sequence with a spatial density higher than the foundation station sequence corresponding to the project to be analyzed, and further obtain the cross-sectional area difference sequence of the micro station sequence.

[0017] The basic stationing sequence can reflect the linear terrain setting used in traditional earthwork volume calculation, while the micro-stationing sequence can reflect the high-frequency undulation data of the actual terrain. The projects to be analyzed can be linear infrastructure construction projects involving long-distance, large-scale earthwork filling and excavation, requiring cross-sectional earthwork volume calculation based on centerline stationing. Specific examples include, but are not limited to: new expressway projects, mountain road reconstruction and expansion projects, long-distance water diversion channel projects, railway subgrade projects, and large-scale flood control dam projects.

[0018] As an exemplary implementation, step S1 above may include: The first step is to obtain the foundation station sequence with a preset fixed spacing corresponding to the project to be analyzed.

[0019] In this embodiment, by parsing the route design documents or cost audit specifications of the project to be analyzed, the design centerline and the specified standard cross-section settlement spacing of the project to be analyzed are extracted, and the standard cross-section settlement spacing is used as a preset fixed spacing. Taking the start and end mileage of the project to be analyzed as the boundary, the road design centerline is spread out at equal intervals according to the preset fixed spacing to generate a basic station number sequence containing the mileage markers of each standard cross-section (for example, when the spacing is 20 meters, the generated station number sequences such as K0+000 and K0+020) as the benchmark skeleton for earthwork calculation.

[0020] The second step is to obtain the micro-chain sequence corresponding to the project to be analyzed based on the basic chain sequence.

[0021] In this embodiment, a fine sampling step size smaller than a preset fixed interval is set; along the road design centerline of the project to be analyzed, an initial encrypted station number is generated according to the fine sampling step size; all basic station numbers in the basic station number sequence are inserted into the initial encrypted station number, and deduplication and reordering are performed according to the mileage value to generate a fine station number sequence, so as to ensure that the generated fine station number sequence strictly contains all basic station numbers in space, providing an index benchmark for the accurate spatial alignment of subsequent measured data and interpolated data.

[0022] The third step is to obtain the cross-sectional area difference sequence of the micro-station sequence.

[0023] By extracting the measured cross-sectional area of ​​each sampling station in the micro-station sequence and subtracting it from the interpolated cross-sectional area (i.e., the predicted cross-sectional area) linearly derived from the basic station sequence, a cross-sectional area difference sequence is generated. This process reduces the complexity of three-dimensional terrain volume errors into a one-dimensional continuous error sequence, providing a direct mathematical analysis benchmark for quantitatively assessing the degree of terrain deviation.

[0024] The cross-sectional area difference sequence includes both fill and cut cross-sectional area difference sequences. Obtaining the measured fill and cut cross-sectional areas at the same sampling station is to avoid error cancellation masking topographic distortion. In complex terrain (such as semi-fill and semi-cut roadbeds), the same cross-section may have both fill and cut errors simultaneously. If the two are combined and subtracted, the positive and negative area differences will cancel each other out (for example, missing fill on the left and missing cut on the right cancel each other out, causing the total difference to approach 0), leading to misjudgment of terrain smoothness and omission of feature points. Secondly, it conforms to the independent accounting rules for engineering costs. In civil engineering, the construction technology, unit cost, and audit rigor of fill (such as ordinary soil) and cut (such as hard rock) are completely different. By separating them into fill cross-sectional area difference sequences and cut cross-sectional area difference sequences for independent parallel calculation, it can be ensured that the final output settlement drawings and reports meet the mandatory requirements of compliance audit.

[0025] The first sub-step is to obtain the measured fill cross-sectional area and the measured cut cross-sectional area for each sampled station in the micro-station sequence.

[0026] First, the measured topographic point cloud data of the project to be analyzed is obtained, and the three-dimensional spatial coordinates and normal vector of each sampling station on the design center line of the project to be analyzed are determined.

[0027] In this embodiment, high-precision measured topographic point cloud data covering the entire area of ​​the project to be analyzed is acquired through airborne lidar scanning or UAV oblique photogrammetry. For each sampling station in the micro-station sequence, mileage mapping is performed on the three-dimensional engineering design centerline model based on its mileage value to extract its accurate three-dimensional spatial coordinates on the design centerline. Subsequently, the spatial curve of the design centerline at this three-dimensional spatial coordinate is differentiated to obtain the tangent vector, and the cross-sectional direction orthogonal to the tangent vector is calculated and determined as the normal vector of the sampling station, thereby providing a spatial geometric reference for the accurate segmentation of the subsequent cross-sectional point cloud data. Next, a cross-sectional search zone is constructed in the measured topographic point cloud data based on the normal vector and the three-dimensional spatial coordinates as the center to extract the ground elevation line.

[0028] In this embodiment, the measured topographic point cloud data is filtered and denoised, and ground points are extracted. Based on the extracted ground points, gridded interpolation is performed to generate a digital elevation model covering the project to be analyzed, serving as a high-precision topographic map. Subsequently, in the high-precision topographic map, a cross-sectional search zone is constructed by extending a preset lateral width along the normal vector direction to both sides, using the three-dimensional spatial coordinates corresponding to each sampling station as the origin. The preset lateral width is determined based on the sum of the total width of the designed roadbed and the preset buffer zone width of the project to be analyzed. Topographic slice sampling data falling within the cross-sectional search zone are extracted to fit and generate corresponding ground elevation lines. The specific method for determining the ground elevation lines is existing technology and will not be elaborated here.

[0029] Finally, the ground elevation line is compared with the design elevation line in the engineering design model. The area where the ground elevation line is lower than the design elevation line is taken as the measured fill cross area, and the area where the ground elevation line is higher than the design elevation line is taken as the measured cut cross area.

[0030] In this embodiment, for each sampling station, the cross-sectional design line (i.e., design elevation line) containing the roadbed width and slope parameters at the sampling station of the engineering design model to be analyzed is extracted. The ground elevation line and the cross-sectional design line are placed in the same local two-dimensional coordinate system for intersection calculation to obtain several closed polygonal regions enclosed by the two lines. Each closed polygonal region is traversed, and the vertical positional relationship of the internal line segments is determined. The areas of all closed polygonal regions enclosed by the cross-sectional design line above the ground elevation line are accumulated to obtain the measured fill cross-sectional area corresponding to the corresponding sampling station. The areas of all closed polygonal regions enclosed by the ground elevation line above the cross-sectional design line are accumulated to obtain the measured cut cross-sectional area corresponding to the corresponding sampling station. The calculation process of the closed polygonal region area is a prior art, including but not limited to: Gaussian area calculation method based on polygon vertex coordinates, trapezoidal segmentation accumulation method based on numerical integration, etc.

[0031] For example, to obtain the area of ​​a closed polygon region: extract the ordered set of vertex coordinates on the boundary of each closed polygon region, use the polygon area coordinate analytical method (such as the shoelace formula), algebraically sum the cross product of the coordinates of two adjacent vertices and take half of the absolute value as the area of ​​the corresponding closed polygon region.

[0032] The second sub-step involves determining the predicted fill cross-sectional area for each sampling station using the measured fill cross-sectional area of ​​every two adjacent foundation stations, and determining the predicted cut cross-sectional area for each sampling station using the measured cut cross-sectional area of ​​adjacent foundation stations.

[0033] Traditional settlement rules assume that the terrain between adjacent foundation stations exhibits a uniform, linear gradient. This sub-step uses the measured cross-sectional area of ​​adjacent foundation stations for linear interpolation to calculate the predicted cross-sectional area corresponding to each sampled station within the interval, namely the predicted fill cross-sectional area and the predicted cut cross-sectional area. Essentially, this constructs a nominal terrain benchmark representing the traditional low-frequency settlement rules.

[0034] By establishing a linear interpolation benchmark, the difference between the measured true value and the predicted value extracted from the point cloud can be compared, thereby independently separating the nonlinear terrain abrupt changes (such as hidden mounds or pits within the standard interval) that are missed by traditional rules, and using them as direct targets for subsequent feature screening and error manifestation.

[0035] In this embodiment, the foundation chainage sequence is traversed, and adjacent preceding and subsequent foundation chainages are extracted to form a settlement interval. First, it is determined whether the mileage difference between the subsequent and preceding foundation chainages is greater than a preset micro-sampling step size. If it is not greater, the measured cross-sectional area corresponding to the preceding foundation chainage is directly used as the predicted cross-sectional area of ​​all sampled chainages in the interval to avoid calculation abnormalities caused by a zero denominator. If it is greater, the measured fill cross-sectional area and measured cut cross-sectional area corresponding to the preceding and subsequent foundation chainages are extracted. Linear interpolation formulas are constructed based on the ratio of the area difference to the mileage difference at both ends, and the mileage difference between each sampled chainage and the preceding foundation chainage in the interval is substituted into the linear interpolation formula to calculate the predicted fill cross-sectional area and predicted cut cross-sectional area of ​​each sampled chainage.

[0036] As an example, the predicted fill cross-sectional area of ​​the i-th sampling station. The calculation formula can be: In the formula, This represents the measured cross-sectional area of ​​the fill at the preceding foundation chainage (i.e., the j-th foundation chainage) of the i-th sampling chainage. This represents the measured cross-sectional area of ​​the fill at the next foundation station after the i-th sampling station (i.e., the (j+1)-th foundation station). This represents the mileage value of the subsequent foundation station (i.e., the (j+1)th foundation station) after the i-th sampling station. This represents the mileage value of the preceding foundation station (i.e., the j-th foundation station) of the i-th sampling station. This represents the mileage value of the i-th sampling station.

[0037] This represents the difference in measured fill cross-sectional area between the preceding and following foundation station numbers. This indicates the mileage difference between the preceding and subsequent foundation station numbers. This represents the mileage difference between the sampling station number and the preceding foundation station number, which can characterize the distance between the sampling station number and the preceding foundation station number.

[0038] The third sub-step involves calculating, for each sampling station, the difference between the measured fill cross-sectional area and the predicted fill cross-sectional area, as well as the difference between the measured cut cross-sectional area and the predicted cut cross-sectional area, to form a fill cross-sectional area difference sequence and a cut cross-sectional area difference sequence.

[0039] In this embodiment, each sampling station is traversed along the mileage increment direction of the micro-station sequence. The algebraic difference of the fill area is obtained by subtracting the predicted fill area from the actual fill cross-sectional area, and the algebraic difference of the cut area is obtained by subtracting the predicted cut cross-sectional area from the actual cut area. For the fill area algebraic difference, a difference greater than zero indicates the presence of hidden pits, and a difference less than zero indicates the presence of hidden mounds. For the cut area algebraic difference, a difference greater than zero indicates the presence of hidden mounds, and a difference less than zero indicates the presence of hidden pits. An algebraic difference approximately equal to zero indicates that the terrain is highly consistent with the linear assumption and no correction is required. Subsequently, all fill area algebraic differences and cut area algebraic differences are concatenated into ordered arrays according to the mileage sequence of the sampling station, thereby reducing the dimensionality of the hidden three-dimensional terrain volume distortion to a fill cross-sectional area difference sequence and a cut cross-sectional area difference sequence that can represent the one-dimensional error situation, providing underlying digital signals for subsequent terrain abrupt change screening based on geometric features.

[0040] Thus, this embodiment has obtained the cross-sectional area difference sequence of the micro-station sequence.

[0041] S2, within the benchmark settlement interval formed by any two adjacent foundation stations, determine the geometric morphological feature value based on the local triangle constructed by the cross-sectional area difference between the sampled station and its adjacent station, and filter out the abrupt sampled station by iteratively eliminating secondary sampled stations through the geometric morphological feature value.

[0042] Step S2 above primarily utilizes computational geometry algorithms to accurately extract the key data nodes that contribute the most to the total volume error from the discrete cross-sectional area difference sequence. Specifically, the one-dimensional cross-sectional area difference sequence is mapped to a two-dimensional discrete data distribution map with mileage as the x-axis and cross-sectional area difference as the y-axis. The area of ​​the local triangle formed by the data points of three adjacent sampling stations is directly proportional to the change in local volume error caused by removing the middle sampling station (i.e., the second sampling station among the three adjacent sampling stations). By iteratively calculating and removing the secondary sampling station with the smallest local triangle area (i.e., geometric morphological feature value), it is possible to adaptively filter out small numerical fluctuations caused by surface gravel or slight topographic undulations. This iterative removal process simulates the feature extraction of the core topographic skeleton, ensuring that the final retained abrupt change sampling stations represent the geometric extreme points of nonlinear topographic distortion within that interval.

[0043] As an exemplary implementation, within the benchmark settlement interval formed by any two adjacent foundation station numbers, the process of determining the geometric morphological feature values ​​based on a local triangle constructed from the cross-sectional area difference between the sampled station number and its adjacent station numbers is as follows: Figure 2 As shown, it includes: S201, for each sampling station in the sampling station sequence of the benchmark settlement interval, excluding the first and last endpoints, in the local two-dimensional coordinate system composed of the difference between the mileage value and the fill cross-sectional area, and the difference between the mileage value and the cut cross-sectional area, the sampling station, its preceding adjacent station, and its following adjacent station are regarded as the three vertices of a local triangle.

[0044] In this embodiment, for each sampling station number sequence within the benchmark settlement interval, independent analysis is performed on the filling and excavation features respectively. First, it is detected whether there is a zero-point crossover in the cross-sectional area difference sequence of the current attribute (fill or excavation). If so, the interval is further divided into pure positive value sub-intervals and pure negative value sub-intervals with the zero point as the boundary. Then, the mileage values ​​in each sub-interval are zeroed out, and the mileage value of the starting base station is uniformly subtracted to generate local horizontal coordinates to eliminate the loss of large number precision in floating-point operations.

[0045] Subsequently, apart from the beginning and end endpoints of the benchmark settlement interval, for each sampling station, in the local two-dimensional coordinate system after its sub-interval is zeroed, the difference in its corresponding cross-sectional area is used as the ordinate, and the coordinate values ​​corresponding to its preceding and following adjacent stations are extracted. The local triangles representing the distortion of fill terrain and the distortion of cut terrain are constructed by combining three continuous and ordered coordinate points.

[0046] S202, calculate the area of ​​the local triangle formed by the three vertices respectively, and obtain the fill morphology feature value and cut morphology feature value of the corresponding sampling station.

[0047] This step utilizes the area of ​​a two-dimensional graphic as an effective proxy indicator for quantifying three-dimensional volumetric loss, specifically determining the fill and cut morphological characteristic values ​​of the sampling station. In traditional full-volume earthwork calculations, accurately quantifying the contribution of a specific sampling station to the total error typically requires complex three-dimensional volumetric modal reconstruction and comparison, which is extremely computationally costly in the context of massive data. However, in this embodiment, after mapping the cross-sectional area difference sequence to a two-dimensional coordinate system, the local triangle formed by three adjacent points mathematically reflects the degree of deviation of the data change in the benchmark settlement interval from the smooth line.

[0048] Since the horizontal axis of the coordinate system represents mileage and the vertical axis represents the difference in cross-sectional area, based on the principles of calculus, the area of ​​this two-dimensional local triangle is dimensionally equivalent to volume. This means that the area of ​​this two-dimensional local triangle is strongly positively correlated with the local earthwork volume that would be missed or over-calculated if this point were ignored and adjacent points were connected by straight lines. Therefore, the area of ​​the two-dimensional triangle can be directly quantified as a feature value of fill or cut morphology. By utilizing geometric computing power, a high degree of sensitivity and accurate quantification of key three-dimensional terrain abrupt changes is achieved, laying the computational foundation for the rapid screening of large-scale point cloud data.

[0049] In this embodiment, the local x-coordinates and cross-sectional area difference coordinates of the three vertices of the local triangle are extracted; based on the coordinate analysis method principle of polygon area (such as the simplified form of the shoelace formula), the x and y coordinate difference vectors of the current sampling station number relative to the previous adjacent station number, and the x and y coordinate difference vectors of the subsequent adjacent station number relative to the previous adjacent station number are calculated respectively; the two sets of coordinate difference vectors are cross-multiplied and half of the absolute value is taken to accurately calculate the two-dimensional geometric area of ​​the local triangle.

[0050] Since the dimension of the local horizontal axis is length and the dimension of the cross-sectional area difference is area, the actual physical dimension of the obtained local triangle area is volume. This value directly quantifies the local earthwork volume error caused by eliminating the current sampling station number, and assigns it to the corresponding sampling station number as fill morphology feature value and cut morphology feature value to guide feature selection.

[0051] As an example, the fill morphology characteristic value of the kth sampling station. The calculation formula can be: In the formula, This represents the local x-coordinate of the k-th sampling station. This represents the local x-coordinate of the (k-1)th sampling station. This represents the difference in cross-sectional area at the (k+1)th sampling station. This represents the difference in cross-sectional area at the (k-1)th sampling station. This represents the local x-coordinate of the (k+1)th sampling station. This represents the difference in cross-sectional area at the kth sampling station. This represents the function for finding the absolute value.

[0052] It can represent the difference vector of the horizontal coordinate of the current sampling station number relative to the previous adjacent station number. The current sampling station number refers to any sampling station number in the sampling station number sequence located in the benchmark settlement interval that has no determined filling shape characteristic value except for the first and last endpoints. The previous adjacent station number refers to the sampling station number that is adjacent to the current sampling station number, while the subsequent adjacent station number refers to the sampling station number that is adjacent to the current sampling station number. It can represent the longitudinal coordinate difference vector between subsequent adjacent station numbers and previous adjacent station numbers. It can represent the vector of differences in the abscissa of subsequent adjacent station numbers relative to previous adjacent station numbers. It can represent the difference vector of the ordinate of the current sampling station number relative to the previous adjacent station number.

[0053] After obtaining the fill morphology feature values ​​and cut morphology feature values ​​for each sampling station, secondary sampling stations are eliminated through iterative elimination of geometric morphology feature values, and abrupt sampling stations are selected.

[0054] Iteratively eliminating secondary sampling stations enables adaptive filtering and dimensionality reduction of high-frequency noise. Real-world high-precision point cloud data contains numerous millimeter-level numerical oscillations (high-frequency noise) caused by surface gravel, vegetation roots, or tiny pits. Directly applying absolute thresholds for filtering can easily lead to algorithm deadlock in noise-dense areas or the selection of numerous pointless, construction-insignificant spikes. By comparing local triangle areas and prioritizing the elimination of minimum values ​​through an iterative topology simplification algorithm, these high-frequency, useless fluctuations can be smoothed out from the bottom up, gradually highlighting the nonlinear characteristics of the underlying error waveform. This achieves morphological dimensionality reduction and key skeleton extraction from high-frequency measurement noise to low-frequency macroscopic topographical abrupt changes, ultimately revealing the true topographic sampling stations that bear the macroscopic earthwork volume errors.

[0055] Specifically, for the fill cross-sectional area difference sequence and the cut cross-sectional area difference sequence, the following independent iterative screening steps are performed respectively: In the corresponding sampling station sequence, find the target sampling station with the smallest geometric feature value and remove the target sampling station from the sampling station sequence; for the preceding and following adjacent stations of the removed station, recalculate the geometric feature value; repeat the steps of finding, removing, and recalculating until the number of remaining sampling stations in the new sampling station sequence reaches the preset maximum allowable number of additions; the sampling stations remaining after independent iterative screening of fill and independent iterative screening of cut are used as mutation sampling stations.

[0056] Furthermore, independent iterative logic is executed for the fill sampling station number sequence and the cut sampling station number sequence respectively, and the maximum allowed number of additions for each can be set to 3. In the fill sequence processing, the target sampling station number (i.e., the secondary sampling station number) with the smallest fill morphological feature value in the current sequence is searched for and removed. Then, the fill morphological feature value is recalculated only for the two new adjacent stations before and after the removed station number to update the local state (no global recalculation is required). This process is repeated until only 3 sampling stations remain in the fill sequence (i.e., fill mutation sampling station numbers). Similarly, the same logic is applied in the cut sequence processing until only 3 sampling stations remain in the cut sequence (i.e., cut mutation sampling station numbers). Finally, the union of the remaining 3 sampling stations in the fill sequence (i.e., the fill sampling station number sequence) and the cut sequence (i.e., the cut sampling station number sequence) is extracted and used as the mutation sampling station number output, forming the mutation sampling station number sequence.

[0057] The setting of the maximum allowable supplementary number is intended to balance the absolute accuracy requirements of earthwork settlement with the cost of manual cost auditing and drawing review. Earthwork calculations are inherently more accurate with denser point counts, but the sheer volume of drawings is exponentially increasing, which is unacceptable to auditing departments. By setting a threshold, dimensionality reduction is forced within the massive high-frequency terrain waveforms, leaving only the few sampling station numbers with the largest contribution to volumetric errors. For standard highway or water conservancy benchmark settlement intervals with a standard spacing of 20 meters, the optimal range for the maximum allowable supplementary number is typically 1 to 3, depending on the degree of terrain fragmentation and the earthwork unit price; no specific limit is set here.

[0058] Thus, this embodiment has obtained the mutation sampling station number sequence.

[0059] S3. When the geometric morphological characteristic value of the mutation sampling station and the terrain mutation clustering degree determined by the total error of the geometric morphological characteristic value and its corresponding benchmark settlement interval both meet the preset correction threshold condition, the corresponding mutation sampling station is inserted into the basic station sequence as the station to be added, and a mixed settlement station sequence is obtained.

[0060] Step S3 above is to perform significance verification on the topographic abrupt change feature points (i.e. abrupt change sampling station numbers) extracted by geometric morphology, so as to achieve redundancy suppression of invalid supplementary sections, that is, to retain only the sampling station numbers with more significant topographic features.

[0061] Single-point volume error quantification based on geometric morphological feature values ​​can only characterize the relative distortion degree of the sampling station number within a local neighborhood. To ensure that each supplementary cross-section has substantial value for engineering settlement correction, this step establishes a progressive decision-making mechanism: First, the absolute volume error of the abruptly changed sampling station number is filtered by using a geometric morphological feature value threshold to eliminate micro-topographic interference that, although protruding, has a very small actual volume; second, the spatial distribution characteristics of the error are quantitatively evaluated by calculating the terrain abrupt change clustering degree, in order to identify and intercept pseudo-abruptly changed sampling station numbers induced by high-frequency random fluctuations across the entire range.

[0062] Only when a mutation sampling station simultaneously meets the dual constraints of "significant absolute magnitude" and "strong spatial clustering" is it determined to carry the core characteristics of nonlinear topographic mutations within its corresponding benchmark settlement interval, and thus confirmed as a proposed supplementary station. This mechanism enables targeted compensation for settlement accuracy and intensive control of audit costs.

[0063] As an exemplary implementation, the process of obtaining the mixed settlement station number sequence includes: In this embodiment, a dual-constraint judgment logic based on absolute magnitude and relative clustering degree is used to make the final decision on the mutation sampling station number: Taking the selected fill mutation sampling station as an example, firstly, it is determined whether the corresponding fill morphology characteristic value is greater than the preset fill characteristic value tolerance upper limit; then, it is determined whether the corresponding fill terrain mutation clustering degree is greater than the preset fill clustering degree threshold; only when the above two judgment conditions are met simultaneously, it is confirmed that the fill mutation sampling station carries significant and concentrated terrain distortion information, has substantial settlement correction value, and is officially confirmed as a proposed supplementary station; if any judgment condition is not met (such as large volume but dispersed throughout the entire range, or extremely small volume), the mutation sampling station is determined to be invalid and discarded.

[0064] Similarly, the selected excavation mutation sampling station numbers are subject to completely independent dual determination.

[0065] Subsequently, the mileage values ​​of all proposed additional chainages after passing the judgment are obtained, and the proposed additional chainages are inserted into the original basic chainage sequence in batches. The global reordering is performed in ascending order of mileage values ​​to generate a non-uniform mixed settlement chainage sequence with adaptive spacing adjustment, which serves as the index benchmark for subsequent drawing output and volume recalculation.

[0066] It is worth noting that for each mutation sampling station, as long as it meets either the double-judgment verification of the fill attribute or the double-judgment verification of the cut attribute, it will be determined as a valid proposed supplementary station.

[0067] Specifically, if a sampling station number (i.e., the same mileage) is both a fill abrupt change sampling station number and an cut abrupt change sampling station number, even if it only meets the fill correction threshold condition but not the cut correction threshold condition, it can still be identified as a proposed supplementary station number. Subsequently, a unique mileage set of all verified proposed supplementary station numbers is obtained and uniformly inserted into the basic station number sequence to generate a mixed settlement station number sequence. When generating the cross-section drawing corresponding to the proposed supplementary station number, all fill and cut measured data on that cross-section will be simultaneously drawn and used for volume recalculation, thereby ensuring the integrity of the cross-section settlement data.

[0068] The preset upper limit of the characteristic value tolerance (fill / cut) is designed to filter out topographic micro-topography that is not large enough to have a substantial impact on the cost, thus avoiding ineffective corrections. The preset threshold for the aggregation degree of topographic abrupt changes is designed to filter out pseudo-extreme points formed by the accumulation of high-frequency small fluctuations across the entire range, ensuring that the supplementary cross-sections only appear at locations where the topography has actually deviated from a single point in a systematic manner.

[0069] For the upper limit of the characteristic value tolerance, it is recommended to take a value range of 5.0 to 20.0 cubic meters. In projects with flat terrain and low earthwork costs, a higher value (such as 15.0) can be used; in special road sections with complex terrain, high unit prices, or extremely high requirements for settlement accuracy, a lower value (such as 5.0) can be used.

[0070] For the terrain abrupt change clustering threshold, a value range of 0.5 to 0.8 is recommended. This threshold serves as a proportionality coefficient, representing the proportion of a single point's feature value to the total error of its interval. A commonly used benchmark value is 0.6, meaning that if a single point's feature value accounts for more than 60% of the total error of the interval, it is determined that this point dominates the terrain abrupt change, and it is worthwhile to supplement the cross-section; if it is below 0.5, it indicates that the error sources are too dispersed, and it is not recommended to supplement the cross-section.

[0071] As an exemplary implementation, obtaining the total error (including the total fill error and the total cut error) for each benchmark settlement interval includes: The first step is to extract the difference in fill cross-sectional area and the difference in cut cross-sectional area corresponding to all sampling station numbers within the benchmark settlement interval.

[0072] The second step is to take the absolute value of the difference in cross-sectional area of ​​each fill section, and to perform a fusion calculation based on the actual mileage difference between two adjacent sampling stations along the mileage distribution direction of the benchmark settlement interval, so as to obtain the total fill error of the benchmark settlement interval.

[0073] The third step is to take the absolute value of the difference in the cross-sectional area of ​​each excavation, and to perform a fusion calculation based on the actual mileage difference between two adjacent sampling stations along the mileage distribution direction of the benchmark settlement interval, so as to obtain the total excavation error of the benchmark settlement interval.

[0074] In this embodiment, for the absolute value of the cross-sectional area difference of the same attribute, the numerical integration method can be used to calculate the interval cumulative sum of the absolute values ​​of each difference, thereby obtaining the total filling error and the total cutting error of the benchmark settlement interval. The total filling error or the total cutting error respectively characterizes the cumulative severity of the deviation of the filling or cutting terrain from the linear benchmark within the road section, serving as an independent benchmark denominator for evaluating the clustering degree of their respective abrupt sampling station corrections.

[0075] Another example involves using the trapezoidal numerical integration method to calculate the cumulative volume of the interval based on the absolute values ​​of the differences in the fill cross-sectional area and the cut cross-sectional area for the benchmark settlement interval, respectively. Specifically, for adjacent micro-sampling step intervals, the average of the absolute values ​​of the fill cross-sectional area differences (or cut cross-sectional area differences) corresponding to the sampling station numbers at both ends of the step is taken, and then multiplied by the actual mileage difference between the two adjacent sampling station numbers. The product results of all micro-steps within the benchmark settlement interval are algebraically summed to obtain the total fill error and the total cut error for the benchmark settlement interval, respectively.

[0076] As an example, the formula for calculating the total filling error of the benchmark settlement interval can be: In the formula, This indicates that the foundation is started from the j-th foundation pile number. With the (j+1)th foundation pile number The total filling error of the baseline settlement interval constituted, This represents the (j+1)th foundation pile number. Position index in the micro-station sequence Indicates the j-th foundation pile number Position index in the micro-station sequence This represents the absolute value of the difference in the cross-sectional area of ​​the fill corresponding to the i-th sampling station. This represents the absolute value of the difference in the cross-sectional area of ​​the fill corresponding to the (i+1)th sampling station. This represents the actual mileage difference between the (i+1)th sampling station and the ith sampling station.

[0077] The above formula for calculating the total filling error is achieved by extracting the arithmetic mean of the absolute values ​​of the area differences between adjacent sampling stations and multiplying it by the corresponding actual mileage difference, thus realizing the discrete integral summation of the cumulative error volume below the discrete sequence.

[0078] After obtaining the total error of the benchmark settlement interval, due to the existence of situations in actual engineering where the road surface is very smooth or the terrain height conforms to linearity (such as a plain highway), the difference in the cross-sectional area of ​​all fill sections within the benchmark settlement interval tends to be close to 0, resulting in... Extremely small, even zero. To prevent program errors or data overflows in subsequent calculations due to a zero denominator, this embodiment also includes comparing the total error of the baseline settlement interval with a preset interval correction trigger threshold: If the total error is not greater than the interval correction trigger threshold, it is determined that there is no significant terrain distortion within the corresponding benchmark settlement interval, and there is no need to generate the proposed supplementary station number.

[0079] If the total error exceeds the interval correction trigger threshold, the step of determining the terrain mutation clustering degree of the mutation sampling station will continue.

[0080] Furthermore, due to significant differences in the engineering nature, unit price, and audit sensitivity of fill and excavation errors, comparing them using the same correction trigger threshold could lead to high-value errors being mistakenly filtered out or low-value noise being incorrectly accepted. This embodiment provides the following distinction and judgment logic: First, the total fill error is independently compared with the preset fill correction trigger threshold, and the total cut error is independently compared with the preset cut correction trigger threshold. If the corresponding attribute error total (fill or cut) is not greater than its corresponding correction trigger threshold (fill threshold or cut threshold), it is directly determined that there is no terrain distortion with correction value under the corresponding attribute in the benchmark settlement interval, and the generation of the proposed supplementary station under the attribute is terminated. If the total error of the corresponding attribute is greater than its corresponding correction trigger threshold, it indicates that there is a significant error accumulation in the interval under the corresponding attribute. Then, the subsequent step of calculating the terrain change clustering degree of the corresponding attribute change sampling station is executed.

[0081] The aforementioned independent comparison mechanism ensures that for engineering attributes with high unit price and high sensitivity (such as rock excavation), refined capture and compensation can be achieved by setting a lower trigger threshold.

[0082] The setting principles for fill and cut correction trigger thresholds are influenced by preset fixed intervals and differentiated based on the economic benefit threshold corresponding to the project attributes, thus filtering out minor terrain fluctuations with no economic correction value. The setting is primarily determined by whether the potential increase in monetary value resulting from earthwork volume correction covers the manual review and auditing costs of supplementary cross-section drawings. Typically, the cut correction trigger threshold is set lower than the fill correction trigger threshold because in highway engineering, cuts usually involve different grades of rock or soil layers, whose comprehensive unit price is often much higher than that of fill materials. A lower cut threshold can sensitively detect terrain distortions caused by small volumes of earthwork that contribute significantly to monetary value.

[0083] The recommended range for the fill correction trigger threshold is 5.0 to 15.0 cubic meters (based on a 20-meter standard settlement interval), which is suitable for most relatively flat fill sections. The recommended range for the cut correction trigger threshold is 1.0 to 8.0 cubic meters. Since cut correction is more sensitive to cost impact, setting a lower threshold can effectively prevent the loss of high-value excavation.

[0084] After obtaining the total error for each benchmark settlement interval, as an exemplary implementation, the terrain abrupt change clustering degree is determined based on the geometric morphological feature values ​​and the total error of their respective benchmark settlement intervals, including: In this embodiment, the terrain abrupt change clustering degree is calculated independently for fill and cut sections.

[0085] Taking fill as an example, the fill morphological feature value corresponding to the fill mutation sampling station is extracted as the numerator, and the total fill error of its corresponding benchmark settlement interval is extracted as the denominator. The fill morphological feature value is divided by the total fill error to calculate the fill terrain mutation cluster degree of the fill mutation sampling station. Similarly, the cut terrain mutation cluster degree of the cut mutation sampling station is calculated using the cut morphological feature value and the corresponding total cut error.

[0086] As an example, the formula for calculating the clustering degree of embankment topographic abrupt changes at embankment abrupt change sampling stations can be: In the formula, The clustering degree of embankment topographic abrupt changes is indicated by the sampling station number of the embankment abrupt change sampling point. This represents the embankment morphology characteristic value corresponding to the sampling station number of the embankment abrupt change. This indicates that the foundation is started from the j-th foundation pile number. With the (j+1)th foundation pile number The total filling error within the baseline settlement interval, where the filling mutation sampling station is located from the j-th foundation station. With the (j+1)th foundation pile number Within the benchmark settlement range.

[0087] It should be noted that the theoretical value of the terrain abrupt change clustering degree is between 0 and 1. The closer the value is to 1, the more concentrated the cumulative absolute error of the benchmark settlement interval is at the sampling station of the abrupt change, which belongs to a single systematic large terrain abrupt change that requires output drawings for settlement correction; the closer the value is to 0, the more dispersed the error is throughout the entire interval, which belongs to high-frequency random noise caused by surface gravel or measurement clutter, which lacks the significance of single correction, i.e., the correction value is low.

[0088] Thus, this embodiment has obtained the mixed settlement chain number sequence.

[0089] S4 generates corresponding cross-sectional drawings for each settlement station in the mixed settlement station sequence, and calculates the final earthwork volume of the project to be analyzed based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area.

[0090] Step S4 above is to realize the data of project cost audit. Figure 1 This approach achieves a closed-loop compliance system and high-precision reconstruction of earthwork volumes. Firstly, engineering cost auditing rules mandate that every cross-sectional data point in the settlement statement must be accompanied by corresponding engineering drawings as verification evidence. This embodiment outputs customized cross-sectional drawings for the mixed settlement chainage sequence containing the proposed additional chainage, transforming abstract mathematical error correction results into visual audit evidence, thus overcoming, to some extent, the shortcomings of high-precision surveying data in actual engineering settlements. Secondly, in the final volume recalculation stage, this embodiment breaks away from the traditional fixed standard spacing (e.g., a fixed 20 meters), instead utilizing adaptively truncated mileage spacing in the mixed settlement chainage sequence (e.g., sub-intervals truncated to 8 meters and 12 meters due to addition), and rigorously backtracks to call the measured cross-sectional area of ​​the corresponding chainage for average cross-sectional method calculation. Since the added cross-section is precisely locked at the core location of the terrain's nonlinear distortion, this piecewise fitting calculation based on key feature nodes can approximate the true three-dimensional surface volume to the greatest extent possible with minimal drawing increments, achieving an optimal balance between engineering quantity calculation accuracy and drawing management costs.

[0091] As an exemplary implementation, the process of step S4 described above is as follows: The first step is to generate corresponding cross-sectional drawings for each settlement station in the mixed settlement station sequence.

[0092] In this embodiment, each settlement station in the mixed settlement station sequence is traversed to determine whether the current settlement station is an original foundation station or a proposed supplementary station. If it is an original foundation station, the existing standard cross-section drawing in the engineering design file is directly called. If it is a proposed supplementary station, the ground elevation line and cross-section design line data corresponding to the station are extracted, and the drawing engine is driven to automatically generate the corresponding cross-section engineering drawing.

[0093] In addition, to meet the need for rapid manual review in cost auditing, when generating cross-sectional engineering drawings for proposed additional chainages, an "Additional" identifier can be automatically added to the drawing title bar and chainage text, and the ground elevation line can be drawn using a preset highlight color different from the standard drawings. Finally, all called and generated cross-sectional drawings are merged in ascending order of mileage, and a comprehensive cross-sectional atlas covering the entire project to be analyzed is output as a physical document for earthwork settlement.

[0094] The second step is to calculate the final earthwork volume of the project to be analyzed based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area.

[0095] As an exemplary implementation, the final earthwork volume includes the final total fill volume and the final total cut volume. Calculating the final earthwork volume of the project to be analyzed includes: The first sub-step involves extracting the measured fill cross-sectional area and measured cut cross-sectional area at both ends of the micro-settlement interval formed by every two adjacent settlement chain numbers in the mixed settlement chain number sequence.

[0096] In this embodiment, for any end (i.e., the settlement station number), the measured fill cross-sectional area and measured cut cross-sectional area of ​​each settlement station number can be obtained by using its index in the micro-station number sequence and the measured fill cross-sectional area and measured cut cross-sectional area of ​​each sampling station number determined in step S1 above.

[0097] The second sub-step involves calculating the average value of the measured fill cross-sectional area and the average value of the measured cut cross-sectional area at both ends of the micro-settlement interval, and then multiplying the two average values ​​by the mileage distance of the micro-settlement interval to obtain the single-segment fill volume and single-segment cut volume of the micro-settlement interval.

[0098] Taking the single-segment fill volume of any micro-settlement interval as an example, the formula for calculating the single-segment fill volume of the micro-settlement interval can be as follows: In the formula, Indicates the volume of a single fill section. This represents the measured cross-sectional area of ​​the fill at the m-th settlement station. This represents the measured cross-sectional area of ​​the fill at the (m+1)th settlement station. This represents the average measured cross-sectional area of ​​the fill at both ends of the micro-settlement interval formed by the m-th settlement station and the (m+1)-th settlement station. This represents the mileage value at the (m+1)th settlement station. This represents the mileage value at the m-th settlement station. This represents the mileage interval of the micro-settlement interval formed by the m-th settlement station and the (m+1)-th settlement station.

[0099] The third sub-step involves summing up the single-segment fill volumes of all micro-settlement intervals to obtain the final total fill volume of the project to be analyzed; and summing up the single-segment excavation volumes of all micro-settlement intervals to obtain the final total excavation volume of the project to be analyzed.

[0100] In this embodiment, the single-segment fill volume of all micro-settlement intervals along the entire length of the project to be analyzed is accumulated, and the accumulated result of the single-segment fill volume is taken as the final total fill volume; the single-segment excavation volume of all micro-settlement intervals along the entire length of the project to be analyzed is accumulated, and the accumulated result of the single-segment excavation volume is taken as the final total excavation volume.

[0101] After obtaining the cross-sectional drawings of each settlement station of the project to be analyzed, as well as the final total fill volume and final total excavation volume, a report can be output, namely, an auxiliary settlement report for earthwork volume. The report can list the cross-sections of all settlement stations in tabular form. Furthermore, for stations to be added, the specifically calculated geometric morphological characteristic values ​​and terrain abrupt change clustering degree can be listed as the basis for correction. At this point, this embodiment not only obtains the corrected volume results but also provides a complete chain of technical evidence and physical drawing documentation, ensuring the compliance, traceability, and high accuracy of the settlement data.

[0102] Thus, this embodiment achieves the goal of effectively capturing hidden terrain distortions to ensure the accuracy of earthwork volume calculation while avoiding the generation of massive amounts of redundant drawings.

[0103] It should be noted that, in the embodiments of the present invention, the acquired and processed data originates from legitimate publicly available datasets, authorized business databases, or real-time sensor signals. To adapt to the technical processing flow of this application, the raw data has been cleaned, converted, and structured according to standard protocols, removing invalid or redundant information.

[0104] Furthermore, if division operations are involved in the embodiments of the present invention, in order to avoid calculation crashes or invalid values ​​caused by the denominator being zero or the input value being zero, this embodiment can introduce a protection mechanism. This protection mechanism can be flexibly configured according to the actual situation. For example, the denominator can be added to a parameter with the same dimension as the denominator. The value of the parameter can be set to a very small value greater than zero, such as 0.0001, to ensure that the division operation is still feasible in extreme cases.

Claims

1. A method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis, characterized in that, Includes the following steps: Obtain the foundation station sequence with a preset fixed spacing and the micro station sequence with a spatial density higher than the foundation station sequence corresponding to the project to be analyzed, and further obtain the cross-sectional area difference sequence of the micro station sequence; Within the benchmark settlement interval formed by any two adjacent foundation stations, the geometric feature value is determined by a local triangle constructed based on the difference in cross-sectional area between the sampled station and its adjacent station. Secondary sampled stations are then eliminated iteratively using the geometric feature value to select abrupt sampled stations. When the geometric morphological feature value of the mutation sampling station and the terrain mutation clustering degree determined by the total error of the geometric morphological feature value and its corresponding benchmark settlement interval both meet the preset correction threshold condition, the corresponding mutation sampling station is inserted as the proposed supplementary station into the basic station sequence to obtain the mixed settlement station sequence. Generate corresponding cross-sectional drawings for each settlement station in the mixed settlement station sequence, and calculate the final earthwork volume of the project to be analyzed based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area.

2. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 1, characterized in that, The cross-sectional area difference sequence includes a fill cross-sectional area difference sequence and an excavation cross-sectional area difference sequence. Obtaining the cross-sectional area difference sequence of the fine station sequence includes: Obtain the measured fill cross-sectional area and measured cut cross-sectional area for each sampled station in the micro-station sequence; The predicted fill cross-sectional area of ​​each sampling station is determined by using the measured fill cross-sectional area of ​​each pair of adjacent foundation stations, and the predicted cut cross-sectional area of ​​each sampling station is determined by using the measured cut cross-sectional area of ​​the adjacent foundation stations. For each sampling station, the difference between the measured fill cross-sectional area and the predicted fill cross-sectional area, as well as the difference between the measured cut cross-sectional area and the predicted cut cross-sectional area, are calculated to form the fill cross-sectional area difference sequence and the cut cross-sectional area difference sequence.

3. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 2, characterized in that, The step of obtaining the measured fill cross-sectional area and measured cut cross-sectional area for each sampled station in the micro-station sequence includes: Acquire measured topographic point cloud data of the project to be analyzed, and determine the three-dimensional spatial coordinates and normal vector of each sampling station on the design center line of the project to be analyzed; Centered on the three-dimensional spatial coordinates, a cross-sectional search zone is constructed in the measured terrain point cloud data based on the normal vector to extract the ground elevation line; The ground elevation line is compared with the design elevation line in the engineering design model. The area where the ground elevation line is lower than the design elevation line is taken as the measured fill section area, and the area where the ground elevation line is higher than the design elevation line is taken as the measured cut section area.

4. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 3, characterized in that, The geometric morphological feature values ​​include fill morphological feature values ​​and cut morphological feature values. The determination of geometric morphological feature values ​​based on the local triangles constructed according to the sampling station number and the cross-sectional area difference corresponding to its adjacent station numbers includes: For each sampling station in the sampling station sequence of the benchmark settlement interval, excluding the first and last endpoints, in a local two-dimensional coordinate system composed of the difference between the mileage value and the fill cross-sectional area, and the difference between the mileage value and the cut cross-sectional area, the sampling station, its preceding adjacent station, and its following adjacent station are regarded as the three vertices of a local triangle. Calculate the area of ​​the local triangle formed by the three vertices respectively to obtain the fill morphology feature value and cut morphology feature value of the corresponding sampling station.

5. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 4, characterized in that, The step of iteratively eliminating secondary sampling stations through the geometric morphological feature values ​​and filtering out abrupt sampling stations includes: For the fill cross-sectional area difference sequence and the cut cross-sectional area difference sequence, perform the following independent iterative screening steps respectively: In the corresponding sampling station number sequence, find the target sampling station number with the smallest geometric feature value, and remove the target sampling station number from the sampling station number sequence in which it is located; For the preceding and following adjacent chain numbers of the eliminated chain number, the geometric morphological characteristic value is recalculated. Repeat the steps of searching, eliminating, and recalculating until the number of remaining sampling stations in the new sampling station sequence reaches the preset maximum allowable number of additions; The remaining sampling station numbers after independent iterative screening of fill and cut are used as the mutation sampling station numbers.

6. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 1, characterized in that, The total error includes the total fill error and the total cut error. The total error for each benchmark settlement interval is obtained, including: Extract the difference in fill cross-sectional area and the difference in cut cross-sectional area corresponding to all sampling station numbers within the benchmark settlement interval; Take the absolute value of the difference in cross-sectional area of ​​each fill, and perform a fusion calculation based on the actual mileage difference between two adjacent sampling stations along the mileage distribution direction of the benchmark settlement interval to obtain the total fill error of the benchmark settlement interval. The absolute value of the difference in the cross-sectional area of ​​each excavation is taken, and a fusion calculation based on the actual mileage difference between two adjacent sampling stations is performed along the mileage distribution direction of the benchmark settlement interval to obtain the total excavation error of the benchmark settlement interval.

7. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 6, characterized in that, After obtaining the total error of the benchmark settlement range, the process further includes: The total error of the benchmark settlement interval is compared with the preset interval correction trigger threshold: If the total error is not greater than the interval correction trigger threshold, it is determined that there is no significant terrain distortion in the corresponding benchmark settlement interval, and there is no need to generate the proposed supplementary station number. If the total error exceeds the interval correction trigger threshold, the step of determining the terrain abrupt change clustering degree of the abrupt sampling station continues.

8. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 1, characterized in that, Obtain the mixed settlement station number sequence, including: All the proposed additional chainages are merged with the basic chainage sequence and reordered according to mileage value to generate the mixed settlement chainage sequence.

9. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 7, characterized in that, The mixed settlement mileage sequence includes micro-settlement intervals consisting of two adjacent settlement mileages; Wherein, if the proposed supplementary station number is not inserted within the benchmark settlement interval, the length of the corresponding micro-settlement interval remains at the preset fixed interval; If a proposed supplementary station number is inserted, the proposed supplementary station number will truncate the original benchmark settlement interval into multiple micro-settlement intervals with a length less than the preset fixed interval.

10. The method for auxiliary calculation of earthwork volume based on high-precision topographic map analysis according to claim 9, characterized in that, The final earthwork volume includes the final total fill volume and the final total excavation volume. The calculation of the final earthwork volume of the project to be analyzed, based on the mileage distance between adjacent settlement stations and the corresponding measured cross-sectional area, includes: In the mixed settlement chainage sequence, the measured fill cross-sectional area and measured cut cross-sectional area at both ends of the micro-settlement interval formed by every two adjacent settlement chainages are extracted; Calculate the average value of the measured fill cross-sectional area and the average value of the measured cut cross-sectional area at both ends of the micro-settlement interval, and multiply the two average values ​​by the mileage distance of the micro-settlement interval to obtain the single-segment fill volume and single-segment cut volume of the micro-settlement interval. The fill volume of each segment in all micro-settlement intervals is summed to obtain the final total fill volume of the project to be analyzed; and the excavation volume of each segment in all micro-settlement intervals is summed to obtain the final total excavation volume of the project to be analyzed.