A BIM-based project cost accounting method and system
By constructing a dynamic cost mirror model that is strictly mapped to the BIM model, cost data is monitored and updated in real time, solving the problem of the disconnect between the BIM model and cost data. This enables dynamic, real-time accounting and visual management of project costs, improving management efficiency and decision support capabilities.
Patent Information
- Application Number
- CN202511589740.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-03
- Publication Date
- 2026-11-17
AI Technical Summary
Existing BIM models cannot respond to design changes and construction progress updates in real time during cost accounting, resulting in the inability to dynamically update cost data. This makes it difficult for managers to conduct real-time cost control and make accurate decisions. Furthermore, the disconnect between the BIM model and cost data makes it difficult to trace the root cause of deviations.
By analyzing the component attributes and logical relationships of the BIM model, a dynamic cost mirror model is constructed, which monitors status change events in real time, automatically updates cost data, and integrates its visualization into the BIM model, thereby achieving real-time synchronization between cost data and engineering entities.
It has enabled the transformation of cost accounting from static to dynamic, automatically and accurately responding to design and schedule changes, providing intuitive visual decision support, improving the refinement and automation level of cost management, and enhancing management efficiency and decision accuracy.
Smart Images

Figure CN123117569A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of project cost accounting technology, and more specifically to a BIM-based project cost accounting method and system. Background Technology
[0002] In the field of construction project management, cost control is one of the key factors for project success. With the popularization of Building Information Modeling (BIM) technology, its characteristics of visualization, coordination, and information integration provide new technical means for project cost management.
[0003] Currently, the common practice in the engineering field is to export a bill of quantities from a BIM model, then import this bill of quantities into traditional cost accounting software or apply fixed quotas for pricing, ultimately generating a total cost estimate or budget for the project. However, this BIM-based cost accounting method is essentially a static, post-hoc data processing process. The BIM model only serves as an initial provider of quantity data, and its connection with cost data is essentially severed after the accounting is completed. In actual projects, design changes occur frequently, and construction schedules are constantly being updated, while existing technical solutions cannot effectively cope with such dynamic changes. When a component in the BIM model is changed, existing methods struggle to automatically and accurately identify all other related components and their cost items affected by the change. This often requires cost engineers to manually judge and recalculate, a process that is not only inefficient but also prone to omissions and errors, leading to distorted cost accounting results.
[0004] Furthermore, existing methods lack effective utilization of the deep logical relationships within BIM models. The organization of cost data is loosely coupled with the physical structure of the BIM model, failing to form a dynamic cost system capable of responding in real-time to changes in the model's state. This results in cost data not automatically updating as the project progresses, preventing managers from obtaining real-time, visualized cost status and hindering dynamic cost control and accurate decision-making during the project. The separation of cost data from the visualization of the BIM model also makes identifying cost deviations and tracing their root causes exceptionally difficult.
[0005] Therefore, there is an urgent need for a dynamic cost accounting method that can deeply integrate BIM model information, automatically respond to changes and update costs in real time, and provide visualized integrated display. Summary of the Invention
[0006] In view of this, the present invention provides a BIM-based project cost accounting method and system to solve the problems mentioned in the background section above.
[0007] To achieve the above objectives, the present invention adopts the following technical solution: A BIM-based project cost accounting method, the method comprising: S1. By parsing the project BIM model, the attribute information of multiple components and the logical relationship information between the multiple components are extracted to provide a basis for building a cost data organization framework. The logical relationship information includes the parent-child hierarchical structure representing the composition relationship and the adjacency relationship structure representing the spatial connection relationship. S2. Based on the extracted logical relationship information, construct a dynamic cost mirror model that forms a one-to-one mapping relationship with the components in the BIM model, and transform the physical logic of the BIM entity into the hierarchical logic of cost data. The dynamic cost mirror model contains multiple cost nodes organized according to the parent-child hierarchical structure. S3. Obtain the cost elements of the multiple components, and allocate the cost elements to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship, obtain the cost data of each cost node, and generate the initial cost data layer. S4. When a status change event is detected in the target component in the BIM model, the change impact domain affected by the event is analyzed and determined according to the type of the status change event and the pre-extracted logical relationship information, and the scope of cost data that needs to be updated is defined. The change impact domain includes the target component and its associated components. S5. According to the preset update rules corresponding to the event type, dynamically update the cost data of all components in the change influence domain corresponding to the cost nodes in the dynamic cost mirror model, so as to synchronize the cost data with the BIM model status in real time. S6. Based on the updated dynamic cost mirror model, generate cost accounting results and feed the cost accounting results back to the BIM model for visualization and integrated display.
[0008] This invention creates a dynamic cost mirror model that is strictly mapped to BIM model entities. By extracting and utilizing the inherent logical relationships within BIM, the system can intelligently define the impact domain of changes, ensuring that any design or schedule change automatically and accurately triggers the synchronized updates of all relevant cost data. This achieves a fundamental shift in cost accounting from static and lagging to dynamic and real-time. Finally, through visual integration and display, abstract cost data is concretely projected back into the BIM model, providing intuitive and efficient decision support for project management and significantly improving the precision and automation of cost management.
[0009] Preferably, in the above-mentioned BIM-based project cost accounting method, in S2, constructing a dynamic cost mirror model includes: Using the parent-child hierarchical structure of the BIM model as the main framework, a tree-shaped cost structure of the dynamic cost mirror model is generated, ensuring that the aggregation and summarization path of cost data is consistent with the assembly logic of physical components. The adjacency relationship structure is then used as an additional constraint relationship to the corresponding cost node in the tree-form cost structure, enabling rapid location of the associated cost node when processing state changes based on spatial relationships.
[0010] Preferably, in the above-mentioned BIM-based project cost accounting method, in step S4, the affected change impact domain is analyzed and determined, including: If the state change event is a design change, then the parent-child hierarchy is traversed, and the target component, all its child components and all its parent components are jointly defined as the first change influence domain, so as to ensure that any design modification of any component can trigger the cost recalculation of all its components and the assembly to which it belongs. If the state change event is a construction progress change, then the adjacency relationship structure is traversed, and the target component and all its adjacent components that meet the preset spatial conditions are defined as the second change influence domain, in order to reflect the correlation between adjacent components in terms of progress and resource consumption during construction activities.
[0011] Preferably, in the above-mentioned BIM-based project cost accounting method, in S5, dynamically updating the cost data of the corresponding cost nodes of all components within the change impact domain in the dynamic cost mirror model specifically includes: For the first change impact domain, first update the cost data of the cost nodes corresponding to the directly affected target components and their child components, and update the cost data of each level of parent nodes from bottom to top according to the tree cost structure, so as to ensure the recursive consistency of cost data from details to the whole. For the second change impact domain, the cost data related to the construction progress in the corresponding cost nodes of the target component and all its adjacent components are updated synchronously to achieve batch processing of the cost impact between construction interfaces.
[0012] Preferably, in the above-mentioned BIM-based project cost accounting method, in S3, the cost elements are allocated to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship, specifically including: Direct costs such as material costs and labor costs are directly allocated to the lowest cost nodes that correspond directly to the components, so as to accurately calculate the direct costs of a single component; Indirect costs such as management fees and amortization expenses are allocated to the parent nodes at all levels affected by them according to the preset allocation rules, so as to reasonably collect indirect costs into the corresponding cost centers or summary items.
[0013] Preferably, in the above-mentioned BIM-based project cost accounting method, after dynamically updating the cost data of the corresponding cost nodes of all components within the change impact domain in the dynamic cost mirror model in step S5, the method further includes: Record the version information of the current update to the dynamic cost mirror model, and store the cost data version before the update, the cost data version after the update, and the status change event information that triggered the update together to generate a complete audit trail of cost data changes.
[0014] Preferably, in the above-mentioned BIM-based project cost accounting method, after recording the version information of the current update of the dynamic cost mirror model, it further includes: Based on the stored version information, the state of the dynamic cost mirror model at a specified historical point in time is reconstructed, and the data change history of the specified cost node is displayed, which enables the traceability of the causes of cost deviations in the later stage.
[0015] Preferably, in the above-mentioned BIM-based project cost accounting method, the step of feeding back the cost accounting results to the BIM model for visualization and integrated display specifically includes: The component cost deviation value is mapped to a color code, and the color code is rendered onto the surface of the corresponding component in the BIM model, thereby intuitively presenting the spatial distribution and anomalies of cost in a three-dimensional visualization environment; In response to a user's interactive operation on a component in the BIM model, the current cost data and its composition details of the corresponding cost node of the component are displayed in detail in the linked display window on the graphical interface side, thereby achieving a seamless connection from macro-visualization to micro-data query.
[0016] A BIM-based project cost accounting system includes a model parsing module, a mirror construction module, a cost association module, an influence domain analysis module, a dynamic update module, and a visualization module.
[0017] Preferably, in the above-mentioned BIM-based project cost accounting system, the model parsing module is used to parse the project BIM model and extract the attribute information of multiple components in the BIM model, as well as the logical relationship information between the multiple components. The mirror building module is connected to the model parsing module and is used to build a dynamic cost mirror model based on the logical relationship information; The cost association module is connected to the mirror construction module and is used to obtain cost elements and allocate them to the corresponding cost nodes in the dynamic cost mirror model; The impact domain analysis module is used to analyze and determine the impact domain of a status change event when it is detected. The dynamic update module is connected to the influence domain analysis module and the cost association module, and is used to dynamically update the cost data of the corresponding cost nodes of the components within the change influence domain according to the update rules. The visualization module is connected to the dynamic update module and is used to generate cost accounting results and feed them back to the BIM model for display.
[0018] This system translates innovative methodologies into concrete tools through the collaborative connection and division of labor among its various specialized modules. The model parsing module ensures accurate information extraction from BIM; the mirroring module establishes core mapping relationships; the cost association module completes data initialization; the influence domain analysis module makes intelligent decisions; the dynamic update module drives real-time data evolution; and the visualization module delivers the results. This system forms a complete closed loop, enabling automated, intelligent, and real-time dynamic accounting of project costs throughout the entire process, effectively improving management efficiency and decision-making accuracy.
[0019] As can be seen from the above technical solution, compared with the prior art, this invention achieves a fundamental transformation of project cost accounting from static and lagging to dynamic and real-time by creating a dynamic cost mirror model that strictly maps to the BIM model entities and deeply utilizing the inherent component logic relationships of the model. This method can automatically monitor state change events in the BIM model, intelligently analyze and accurately define the change impact domain, and then drive the linkage update of all related cost data according to preset rules, ensuring a high degree of synchronization and recursive consistency between cost data and the state of the engineering entity.
[0020] Meanwhile, by integrating the accounting results into the BIM visualization environment in real time through color coding and linked queries, abstract cost data is visualized, providing an intuitive understanding of cost spatial distribution and deviation status, achieving a seamless connection from macro-level insight to micro-level causal analysis. Furthermore, the system's complete version management and historical traceability capabilities construct a transparent cost data evolution chain, greatly enhancing the auditability of cost management. Ultimately, this solution effectively solves the problem of the disconnect between BIM information and cost data, constructs an automated cost management process, and significantly improves the precision, responsiveness, and decision support capabilities of cost control. Attached Figure Description
[0021] To more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.
[0022] Figure 1 The attached figure is a flowchart of a BIM-based project cost accounting method according to the present invention. Detailed Implementation
[0023] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0024] This invention discloses a BIM-based project cost accounting method, the method comprising: S1. By parsing the project BIM model, the attribute information of multiple components and the logical relationship information between multiple components are extracted to provide a foundation for building a cost data organization framework. The logical relationship information includes the parent-child hierarchical structure representing the composition relationship and the adjacency relationship structure representing the spatial connection relationship. S2. Based on the extracted logical relationship information, construct a dynamic cost mirror model that forms a one-to-one mapping relationship with the components in the BIM model, and transform the physical logic of the BIM entity into the hierarchical logic of cost data. The dynamic cost mirror model contains multiple cost nodes organized according to the parent-child hierarchical structure. S3. Obtain the cost elements of multiple components and allocate the cost elements to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship. Obtain the cost data of each cost node and generate the initial cost data layer. S4. When a status change event is detected in the target component in the BIM model, the change impact domain affected by the event is analyzed and determined based on the type of the status change event and the pre-extracted logical relationship information. The scope of cost data that needs to be updated is defined. The change impact domain includes the target component and its related components. S5. Based on the preset update rules corresponding to the event type, dynamically update the cost data of all components in the affected domain and the corresponding cost nodes in the dynamic cost mirror model, so as to synchronize the cost data with the BIM model status in real time. S6. Based on the updated dynamic cost mirror model, generate cost accounting results and feed them back to the BIM model for visualization and integrated display.
[0025] This invention creates a dynamic cost mirror model that is strictly mapped to BIM model entities. By extracting and utilizing the inherent logical relationships within BIM, the system can intelligently define the impact domain of changes, ensuring that any design or schedule change automatically and accurately triggers the synchronized updates of all relevant cost data. This achieves a fundamental shift in cost accounting from static and lagging to dynamic and real-time. Finally, through visual integration and display, abstract cost data is concretely projected back into the BIM model, providing intuitive and efficient decision support for project management and significantly improving the precision and automation of cost management.
[0026] To further optimize the above technical solution, a dynamic cost mirror model is constructed in S2, including: Using the parent-child hierarchical structure of the BIM model as the main framework, a tree-shaped cost structure of the dynamic cost mirror model is generated, ensuring that the aggregation and summarization path of cost data is consistent with the assembly logic of physical components. The adjacency structure is used as an additional constraint to link corresponding cost nodes in the tree-shaped cost structure, enabling rapid location of associated cost nodes when handling state changes based on spatial relationships. By constructing a tree structure with parent-child hierarchies as the main trunk, the organization of cost data fully follows the physical composition logic of the project. This ensures that when summarizing costs, data can be naturally and accurately aggregated layer by layer from bottom to top, avoiding errors caused by manual partitioning. Simultaneously, by using spatial adjacency relationships as additional constraints, a precise navigation map is provided for the system to handle cost impacts involving spatial relationships, such as construction progress and regional collaboration. This ensures the comprehensiveness and accuracy of cost updates for such changes, enhancing the system's ability to handle complex project scenarios.
[0027] To further optimize the above technical solution, in step S4, the affected change impact domain is analyzed and determined, including: If the state change event is a design change, the parent-child hierarchy is traversed, and the target component, all its child components and all its parent components are defined as the first change influence domain, so as to ensure that any design modification of any component can trigger the cost recalculation of all its components and the assembly to which it belongs. If the state change event is a construction schedule change, the adjacency structure is traversed, and the target component and all its adjacent components that meet the preset spatial conditions are designated as the second change influence domain. This domain reflects the correlation between adjacent components in terms of schedule and resource consumption during construction activities. For design changes, traversing the parent-child hierarchy ensures the vertical penetration of the impact; that is, modifying a screw will lead to a recalculation of the cost of its associated equipment and even the entire system, eliminating omissions. For schedule changes, traversing the spatial adjacency relationship includes potentially affected adjacent work surface components in the update scope, accurately reflecting the chain reactions in construction, making schedule cost accounting more realistic, and providing a reliable basis for dynamic cost control.
[0028] To further optimize the above technical solution, in S5, the cost data of the corresponding cost nodes of all components within the change impact domain in the dynamic cost mirror model is dynamically updated, specifically including: For the first change impact domain, first update the cost data of the cost nodes corresponding to the directly affected target components and their child components, and then update the cost data of each level of parent nodes from bottom to top according to the tree cost structure to ensure the recursive consistency of cost data from details to the whole. For the second change impact domain, the cost data related to the construction progress in the corresponding cost nodes of the target component and all its adjacent components are updated simultaneously to achieve batch processing of the cost impact between construction interfaces.
[0029] For design changes, a bottom-up recursive update strategy is adopted, starting with updating the lowest-level costs from the source of the change, and then re-aggregating them level by level upwards. This process naturally ensures the consistency between the aggregated data at each level and the underlying detailed data, eliminating the risk of data asynchrony. For schedule changes, a synchronous batch update strategy is adopted, updating the schedule costs of all components within the same construction interface at once. This greatly improves processing efficiency and ensures the timeliness and consistency of cost data in the same area, avoiding temporary data inconsistencies caused by step-by-step updates.
[0030] To further optimize the above technical solution, in S3, cost elements are allocated to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship, specifically including: Direct costs such as material costs and labor costs are directly allocated to the lowest cost nodes that correspond directly to the components, so as to accurately calculate the direct costs of a single component; Indirect costs such as management fees and amortization expenses are allocated to the parent nodes at all levels affected by them according to the preset allocation rules, so as to reasonably collect indirect costs into the corresponding cost centers or summary items.
[0031] By accurately allocating direct costs to the lowest-level components, cost accounting granularity reaches the individual component level, laying a solid foundation for precise cost control and accounting. By allocating indirect costs to parent nodes (such as sub-projects or individual projects) according to rules, it conforms to the accounting standards and management practices of engineering project cost accounting, making the composition of the comprehensive unit price clear and transparent. This ensures both the accuracy of accounting and meets the needs of cost analysis at different levels.
[0032] To further optimize the above technical solution, in S5, after dynamically updating the cost data of the corresponding cost nodes of all components within the change impact domain in the dynamic cost mirror model, the following is also included: Record the version information of this update to the dynamic cost mirror model, and store the cost data version before the update, the cost data version after the update, and the status change event information that triggered the update together to generate a complete audit trail of cost data changes.
[0033] By recording the complete context of each update (previous and subsequent version data + change events), the system constructs an immutable and traceable audit trail. This greatly enhances the reliability and transparency of cost data, making it possible to trace the cause of any change in cost data (who, when, and what model change caused it), meeting the high standards required for engineering audits, accountability, and process review—something that traditional cost management methods struggle to achieve.
[0034] To further optimize the above technical solution, after recording the version information of this update to the dynamic cost mirror model, the following is also included: Based on stored version information, the dynamic cost mirror model is reconstructed to reflect the state at a specified historical point in time, and the data change history of the specified cost node is displayed, enabling later tracing of the causes of cost deviations. Building upon version management, it provides powerful historical tracing and data analysis capabilities. It accurately reconstructs the cost state at any historical point in time and intuitively displays the change curve of a specific cost item over time.
[0035] To further optimize the above technical solution, the cost accounting results will be fed back to the BIM model for visualization and integration, specifically including: The component cost deviation value is mapped to a color code, and the color code is rendered onto the surface of the corresponding component in the BIM model, so as to intuitively present the spatial distribution of cost and anomalies in a three-dimensional visualization environment. In response to user interactions with a component in the BIM model, a linked display window on the graphical interface shows detailed current cost data and its breakdown for the corresponding cost node, achieving a seamless transition from macro-level visualization to micro-level data querying. Color-coded rendering transforms abstract numbers into intuitive visual signals, allowing project stakeholders to quickly locate cost overruns or savings in the 3D model without needing to read complex reports, significantly improving the efficiency and intuitiveness of information transmission. Linked detailed queries enable "click-and-get" data drill-down, allowing users to seamlessly switch from a macro-level perspective to the micro-cost composition of any component, meeting the viewing needs of managers at different levels and truly realizing the core value of the BIM model as an information integration and visualization carrier. A BIM-based project cost accounting system includes a model parsing module, a mirror construction module, a cost association module, an influence domain analysis module, a dynamic update module, and a visualization module.
[0036] To further optimize the above technical solution, the model parsing module is used to parse the project BIM model and extract the attribute information of multiple components in the BIM model, as well as the logical relationship information between multiple components. The image building module is connected to the model parsing module and is used to build a dynamic cost image model based on logical relationship information; The cost association module is connected to the mirror construction module to obtain cost elements and assign them to the corresponding cost nodes in the dynamic cost mirror model; The impact domain analysis module is used to analyze and determine the impact domain of a status change event when it is detected. The dynamic update module is connected to the impact domain analysis module and the cost association module, and is used to dynamically update the cost data of the corresponding cost nodes of the components within the impact domain according to the update rules. The visualization module is connected to the dynamic update module to generate cost accounting results and feed them back to the BIM model for display.
[0037] This system translates innovative methodologies into concrete tools through the collaborative connection and division of labor among its various specialized modules. The model parsing module ensures accurate information extraction from BIM; the mirroring module establishes core mapping relationships; the cost association module completes data initialization; the influence domain analysis module makes intelligent decisions; the dynamic update module drives real-time data evolution; and the visualization module delivers the results. This system forms a complete closed loop, enabling automated, intelligent, and real-time dynamic accounting of project costs throughout the entire process, effectively improving management efficiency and decision-making accuracy.
[0038] Technical principle: The core principle of this technical solution lies in constructing a "dynamic cost mirror model" that is strictly mapped to BIM model entities and can interact with them in real time. This principle first involves deep analysis of the BIM model to extract the physical attributes and inherent logical relationships (such as parent-child hierarchy and spatial adjacency) of its components, using this as the foundation for building the cost data organization framework. Then, by establishing a one-to-one mapping relationship between BIM components and cost nodes, the logical structure of the physical entities is transformed into a hierarchical structure of cost data, forming the dynamic cost mirror model.
[0039] Based on this architecture, the system continuously monitors BIM model status change events and intelligently analyzes and accurately delineates the impact domain of the changes according to their types and pre-established logical relationships, thereby defining the scope of cost data that needs to be updated. Then, according to preset rules corresponding to the event type, the system dynamically updates the data of all associated cost nodes within the impact domain, achieving automatic synchronization and recursive consistency between cost information and the status of the engineering entity.
[0040] Ultimately, by feeding back the updated cost data in real time and integrating it into the BIM visualization environment, abstract cost values are mapped into intuitive graphical information, realizing two-way linkage and immersive visualization between cost data and 3D models, thus completing the process from information perception and intelligent processing to intuitive feedback.
[0041] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. For the apparatus disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple; relevant parts can be referred to the method section.
[0042] The above description of the disclosed embodiments enables those skilled in the art to make or use the invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the invention. Therefore, the invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A BIM-based project cost accounting method, characterized in that, The method includes: S1. By parsing the project BIM model, the attribute information of multiple components and the logical relationship information between the multiple components are extracted to provide a basis for building a cost data organization framework. The logical relationship information includes the parent-child hierarchical structure representing the composition relationship and the adjacency relationship structure representing the spatial connection relationship. S2. Based on the extracted logical relationship information, construct a dynamic cost mirror model that forms a one-to-one mapping relationship with the components in the BIM model, and transform the physical logic of the BIM entity into the hierarchical logic of cost data. The dynamic cost mirror model contains multiple cost nodes organized according to the parent-child hierarchical structure. S3. Obtain the cost elements of the multiple components, and allocate the cost elements to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship, obtain the cost data of each cost node, and generate the initial cost data layer. S4. When a status change event is detected in the target component in the BIM model, the change impact domain affected by the event is analyzed and determined according to the type of the status change event and the pre-extracted logical relationship information, and the scope of cost data that needs to be updated is defined. The change impact domain includes the target component and its associated components. S5. According to the preset update rules corresponding to the event type, dynamically update the cost data of all components in the change influence domain corresponding to the cost nodes in the dynamic cost mirror model, so as to synchronize the cost data with the BIM model status in real time. S6. Based on the updated dynamic cost mirror model, generate cost accounting results and feed the cost accounting results back to the BIM model for visualization and integrated display.
2. The BIM-based project cost accounting method according to claim 1, characterized in that, In S2, a dynamic cost mirror model is constructed, including: Using the parent-child hierarchical structure of the BIM model as the main framework, a tree-shaped cost structure of the dynamic cost mirror model is generated, ensuring that the aggregation and summarization path of cost data is consistent with the assembly logic of physical components. The adjacency relationship structure is then used as an additional constraint relationship to the corresponding cost node in the tree-form cost structure, enabling rapid location of the associated cost node when processing state changes based on spatial relationships.
3. The BIM-based project cost accounting method according to claim 2, characterized in that, In step S4, the affected change impact domain is analyzed and determined, including: If the state change event is a design change, then the parent-child hierarchy is traversed, and the target component, all its child components and all its parent components are jointly defined as the first change influence domain, so as to ensure that any design modification of any component can trigger the cost recalculation of all its components and the assembly to which it belongs. If the state change event is a construction progress change, then the adjacency relationship structure is traversed, and the target component and all its adjacent components that meet the preset spatial conditions are defined as the second change influence domain, in order to reflect the correlation between adjacent components in terms of progress and resource consumption during construction activities.
4. The BIM-based project cost accounting method according to claim 3, characterized in that, In S5, the cost data of all components within the change's impact domain and their corresponding cost nodes in the dynamic cost mirror model are dynamically updated, specifically including: For the first change impact domain, first update the cost data of the cost nodes corresponding to the directly affected target components and their child components, and update the cost data of each level of parent nodes from bottom to top according to the tree cost structure, so as to ensure the recursive consistency of cost data from details to the whole. For the second change impact domain, the cost data related to the construction progress in the corresponding cost nodes of the target component and all its adjacent components are updated synchronously to achieve batch processing of the cost impact between construction interfaces.
5. The BIM-based project cost accounting method according to claim 1, characterized in that, In S3, the cost elements are allocated to the corresponding cost nodes in the dynamic cost mirror model according to the mapping relationship, specifically including: Direct costs such as material costs and labor costs are directly allocated to the lowest cost nodes that correspond directly to the components, so as to accurately calculate the direct costs of a single component; Indirect costs such as management fees and amortization expenses are allocated to the parent nodes at all levels affected by them according to the preset allocation rules, so as to reasonably collect indirect costs into the corresponding cost centers or summary items.
6. The BIM-based project cost accounting method according to claim 1, characterized in that, In S5, after dynamically updating the cost data of the corresponding cost nodes of all components within the change impact domain in the dynamic cost mirror model, the following steps are also included: Record the version information of the current update to the dynamic cost mirror model, and store the cost data version before the update, the cost data version after the update, and the status change event information that triggered the update together to generate a complete audit trail of cost data changes.
7. The BIM-based project cost accounting method according to claim 6, characterized in that, After recording the version information for this update of the dynamic cost mirror model, it also includes: Based on the stored version information, the state of the dynamic cost mirror model at a specified historical point in time is reconstructed, and the data change history of the specified cost node is displayed, which enables the traceability of the causes of cost deviations in the later stage.
8. The BIM-based project cost accounting method according to claim 1, characterized in that, The step of feeding back the cost accounting results to the BIM model for visualization and integrated display specifically includes: The component cost deviation value is mapped to a color code, and the color code is rendered onto the surface of the corresponding component in the BIM model, thereby intuitively presenting the spatial distribution and anomalies of cost in a three-dimensional visualization environment; In response to a user's interactive operation on a component in the BIM model, the current cost data and its composition details of the corresponding cost node of the component are displayed in detail in the linked display window on the graphical interface side, thereby achieving a seamless connection from macro-visualization to micro-data query.
9. A system for a BIM-based project cost accounting method according to any one of claims 1 to 8, characterized in that, It includes a model parsing module, a mirror building module, a cost correlation module, an impact domain analysis module, a dynamic update module, and a visualization module.
10. A BIM-based project cost accounting system according to claim 9, characterized in that: The model parsing module is used to parse the project BIM model and extract the attribute information of multiple components in the BIM model, as well as the logical relationship information between the multiple components. The mirror building module is connected to the model parsing module and is used to build a dynamic cost mirror model based on the logical relationship information; The cost association module is connected to the mirror construction module and is used to obtain cost elements and allocate them to the corresponding cost nodes in the dynamic cost mirror model; The impact domain analysis module is used to analyze and determine the impact domain of a status change event when it is detected. The dynamic update module is connected to the influence domain analysis module and the cost association module, and is used to dynamically update the cost data of the corresponding cost nodes of the components within the change influence domain according to the update rules. The visualization module is connected to the dynamic update module and is used to generate cost accounting results and feed them back to the BIM model for display.