Microgrid load sharing method and smart grid based on intelligent converged terminal

By dynamically adjusting the load distribution of the microgrid through intelligent fusion terminals, and optimizing the load distribution sequence based on the response speed of interruptible loads and historical interruption data, the problem of unstable load distribution in existing technologies is solved, thereby improving the power supply reliability and stability of the microgrid.

CN123121640APending Publication Date: 2026-11-17SHIJIAZHUANG KE ELECTRIC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611504251.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, microgrid load allocation does not fully consider the differences in power regulation response speed among interruptible loads, resulting in slow-responding loads being preferentially selected while fast-responding loads are not fully utilized, or the same load being repeatedly interrupted and restored, causing voltage and frequency fluctuations in the microgrid and affecting power supply reliability.

Method used

By acquiring historical and current data of the microgrid through intelligent fusion terminals, the adjustable power range and power regulation response speed of each interruptible load are extracted. Target interruptible loads are selected in descending order of current power regulation response speed. Combined with energy storage status and load interruption history, load priority is dynamically adjusted and minimum action interval time is set to achieve load distribution control.

Benefits of technology

It improves the stability of microgrid load distribution, avoids frequent load switching, reduces voltage and frequency fluctuations, and ensures power supply reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123121640A_ABST
    Figure CN123121640A_ABST
Patent Text Reader

Abstract

This application provides a microgrid load allocation method and smart grid based on a smart fusion terminal, belonging to the field of microgrid control technology. The method includes: acquiring historical and current power generation output on the generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side; extracting the adjustable power range and current power regulation response speed of each interruptible load from the current electricity consumption data, and acquiring the initial load interruption tolerance weight of each interruptible load; and executing load allocation control on a rolling basis at a preset period until the expected supply-demand gap of the microgrid is less than or equal to zero. The microgrid load allocation method and smart grid based on a smart fusion terminal provided in this application can improve the stability of microgrid load allocation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application belongs to the field of microgrid control technology, and more specifically, relates to a microgrid load distribution method based on intelligent fusion terminals and a smart grid. Background Technology

[0002] With the gradual application of smart converged terminals in microgrids, the load distribution control of microgrids faces higher requirements for real-time performance and reliability. Microgrids typically consist of a generation side, an energy storage side, and a load side. The smart converged terminal is responsible for collecting operational data and executing load distribution control. In existing technologies, load distribution is mostly based on the static importance level or adjustable capacity of the loads, without fully considering the differences in power regulation response speed among interruptible loads, nor the historical interruption scenarios. When a supply-demand gap exists between generation output and load demand, slower-responding loads are easily prioritized while fast-responding loads are not fully utilized, or the same load is repeatedly interrupted and restored, leading to frequent load switching, causing voltage and frequency fluctuations in the microgrid, and affecting power supply reliability. Therefore, how to improve the stability of microgrid load distribution has become an urgent technical problem to be solved in this field. Summary of the Invention

[0003] The purpose of this application is to provide a microgrid load distribution method and smart grid based on a smart fusion terminal that can improve the stability of microgrid load distribution. To achieve the above objective, the technical solution provided by this application is as follows: Firstly, a microgrid load allocation method based on intelligent converged terminals is provided, including: Acquire historical and current power generation output on the generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side in the microgrid; Extract the adjustable power range and current power regulation response speed of each interruptible load from the current power consumption data, and obtain the initial load interruption tolerance weight of each interruptible load. Load allocation control is executed on a rolling basis at a preset cycle until the expected supply and demand gap of the microgrid is less than or equal to zero. The steps of load distribution control are as follows: Based on historical power generation output, historical load demand, and current power generation output, predict the power generation output trend and load demand trend within a preset time period in the future, and calculate the expected supply and demand gap within the preset time period in combination with the current energy storage status. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible loads. If a supply-demand gap still exists after issuing a continuous power reduction operation command, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight, and short-time interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficient. A minimum action interval is set between two consecutive short-time interruption commands.

[0004] Secondly, a microgrid load distribution device based on a smart converged terminal is provided, including: The data acquisition module is used to acquire historical and current power generation output on the power generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side in the microgrid. The parameter extraction module is used to extract the adjustable power range and current power adjustment response speed of each interruptible load from the current power consumption data, and to obtain the initial load interruption tolerance weight of each interruptible load. The load distribution control module is used to perform load distribution control on a rolling basis at a preset cycle until the expected supply and demand gap of the microgrid is less than or equal to zero. Specifically, the load distribution control module is used for: Based on historical power generation output, historical load demand, and current power generation output, predict the power generation output trend and load demand trend within a preset time period in the future, and calculate the expected supply and demand gap within the preset time period in combination with the current energy storage status. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible loads. If a supply-demand gap still exists after issuing a continuous power reduction operation command, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight, and short-time interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficient. A minimum action interval is set between two consecutive short-time interruption commands.

[0005] Thirdly, embodiments of this application also provide an intelligent fusion terminal, which includes a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement the microgrid load distribution method based on the intelligent fusion terminal provided in any possible implementation of the first aspect.

[0006] Fourthly, embodiments of this application also provide a smart grid, which includes a smart distribution network and a smart converged terminal. The smart distribution network includes a microgrid, which includes a generation side, an energy storage side, and a load side. The smart converged terminal is communicatively connected to the generation side, energy storage side, and load side of the microgrid.

[0007] The beneficial effects of the technical solution provided in this application are as follows: The microgrid load allocation method and smart grid based on intelligent fusion terminals provided in this application, compared with related technologies, are as follows: This application selects target interruptible loads from all interruptible loads in descending order of their current power regulation response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap. This prioritizes interruptible loads with fast current power regulation response speeds for continuous power reduction operation, preventing slow-responding interruptible loads from being selected while fast-responding loads are underutilized. This ensures more efficient use of the adjustable power ranges of each interruptible load to cover the expected supply-demand gap. The initial load interruption tolerance weights are updated based on the actual number of interruptions and cumulative interruption duration of each interruptible load in the previous preset cycle. Dynamic priority coefficients for each interruptible load are calculated based on these updated load interruption tolerance weights, causing the order of short-term interruption commands to dynamically change according to the actual interruption history of each interruptible load, preventing the same interruptible load from being repeatedly interrupted and restored. A minimum action interval is set between two consecutive short-term interruption commands to prevent frequent load switching and reduce microgrid voltage and frequency fluctuations. Load allocation control is executed on a rolling basis at a preset cycle until the expected supply-demand gap is less than or equal to zero. The load allocation is continuously tracked and adjusted on a rolling basis to solve the problems of slow-responding loads being selected first, fast-responding loads not being fully utilized, and the power supply reliability being reduced due to repeated interruptions and recovery of the same load, thereby improving the stability of microgrid load allocation. Attached Figure Description

[0008] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments of this application will be briefly introduced below.

[0009] Figure 1 A flowchart illustrating the microgrid load allocation method based on a smart fusion terminal provided in this application embodiment; Figure 2 A structural block diagram of a microgrid load distribution device based on a smart fusion terminal provided in this application embodiment; Figure 3 This is a schematic block diagram of the intelligent fusion terminal provided in the embodiments of this application. Detailed Implementation

[0010] The embodiments of this application are described below with reference to the accompanying drawings. It should be understood that the embodiments described below with reference to the accompanying drawings are exemplary descriptions for explaining the technical solutions of the embodiments of this application, and do not constitute a limitation on the technical solutions of the embodiments of this application.

[0011] Those skilled in the art will understand that, unless specifically stated otherwise, the singular forms “a,” “an,” “the,” and “the” used herein may also include the plural forms. It should be further understood that the terms “comprising” and “including” as used in embodiments of this application mean that the corresponding feature can be implemented as the presented feature, information, data, step, operation, element, and / or component, but do not exclude implementation as other features, information, data, step, operation, element, component, and / or combinations thereof supported by the art. It should be understood that when we say that an element is “connected” or “coupled” to another element, the one element can be directly connected or coupled to the other element, or it can mean that the one element and the other element establish a connection relationship through an intermediate element. Furthermore, “connected” or “coupled” as used herein can include wireless connection or wireless coupling. The term “and / or” as used herein indicates at least one of the items defined by the term; for example, “A and / or B” can be implemented as “A,” or as “B,” or as “A and B.” When describing multiple (two or more) items, if the relationship between the multiple items is not explicitly defined, the multiple items can refer to one, several or all of the multiple items. For example, the description of "parameter A includes A1, A2, A3" can be implemented as parameter A includes A1 or A2 or A3, or it can be implemented as parameter A includes at least two of the three items A1, A2 and A3.

[0012] It is understood that in the embodiments of this application, data such as user information are involved. When the embodiments of this application are applied to specific products or technologies, user permission or consent is required, and the collection, use and processing of related data must comply with relevant laws, regulations and standards.

[0013] To make the objectives, technical solutions, and advantages of this application clearer, the following description will be provided in conjunction with the accompanying drawings and specific embodiments.

[0014] This application provides a microgrid load allocation method based on a smart fusion terminal, which can be executed by the smart fusion terminal, such as... Figure 1 As shown, the method may include: S101: Obtain historical and current power generation output on the generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side in the microgrid.

[0015] In this embodiment, the microgrid is a power system comprising a generation side, an energy storage side, and a load side. The generation side is a collection of devices that generate electrical energy, the energy storage side is a collection of devices that store and release electrical energy, and the load side is a collection of devices that consume electrical energy. Historical power generation output refers to the active power output of the generation side in past periods, obtained by reading the active power sequence of the past 30 minutes from the historical database of the generation-side inverter via a communication bus. Current power generation output refers to the active power output of the generation side at the current moment, obtained by reading the active power of the current moment from the generation-side inverter via a communication bus. Current energy storage status refers to the current remaining capacity and charging / discharging capacity of the energy storage side, obtained by reading the current remaining capacity, minimum allowable capacity, and maximum allowable capacity from the energy storage side battery management system, and the maximum discharge power and maximum charging power from the energy storage side energy storage converter. Historical load demand refers to the active power consumed by the load side in past periods, obtained by reading the active power sequence of the past 7 days from the historical database of the load-side smart meters. The current power consumption data consists of the voltage, current and power data of the load side at the current moment. The voltage waveform and current waveform of the main incoming line of the load side are collected at a first sampling rate, such as 1 kHz, and the total power timing signal is generated and stored. If there are missing data, linear interpolation is used to complete it.

[0016] Given the volatility and temporal nature of power generation and load demand, it is difficult to predict trends using only current data, and historical data alone cannot reflect real-time conditions. Obtaining both historical and current power generation output can account for both patterns and real-time deviations; obtaining current energy storage status can assess power and energy support capabilities; obtaining historical load demand can predict load trends; and obtaining current electricity consumption data can provide a basis for extracting the adjustable power range of each interruptible load and the current power regulation response speed. The above data serves as input data for microgrid load distribution control.

[0017] S102: Extract the adjustable power range and current power regulation response speed of each interruptible load from the current power consumption data, and obtain the initial load interruption tolerance weight of each interruptible load.

[0018] In this embodiment, extracting the adjustable power range and current power regulation response speed of each interruptible load from the current power consumption data includes: The voltage and current waveforms of the main incoming line on the load side are acquired at the first sampling rate to generate the total power timing signal. Transient event detection is performed on the total power time-series signal to identify multiple start-stop events with power step changes. Based on the occurrence time and power change amplitude of each start-stop event, the total power time-series signal is decomposed into independent power curves for each interruptible load. For each interruptible load, a steady-state segment is identified for the independent power curve of that interruptible load, and the average power within the latest identified steady-state segment is taken as the current operating power of that interruptible load. Obtain the rated power of the interruptible load, and use the difference between the rated power and the current operating power as the adjustable power range of the interruptible load; Fit the rising or falling edge of the power curve of the interruptible load, and extract the time taken from the start of the power step to the power reaching the first preset proportion of the steady state value as the current power regulation response speed of the interruptible load.

[0019] In this embodiment, interruptible loads are electrical devices capable of accepting short-term interruption commands. Since the load side typically only has voltage and current acquisition devices installed at the main incoming line, and each interruptible load may not have its own independent measuring device, installing a separate sensor for each interruptible load would be costly and difficult to modify. Therefore, the voltage and current waveforms of the main incoming line on the load side are acquired at a first sampling rate, such as 1 kHz, to generate a total power timing signal. The main incoming line is the common power supply line connecting the load side to the microgrid, and the total power timing signal is a sequence of total active power data arranged in chronological order.

[0020] Transient event detection is a method of identifying the moment when power changes abruptly from the total power time-series signal. A power step change is a phenomenon where active power rises or falls significantly within a short period. Start-up and shutdown events are power abrupt changes caused by the addition or removal of interruptible loads. Independent power curves are curves showing the change in active power of a single interruptible load over time, separated from the total power time-series signal. Considering that the start-up and shutdown of each interruptible load will cause a power step change in the total power time-series signal, transient event detection identifies start-up and shutdown events and decomposes them according to the occurrence time and the magnitude of the power change. This allows for the acquisition of independent power curves for each interruptible load without adding hardware. In practice, the active power difference between adjacent sampling points is calculated. When the absolute value of the difference exceeds a preset power threshold, such as 50 W, a power step change is determined. This moment is recorded as the occurrence time of the start-stop event, and the difference is used as the power change amplitude. Each start-stop event is sorted according to its occurrence time. For each start-stop event, if the power change amplitude is positive, it is determined that the interruptible load is put into operation. If the power change amplitude is negative, it is determined that the interruptible load is taken out of operation. The power segment between the start-up event and the take-out event of the same interruptible load is assigned to the independent power curve of the interruptible load.

[0021] Steady-state segment identification involves finding time periods where power remains stable from independent power curves. The latest steady-state segment is the one closest to the current moment, and the current operating power is the actual active power consumed by the interruptible load at the current moment. Considering that the power average within the latest steady-state segment best reflects the current actual operating state of the interruptible load, it is used as the current operating power, and the difference between the rated power and the current operating power is used as the adjustable power range. In specific implementation, the power standard deviation within a sliding window, such as 10 seconds, is calculated. When the standard deviation is less than a preset standard deviation threshold, such as 5 W, the time period corresponding to that window is determined to be a steady-state segment, and the rated power is read from the nameplate parameters or factory parameters of the interruptible load.

[0022] The power rising edge is the transition segment in an independent power curve where power changes from low to high, and the power falling edge is the transition segment in an independent power curve where power changes from high to low. Fitting is a process that uses a mathematical function to approximate the data points of the power rising edge or power falling edge. Considering that the duration of the power rising edge or power falling edge can characterize the speed at which an interruptible load responds to a power regulation command, the power rising edge or power falling edge is fitted, and the time taken from the start of a power step change to the power reaching a first preset proportion of the steady-state value, such as 90%, is extracted as the current power regulation response speed of the interruptible load. In specific implementation, the least squares method is used to perform linear fitting on the data points of the power rising edge or power falling edge.

[0023] This embodiment uses a first sampling rate to acquire the voltage and current waveforms of the main incoming line on the load side and generates a total power timing signal. It eliminates the need for separate measuring devices for each interruptible load, allowing for the acquisition of independent power curves for each interruptible load through transient event detection and decomposition. The average power within the latest steady-state range is used as the current operating power, and the difference between the rated power and the current operating power is used as the adjustable power range. This accurately reflects the interruptible load's ability to participate in continuous power reduction operation. By fitting the power rising or falling edge, the time elapsed from the power step to the power reaching a first preset proportion of the steady-state value is extracted as the current power adjustment response speed. This accurately characterizes how quickly the interruptible load responds to continuous power reduction operation commands, providing a basis for subsequently selecting target interruptible loads in descending order of current power adjustment response speed.

[0024] S103: Perform load distribution control on a rolling basis at a preset cycle until the expected supply and demand gap of the microgrid is less than or equal to zero; The steps of load distribution control are as follows: Based on historical power generation output, historical load demand, and current power generation output, predict the power generation output trend and load demand trend within a preset time period in the future, and calculate the expected supply and demand gap within the preset time period in combination with the current energy storage status. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible loads. If a supply-demand gap still exists after issuing a continuous power reduction operation command, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight, and short-time interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficient. A minimum action interval is set between two consecutive short-time interruption commands.

[0025] In this embodiment, the preset period is the time interval between two consecutive load allocation control executions, which can be configured according to the microgrid's operating characteristics and the response requirements of load allocation control, for example, 1 minute. Since power generation and load demand change continuously over time, a single execution of load allocation control can only reflect the supply and demand status at the time of execution and cannot adapt to new changes that occur after execution. Therefore, load allocation control needs to be executed repeatedly at a preset period, i.e., rolling execution. Rolling execution means that after each preset period, data is reacquired, the expected supply and demand gap is recalculated, and load allocation control is re-executed, rather than executing it only once.

[0026] When the calculated expected supply-demand gap is zero or negative, it indicates that power generation, energy storage discharge, and load allocation are sufficient to cover load demand, and there is no need to continue implementing power reduction or short-term interruption. At this point, the current rolling execution is stopped. If the expected supply-demand gap is found to be greater than zero again after recalculation in the next preset cycle, load allocation control is restarted.

[0027] In this embodiment, based on historical power generation output, historical load demand, and current power generation output, the trend of power generation output and load demand within a preset time period is predicted, including: Historical power generation output trends are extracted to obtain power generation output trend terms; Historical load demand trends are extracted to obtain load demand trend items; The first deviation is obtained by subtracting the current power generation output from the power generation output trend value at the same time. The second deviation is obtained by subtracting the current load demand from the load demand trend at the same time. Based on the current energy storage status, determine the remaining discharge time and remaining recharge time of the energy storage, and use the smaller value between the remaining discharge time and the remaining recharge time of the energy storage as the constraint duration; The preset duration is compared with the constraint duration. When the preset duration is longer than the constraint duration, the preset duration is corrected to the constraint duration to obtain the corrected prediction duration. Within the revised forecast period, the power generation trend is obtained based on the power generation trend term and the first deviation, and the load demand trend is obtained based on the load demand trend term and the second deviation.

[0028] In this embodiment, since historical power generation and load demand exhibit both long-term patterns and short-term fluctuations, direct prediction using the original sequences is susceptible to noise interference. Therefore, trend extraction is necessary to separate the long-term pattern component. The power generation trend term represents the component reflecting the long-term pattern in historical power generation, and the load demand trend term represents the component reflecting the long-term pattern in historical load demand. Specifically, the active power sequence of the past 30 minutes is read from the historical database of the inverter on the generation side. Using a moving average method with a window length of, for example, 5 minutes, the average active power within the window is calculated point by point to obtain the power generation trend term. Similarly, the active power sequence of the past 7 days is read from the historical database of the smart meters on the load side. Using the same moving average method with a window length of, for example, 30 minutes, the average active power within the window is calculated point by point to obtain the load demand trend term.

[0029] Trend terms alone cannot reflect the real-time deviation of the current moment from historical patterns; therefore, a real-time correction component needs to be introduced. The first deviation is the difference between the current power generation output and the power generation output trend term value at the same time. The second deviation is the difference between the current load demand and the load demand trend term value at the same time. In practice, the current power generation output is read from the inverter on the generator side via the communication bus, and the power generation output trend term value at the same time is read from the power generation output trend term sequence. The difference between the two values ​​yields the first deviation. Similarly, the current load demand is read from the smart meter on the load side, and the load demand trend term value at the same time is read from the load demand trend term sequence. The difference between the two values ​​yields the second deviation.

[0030] Considering the limited energy storage capacity, if the prediction duration exceeds the storage's sustainable time, the excess prediction results are meaningless. Therefore, it is necessary to determine the remaining discharge and rechargeable times of the energy storage based on the current energy storage status, and use the smaller of the two as the constraint duration. The remaining discharge time is the time required for the energy storage to discharge from the current remaining capacity to the minimum allowable capacity at maximum discharge power, and the remaining rechargeable time is the time required for the energy storage to charge from the current remaining capacity to the maximum allowable capacity at maximum charging power. In specific implementation, the current remaining capacity, minimum allowable capacity, and maximum allowable capacity are read from the energy storage-side battery management system, while the maximum discharge power and maximum charging power are read from the energy storage-side energy storage converter. The remaining discharge time is the difference between the current remaining capacity and the minimum allowable capacity divided by the maximum discharge power, and the remaining rechargeable time is the difference between the maximum allowable capacity and the current remaining capacity divided by the maximum charging power; the smaller of the two is taken as the constraint duration.

[0031] This embodiment extracts long-term regularity components through trend extraction, suppressing noise interference from short-term fluctuations in historical data. By introducing a first and second deviation through differential estimation, the prediction result reflects the real-time deviation of the current moment from historical patterns. The preset duration is corrected by the smaller of the remaining discharge and rechargeable time of the energy storage, ensuring the prediction duration does not exceed the energy storage's support capacity. By superimposing the trend term and the deviation, the power generation output trend and load demand trend are obtained, improving prediction accuracy and providing a more reliable basis for subsequent calculations of the expected supply-demand gap.

[0032] In this embodiment, the expected supply-demand gap within a preset time period is calculated based on the current energy storage status, including: Divide the future preset duration into multiple consecutive time sub-intervals; Based on the power generation output trend and load demand trend, the predicted power generation output and load demand for each time sub-interval are calculated respectively, and the difference between the predicted load demand and the predicted power generation output is taken as the net power demand for that time sub-interval. Based on the current energy storage status, obtain the maximum discharge power, maximum charging power, current remaining energy, minimum allowable energy, and maximum allowable energy of the energy storage; The system iterates through each time sub-interval in chronological order. For each time sub-interval, if the net power demand is greater than zero, the energy storage is controlled to discharge up to the maximum discharge power. The discharge power is the smaller of the net power demand and the maximum discharge power. The remaining power is updated based on the discharge power and the duration of the time sub-interval. If the updated remaining power is less than the minimum allowable power, the difference between the net power demand and the actual discharge power of the energy storage in the time sub-interval is included in the supply and demand deficit of the time sub-interval. If the net power demand is less than or equal to zero, the energy storage will be controlled to charge at the maximum charging power as the upper limit. The charging power is the smaller of the absolute value of the net power demand and the maximum charging power. The current remaining power is updated according to the charging power and the duration of the time sub-interval. If the updated current remaining power is greater than the maximum allowable power, it will no longer be included in the supply and demand deficit. The sum of the supply and demand deficits in each time sub-interval is taken as the expected supply and demand gap within the future preset time period.

[0033] In this embodiment, a time sub-interval is a continuous and equal-length time period obtained by dividing a future preset duration in chronological order. For example, 15 minutes is divided into 15 time sub-intervals of 1 minute each. Net power demand is the difference between the predicted load demand and the predicted power generation output. For example, if the predicted load demand in a certain time sub-interval is 80 kW and the predicted power generation output is 50 kW, then the net power demand is 30 kW. The predicted power generation output is the power generation output value within a certain time sub-interval calculated based on the power generation output trend. The predicted load demand is the load demand value within a certain time sub-interval calculated based on the load demand trend. The supply-demand deficit is the difference between the net power demand and the actual discharge power of the energy storage within a certain time sub-interval. For example, if the net power demand is 30 kW and the actual discharge power of the energy storage is 20 kW, then the supply-demand deficit is 10 kW. Discharge power is the actual active power output from the energy storage side. Charging power is the actual active power absorbed by the energy storage side.

[0034] Given the limited capacity of energy storage, judging the supply-demand gap solely based on the power difference at a single time point would ignore the impact of the cumulative change in energy storage capacity over the predicted duration. Therefore, it is necessary to simulate the charging and discharging behavior of energy storage on a time-by-time basis. Specifically, each time sub-interval is traversed sequentially, and within each sub-interval, it is determined whether energy storage should discharge or charge. When the net power demand in a given time sub-interval is greater than zero, it indicates that the power generation output is insufficient to cover the load demand, requiring energy storage to discharge to fill the gap. However, the discharge power cannot exceed the maximum discharge power of the energy storage; therefore, the actual discharge power is taken as the smaller value between the net power demand and the maximum discharge power. After discharge, the current remaining capacity is updated based on the discharge power and the duration of the time sub-interval. If the current remaining capacity after discharge is lower than the minimum allowable capacity, it indicates that energy storage can no longer support the load. In this case, the difference between the net power demand and the actual discharge power of the energy storage is the truly unbalanced power deficit in that time sub-interval, and it is included in the supply-demand gap for that time sub-interval. When net power demand is less than or equal to zero, it indicates a surplus in power generation, requiring energy storage charging to absorb it. However, the charging power cannot exceed the maximum charging power. Therefore, the actual charging power is the smaller of the absolute value of net power demand and the maximum charging power. After charging, the current remaining power is updated based on the charging power and the duration of that time sub-interval. If the current remaining power after charging is higher than the maximum allowable power, it means the energy storage is fully charged, and the excess power cannot be absorbed. This is considered wind and solar curtailment rather than a supply-demand deficit, and therefore is no longer included in the supply-demand deficit calculation. After traversing all time sub-intervals, the sum of the supply-demand deficits in each time sub-interval is taken as the expected supply-demand gap within the future preset duration.

[0035] In this embodiment, the energy storage charging and discharging are simulated time-by-time, and the supply-demand gap is accumulated. This ensures that the expected supply-demand gap reflects the power difference that the energy storage capacity cannot continue to support after reaching its upper and lower limits, avoiding the underestimation of the gap caused by using the power difference of a single time segment. During discharge, the maximum discharge power is used as the upper limit, constrained by the current remaining energy not being lower than the minimum allowable energy. During charging, the maximum charging power is used as the upper limit, constrained by the current remaining energy not being higher than the maximum allowable energy. This ensures that the gap calculation is consistent with the actual energy storage capacity, providing a more accurate triggering basis for subsequent load allocation control.

[0036] In this embodiment, target interruptible loads are selected from each interruptible load in descending order of current power regulation response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, including: The interruptible loads are sorted in descending order of their current power regulation response speed to obtain a candidate sequence; Interruptible loads are selected sequentially from the candidate sequence as target interruptible loads, and the adjustable power ranges of the selected target interruptible loads are accumulated to obtain the cumulative adjustable power. After selecting each target interruptible load, determine whether the cumulative adjustable power is greater than or equal to the expected supply-demand gap. If not, continue selecting the next interruptible load from the candidate sequence; If so, then stop selecting, and the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap.

[0037] In this embodiment, interruptible loads are sorted in descending order of their current power regulation response speed, and selection stops when the cumulative adjustable power covers the expected supply-demand gap. The core principle is to simultaneously consider both the filling speed and regulation accuracy. A faster current power regulation response speed means a shorter time required for the interruptible load to actually reach the target power after receiving a continuous power reduction command. Prioritizing interruptible loads with faster responses shortens the time needed to fill the expected supply-demand gap and reduces the risk of voltage and frequency fluctuations in the microgrid during the gap's duration. The candidate sequence is the sequence obtained by arranging the interruptible loads in this order. Specifically, the current power regulation response speed of each interruptible load is read from the storage unit of the intelligent fusion terminal and arranged in ascending order. For example, if the current power regulation response speeds of the interruptible loads are 5 s, 10 s, and 15 s, the candidate sequence is the interruptible load corresponding to 5 s, the interruptible load corresponding to 10 s, and the interruptible load corresponding to 15 s, respectively.

[0038] If all interruptible loads are selected at once, the sum of their adjustable power ranges may far exceed the expected supply-demand gap, leading to excessive power reduction and affecting users' normal electricity consumption. Therefore, it is necessary to select and accumulate the adjustable power ranges of the selected target interruptible loads sequentially from the candidate sequence. After each selection, it is determined whether the accumulated adjustable power is greater than or equal to the expected supply-demand gap. If not, selection continues; otherwise, selection stops. For example, if the expected supply-demand gap is 50 kW, and the first interruptible load has an adjustable power range of 20 kW, the accumulated adjustable power is 20 kW, which is less than 50 kW, so selection continues. The second interruptible load has an adjustable power range of 30 kW, and the accumulated adjustable power is 50 kW, so selection stops. The sum of the adjustable power ranges of the target interruptible loads exactly covers the expected supply-demand gap. The described embodiments are merely some embodiments of this application, and not all embodiments.

[0039] This embodiment selects target interruptible loads in descending order of their current power regulation response speed, prioritizing fast-responding interruptible loads for continuous power reduction operation, thus shortening the time needed to fill the expected supply-demand gap. By accumulating the adjustable power range and stopping selection when it covers the expected supply-demand gap, it avoids selecting too many interruptible loads, preventing excessive power reduction, reducing the impact on users' normal electricity consumption, and improving the stability of microgrid load distribution.

[0040] In this embodiment, issuing a continuous power reduction operation command to the target interruptible load includes: Calculate the remaining gap between the accumulated adjustable power before the selection stops and the expected supply-demand gap; If the adjustable power range of the last selected target interruptible load is greater than the remaining gap, a partial power reduction operation command is issued to the last selected target interruptible load. The power reduction value of the partial power reduction operation command is equal to the remaining gap. A full range power reduction operation command is issued to the remaining target interruptible loads. If the adjustable power range of the finally selected target interruptible load is equal to or less than the remaining gap, then a full-range power reduction operation command is issued to all target interruptible loads.

[0041] In this embodiment, the remaining gap between the accumulated adjustable power before selection stops and the expected supply-demand gap is calculated. The purpose is to accurately allocate the final selected target interruptible load. The remaining gap is the difference between the accumulated adjustable power before selection stops and the expected supply-demand gap, i.e., the amount of power reduction that the final selected target interruptible load actually needs to bear. For example, if the expected supply-demand gap is 50 kW and the accumulated adjustable power before selection stops is 20 kW, then the remaining gap is 30 kW. The final selected target interruptible load is the interruptible load in the candidate sequence that makes the accumulated adjustable power first greater than or equal to the expected supply-demand gap.

[0042] If a full-range power reduction command is issued to the last selected target interruptible load, the total power reduction for all target interruptible loads will exceed the expected supply-demand gap, resulting in excessive power reduction. Therefore, it is necessary to handle the issue separately based on the relationship between the adjustable power range of the last selected target interruptible load and the remaining gap. A partial power reduction command is a continuous power reduction command where the power reduction value equals the remaining gap. A full-range power reduction command is a continuous power reduction command where the power reduction value equals the adjustable power range of the interruptible load.

[0043] For example, the adjustable power range of the final selected target interruptible load is 40 kW, and the remaining gap is 30 kW. Since 40 kW is greater than 30 kW, a partial power reduction operation command of 30 kW is issued to the interruptible load, and a full range power reduction operation command is issued to the remaining target interruptible loads. The total power reduction of all target interruptible loads is exactly equal to 50 kW, which precisely matches the expected supply and demand gap.

[0044] In this embodiment, the total power reduction of all target interruptible loads exactly covers the expected supply-demand gap, avoiding excessive power reduction that could affect users' normal electricity consumption and improving the stability of microgrid load distribution.

[0045] In this embodiment, the initial load interruption tolerance weights for each interruptible load are updated based on the actual number of interruptions and the cumulative interruption duration within the previous preset period, including: For each interruptible load, count the actual number of interruptions and the cumulative interruption duration of that interruptible load in the previous preset period; Calculate the weight attenuation of the interruptible load based on the actual number of interruptions and the cumulative interruption duration; When the actual number of interruptions is greater than zero, the initial load interruption tolerance weight of the interruptible load is subtracted from the corresponding weight decay amount to obtain the updated load interruption tolerance weight of the interruptible load, and the updated load interruption tolerance weight is greater than or equal to the preset lower limit value. When the actual number of interruptions is zero, the initial load interruption tolerance weight of the interruptible load is increased according to the preset recovery rate to obtain the increased load interruption tolerance weight of the interruptible load, which is used as the updated load interruption tolerance weight of the interruptible load. The increased load interruption tolerance weight is less than or equal to the initial load interruption tolerance weight.

[0046] In this embodiment, if a supply-demand gap still exists after issuing a continuous power reduction operation command, it indicates that relying solely on the continuous power reduction operation of interruptible loads is insufficient to balance power generation output with load demand. In this case, it is necessary to issue short-term interruption commands to some interruptible loads.

[0047] Repeated interruptions of the same interruptible load will affect users' normal power experience, and frequent switching will cause voltage and frequency fluctuations in the microgrid. Therefore, a feedback mechanism is needed to dynamically change the tolerance weight based on the actual interruption history of each interruptible load. The actual interruption count is the number of times the interruptible load received a short-term interruption command in the previous preset cycle, and the cumulative interruption duration is the sum of the durations of each interruption of the interruptible load in the previous preset cycle. Both reflect the frequency and sustained impact of recent interruptions of the interruptible load. The weight decay is the reduction in load interruption tolerance weight calculated based on the actual interruption count and cumulative interruption duration. The more actual interruptions or the longer the cumulative interruption duration, the greater the weight decay, causing the weight of frequently and prolonged interrupted interruptible loads to decrease rapidly. The lower limit is the minimum allowable value of the updated load interruption tolerance weight, for example, 20% of the initial load interruption tolerance weight. Its purpose is to prevent the weight of a certain interruptible load from reaching zero due to continuous interruptions, and to prevent the system from indiscriminately prioritizing the disconnection of that interruptible load in subsequent cycles. The preset recovery rate is the percentage increase in the load interruption tolerance weight per cycle when the actual number of interruptions is zero. For example, it is 5% of the initial load interruption tolerance weight per cycle. Its purpose is to gradually restore the tolerance weight of interruptible loads that have not been interrupted for a long time, and to avoid long-term discrimination due to historical interruption records.

[0048] In this embodiment, the dynamic priority coefficient of each interruptible load is calculated based on each updated load interruption tolerance weight, including: For each interruptible load, obtain the load interruption tolerance weight of the interruptible load after the current cycle update, and the load interruption tolerance weight of the interruptible load after the previous cycle update. Calculate the difference between the load interruption tolerance weight updated in the current cycle and the load interruption tolerance weight updated in the previous cycle, and use it as the weight change amount; Divide the updated load interruption tolerance weight by the initial load interruption tolerance weight to obtain the first ratio, and subtract the first ratio from 1 to obtain the first factor; Divide the weight change by the initial load interruption tolerance weight to obtain the second ratio, and then negative the second ratio to obtain the second factor; Multiply the first factor by a preset first coefficient to obtain the first value, and multiply the second factor by a preset second coefficient to obtain the second value; Add the first value to the second value to obtain the dynamic priority coefficient of the interruptible load.

[0049] In this embodiment, the calculation of the dynamic priority coefficient needs to consider two dimensions simultaneously: the tolerance weight level of the interruptible load in the current cycle and the trend of the tolerance weight from the previous cycle to the current cycle. If only the tolerance weight of the current cycle is used for sorting, when the weight of an interruptible load continues to decrease due to being interrupted for multiple consecutive cycles, its priority coefficient will remain low, causing it to continue to be preferentially interrupted in subsequent cycles, resulting in the problem of repeatedly interrupting the same interruptible load. If only the weight change trend is used for sorting, it cannot reflect the relative differences in the current tolerance weight among the interruptible loads. Therefore, it is necessary to include both the current weight level and the weight change trend in the calculation.

[0050] The weight change is the difference between the load interruption tolerance weight updated in the current cycle and the load interruption tolerance weight updated in the previous cycle. A negative value indicates that the tolerance weight of the interruptible load is decreasing, meaning it has been frequently interrupted recently. A positive value indicates that its tolerance weight is recovering. The first ratio is the load interruption tolerance weight updated in the current cycle divided by the initial load interruption tolerance weight. The first factor is the value obtained by subtracting the first ratio from 1. The smaller the load interruption tolerance weight updated in the current cycle, the smaller the first ratio and the larger the first factor, indicating that the interruptible load should be interrupted later. The second ratio is the weight change divided by the initial load interruption tolerance weight. The second factor is the negative of the second ratio. When the weight change is negative, the second ratio is negative. When the second factor is negative, the second factor is positive, indicating that the tolerance of the interruptible load is decreasing, and its priority coefficient should be increased, thus delaying its interruption. The first and second preset coefficients are used for weighted summation, for example, 0.7 and 0.3 respectively. The first coefficient is used to adjust the contribution of the current weight level, and the second coefficient is used to adjust the contribution of the weight change trend.

[0051] For example, taking an initial load interruption tolerance weight of 100, a load interruption tolerance weight of 80 after the previous cycle update, and a load interruption tolerance weight of 60 after the current cycle update as an example, the weight change is 60 minus 80 equals -20. The first ratio is 60 divided by 100 equals 0.6, and the first factor is 1 minus 0.6 equals 0.4. The second ratio is -20 divided by 100 equals -0.2, and the second factor is 0.2. Multiplying the first factor by 0.7 gives 0.28, and multiplying the second factor by 0.3 gives 0.06. Adding these two together gives a dynamic priority coefficient of 0.34. If another interruptible load has a load interruption tolerance weight of 60 after the current cycle update and a load interruption tolerance weight of 60 after the previous cycle update, i.e., the weight change is 0, then the second ratio is 0, the second factor is 0, and the dynamic priority coefficient is 0.28, which is lower than the previous interruptible load's 0.34. This indicates that interruptible loads with the same current weight level but continuously decreasing weight should be interrupted later. Short-time interrupt commands are issued to their respective interruptible loads in ascending order of dynamic priority coefficients, with a minimum action interval set between two consecutive short-time interrupt commands, for example, 30 seconds.

[0052] This embodiment uses the above method to make the tolerance weight dynamically change with the actual interruption history, avoid the same interruptible load being repeatedly interrupted, and reduce voltage and frequency fluctuations caused by frequent load switching by minimizing the action interval time, thereby improving the stability of microgrid load distribution.

[0053] As can be seen from the above, the embodiments of this application select target interruptible loads from each interruptible load in descending order of current power regulation response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap. This ensures that interruptible loads with fast current power regulation response speeds take priority in continuous power reduction operation, avoiding the priority selection of interruptible loads with slow current power regulation response speeds while the fast-responding interruptible loads are not fully utilized, thus making fuller use of the adjustable power ranges of each interruptible load to cover the expected supply-demand gap. The initial load interruption tolerance weight is updated based on the actual number of interruptions and cumulative interruption duration of each interruptible load in the previous preset cycle, and the dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weights. This allows the order of short-term interruption commands to dynamically change with the actual interruption history of each interruptible load, avoiding repeated interruption and recovery of the same interruptible load. A minimum action interval is set between two adjacent short-term interruption commands to prevent frequent load switching and reduce microgrid voltage and frequency fluctuations. Load allocation control is executed on a rolling basis at a preset cycle until the expected supply-demand gap is less than or equal to zero. The load allocation is continuously tracked and adjusted on a rolling basis to solve the problems of slow-responding loads being selected first, fast-responding loads not being fully utilized, and the power supply reliability being reduced due to repeated interruptions and recovery of the same load, thereby improving the stability of microgrid load allocation.

[0054] Based on the same principle as the microgrid load sharing method based on intelligent fusion terminals provided in the embodiments of this application, the embodiments of this application also provide a microgrid load sharing device based on intelligent fusion terminals, such as... Figure 2 As shown, the microgrid load distribution device 20 based on the intelligent fusion terminal may specifically include: a data acquisition module 21, a parameter extraction module 22, and a load distribution control module 23. The data acquisition module 21 is used to acquire the historical and current power generation output of the power generation side, the current energy storage status of the energy storage side, and the historical load demand and current electricity consumption data of the load side in the microgrid. The parameter extraction module 22 is used to extract the adjustable power range and current power adjustment response speed of each interruptible load from the current power consumption data, and to obtain the initial load interruption tolerance weight of each interruptible load. The load distribution control module 23 is used to perform load distribution control on a rolling basis at a preset cycle until the expected supply and demand gap of the microgrid is less than or equal to zero. The load distribution control module 23 is specifically used for: Based on historical power generation output, historical load demand, and current power generation output, predict the power generation output trend and load demand trend within a preset time period in the future, and calculate the expected supply and demand gap within the preset time period in combination with the current energy storage status. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible loads. If a supply-demand gap still exists after issuing a continuous power reduction operation command, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight, and short-time interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficient. A minimum action interval is set between two consecutive short-time interruption commands.

[0055] In one embodiment of this application, the parameter extraction module 22 is specifically used for: The voltage and current waveforms of the main incoming line on the load side are acquired at the first sampling rate to generate the total power timing signal. Transient event detection is performed on the total power time-series signal to identify multiple start-stop events with power step changes. Based on the occurrence time and power change amplitude of each start-stop event, the total power time-series signal is decomposed into independent power curves for each interruptible load. For each interruptible load, a steady-state segment is identified for the independent power curve of that interruptible load, and the average power within the latest identified steady-state segment is taken as the current operating power of that interruptible load. Obtain the rated power of the interruptible load, and use the difference between the rated power and the current operating power as the adjustable power range of the interruptible load; Fit the rising or falling edge of the power curve of the interruptible load, and extract the time taken from the start of the power step to the power reaching the first preset proportion of the steady state value as the current power regulation response speed of the interruptible load.

[0056] In one embodiment of this application, the load distribution control module 23 is specifically used for: Historical power generation output trends are extracted to obtain power generation output trend terms; Historical load demand trends are extracted to obtain load demand trend items; The first deviation is obtained by subtracting the current power generation output from the power generation output trend value at the same time. The second deviation is obtained by subtracting the current load demand from the load demand trend at the same time. Based on the current energy storage status, determine the remaining discharge time and remaining recharge time of the energy storage, and use the smaller value between the remaining discharge time and the remaining recharge time of the energy storage as the constraint duration; The preset duration is compared with the constraint duration. When the preset duration is longer than the constraint duration, the preset duration is corrected to the constraint duration to obtain the corrected prediction duration. Within the revised forecast period, the power generation trend is obtained based on the power generation trend term and the first deviation, and the load demand trend is obtained based on the load demand trend term and the second deviation.

[0057] In one embodiment of this application, the load distribution control module 23 is specifically used for: Divide the future preset duration into multiple consecutive time sub-intervals; Based on the power generation output trend and load demand trend, the predicted power generation output and load demand for each time sub-interval are calculated respectively, and the difference between the predicted load demand and the predicted power generation output is taken as the net power demand for that time sub-interval. Based on the current energy storage status, obtain the maximum discharge power, maximum charging power, current remaining energy, minimum allowable energy, and maximum allowable energy of the energy storage; The system iterates through each time sub-interval in chronological order. For each time sub-interval, if the net power demand is greater than zero, the energy storage is controlled to discharge up to the maximum discharge power. The discharge power is the smaller of the net power demand and the maximum discharge power. The remaining power is updated based on the discharge power and the duration of the time sub-interval. If the updated remaining power is less than the minimum allowable power, the difference between the net power demand and the actual discharge power of the energy storage in the time sub-interval is included in the supply and demand deficit of the time sub-interval. If the net power demand is less than or equal to zero, the energy storage will be controlled to charge at the maximum charging power as the upper limit. The charging power is the smaller of the absolute value of the net power demand and the maximum charging power. The current remaining power is updated according to the charging power and the duration of the time sub-interval. If the updated current remaining power is greater than the maximum allowable power, it will no longer be included in the supply and demand deficit. The sum of the supply and demand deficits in each time sub-interval is taken as the expected supply and demand gap within the future preset time period.

[0058] In one embodiment of this application, the load distribution control module 23 is specifically used for: The interruptible loads are sorted in descending order of their current power regulation response speed to obtain a candidate sequence; Interruptible loads are selected sequentially from the candidate sequence as target interruptible loads, and the adjustable power ranges of the selected target interruptible loads are accumulated to obtain the cumulative adjustable power. After selecting each target interruptible load, determine whether the cumulative adjustable power is greater than or equal to the expected supply-demand gap. If not, continue selecting the next interruptible load from the candidate sequence; If so, then stop selecting, and the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap.

[0059] In one embodiment of this application, the load distribution control module 23 is specifically used for: For each interruptible load, count the actual number of interruptions and the cumulative interruption duration of that interruptible load in the previous preset period; Calculate the weight attenuation of the interruptible load based on the actual number of interruptions and the cumulative interruption duration; When the actual number of interruptions is greater than zero, the initial load interruption tolerance weight of the interruptible load is subtracted from the corresponding weight decay amount to obtain the updated load interruption tolerance weight of the interruptible load, and the updated load interruption tolerance weight is greater than or equal to the preset lower limit value. When the actual number of interruptions is zero, the initial load interruption tolerance weight of the interruptible load is increased according to the preset recovery rate to obtain the increased load interruption tolerance weight of the interruptible load, which is used as the updated load interruption tolerance weight of the interruptible load. The increased load interruption tolerance weight is less than or equal to the initial load interruption tolerance weight.

[0060] In one embodiment of this application, the load distribution control module 23 is specifically used for: For each interruptible load, obtain the load interruption tolerance weight of the interruptible load after the current cycle update, and the load interruption tolerance weight of the interruptible load after the previous cycle update. Calculate the difference between the load interruption tolerance weight updated in the current cycle and the load interruption tolerance weight updated in the previous cycle, and use it as the weight change amount; Divide the updated load interruption tolerance weight by the initial load interruption tolerance weight to obtain the first ratio, and subtract the first ratio from 1 to obtain the first factor; Divide the weight change by the initial load interruption tolerance weight to obtain the second ratio, and then negative the second ratio to obtain the second factor; Multiply the first factor by a preset first coefficient to obtain the first value, and multiply the second factor by a preset second coefficient to obtain the second value; Add the first value to the second value to obtain the dynamic priority coefficient of the interruptible load.

[0061] The apparatus in this application embodiment can execute the method provided in this application embodiment, and the implementation principle is similar. The actions performed by each module in the apparatus of each embodiment of this application correspond to the steps in the method of each embodiment of this application. For detailed functional descriptions of each module of the apparatus, please refer to the descriptions in the corresponding methods shown above, which will not be repeated here.

[0062] Figure 3 The diagram shows a structural schematic of a smart fusion terminal applicable to embodiments of this application, as shown below. Figure 3 As shown, the intelligent fusion terminal can be used to implement the methods provided in any embodiment of this application.

[0063] like Figure 3 As shown, the intelligent fusion terminal 300 mainly includes at least one processor 301. Figure 3 The diagram shows components such as a memory 302, a communication module 303, and an input / output interface 304. Optionally, these components can be connected and communicate with each other via a bus 305. It should be noted that... Figure 3 The structure of the intelligent fusion terminal 300 shown is merely illustrative and does not constitute a limitation on the intelligent fusion terminal to which the method provided in the embodiments of this application applies.

[0064] The memory 302 can be used to store operating systems and applications, etc. The applications can include computer programs that implement the methods shown in the embodiments of this application when invoked by the processor 301, and can also include programs for implementing other functions or services. The memory 302 can be ROM (Read Only Memory) or other types of static storage devices that can store static information and instructions, RAM (Random Access Memory) or other types of dynamic storage devices that can store information and computer programs, or it can be EEPROM (Electrically Erasable Programmable Read Only Memory), CD-ROM (Compact Disc Read Only Memory) or other optical disc storage, optical disc storage (including compressed optical discs, laser discs, optical discs, digital universal optical discs, Blu-ray discs, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium that can be used to carry or store desired program code in the form of instructions or data structures and that can be accessed by a computer, but is not limited thereto.

[0065] Processor 301 is connected to memory 302 via bus 305 and implements corresponding functions by calling the application programs stored in memory 302. Processor 301 can be a CPU (Central Processing Unit), a general-purpose processor, a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field Programmable Gate Array), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It can implement or execute the various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. Processor 301 can also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of a DSP and a microprocessor, etc.

[0066] The intelligent converged terminal 300 can connect to the network via a communication module 303 (which may include, but is not limited to, components such as a network interface) to communicate with other devices (such as user terminals or servers) through the network and achieve data interaction, such as sending data to or receiving data from other devices. The communication module 303 may include a wired network interface and / or a wireless network interface, meaning the communication module may include at least one of a wired communication module or a wireless communication module.

[0067] The intelligent converged terminal 300 can connect to necessary input / output devices, such as keyboards and display devices, via the input / output interface 304. The intelligent converged terminal 300 itself can have a display device, and other external display devices can also be connected via the input / output interface 304. Optionally, a storage device, such as a hard drive, can also be connected via the input / output interface 304 to store data from the intelligent converged terminal 300, retrieve data from the storage device, or store data from the storage device in the memory 302. It is understood that the input / output interface 304 can be a wired interface or a wireless interface. Depending on the actual application scenario, the device connected to the input / output interface 304 can be a component of the intelligent converged terminal 300 or an external device connected to the intelligent converged terminal 300 when needed.

[0068] The bus 305 used to connect the components may include a path for transmitting information between the components. The bus 305 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. Depending on its function, the bus 305 may be divided into an address bus, a data bus, a control bus, etc.

[0069] Optionally, for the solution provided in the embodiments of this application, the memory 302 can be used to store a computer program that executes the solution of this application, and the processor 301 runs the computer program. When the processor 301 runs the computer program, it implements the operation of the method or apparatus provided in the embodiments of this application.

[0070] Based on the same principle as the method provided in the embodiments of this application, the embodiments of this application provide a computer-readable storage medium storing a computer program, which, when executed by a processor, can implement the corresponding content of the aforementioned method embodiments.

[0071] It should be noted that the terms "first," "second," "third," "fourth," "1," "2," etc. (if present) in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented in a sequence other than that shown in the figures or text.

[0072] In the embodiments of this application, the terms "module" or "unit" refer to a computer program or part of a computer program that has a predetermined function and works with other related parts to achieve a predetermined goal, and can be implemented wholly or partially using software, hardware (such as processing circuitry or memory), or a combination thereof. Similarly, a processor (or multiple processors or memory) can be used to implement one or more modules or units. Furthermore, each module or unit can be part of an overall module or unit that includes the functionality of that module or unit.

[0073] It should be understood that although arrows indicate various operation steps in the flowcharts of this application's embodiments, the order in which these steps are implemented is not limited to the order indicated by the arrows. Unless explicitly stated herein, in some implementation scenarios of this application's embodiments, the implementation steps in each flowchart can be executed in other orders as required. Furthermore, some or all steps in each flowchart, based on the actual implementation scenario, may include multiple sub-steps or multiple stages. Some or all of these sub-steps or stages can be executed at the same time, and each sub-step or stage can also be executed at different times. In scenarios where execution times differ, the execution order of these sub-steps or stages can be flexibly configured according to requirements, and this application's embodiments do not limit this.

[0074] The above description is only an optional implementation method for some implementation scenarios of this application. It should be noted that for those skilled in the art, other similar implementation methods based on the technical concept of this application without departing from the technical concept of this application also fall within the protection scope of the embodiments of this application.

Claims

1. A microgrid load allocation method based on intelligent converged terminals, characterized in that, include: Acquire historical and current power generation output on the generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side in the microgrid; Extract the adjustable power range and current power adjustment response speed of each interruptible load from the current power consumption data, and obtain the initial load interruption tolerance weight of each interruptible load. Load allocation control is executed on a rolling basis at a preset cycle until the expected supply-demand gap of the microgrid is less than or equal to zero. The load distribution control steps are as follows: Based on the historical power generation output, the historical load demand, and the current power generation output, the power generation output trend and load demand trend within a preset time period are predicted, and combined with the current energy storage status, the expected supply and demand gap within the preset time period is calculated. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of the current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible load. If a supply-demand gap still exists after the continuous power reduction operation command is issued, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight. Short-term interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficients. A minimum action interval is set between two consecutive short-term interruption commands.

2. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The step of extracting the adjustable power range and current power adjustment response speed of each interruptible load from the current power consumption data includes: The voltage and current waveforms of the main incoming line on the load side are acquired at a first sampling rate to generate a total power timing signal. Transient event detection is performed on the total power time-series signal to identify multiple start-stop events with power step changes. Based on the occurrence time and power change amplitude of each start-stop event, the total power time-series signal is decomposed into independent power curves for each interruptible load. For each interruptible load, a steady-state segment is identified for the independent power curve of that interruptible load, and the average power within the latest identified steady-state segment is taken as the current operating power of that interruptible load. Obtain the rated power of the interruptible load, and use the difference between the rated power and the current operating power as the adjustable power range of the interruptible load; Fit the rising or falling edge of the power curve of the interruptible load, and extract the time taken from the start of the power step to the power reaching the first preset proportion of the steady state value as the current power regulation response speed of the interruptible load.

3. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The method of predicting the power generation output trend and load demand trend within a preset time period based on the historical power generation output, the historical load demand, and the current power generation output includes: The historical power generation output is trend-extracted to obtain the power generation output trend term; The historical load demand is trend-extracted to obtain a load demand trend item; The first deviation is obtained by subtracting the value of the current power generation output from the value of the power generation output trend term at the same time. The second deviation is obtained by differentiating the current load demand from the value of the load demand trend term at the same time. Based on the current energy storage state, determine the remaining discharge time and remaining recharge time of the energy storage, and use the smaller value between the remaining discharge time and the remaining recharge time as the constraint duration; The preset duration is compared with the constraint duration. When the preset duration is longer than the constraint duration, the preset duration is corrected to the constraint duration to obtain the corrected predicted duration. Within the corrected forecast period, the power generation trend is obtained based on the power generation trend term and the first deviation, and the load demand trend is obtained based on the load demand trend term and the second deviation.

4. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The step of calculating the expected supply-demand gap within a preset future timeframe, based on the current energy storage status, includes: The preset future duration is divided into multiple consecutive time sub-intervals; Based on the power generation trend and the load demand trend, the predicted power generation value and the predicted load demand value are calculated for each time sub-interval, and the difference between the predicted load demand value and the predicted power generation value is taken as the net power demand for that time sub-interval. Based on the current energy storage status, obtain the maximum discharge power, maximum charging power, current remaining energy, minimum allowable energy, and maximum allowable energy of the energy storage; The time sub-intervals are traversed sequentially according to time order. For each time sub-interval, if the net power demand is greater than zero, the energy storage is controlled to discharge with the maximum discharge power as the upper limit. The discharge power is the smaller value between the net power demand and the maximum discharge power. The current remaining power is updated according to the discharge power and the duration of the time sub-interval. If the updated current remaining power is less than the minimum allowable power, the difference between the net power demand of the time sub-interval and the actual discharge power of the energy storage is included in the supply and demand deficit of the time sub-interval. If the net power demand is less than or equal to zero, the energy storage is controlled to charge at the maximum charging power as the upper limit. The charging power is the smaller of the absolute value of the net power demand and the maximum charging power. The current remaining power is updated according to the charging power and the duration of the time sub-interval. If the updated current remaining power is greater than the maximum allowable power, it is no longer included in the supply and demand deficit. The sum of the supply and demand deficits in each of the aforementioned time sub-intervals is taken as the expected supply and demand gap within the aforementioned future preset time period.

5. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The step of selecting target interruptible loads from each interruptible load in descending order of current power regulation response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, includes: The interruptible loads are sorted in descending order of their current power regulation response speed to obtain a candidate sequence; Interruptible loads are selected sequentially from the candidate sequence as target interruptible loads, and the adjustable power ranges of the selected target interruptible loads are accumulated to obtain the cumulative adjustable power. After selecting each target interruptible load, it is determined whether the cumulative adjustable power is greater than or equal to the expected supply-demand gap; If not, then continue to select the next interruptible load from the candidate sequence; If so, then stop selecting, and the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap.

6. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The step of updating the initial load interruption tolerance weights for each interruptible load based on the actual number of interruptions and cumulative interruption duration in the previous preset period includes: For each interruptible load, count the actual number of interruptions and the cumulative interruption duration of that interruptible load in the previous preset period; Calculate the weight attenuation of the interruptible load based on the actual number of interruptions and the cumulative interruption duration; When the actual number of interruptions is greater than zero, the initial load interruption tolerance weight of the interruptible load is subtracted from the corresponding weight decay amount to obtain the updated load interruption tolerance weight of the interruptible load, and the updated load interruption tolerance weight is greater than or equal to the preset lower limit value. When the actual number of interruptions is zero, the initial load interruption tolerance weight of the interruptible load is increased according to a preset recovery rate to obtain the increased load interruption tolerance weight of the interruptible load, which is used as the updated load interruption tolerance weight of the interruptible load. The increased load interruption tolerance weight is less than or equal to the initial load interruption tolerance weight.

7. The microgrid load allocation method based on intelligent fusion terminals as described in claim 1, characterized in that, The calculation of the dynamic priority coefficient for each interruptible load based on each updated load interruption tolerance weight includes: For each interruptible load, obtain the load interruption tolerance weight of the interruptible load after the current cycle update, and the load interruption tolerance weight of the interruptible load after the previous cycle update. The difference between the load interruption tolerance weight updated in the current cycle and the load interruption tolerance weight updated in the previous cycle is calculated as the weight change amount; Divide the current period-updated load interruption tolerance weight by the initial load interruption tolerance weight to obtain a first ratio, and subtract the first ratio from 1 to obtain a first factor; Divide the weight change by the initial load interruption tolerance weight to obtain a second ratio, and then negative the second ratio to obtain a second factor; Multiply the first factor by a preset first coefficient to obtain a first value, and multiply the second factor by a preset second coefficient to obtain a second value; Add the first value to the second value to obtain the dynamic priority coefficient of the interruptible load.

8. A microgrid load distribution device based on a smart converged terminal, characterized in that, include: The data acquisition module is used to acquire historical and current power generation output on the power generation side, current energy storage status on the energy storage side, and historical load demand and current electricity consumption data on the load side in the microgrid. The parameter extraction module is used to extract the adjustable power range and current power adjustment response speed of each interruptible load from the current power consumption data, and to obtain the initial load interruption tolerance weight of each interruptible load. The load distribution control module is used to perform load distribution control on a rolling basis at a preset cycle until the expected supply and demand gap of the microgrid is less than or equal to zero. Specifically, the load distribution control module is used for: Based on the historical power generation output, the historical load demand, and the current power generation output, the power generation output trend and load demand trend within a preset time period are predicted, and combined with the current energy storage status, the expected supply and demand gap within the preset time period is calculated. If the expected supply-demand gap is greater than zero, then target interruptible loads are selected from each interruptible load in descending order of the current power adjustment response speed, until the sum of the adjustable power ranges of the target interruptible loads covers the expected supply-demand gap, and a continuous power reduction operation command is issued to the target interruptible load. If a supply-demand gap still exists after the continuous power reduction operation command is issued, the initial load interruption tolerance weight is updated based on the actual number of interruptions and the cumulative interruption duration of each interruptible load in the previous preset cycle. The dynamic priority coefficient of each interruptible load is calculated based on the updated load interruption tolerance weight. Short-term interruption commands are issued to the corresponding interruptible loads in order of increasing dynamic priority coefficients. A minimum action interval is set between two consecutive short-term interruption commands.

9. A smart converged terminal, characterized in that, The intelligent fusion terminal includes a memory and a processor. The memory stores a computer program, and the processor executes the microgrid load distribution method based on the intelligent fusion terminal as described in any one of claims 1 to 7 when running the computer program.

10. A smart grid, characterized in that, The smart grid includes a smart distribution network and a smart converged terminal as described in claim 9. The smart distribution network includes a microgrid, which includes a generation side, an energy storage side, and a load side. The smart converged terminal is communicatively connected to the generation side, energy storage side, and load side of the microgrid.