Optimal Dispatch Method and Device for New Energy Power Systems Considering Grid Strength Constraints
By dynamically determining the grid strength constraint threshold through fault current iteration and voltage stiffness evaluation, the problem of insufficient voltage support caused by the fixed grid strength constraint threshold in the existing technology is solved, thereby improving the grid security and stability in scenarios with high penetration of new energy.
Patent Information
- Application Number
- CN202611046453.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-14
- Publication Date
- 2026-11-17
AI Technical Summary
In existing methods for optimizing the dispatch of new energy power systems, the grid strength constraint threshold is usually a fixed value, which makes it difficult to reflect the impact of the capacity of new energy access equipment, the equivalent impedance of grid-connected equipment, the Thevenin equivalent impedance of the grid side, and the impedance angle difference on the voltage support capability. This leads to problems such as slower voltage recovery and decreased converter control stability in scenarios with high penetration of new energy.
By iteratively calculating fault current and evaluating voltage stiffness, the power grid strength constraint threshold is dynamically determined, a system strength support coefficient matrix is constructed, and combined with the online state variables and proportional coefficients of synchronous generators, a linearized power grid strength constraint is formed and embedded into the optimization scheduling model to optimize the combination of synchronous generators and the operation mode of energy storage.
It improves the voltage support capability and operational safety of the power grid in scenarios with high penetration of new energy sources, avoids the problem of insufficient actual fault level caused by linear approximation, and improves the accuracy and engineering applicability of optimized dispatch results.
Smart Images

Figure CN123121822A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of safe operation and optimized dispatching technology of new energy power systems, and in particular to an optimized dispatching method and apparatus for new energy power systems that takes into account grid strength constraints. Background Technology
[0002] As the installed capacity of new energy sources such as wind power and photovoltaics continues to increase, the proportion of traditional synchronous generator units in the power system is decreasing, leading to a decline in system short-circuit capacity and voltage support capability. New energy units typically connect to the grid via power electronic converters, whose fault current contribution capability, control characteristics, and voltage support methods differ significantly from those of synchronous generators. In scenarios with high penetration of new energy, insufficient grid strength may result in reduced voltage support capability at the new energy grid connection point, slower voltage recovery after a fault, decreased converter control stability, and reduced reliability of protection actions.
[0003] Existing optimization and dispatch methods for renewable energy power systems typically focus on constraints such as power balance, generator output, ramp-up, line power flow, renewable energy consumption, and energy storage operation, while neglecting grid strength constraints. Some methods use the minimum short-circuit capacity or minimum fault level of a specified node as the system strength constraint threshold, but these thresholds are usually preset fixed values and cannot reflect the impact of renewable energy access capacity, grid-connected equipment equivalent impedance, grid-side Thevenin equivalent impedance, and impedance angle difference on the node voltage support capability.
[0004] Existing system strength support coefficient methods can transform complex fault current calculations into a linear weighted expression of synchronous generator online state variables, making them suitable for embedding in unit combination or optimization scheduling models. However, the right-hand side of its system strength constraint still relies on a preset minimum fault level and does not further dynamically construct thresholds based on the voltage support requirements of renewable energy access points.
[0005] Therefore, a new method for optimizing the scheduling of new energy power systems is needed. While maintaining the advantage of linearizing the system strength support coefficient, the voltage stiffness index is introduced into the process of constructing the system strength constraint threshold, so that the grid strength constraint is not only easy to optimize, but also reflects the voltage support safety requirements of the new energy access nodes. Summary of the Invention
[0006] The purpose of this invention is to provide an optimized scheduling method for new energy power systems that considers grid strength constraints. This method addresses the technical problem that existing optimized scheduling methods for new energy power systems typically use fixed minimum fault levels or fixed short-circuit ratio thresholds for grid strength constraints, which fail to reflect the impact of new energy access capacity, equivalent impedance of access equipment, the Thevenin equivalent impedance of the grid side, and impedance angle difference on voltage support capability.
[0007] To achieve the above objectives, the technical solution provided by this invention is: an optimized dispatching method for a new energy power system considering grid strength constraints, comprising the following steps:
[0008] S10, acquire operating status data of new energy power system;
[0009] S20, Based on the operating status data, establish an augmented node network equation for calculating the fault current of a specified new energy access node, and calculate the fault current of the specified new energy access node through a fault current iterative solution method.
[0010] S30, Based on the fault current, calculate the system strength support coefficient of the synchronous generator for the designated new energy access node, and form a system strength support coefficient matrix;
[0011] S40, Based on the system strength support coefficient matrix and the fault current iterative verification result, the power grid strength constraint ratio coefficient is iteratively solved to make the linear superposition result of the system strength support coefficient match the actual fault current level.
[0012] S50, calculate the voltage stiffness index of the new energy access node, and determine the minimum equivalent short-circuit capacity threshold required by the new energy access node based on the preset minimum voltage stiffness threshold.
[0013] S60, Based on the system strength support coefficient matrix, synchronous generator online state variables, proportional coefficient and minimum equivalent short-circuit capacity threshold, construct grid strength constraints;
[0014] S70, incorporate the power grid strength constraint into the new energy power system optimization scheduling model, and solve for the new energy power system optimization scheduling scheme that satisfies the constraint conditions.
[0015] Furthermore, in S20, the synchronous generator is equivalent to a Thevenin model with a voltage source connected to a reactance branch, the inverter-type new energy power source is equivalent to a voltage-controlled current source, and the reactive power compensation equipment is equivalent to a variable admittance branch, thus establishing the augmented node network equations:
[0016]
[0017] in, This refers to the node admittance matrix and system network admittance matrix of the new energy power system under fault calculation scenarios. For node voltage vectors, This is the output current vector of the equivalent voltage source of the synchronous generator. For the fault current vector, The equivalent voltage source voltage vector of the synchronous generator. The correlation matrix of the synchronous generator access nodes. The correlation matrix of faulty nodes;
[0018] During the iteration process, the inverter current injection and reactive power compensation device admittance of the inverter-type renewable energy power supply are updated according to the voltage of the renewable energy access node; when the node voltage change between two adjacent iterations meets the convergence condition, the fault current is output; the convergence condition is expressed as:
[0019]
[0020] in, To improve convergence accuracy, For the number of iterations, Let be the voltage at node i.
[0021] Furthermore, in S30, a stress operation scenario is constructed for each new energy access node i and each synchronous generator j. In the stress operation scenario, only the fault current of the j-th synchronous generator to node i is retained, and the fault current of the other generators is set to zero or removed from the fault current calculation.
[0022] Solve for the fault current at node i under this stress operation scenario. And calculate the system strength support coefficient of the j-th synchronous generator to node i:
[0023]
[0024] in, Let be the system strength support coefficient of the j-th synchronous generator for the i-th new energy access node. Let i be the rated voltage. To retain only the fault current at node i when only the j-th synchronous generator is present, This is the system's baseline capacity;
[0025] The system strength support coefficient matrix C is composed of all new energy access nodes and synchronous generators, where the matrix rows correspond to new energy access nodes and the matrix columns correspond to synchronous generators. The system strength support coefficient matrix is used to characterize the short-circuit capacity contribution of different synchronous generators to different new energy access nodes.
[0026] Furthermore, in S40, the scaling factor The fault current is determined through a complete iterative verification method, including: selecting multiple representative operating scenarios and online combinations of synchronous generators; calculating a linear estimate of the short-circuit capacity based on the system strength support coefficient matrix and the online state of the synchronous generators under each representative operating scenario; iteratively solving for the corresponding actual fault level using augmented node network equations; and determining the proportionality coefficient based on the deviation between the actual fault level and the linearly estimated short-circuit capacity. , make The corrected linear estimate of the short-circuit capacity should not exceed the corresponding actual fault level; when a new representative operating scenario is added or the verification results do not meet the conservatism requirement, the estimate should be updated. And re-verify.
[0027] Furthermore, in S50, for the new energy access node i, the equivalent impedance of the network-connected equipment is defined as follows during time period t: The Thevenin equivalent impedance on the grid side is The voltage stiffness index of the new energy access node i in time period t is:
[0028]
[0029] Let the impedance angle difference be:
[0030]
[0031] in, The equivalent impedance angle of the new energy access equipment. The Thevenin equivalent impedance angle on the grid side;
[0032] Let the equivalent short-circuit ratio be:
[0033]
[0034] in Let be the equivalent short-circuit capacity of the i-th renewable energy access node during time period t. Let be the equivalent capacity of the network-connected equipment of the i-th new energy access node in time period t;
[0035] The voltage stiffness index is then expressed as:
[0036] .
[0037] Furthermore, let the minimum voltage stiffness threshold of node i be... Node i is required to satisfy the following condition during time period t:
[0038]
[0039] Substituting the voltage stiffness expression into the above inequality, we obtain the minimum equivalent short-circuit ratio that satisfies the voltage stiffness requirement:
[0040]
[0041] Therefore, the minimum equivalent short-circuit capacity threshold required for node i to meet the voltage stiffness requirement in time period t is obtained:
[0042] .
[0043] Furthermore, in S60, based on the system strength support coefficient matrix... and synchronous generator online state variables The equivalent short-circuit capacity of node i in time period t is expressed as:
[0044]
[0045] The online state variables of the synchronous generator For variables of 0-1, when synchronous generator j is online during time period t, When synchronous generator j is offline during time period t, ;
[0046] By using the minimum equivalent short-circuit capacity threshold based on voltage stiffness as the lower limit of system strength, new system strength constraints are generated:
[0047]
[0048] in, This is the system strength correction factor. For a collection of synchronous generators, Let be the online state variable of synchronous generator j during time period t.
[0049] Furthermore, the optimized scheduling model uses the total system operating cost within the scheduling period. With the goal of minimizing costs, the total operating cost of the system includes the operating cost of conventional synchronous generators, start-up and shutdown costs, curtailment penalty costs, and carbon emission costs.
[0050]
[0051] Where T is the number of scheduling periods. The number of synchronous generators, The number of inverter-type new energy power sources; Let j be the active power output of synchronous generator j during time period t. and These are startup variables and shutdown variables, respectively. The power curtailment of inverter-type renewable energy source k during time period t; , , , These are the operating cost coefficient, start-up cost coefficient, shutdown cost coefficient, and curtailment penalty cost coefficient for conventional generating units, respectively. Cost per unit of carbon emissions Let be the carbon emission coefficient of synchronous generator j.
[0052] Furthermore, the constraints of the new energy power system optimization scheduling model also include power balance constraints, synchronous generator output upper and lower limit constraints, synchronous generator start-stop logic constraints, ramping constraints, new energy output and curtailment constraints, branch power flow constraints, and new energy output constraints.
[0053] The present invention also provides a new energy power system optimization scheduling device considering grid strength constraints, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. The feature is that when the processor executes the computer program, it implements a new energy power system optimization scheduling method considering grid strength constraints as described in the above technical solution.
[0054] Through the above technical solution, this invention combines fault current iterative calculation, voltage stiffness evaluation, and optimized scheduling model, enabling system strength constraints to no longer rely on fixed empirical thresholds, but instead dynamically determine the required system strength level for each node based on the characteristics of new energy access equipment and the equivalent impedance of the grid. Simultaneously, it utilizes the system strength support coefficient matrix and proportional coefficient... This transforms the complex fault current verification results into a linear constraint form suitable for optimal scheduling solutions, thereby improving the model's engineering applicability and solution efficiency.
[0055] This invention transforms complex fault current calculations into linear constraints suitable for optimized scheduling by using system strength support coefficients, thereby reducing the difficulty of directly embedding system strength constraints into the optimization model.
[0056] This invention replaces the traditional fixed minimum fault level threshold with a voltage stiffness index, enabling the right side of the system strength constraint to reflect the influence of the capacity of new energy access equipment, the equivalent impedance of grid-connected equipment, the Thevenin equivalent impedance of the grid side, and the impedance angle difference.
[0057] The power grid strength constraint constructed in this invention maintains a linear structure, which is easy to embed into the unit combination, economic dispatch, new energy consumption optimization and energy storage coordinated dispatch models.
[0058] This invention can identify and constrain weak points in voltage support in scenarios with high penetration of new energy sources. By optimizing the online combination of synchronous generators, the output of new energy sources and the operation mode of energy storage, it can improve the voltage support capability and operational safety margin of the system.
[0059] This invention corrects the power grid strength constraint by setting a correction coefficient. It can correct the deviation between the linear superposition result of the system strength support coefficient and the actual fault level, so that the constructed power grid strength constraint maintains a linear form and has engineering conservatism and safety margin, avoiding the problem of insufficient actual fault level of new energy access nodes due to linear approximation.
[0060] Compared with existing technologies, this invention has at least the following advantages: First, it can reflect the impact of renewable energy access capacity, grid-connected equipment impedance, grid-side Thevenin equivalent impedance, and impedance angle difference on system strength requirements; Second, it can utilize the fault current iteration results to establish the system strength support relationship between synchronous generators and renewable energy access nodes, avoiding reliance solely on empirical short-circuit ratio thresholds; Third, it uses a proportionality coefficient... The linearized system strength constraints are modified to improve the consistency between the optimized scheduling results and the complete fault current verification results; fourth, the constructed system strength constraints maintain a linear structure, which is convenient for embedding into the power system optimized scheduling program for solving. Attached Figure Description
[0061] Figure 1 This is a flowchart illustrating the overall process of the new energy power system optimization scheduling method considering grid strength constraints, as presented in this invention.
[0062] Figure 2 This is a flowchart of the system strength support coefficient calculation for the present invention.
[0063] Figure 3 This is a flowchart illustrating the calculation of the minimum equivalent short-circuit capacity threshold based on voltage stiffness according to the present invention.
[0064] Figure 4 This is a schematic diagram of the structure of the new energy power system optimized dispatching system of the present invention.
[0065] Figure 5 This is a rendering of an embodiment of the present invention. Detailed Implementation
[0066] The technical solution of the present invention will be described below with reference to the embodiments. It should be understood that the embodiments are only used to explain the present invention and are not intended to limit the scope of protection of the present invention.
[0067] This invention provides an optimized scheduling method for a new energy power system considering grid strength constraints, comprising the following steps: acquiring operating status data of the new energy power system; establishing augmented node network equations for calculating fault currents at new energy access nodes; continuously updating node current injection vectors and node admittance matrices based on fault equivalent models of synchronous generators, inverter-type new energy sources, reactive power compensation equipment, and loads during the fault current solution process, and verifying voltage convergence based on the node voltage changes between adjacent iterations to obtain the fault current level of a specified new energy access node; calculating the system strength support coefficient of the synchronous generator for the new energy access node based on the fault current level and forming a system strength support coefficient matrix; iteratively determining the proportional coefficient based on the complete fault current iterative verification results; determining the minimum equivalent short-circuit capacity threshold required for the new energy access node based on the voltage stiffness index; and finally, incorporating the system strength constraint conditions based on voltage stiffness into the power system optimized scheduling model to obtain an optimized scheduling scheme that meets the system strength safety requirements.
[0068] Specifically, the operational status data includes the synchronous generator's operating status, synchronous generator output limits (upper and lower), unit start-up and shutdown status, renewable energy power supply access nodes, renewable energy output forecasts, load forecasts, branch parameters, node admittance parameters, reactive power compensation equipment parameters, and equivalent impedance parameters of renewable energy access equipment. This data allows for the determination of the system network topology, equipment online status, and voltage support requirements of renewable energy access nodes during different scheduling periods.
[0069] In the fault current calculation stage, this invention describes the relationship between the voltage of each node and the injected current during a fault based on the augmented node network equations. Unlike methods that only use static short-circuit capacity estimation, this invention incorporates the transient electromotive force and transient reactance of synchronous generators, the current limiting characteristics of inverter-type renewable energy sources, the equivalent admittance changes of reactive power compensation equipment, and the equivalent load model into the calculation during the iteration process, and updates the node current injection vector and node admittance matrix in each iteration. When the node voltage amplitude or phase angle change obtained in two adjacent iterations is less than a preset convergence threshold, the fault current calculation is considered to have converged, and the converged fault current is used as the basis for evaluating the strength of the renewable energy access node system.
[0070] In the system strength support coefficient calculation stage, this invention calculates the system strength support coefficient for a given renewable energy access node based on the contribution of a single synchronous generator to the fault current or equivalent short-circuit capacity provided by that generator under stress scenarios. This calculation is repeated for multiple synchronous generators and multiple renewable energy access nodes to form a system strength support coefficient matrix. This matrix characterizes the impact of online state changes of different synchronous generators on the system strength of each renewable energy access node, enabling system strength constraints to be embedded linearly into the optimization scheduling model.
[0071] like Figure 1 As shown in the figure, the optimized scheduling method for a new energy power system considering grid strength constraints provided in this embodiment of the invention specifically includes the following steps:
[0072] S10: Obtain operating status data of the new energy power system;
[0073] The system acquires operational status data of the new energy power system during the dispatch cycle. The operational status data includes network topology parameters, line parameters, transformer parameters, node load data, synchronous generator operating status and electrical parameters, new energy power plant output, reactive power compensation equipment parameters, energy storage operating status, node rated voltage, and new energy access equipment capacity.
[0074] The operational status data can come from the dispatch automation system, energy management system, status estimation system, station monitoring system, or offline planning data.
[0075] S20: Establish an iterative solution model for fault current;
[0076] Thevenin model is used to equate synchronous generators to voltage sources connected to reactance branches, inverter-type renewable energy sources to voltage-controlled current sources, and reactive power compensation equipment to variable admittance branches. Augmented node network equations are then established as follows:
[0077]
[0078] in, This refers to the node admittance matrix and system network admittance matrix of the new energy power system under fault calculation scenarios. For node voltage vectors, This is the output current vector of the equivalent voltage source of the synchronous generator. For the fault current vector, The equivalent voltage source voltage vector of the synchronous generator. The correlation matrix of the synchronous generator access nodes. This is the correlation matrix of the faulty nodes.
[0079] During the iteration process, the inverter current injection and reactive power compensation device admittance of the inverter-type renewable energy power supply are updated based on the voltage of the renewable energy access node; when the node voltage change between two adjacent iterations meets the convergence condition, the fault current is output. The convergence condition can be expressed as:
[0080]
[0081] in, To improve convergence accuracy, For the number of iterations, Let be the voltage at node i.
[0082] S30: Calculate the system strength support coefficient;
[0083] For each new energy access node i and each synchronous generator j, a stress operation scenario is constructed. In the stress operation scenario, only the fault current of the j-th synchronous generator to node i is retained, and the fault current of the other generators is set to zero or excluded from the fault current calculation.
[0084] Solve for the fault current at node i under this stress operation scenario. And calculate the system strength support coefficient of the j-th synchronous generator to node i:
[0085]
[0086] in, Let be the system strength support coefficient of the j-th synchronous generator for the i-th new energy access node. Let i be the rated voltage. To retain only the fault current at node i when only the j-th synchronous generator is present, This represents the system's baseline capacity.
[0087] A system strength support coefficient matrix C is constructed from all renewable energy access nodes and synchronous generators, where the matrix rows correspond to renewable energy access nodes and the matrix columns correspond to synchronous generators. This system strength support coefficient matrix characterizes the short-circuit capacity contribution of different synchronous generators to different renewable energy access nodes. The system strength support coefficient also reflects the impact of synchronous generator capacity, generator equivalent reactance, and the electrical distance between the generator and the renewable energy access node on short-circuit capacity.
[0088] S40: Iterative solution of the scaling factor ;
[0089] After obtaining the system strength support coefficient matrix, the proportional coefficients are further determined. The system strength linearization constraint can be adopted. In the form of, This is used to correct the deviation between the linear superposition result of the system strength support coefficients and the actual failure level. This implementation does not include... Instead of being an arbitrary empirical parameter, it is determined based on the complete fault current iterative verification results.
[0090] Specifically, multiple representative operating scenarios and online combinations of synchronous generators are selected. For each representative operating scenario, the system strength support coefficient matrix is used. and synchronous generator online state variables Calculate linear estimation of short-circuit capacity .
[0091] For the same representative operating scenario, the actual fault level of the corresponding new energy access node is obtained by using the augmented node network equation and fault current iterative solution process in step S20. .
[0092] Based on each representative operating scenario and Determine the proportionality coefficient between the deviations ,make Not higher than the corresponding actual fault level This ensures that the strength constraints of the subsequent linear system are conservative.
[0093] In one implementation, it can be made Take all representative operating scenarios The lower limit value, or a further multiplier of that lower limit value by a safety margin coefficient; when the verification results of the newly added operating scenario show... At that time, reduce And re-verify.
[0094] when When =1, it indicates that the linear superposition result of the system strength support coefficient is not reduced; when 0 < When the value is less than 1, it indicates a conservative reduction in the estimated equivalent short-circuit capacity contribution to avoid overestimating the system strength level of new energy access nodes in the linear superposition model. This is achieved through iterative updates. This allows the system strength constraints in the optimized scheduling model to maintain a linear expression while also reflecting the nonlinear effects in the calculation of the complete fault current.
[0095] Through the above verification process, the proportionality coefficient is... It is matched with the specific system topology, new energy penetration rate, reactive power compensation status and inverter current limiting characteristics; then the voltage stiffness index is used to determine the right-hand threshold of the system strength constraint, thereby combining the system strength linearization constraint with the voltage stiffness evaluation method based on Thevenin equivalent impedance.
[0096] S50: Construct a voltage stiffness index and determine the minimum equivalent short-circuit capacity based on the voltage stiffness threshold;
[0097] For new energy access node i, the equivalent impedance of the network access equipment is defined as follows during time period t: The Thevenin equivalent impedance on the grid side is The voltage stiffness index of node i is expressed as:
[0098]
[0099] in, Let be the equivalent impedance of the network-connected equipment at node i during time period t. Let be the Thevenin equivalent impedance of node i as seen from the access point to the grid side during time period t.
[0100] Further, the impedance is written in polar coordinates:
[0101]
[0102]
[0103] Let the impedance angle difference be:
[0104]
[0105] in, The equivalent impedance angle of the new energy access equipment. The Thevenin equivalent impedance angle on the grid side.
[0106] And define the equivalent short-circuit ratio based on the equivalent short-circuit capacity as:
[0107]
[0108] in Let be the equivalent short-circuit capacity of the i-th renewable energy access node during time period t. Let be the equivalent capacity of the network-connected equipment of the i-th new energy access node during time period t.
[0109] The voltage stiffness of node i in time period t can be expressed as:
[0110]
[0111] Let the minimum voltage stiffness threshold of node i be... Node i is required to satisfy the following condition during time period t:
[0112]
[0113] Substituting the voltage stiffness expression into the above inequality, we obtain the minimum equivalent short-circuit ratio that satisfies the voltage stiffness requirement:
[0114]
[0115] Therefore, the minimum equivalent short-circuit capacity threshold required for node i to meet the voltage stiffness requirement in time period t is obtained:
[0116]
[0117] The Used to replace the fixed minimum fault level threshold in traditional system strength constraints .
[0118] S60: Establish grid strength constraints based on voltage stiffness;
[0119] Based on the system strength support coefficient matrix and synchronous generator online state variables The equivalent short-circuit capacity of node i in time period t is expressed as:
[0120]
[0121] The online state variables of the synchronous generator For variables of 0-1, when synchronous generator j is online during time period t, When synchronous generator j is offline during time period t, ;
[0122] By using the minimum equivalent short-circuit capacity threshold based on voltage stiffness as the lower limit of system strength, new system strength constraints are generated:
[0123]
[0124] in, This is the system strength correction factor. For a collection of synchronous generators, Let be the online state variable of synchronous generator j during time period t.
[0125] The above formula means that, during any scheduling period, the system strength support capability provided by the online synchronous generator to the new energy access node shall not be lower than the short-circuit capacity threshold required to meet the minimum voltage stiffness requirement of that node.
[0126] S70: Establish and solve the optimal scheduling model;
[0127] Finally, the new system strength constraints obtained in step S60 are added to the power system dispatching program to construct an optimized dispatching model for the new energy power system. The optimized dispatching model aims to minimize the total system operating cost within the dispatching cycle. The total system operating cost includes the operating cost of conventional synchronous generators, start-up and shutdown costs, curtailment penalty costs, and carbon emission costs.
[0128]
[0129] Where T is the number of scheduling periods. The number of synchronous generators, The number of inverter-type new energy power sources; Let j be the active power output of synchronous generator j during time period t. and These are startup variables and shutdown variables, respectively. The power curtailment of inverter-type renewable energy source k during time period t; , , , These are the operating cost coefficient, start-up cost coefficient, shutdown cost coefficient, and curtailment penalty cost coefficient for conventional generating units, respectively. Cost per unit of carbon emissions Let be the carbon emission coefficient of synchronous generator j.
[0130] The constraints of the optimized scheduling model include power balance constraints:
[0131]
[0132] in, To predict the active power that the new energy power source k can generate in time period t based on the inverter, Let t be the system load demand for time period t.
[0133] The optimized scheduling model for the new energy power system includes upper and lower limits for synchronous generator output constraints:
[0134]
[0135] in, and Let be the minimum and maximum active power outputs of synchronous generator j, respectively. Let be the online state variable of synchronous generator j during time period t.
[0136] The optimized scheduling model for the new energy power system includes synchronous generator start-stop logic constraints:
[0137]
[0138] in, This indicates that synchronous generator j starts during time period t. This indicates that synchronous generator j stops operating during time period t.
[0139] The optimized scheduling model for the new energy power system includes synchronous generator ramping constraints:
[0140]
[0141] in, and These are the upward and downward ramp limits for synchronous generator j, respectively.
[0142] The optimized scheduling model for the new energy power system includes new energy output and curtailment constraints:
[0143]
[0144] Furthermore, the actual grid-connected power of inverter-type new energy power sources is:
[0145]
[0146] in, The actual grid-connected active power of inverter-type new energy power source k during time period t.
[0147] The optimized scheduling model for the new energy power system includes branch power flow constraints:
[0148]
[0149] in, For the active power flow of branch l in time period t, The power flow transmission limit for branch l, This represents the number of branches in the system.
[0150] The optimal dispatch model for the new energy power system also includes system strength constraints based on voltage stiffness:
[0151]
[0152] in, For a collection of synchronous generators, A collection of new energy access nodes. Let j be the system strength support coefficient for synchronous generator j to new energy access node i. This is the proportionality coefficient. This refers to the network access capacity or equivalent capacity of new energy access node i during time period t. This is the threshold coefficient determined based on the minimum voltage stiffness requirement.
[0153] Through the above objective function and constraints, the constructed new energy power system optimization scheduling model can comprehensively characterize the system operation economy, new energy absorption level, synchronous generator operation boundary, network transmission security, and system strength security requirements of new energy access nodes within the same solution framework. Thus, the grid strength constraints determined based on voltage stiffness are transformed into scheduling constraints that can participate in the optimization solution.
[0154] Based on this, the optimization scheduling model of the new energy power system is solved to obtain the synchronous generator start-up and shutdown status, synchronous generator active power output, actual grid-connected power output of new energy sources, new energy curtailment power, branch power flow, and grid strength satisfaction of each new energy access node during each scheduling period. Based on this, an optimization scheduling scheme is generated to guide the operation of the new energy power system.
[0155] Figure 5The figure shows the effect of an embodiment of the present invention. The left side of the figure is the optimized scheduling result without considering system strength constraints, and the right side is the optimized scheduling result after considering system strength constraints. The two upper curves represent the short-circuit capacity level of the designated new energy access nodes Bus29, Bus31 and Bus38 in the 24-hour scheduling cycle, and the two lower curves represent the 24-hour active power output of each synchronous generator set SG1 to SG6.
[0156] The results, without considering system strength constraints, show that although optimized scheduling can meet conventional power balance and unit operation constraints, the short-circuit capacity of designated fault nodes decreases significantly during certain periods. For example, during periods of high renewable energy output or low synchronous generator output, the short-circuit capacity of Bus29, Bus31, and Bus38 fluctuates to varying degrees, with some nodes even falling below the corresponding system strength safety threshold. This indicates that scheduling schemes focused solely on economic efficiency may lead to insufficient grid strength at local renewable energy access nodes. The corresponding unit output results also show that without system strength constraints, the output of some synchronous generators fluctuates drastically, with synchronous generators shutting down or operating at low output during certain periods, resulting in insufficient short-circuit capacity support provided by the system for renewable energy access nodes.
[0157] The results, considering system strength constraints, show that the short-circuit capacity levels of Bus29, Bus31, and Bus38 are generally improved and remain above the corresponding minimum system strength demand threshold in each scheduling period, avoiding the problem of insufficient short-circuit capacity in local periods when strength constraints are not considered. Simultaneously, the output allocation of each synchronous generator unit has also been adjusted. Specifically, during periods of high system strength demand, the scheduling model increases or maintains the online output level of some synchronous generator units, thereby utilizing the fault current contribution of online synchronous generators to improve the short-circuit capacity support level of renewable energy access nodes. During periods of greater system strength margin, renewable energy units are allowed to undertake more output, thus balancing system operating economy and renewable energy absorption levels.
[0158] In summary, the scheduling model considering system strength constraints not only takes into account conventional operating costs, unit output boundaries, and network transmission constraints, but also adjusts the start-up and shutdown status and output allocation of synchronous generator units according to the system strength requirements of renewable energy access nodes. Compared with scheduling schemes that do not consider system strength constraints, the scheduling model incorporating system strength constraints can significantly improve the short-circuit capacity level of designated renewable energy access nodes, and enhance the voltage support capability and operational safety of the power system under conditions of high renewable energy access.
[0159] Secondly, embodiments of the present invention also provide a new energy power system optimization scheduling device considering grid strength constraints, including a processor and a memory. The memory is used to store program instructions, and the processor is used to call the program instructions in the memory to execute a new energy power system optimization scheduling method considering grid strength constraints as described in the above technical solution.
[0160] The specific embodiments described herein are merely illustrative of the spirit of the invention. Those skilled in the art to which this invention pertains may make various modifications or additions to the described specific embodiments or use similar methods to substitute them, without departing from the spirit of the invention or exceeding the scope defined by the appended claims.
Claims
1. A method for optimal dispatch of a new energy power system considering grid strength constraints, characterized in that, Includes the following steps: S10, acquire operating status data of new energy power system; S20, Based on the operating status data, establish an augmented node network equation for calculating the fault current of a specified new energy access node, and calculate the fault current of the specified new energy access node through a fault current iterative solution method. S30, Based on the fault current, calculate the system strength support coefficient of the synchronous generator for the designated new energy access node, and form a system strength support coefficient matrix; S40, Based on the system strength support coefficient matrix and the fault current iterative verification result, the power grid strength constraint ratio coefficient is iteratively solved to make the linear superposition result of the system strength support coefficient match the actual fault current level. S50, calculate the voltage stiffness index of the new energy access node, and determine the minimum equivalent short-circuit capacity threshold required by the new energy access node based on the preset minimum voltage stiffness threshold. S60, Based on the system strength support coefficient matrix, synchronous generator online state variables, proportional coefficient and minimum equivalent short-circuit capacity threshold, construct grid strength constraints; S70, incorporate the power grid strength constraint into the new energy power system optimization scheduling model, and solve for the new energy power system optimization scheduling scheme that satisfies the constraint conditions. 2.The method of claim 1, wherein: In S20, the Thevenin model is used to equate synchronous generators to voltage sources connected to reactance branches, inverter-type renewable energy sources to voltage-controlled current sources, and reactive power compensation equipment to variable admittance branches, thus establishing augmented node network equations: ; wherein, is a system network admittance matrix of the new energy power system corresponding to the fault calculation scenario, is a node voltage vector, is an equivalent voltage source output current vector of the synchronous generator, is a fault current vector, is an equivalent voltage source voltage vector of the synchronous generator, is a synchronous generator access node association matrix, is a fault node association matrix; During the iteration process, the inverter current injection and reactive power compensation device admittance of the inverter-type renewable energy power supply are updated according to the voltage of the renewable energy access node; when the node voltage change between two adjacent iterations meets the convergence condition, the fault current is output; the convergence condition is expressed as: ; wherein, is the convergence accuracy, is the number of iterations, is the voltage of node i. 3.The method of claim 1, wherein: In S30, a stress operation scenario is constructed for each new energy access node i and each synchronous generator j. In the stress operation scenario, only the fault current of the j-th synchronous generator to node i is retained, and the fault current of the other generators is set to zero or removed from the fault current calculation. Solve the fault current of node i under this stress operating scenario and calculate the system strength support coefficient of the jth synchronous generator to node i: ; wherein, is the system strength support coefficient of the jth synchronous generator to the ith new energy access node, is the rated voltage of node i, is the fault current of node i when only the jth synchronous generator is retained, is the system reference capacity; The system strength support coefficient matrix C is composed of all new energy access nodes and synchronous generators, where the matrix rows correspond to new energy access nodes and the matrix columns correspond to synchronous generators. The system strength support coefficient matrix is used to characterize the short-circuit capacity contribution of different synchronous generators to different new energy access nodes. 4.The method of claim 1, wherein: In S40, the scaling factor The fault current is determined through a complete iterative verification method, including: selecting multiple representative operating scenarios and online combinations of synchronous generators; calculating a linear estimate of the short-circuit capacity based on the system strength support coefficient matrix and the online state of the synchronous generators under each representative operating scenario; iteratively solving for the corresponding actual fault level using augmented node network equations; and determining the proportionality coefficient based on the deviation between the actual fault level and the linearly estimated short-circuit capacity. , make The corrected linear estimate of the short-circuit capacity should not exceed the corresponding actual fault level; when a new representative operating scenario is added or the verification results do not meet the conservatism requirement, the estimate should be updated. And re-verify. 5.The method of claim 1, wherein: In S50, for the new energy access node i, the equivalent impedance of the grid-connected equipment at the time period t is defined as , the equivalent impedance of the grid side is defined as , and the voltage stiffness index of the new energy access node i at the time period t is ; Let the impedance angle difference be: ; wherein, is the equivalent impedance angle of the new energy access device, is the equivalent impedance angle of the grid side Let the equivalent short-circuit ratio be: ; in Let be the equivalent short-circuit capacity of the i-th renewable energy access node during time period t. Let be the equivalent capacity of the network-connected equipment of the i-th new energy access node in time period t; The voltage stiffness index is then expressed as: 。 6. The method of claim 5, wherein the method further comprises: Let the minimum voltage stiffness threshold of node i be , node i is required to satisfy at period t: ; Substituting the voltage stiffness expression into the above inequality, we obtain the minimum equivalent short-circuit ratio that satisfies the voltage stiffness requirement: ; Therefore, the minimum equivalent short-circuit capacity threshold required for node i to meet the voltage stiffness requirement in time period t is obtained: 。 7. The method of claim 1, wherein the method further comprises: determining the power output of the new energy power system based on the power grid strength constraint. In S60, the equivalent short circuit capacity of node i at period t is expressed as: and the online state variables of the synchronous generator , node i at period t is expressed as: ; in, System strength support coefficient matrix The elements in the equation are the system strength support coefficient of the j-th synchronous generator for the i-th new energy access node, and the online state variables of the synchronous generator. For variables of 0-1, when synchronous generator j is online during time period t, When synchronous generator j is offline during time period t, ; By using the minimum equivalent short-circuit capacity threshold based on voltage stiffness as the lower limit of system strength, new system strength constraints are generated: ; in, This is the system strength correction factor. For a collection of synchronous generators, Let j be the online state variable of synchronous generator j during time period t. Let be the equivalent capacity of the network-connected equipment of the i-th renewable energy access node during time period t. It is the minimum equivalent short-circuit ratio.
8. The optimal dispatching method for a new energy power system considering grid strength constraints as described in claim 1, characterized in that: The optimization scheduling model aims at minimizing total system operation cost in a scheduling period The total system operation cost includes conventional synchronous generator operation cost, start-up and shut-down cost, abandoned power penalty cost and carbon emission cost ; Where T is the number of scheduling periods. The number of synchronous generators, The number of inverter-type new energy power sources; Let j be the active power output of synchronous generator j during time period t. and These are startup variables and shutdown variables, respectively. The power curtailment of inverter-type renewable energy source k during time period t; , , , These are the operating cost coefficient, start-up cost coefficient, shutdown cost coefficient, and curtailment penalty cost coefficient for conventional generating units, respectively. Cost per unit of carbon emissions Let be the carbon emission coefficient of synchronous generator j.
9. The optimal dispatching method for a new energy power system considering grid strength constraints as described in claim 1, characterized in that: The constraints of the optimized scheduling model for the new energy power system also include power balance constraints, upper and lower limits of synchronous generator output constraints, synchronous generator start-stop logic constraints, ramping constraints, new energy output and curtailment constraints, branch power flow constraints, and new energy output constraints.
10. A new energy power system optimization dispatching device considering grid strength constraints, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, The processor implements the method for optimal scheduling of a new energy power system considering grid strength constraints according to any one of claims 1 to 9 when executing the computer program.