Resource processing methods, apparatus, equipment, media and process products

By quantifying the reliability of computing resource mapping results and making decisions based on credibility evaluation indicators, the problem of reliability differences in resource mapping conversion methods under different scenarios is solved, and the accuracy of computing resource scheduling is improved.

CN123123142APending Publication Date: 2026-11-17CHINA UNITED NETWORK COMM GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611430880.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-15
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing technologies, resource mapping and transformation methods are not adapted to different application scenarios, resulting in differences in the reliability of mapping results in different scenarios, which affects the accuracy of resource scheduling and decision-making.

Method used

By acquiring computing resource information, mapping it, and calculating a credibility score, the reliability of computing resources is quantified based on credibility evaluation indicators, enabling differentiated decision-making.

Benefits of technology

It improves the accuracy of computing resource decisions and reduces the risk of resource status distortion and scheduling failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123123142A_ABST
    Figure CN123123142A_ABST
Patent Text Reader

Abstract

This application provides a resource processing method, apparatus, device, medium, and program product, relating to the field of communication technology, for improving the accuracy of computing power resource decision-making. The specific technical solution is as follows: obtaining first computing power resource information corresponding to each of at least one first computing power resource; mapping each piece of first computing power resource information to obtain second computing power resource information corresponding to each piece of first computing power resource information; calculating a credibility score for each piece of second computing power resource information based on at least one credibility evaluation index; making a decision based on the credibility score of each piece of second computing power resource information and the computing power resource corresponding to each piece of second computing power resource information, and outputting the decision result. This application is applied in computing power network resource decision-making scenarios.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of communication technology, and in particular to a resource processing method, apparatus, device, medium, and program product. Background Technology

[0002] With the rapid development of computing network technology, computing networks can aggregate computing, storage, and network resources from multiple operators, cloud platforms, and data centers to form a unified resource pool for collaborative scheduling. The mapping and conversion of cross-domain heterogeneous resources is the core technology for realizing cross-platform resource orchestration and scheduling of computing networks.

[0003] In related technologies, conventional resource mapping and conversion methods mainly rely on resource specification parameters, performance test data, or preset rules to convert various heterogeneous hardware resources into standardized resource capability representations. At the same time, through dedicated namespaces and attribute models, resource information conversion and association in cross-domain scenarios can be completed, thereby realizing unified orchestration and scheduling of computing resources across platforms.

[0004] However, the above resource mapping conversion method only focuses on the resource mapping result itself, assuming that the resource measurement data is constant and accurate, and does not adapt to different application scenarios. As a result, the reliability of the mapping result varies in different application scenarios, which directly causes the problem of poor accuracy in subsequent resource scheduling and decision-making. Summary of the Invention

[0005] This application provides a resource processing method, apparatus, equipment, medium, and program product for improving the accuracy of computing resource decision-making.

[0006] In a first aspect, embodiments of this application provide a resource processing method, comprising: acquiring first computing power resource information corresponding to each of at least one first computing power resource; wherein the at least one first computing power resource is a computing power resource required for performing a computing power task; mapping each of the first computing power resource information to obtain second computing power resource information corresponding to each of the first computing power resource information, wherein the second computing power resource information is resource information of the second computing power resource actually required for performing the computing power task; calculating a credibility score for each of the second computing power resource information based on at least one credibility evaluation index, wherein the at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information, and the credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information; making a decision based on the credibility score of each of the second computing power resource information and the computing power resource corresponding to each of the second computing power resource information, and outputting a decision result.

[0007] The technical solution provided in this application brings at least the following beneficial effects: by quantifying the reliability of the computing resource mapping result and obtaining the quantified score of the computing resource mapping result based on at least one credibility evaluation index, different decisions can be made for the computing resource based on different quantified scores, thereby improving the accuracy of computing resource decision-making.

[0008] In one possible implementation, the decision result includes a resource processing strategy corresponding to the computing power task, wherein the resource processing strategy is used to instruct the execution of at least one of the following resource processing operations: resource scheduling, resource selection, resource orchestration, and resource management.

[0009] Another possible implementation involves making a decision based on the credibility score of each second computing resource information and the computing resources corresponding to each second computing resource information, and outputting a decision result, including: generating a credibility level corresponding to each second computing resource information based on the credibility score of each second computing resource information, wherein the credibility level includes any one of the following: high credibility level, low credibility level, and medium credibility level; making a decision based on the credibility level corresponding to each second computing resource information, and outputting a decision result, wherein different credibility levels correspond to different resource processing strategies.

[0010] In another possible implementation, the aforementioned credibility evaluation index includes at least one of the following: a data timeliness index, which characterizes the time interval between the moment when the first computing power resource information was acquired and the current moment; a measurement accuracy index, which characterizes the error range of monitoring the first computing power resource; a resource stability index, which characterizes the degree of resource state change between the first computing power resource and the second computing power resource; a mapping reliability index, which characterizes the historical accuracy of mapping from the first computing power resource to the second computing power resource using the mapping rule; and a historical deviation index, which characterizes the degree of deviation between historical mapping results and actual operating results.

[0011] Another possible implementation involves calculating the credibility score of each piece of second computing power resource information based on at least one credibility evaluation index, including: performing normalization processing on each of the at least one credibility evaluation index; performing weighted processing on each of the normalized credibility evaluation indices based on at least one preset weight; the at least one preset weight corresponds one-to-one with the at least one credibility evaluation index, and the preset weight is used to characterize the degree of influence of the corresponding credibility evaluation index on the accuracy of the mapping result; and fusing each of the normalized and weighted credibility evaluation indices to obtain the credibility score.

[0012] Another possible implementation is that the at least one first computing resource is a computing resource in the computing network required to perform the computing task; or, the number of the at least one first computing resource is at least two, and the at least two first computing resources are computing resources in different resource domains required to perform the computing task.

[0013] Another possible implementation, where the number of the first computing resources is at least two and the different first computing resources come from different resource domains, the resource processing method further includes: calculating the credibility score of the second computing resource information based on the at least one credibility evaluation index; calculating the domain credibility factor based on the historical operating data of the resource domain; and processing the credibility score of each of the second computing resource information based on the domain credibility factor and the credibility score to obtain a comprehensive credibility score.

[0014] Secondly, embodiments of this application provide a resource processing apparatus, comprising: an acquisition module, configured to acquire first computing power resource information corresponding to each of at least one first computing power resource; wherein the at least one first computing power resource is a computing power resource required to perform a computing power task; a mapping module, configured to map each of the first computing power resource information to obtain second computing power resource information corresponding to each of the first computing power resource information, wherein the second computing power resource information is resource information of the second computing power resource actually required to perform the computing power task; a calculation module, configured to calculate a credibility score for each of the second computing power resource information based on at least one credibility evaluation index, wherein the at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information, and the credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information; and a decision module, configured to make a decision based on the credibility score of each of the second computing power resource information and the computing power resource corresponding to each of the second computing power resource information, and output a decision result.

[0015] One possible implementation is that the decision result includes the resource processing strategy corresponding to the computing power task, and the resource processing strategy is used to instruct the execution of at least one of the following resource processing operations: resource scheduling, resource selection, resource orchestration, and resource management.

[0016] Another possible implementation, the decision module described above, is specifically used to: generate a credibility level corresponding to each of the above second computing power resource information based on the credibility score of each of the above second computing power resource information, the credibility level including any of the following: high credibility level, low credibility level, medium credibility level; make a decision based on the credibility level corresponding to each of the above second computing power resource information, and output the decision result, the resource processing strategy corresponding to different credibility levels is different.

[0017] Another possible implementation is that the aforementioned credibility evaluation index includes at least one of the following: a data timeliness index, which characterizes the time interval between the moment when the information on the first computing power resource was acquired and the current moment; a measurement accuracy index, which characterizes the error range of monitoring the first computing power resource; a resource stability index, which characterizes the degree of change in the resource state between the first computing power resource and the second computing power resource; a mapping reliability index, which characterizes the historical accuracy of mapping from the first computing power resource to the second computing power resource using the mapping rule; and a historical deviation index, which characterizes the degree of deviation between the historical mapping results and the actual operating results.

[0018] Another possible implementation is that the above calculation module is specifically used to: perform normalization processing on each of the at least one credibility evaluation indicators; perform weighted processing on each of the normalized credibility evaluation indicators based on at least one preset weight; the at least one preset weight corresponds one-to-one with the at least one credibility evaluation indicator, and the preset weight is used to characterize the degree of influence of the corresponding credibility evaluation indicator on the accuracy of the mapping result; and fuse each of the normalized and weighted credibility evaluation indicators to obtain the credibility score.

[0019] Another possible implementation is that the at least one first computing resource is a computing resource in the computing network required to perform the computing task; or, the number of the at least one first computing resource is at least two, and the at least two first computing resources are computing resources in different resource domains required to perform the computing task.

[0020] In another possible implementation, where the number of the first computing resources is at least two and the different first computing resources come from different resource domains, the resource processing device further includes: a calculation module, used to calculate the credibility score of the second computing resource information based on the at least one credibility evaluation index; the calculation module is also used to calculate a domain credibility factor based on the historical operating data of the resource domain; and a processing module, used to process the credibility score of each of the second computing resource information based on the domain credibility factor and the credibility score to obtain a comprehensive credibility score.

[0021] Thirdly, this application provides an electronic device comprising: a processor and a memory; the memory stores a program or instructions executable on the processor, wherein the program or instructions, when executed by the processor, implement the method of the first aspect described above.

[0022] Fourthly, this application provides a readable storage medium on which a program or instructions are stored, which, when executed by a computer, implement the method of the first aspect described above.

[0023] Fifthly, this application provides a computer program product stored in a storage medium, which, when executed by a computer, implements the method described in the first aspect.

[0024] In a sixth aspect, embodiments of this application provide a chip including a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the method described in the first aspect.

[0025] The beneficial effects of the second to sixth aspects mentioned above are described in the corresponding description of the first aspect and will not be repeated here. Attached Figure Description

[0026] Figure 1 A schematic diagram of a network architecture for a resource processing method application provided in an embodiment of this application;

[0027] Figure 2 A flowchart illustrating a resource processing method provided in an embodiment of this application;

[0028] Figure 3 A flowchart illustrating another resource processing method provided in an embodiment of this application;

[0029] Figure 4 A flowchart illustrating yet another resource processing method provided in an embodiment of this application;

[0030] Figure 5 A flowchart illustrating another resource processing method provided in an embodiment of this application;

[0031] Figure 6 A flowchart illustrating the implementation process of a resource processing method in a given scenario, as provided in an embodiment of this application;

[0032] Figure 7 A flowchart illustrating the implementation process of a resource processing method in another scenario provided in this application embodiment;

[0033] Figure 8 This is a schematic diagram of the structure of a resource processing system provided in an embodiment of this application;

[0034] Figure 9 This is a schematic diagram of the structure of a resource processing device provided in an embodiment of this application;

[0035] Figure 10 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application. Detailed Implementation

[0036] The resource processing methods, apparatus, equipment, media, and program products provided in this application will now be described in detail with reference to the accompanying drawings.

[0037] The technical solutions of the embodiments of this application will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application are within the scope of protection of this application.

[0038] The terms "first," "second," etc., used in the specification and claims of this application are used to distinguish similar objects and not to describe a specific order or sequence. It should be understood that such use of data can be interchanged where appropriate so that embodiments of this application can be implemented in orders other than those illustrated or described herein, and the objects distinguished by "first," "second," etc., are generally of the same class and the number of objects is not limited; for example, a first object can be one or more. Furthermore, in the specification and claims, "and / or" indicates at least one of the connected objects, and the character " / " generally indicates that the preceding and following objects are in an "or" relationship.

[0039] The terms "at least one," "at least one of," etc., used in the specification and claims of this application refer to any one, any two, or a combination of two or more of the included items. For example, at least one of a, b, and c can mean: "a," "b," "c," "a and b," "a and c," "b and c," and "a, b, and c," where a, b, and c can be single or multiple. Similarly, "at least two" refers to two or more items, and its meaning is similar to that of "at least one."

[0040] In the description of this application, unless otherwise stated, "a plurality of" means two or more.

[0041] The resource processing method, apparatus, device, medium, and program product provided in this application embodiment can be applied to computing power network resource decision-making scenarios.

[0042] Existing solutions primarily focus on the mapping results of resource capacity values ​​themselves, typically assuming that the measurement data is true, accurate, and stable, lacking a quantitative description of the reliability of the mapping results. When resource status changes dynamically, measurement data contains latency or errors, or the data quality reported from different domains is inconsistent, the same mapping rules may produce mapping results with varying degrees of reliability. Existing technologies generally cannot assess and label the reliability of mapping results, and lack reliability calculation mechanisms based on factors such as data quality, resource volatility, and historical biases, which may affect the accuracy of subsequent resource scheduling and decision-making.

[0043] To address the aforementioned technical problems, embodiments of this application provide a resource processing method, apparatus, device, medium, and program product. By quantifying the reliability of the computing power resource mapping result and obtaining a quantified score for the computing power resource mapping result based on at least one credibility evaluation index, different decisions can be made for the computing power resource based on different quantified scores, thereby improving the accuracy of computing power resource decisions.

[0044] The following is an explanation of the English terms used in this application.

[0045] Computing Power Network (CPN);

[0046] Central Processing Unit (CPU);

[0047] Artificial Intelligence (AI);

[0048] Neural Processing Unit (NPU)

[0049] Graphics Processing Unit (GPU).

[0050] The resource processing methods, apparatus, devices, media, and program products provided in the embodiments of this application will be described in detail below with reference to the accompanying drawings.

[0051] Figure 1 This illustration shows a network architecture for a resource processing method provided in an embodiment of this application. For example... Figure 1 As shown, the network architecture includes a resource processing device 101 and a terminal device 102. The resource processing device 101 and the terminal device 102 are interconnected.

[0052] In some embodiments, the resource processing device 101 may be a server, a computer, or a processor or processing unit within a server or computer. The server may be a single server or a server cluster comprising multiple servers. It should be noted that the embodiments of this application do not limit the specific device form of the resource processing device 101. Figure 1 The example shown is a resource processing device 101 as a single server.

[0053] In some embodiments, the terminal device may be a mobile phone, tablet computer, laptop computer, handheld computer, in-vehicle electronic device, mobile internet device (MID), augmented reality (AR) / virtual reality (VR) device, robot, wearable device, personal computer (PC), ultra-mobile personal computer (UMPC), netbook, or personal digital assistant (PDA), etc., and the embodiments of this application do not specifically limit it. Figure 1 The example shown is a mobile phone, with terminal device 102 as an example.

[0054] In some embodiments, the resource processing device 101 acquires first computing power resource information corresponding to each of at least one first computing power resource; maps each of the first computing power resource information to obtain second computing power resource information corresponding to each of the first computing power resource information, wherein the second computing power resource information is the resource information of the second computing power resource actually required to execute the computing power task; calculates a credibility score for each of the second computing power resource information based on at least one credibility evaluation index, wherein the at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information, and the credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information; makes a decision based on the credibility score of each of the second computing power resource information and the computing power resource corresponding to each of the second computing power resource information, and outputs the decision result to the terminal device 102.

[0055] It should be noted that the network architecture described in the embodiments of this application is for the purpose of more clearly illustrating the technical solutions of the embodiments of this application, and does not constitute a limitation on the technical solutions provided in the embodiments of this application. As network architectures evolve, the technical solutions provided in the embodiments of this application are also applicable to similar technical problems.

[0056] See Figure 2 This is a flowchart illustrating a resource processing method provided in an embodiment of this application. Figure 2 As shown, the resource processing method provided in this application embodiment can be implemented by the above-mentioned resource processing device, specifically including the following steps 201 to 204.

[0057] Step 201: The resource processing device obtains the first computing power resource information corresponding to each of the at least one first computing power resources.

[0058] Wherein, at least one of the aforementioned first computing resources is the computing resource required to perform computing tasks.

[0059] It can be understood that the computing resources in this application can be considered as the sum of the computing power of the device to perform calculations and process data, as well as the hardware resources and scheduling resources that support the above computing power.

[0060] In some embodiments, the aforementioned first computing power resource may originate from a computing power network or from different resource domains, and this application does not limit this.

[0061] In some embodiments, the at least one first computing resource is a computing resource in a computing network required to perform the computing task; or, the number of the at least one first computing resource is at least two, and the at least two first computing resources are computing resources in different resource domains required to perform the computing task.

[0062] In this way, for different usage scenarios, whether the computing resources are provided by the same resource domain or different resource domains, different computing resource decisions are made by quantifying the mapping results. This avoids making the same computing resource decisions for mapping results with different levels of reliability, thereby improving the accuracy of computing resources.

[0063] In some embodiments, the computing resource information mentioned above includes, but is not limited to: resource identification information, resource type information, resource capability parameters, resource status parameters, and resource measurement time information.

[0064] For example, the resource identification information mentioned above is identification data used to uniquely and accurately locate or identify a resource.

[0065] For example, the above-mentioned resource type information is data used to describe the category, form, and carrier of the resource.

[0066] For example, the above resource capability parameters are a set of data used to describe the functions, performance limits, service capabilities, operating indicators, and constraints of a certain type of resource.

[0067] For example, the above resource status parameters are dynamic data used to describe the current operation, availability, lifecycle, and occupancy of a resource.

[0068] For example, the resource measurement time information mentioned above is the time data used to collect resource indicators (load, status, performance, operation data).

[0069] Step 202: The resource processing device maps each first computing power resource information to obtain the second computing power resource information corresponding to each first computing power resource information.

[0070] In some embodiments, the aforementioned second computing resource information refers to the resource information of the second computing resources actually required to execute the aforementioned computing task. In other words, the aforementioned second computing resources can be considered as the actual computing resources actually required to execute the aforementioned computing task.

[0071] In some embodiments, the mapping of each first computing resource information as described above includes, but is not limited to: physical resource to virtual resource mapping, cross-architecture resource mapping, and cross-domain resource mapping.

[0072] It is understood that the resource processing device can map each piece of first computing power resource information based on preset mapping rules to obtain the second computing power resource information corresponding to each piece of first computing power resource information. For example, the preset mapping rules may include physical resource to virtual resource mapping rules, cross-domain resource mapping rules, and cross-architecture resource equivalent mapping rules.

[0073] For example, multiple CPU nodes, GPU nodes, and NPU nodes are mapped to obtain a new resource description.

[0074] Step 203: The resource processing device calculates the credibility score of each second computing power resource information based on at least one credibility evaluation index.

[0075] In some embodiments, the above-mentioned at least one credibility evaluation index is determined based on the above-mentioned first computing power resource information and the second computing power resource information corresponding to the above-mentioned first computing power resource information, and the credibility score is used to characterize the accuracy of the mapping of the above-mentioned first resource information to the second computing power resource information corresponding to the above-mentioned first computing power resource information.

[0076] In some embodiments, the above-mentioned credibility evaluation indicators include at least one of the following: data timeliness indicators, measurement accuracy indicators, resource stability indicators, mapping reliability indicators, and historical deviation indicators.

[0077] For example, the above-mentioned data timeliness index is used to characterize the time interval between the moment when the information of the first computing power resource is obtained and the current moment; the above-mentioned measurement accuracy index is used to characterize the error range of monitoring the first computing power resource; the above-mentioned resource stability index is used to characterize the degree of resource status change between the first computing power resource and the second computing power resource; the above-mentioned mapping rule reliability index is used to characterize the historical accuracy of mapping from the first computing power resource to the second computing power resource using the mapping rule; and the above-mentioned historical deviation index is used to characterize the degree of deviation between the historical mapping results and the actual operation results.

[0078] In some embodiments, the credibility score may be represented by a numerical value from 0 to 100, or by other numerical ranges, and this application does not limit this.

[0079] Generally, a higher credibility score indicates a higher consistency between the current mapping result and the actual resource capability. Conversely, a lower credibility score indicates a lower consistency between the current mapping result and the actual resource capability.

[0080] In this way, by quantifying different credibility evaluation indicators, a quantified credibility score is obtained. Based on this credibility score, the reliability of the computing resource mapping result can be accurately reflected, which facilitates subsequent resource processing decisions and improves the accuracy of computing resource decisions.

[0081] In some embodiments, combined with Figure 2 ,like Figure 3 As shown, step 203 above can be implemented through steps 203a to 203c.

[0082] Step 203a: The resource processing device performs normalization processing on each of the at least one credibility evaluation index.

[0083] In some embodiments, normalization refers to normalizing the credibility evaluation index to generate a value between 0 and 100.

[0084] Step 203b: The resource processing device performs weighted processing on each normalized credibility evaluation index based on at least one preset weight.

[0085] In some embodiments, the above-mentioned at least one preset weight corresponds one-to-one with the above-mentioned at least one credibility evaluation index, and the above-mentioned preset weight is used to characterize the degree of influence of the corresponding credibility evaluation index on the accuracy of the mapping result.

[0086] In some embodiments, the sum of the preset weighting coefficients is equal to 1, and the preset weighting coefficients can be configured by the operator or dynamically adjusted according to historical operating conditions.

[0087] Step 203c: The resource processing device merges each normalized and weighted credibility evaluation index to obtain a credibility score.

[0088] In some embodiments, the credibility score can be calculated using the following formula:

[0089] Confidence Score=w1×Freshness+w2×Accuracy+w3×Stability+ w4×RuleReliability+w5×HistoricalConsistency (Formula 1)

[0090] Here, Confidence Score represents the credibility score, a normalized score between 0 and 100; Freshness represents the data timeliness index; Accuracy represents the measurement accuracy index; Stability represents the resource stability index; Rule Reliability represents the mapping rule reliability index; Historical Consistency represents the historical deviation index; and w1 to w5 are weighting coefficients, satisfying the condition: w1 + w2 + w3 + w4 + w5 = 1. The weighting coefficients can be pre-configured by the operator or dynamically adjusted based on historical operating data.

[0091] For example, Freshness=90; Accuracy=95; Stability=80; RuleReliability=85; HistoricalConsistency=88;

[0092] The final calculated score is 87.

[0093] In this way, by quantifying different credibility evaluation indicators, a quantified credibility score is obtained. Based on this credibility score, the reliability of the computing resource mapping result can be accurately reflected, which facilitates subsequent resource processing decisions and improves the accuracy of computing resource decisions.

[0094] Step 204: The resource processing device makes a decision based on the credibility score of each second computing power resource information and the computing power resources corresponding to each second computing power resource information, and outputs the decision result.

[0095] In some embodiments, the decision result includes the resource processing strategy corresponding to the computing power task, and the resource processing strategy is used to instruct the execution of at least one of the following resource processing operations: resource scheduling, resource selection, resource orchestration, and resource management.

[0096] In some embodiments, after obtaining the credibility score of each second computing power resource information, the resource processing device can upload the credibility score of each second computing power resource information to the resource scheduling system. The resource scheduling system selects the most suitable computing power resource (i.e., the second computing power resource with the highest credibility score) from each second computing power resource based on the credibility score to participate in the AI ​​training task scheduling.

[0097] In this way, different computing resources are used to make decisions based on different credibility scores, thereby determining the most suitable computing resources to participate in subsequent tasks, reducing the risk of resource status distortion and scheduling failure, and thus improving the accuracy of computing resource decision-making.

[0098] In some embodiments, when there are at least two first computing resources and the different first computing resources come from different resource domains, the comprehensive credibility score can be calculated by combining the domain credibility factor of each resource domain.

[0099] For example, such as Figure 5 As shown, the resource processing method provided in this application embodiment further includes steps 205 to 207.

[0100] Step 205: The resource processing device calculates the credibility score of the second computing power resource information based on at least one credibility evaluation index.

[0101] Step 206: The resource processing device calculates the domain reliability factor based on the historical operating data of the resource domain.

[0102] In some embodiments, the domain trust factor is used to describe the degree of data trustworthiness exhibited by a resource domain during long-term operation.

[0103] For example, the domain trust factor mentioned above includes at least one of the following parameters: data update timeliness rate, resource data integrity rate, historical mapping accuracy rate, resource status consistency rate, and frequency of abnormal events.

[0104] Step 207: The resource processing device processes the credibility score of each second computing power resource information based on the domain credibility factor and credibility score to obtain a comprehensive credibility score.

[0105] For example, if a GPU resource has a resource-level credibility of 92 and a domain credibility factor of 0.95, then its overall credibility is higher than that of similar resources from low-credibility domains.

[0106] In this way, by comprehensively considering the domain trust factor and trust score for computing resources in different resource domains, a comprehensive trust score is obtained for computing resources in different resource domains. When the comprehensive trust score is high, computing resources corresponding to higher comprehensive trust scores are selected first to participate in task scheduling, thereby improving the accuracy of computing resource decision-making.

[0107] In some embodiments, combined with Figure 2 ,like Figure 4 As shown, step 204 above can be implemented through steps 204a and 204b.

[0108] Step 204a: The resource processing device generates a credibility level corresponding to each second computing power resource information based on the credibility score of each second computing power resource information.

[0109] In some embodiments, the above-mentioned trust level includes any one of the following: high trust level, low trust level, and medium trust level.

[0110] For example, when the credibility score is greater than or equal to 85, the corresponding credibility level is a high credibility level.

[0111] For example, when the credibility score is greater than or equal to 60 and less than 85, the corresponding credibility level is medium credibility level.

[0112] For example, when the credibility score is less than 60, the corresponding credibility level is a low credibility level.

[0113] For example, Freshness=90; Accuracy=95; Stability=80; RuleReliability=85; HistoricalConsistency=88; the final calculated Confidence Score is 87.

[0114] Among them, Confidence Score represents the confidence score, which is a confidence score between 0 and 100 generated after normalization; Freshness represents the data timeliness index; Accuracy represents the measurement accuracy index; Stability represents the resource stability index; RuleReliability represents the mapping rule reliability index; and HistoricalConsistency represents the historical deviation index.

[0115] Step 204b: The resource processing device makes a decision based on the credibility level corresponding to each second computing power resource information and outputs the decision result.

[0116] In some embodiments, different trust levels correspond to different resource processing strategies.

[0117] In some embodiments, the above resource processing strategies include, but are not limited to: resource scheduling strategies, resource management strategies, resource orchestration strategies, and resource selection strategies.

[0118] In some embodiments, different trust levels correspond to different resource scheduling strategies for resource scheduling; or, different trust levels correspond to different resource management strategies for scheduling management; and different trust levels correspond to different resource orchestration strategies for scheduling orchestration.

[0119] For example, regarding resource scheduling, when multiple candidate resources meet business requirements, resources with higher overall credibility are prioritized for task scheduling. When multiple resources have similar capabilities, overall credibility is used as one of the criteria for resource selection. When the credibility of a resource falls below a preset threshold, a remeasurement, remapping, or credibility verification process can be triggered.

[0120] In this way, by comparing the credibility score with a preset threshold, the credibility level corresponding to the credibility score is determined, and different decisions on computing resources are made based on the credibility level, thereby improving the accuracy of computing resource decisions.

[0121] The resource processing method provided in this application quantifies the reliability of the computing resource mapping result and obtains a quantitative score for the computing resource mapping result based on at least one credibility evaluation index. This allows for different decisions to be made for the computing resource based on different quantitative scores, thereby improving the accuracy of computing resource decision-making.

[0122] The resource processing method of this application will be described below through specific embodiments.

[0123] This application proposes a heterogeneous computing power resource mapping evaluation method, which is applied to computing power networks (CPN). By introducing a mapping credibility assessment mechanism in the computing power resource mapping process, it realizes a quantitative description of the reliability of the mapping results, providing a reliable basis for subsequent resource scheduling, resource orchestration, resource management and resource transactions.

[0124] This application constructs a mapping credibility assessment system, which includes a resource data acquisition module, a mapping transformation module, a credibility assessment module, a credibility identifier generation module, and a mapping result output module. Each module is explained in detail below.

[0125] For example, the resource data acquisition module is used to receive resource measurement data from heterogeneous computing resources in the computing network, including computing, storage, and network resources. The aforementioned resource measurement data includes, but is not limited to, CPU utilization, GPU utilization, memory capacity, storage capacity, network bandwidth, network latency, service throughput, and resource status information.

[0126] For example, the mapping conversion module is used to convert measurement data from different resource domains, different hardware architectures, and different resource types into new resource descriptions according to preset mapping rules. These mapping rules may include physical resource to virtual resource mapping rules, cross-domain resource mapping rules, and cross-architecture resource equivalence mapping rules. After mapping conversion, new description information of resource capabilities is generated.

[0127] For example, the credibility assessment module is used to calculate the credibility of the mapping transformation results. The credibility assessment module analyzes the reliability of the mapping results from multiple dimensions, including data timeliness indicators, measurement accuracy indicators, resource stability indicators, mapping rule reliability indicators, and historical deviation indicators. Specifically, the data timeliness indicator reflects the time difference between resource measurement data and the current actual state; the measurement accuracy indicator reflects the error level of the resource measurement system; the resource stability indicator reflects the degree of fluctuation in resource status within a certain time window; the mapping rule reliability indicator reflects the accuracy of the current mapping rule in historical applications; and the historical deviation indicator reflects the degree of deviation between the mapping results and the actual operating results.

[0128] Furthermore, the aforementioned credibility assessment module also generates a mapped credibility score (i.e., the credibility score mentioned above) based on the aforementioned multiple indicators.

[0129] For example, the credibility identifier generation module generates a corresponding credibility level based on the credibility score. Preferably, the credibility level can be divided into three levels: high credibility, medium credibility, and low credibility. Among them, high credibility means that the mapping result can be directly used for resource scheduling decisions; medium credibility means that the mapping result can be combined with other information to assist in decision-making; low credibility means that the mapping result needs to be further verified before it can be used.

[0130] For example, the mapping result output module is used to output a mapping tuple containing resource mapping results and credibility information. This mapping tuple includes the resource identifier, mapping result, credibility score, credibility level, and timestamp information. Through the mapping tuple, the upper-layer orchestration system can simultaneously obtain resource capability information and corresponding credibility information.

[0131] The resource processing method proposed in this application will be explained in detail below through specific implementation methods.

[0132] Implementation method 1: Credibility assessment calculation method.

[0133] like Figure 6 As shown, the specific implementation process of Implementation Method 1 includes the following steps S1 to S7:

[0134] Step S1: The mapping and transformation function entity receives measurement data from the computing power resources of the computing power network. The received data includes: resource identification information; resource type information; resource capability parameters; resource status parameters; and resource measurement time information. For example: CPU utilization = 62%; GPU utilization = 71%; available memory = 256GB; network latency = 12ms; data acquisition time = 2025-03-01 10:00:00.

[0135] Step S2: The resource standardization mapping module performs a new conversion on heterogeneous resources according to the preset mapping rules.

[0136] Specifically, this includes: mapping physical resources to virtual resources; cross-architecture resource mapping; and cross-domain resource mapping. For example, Intel CPU nodes, ARM CPU nodes, GPU nodes, and NPU nodes are each converted into new resource capability representations. The converted data forms resource description objects.

[0137] Step S3: The credibility index extraction module extracts credibility evaluation indicators from the resource data and mapping process. This implementation uses the following five types of indicators: data timeliness indicators, measurement accuracy indicators, resource stability indicators, mapping rule reliability indicators, and historical deviation indicators.

[0138] Step S4: The credibility calculation module calculates the mapping credibility score based on the above indicators. The specific calculation formula can be found in formula (1) above.

[0139] For example, Freshness=90; Accuracy=95; Stability=80; RuleReliability=85; HistoricalConsistency=88;

[0140] The final calculated score is 87.

[0141] Step S5: The credibility level generation module determines the credibility level based on the credibility score. This implementation adopts a three-level classification method: High credibility level: Confidence Score ≥ 85; Medium credibility level: 60 ≤ Confidence Score < 85; Low credibility level: Confidence Score < 60. For the example result above: Confidence Score = 87, the corresponding credibility level is "High Credibility".

[0142] Step S6: The mapping result output module generates a Resource Mapping Confidence Tuple (RMCT). The RMCT includes: Resource ID; MappedResource; Confidence Score; Confidence Level; and Timestamp. For example: (Resource ID=001, Virtual Compute Unit=120, Confidence Score=87, Confidence Level=High, Timestamp=2025-03-01 10:00:05).

[0143] Step S7: The mapping result output module sends the above tuples to the orchestration system, scheduling system or resource management system.

[0144] In this implementation, the mapping and transformation function entity can not only output new mapping results for heterogeneous resources, but also simultaneously output the corresponding reliability information. The upper-layer scheduling system can prioritize high-reliability resources for resource scheduling, and trigger re-measurement, re-mapping, or manual verification processes for low-reliability resources, thereby improving the reliability and accuracy of resource scheduling decisions in a computing network environment.

[0145] Implementation Method 2: Mapping credibility calculation method in cross-carrier / cross-cloud resource pool scenarios.

[0146] This implementation method is applied to cross-carrier and cross-cloud resource pool collaboration scenarios in computing power networks. Multiple carrier networks, multiple cloud service providers, and multiple data centers together constitute a new computing resource pool to provide end-to-end computing services to users.

[0147] For example, because different operators and cloud service providers use different resource management systems, resource naming methods, performance indicator systems, and data collection mechanisms, there is significant heterogeneity among different resource information during cross-domain resource collaboration. Furthermore, the accuracy, real-time nature, and completeness of resource data provided by different domains vary, leading to different levels of reliability in mapping results even with the same mapping rules.

[0148] To address the aforementioned issues, this implementation method further introduces a domain credibility factor mechanism based on implementation method 1 and incorporates it into the mapping credibility evaluation process.

[0149] like Figure 7 As shown, the specific implementation process of Implementation Method 1 includes the following steps S8 to S13:

[0150] Step S8: The cross-domain mapping function entity receives resource description information from multiple resource domains.

[0151] For example, operator A provides GPU resources; operator B provides CPU cluster resources; and cloud service provider C provides AI inference resources. Each resource domain uses different data formats and resource description methods.

[0152] Step S9: The cross-domain mapping function entity performs a new transformation according to the preset cross-domain mapping rules.

[0153] For example, "AI Compute Unit" in domain A, "Accelerator Resource" in domain B, and "GPU Service Instance" in domain C are all converted into new resource capability description models. After the conversion, new resource description objects are formed.

[0154] Step S10: The domain credibility assessment module calculates the domain credibility factor for each resource domain. The domain credibility factor describes the degree of data credibility exhibited by the resource domain during long-term operation. In this embodiment, the domain credibility factor includes at least the following parameters: data update timeliness rate, resource data integrity rate, historical mapping accuracy rate, resource status consistency rate, and frequency of abnormal events.

[0155] For example, Operator A: Domain Trust Factor = 0.95; Operator B: Domain Trust Factor = 0.88; Cloud Service Provider C: Domain Trust Factor = 0.76.

[0156] Step S11: For each mapping result, the credibility fusion module combines resource-level credibility and domain-level credibility to generate a comprehensive credibility value. Resource-level credibility reflects the reliability of the current resource mapping result; domain-level credibility reflects the overall credibility of the resource source domain.

[0157] For example, for a certain GPU resource: resource-level trustworthiness = 92; domain trustworthiness factor = 0.95; then the overall trustworthiness is higher than that of similar resources from low-trust domains.

[0158] Step S12: The cross-domain mapping function entity generates a cross-domain resource credibility mapping tuple. The tuple includes: resource identifier, resource domain, new resource capability description, resource credibility score, domain credibility factor, overall credibility level, and timestamp information.

[0159] For example, Resource=1001, Domain=A, Virtual GPU Unit=100, ResourceConfidence=92, Domain Trust Factor=0.95, Overall Confidence=High.

[0160] Step S13: The resource scheduling module selects resources based on the overall trust level. For multiple candidate resources that meet business requirements, resources with higher overall trust levels are prioritized for task scheduling. When multiple resources have similar capabilities, overall trust level is used as one of the resource selection criteria. When a resource's trust level falls below a preset threshold, a remeasurement, remapping, or trust verification process can be triggered.

[0161] For example, the following describes the application scenario of this embodiment using scenario 1.

[0162] Scenario 1: In a cross-carrier AI training task scheduling scenario, the scheduling system needs to select a suitable large-scale GPU cluster from multiple carrier resource pools. Both Carrier A and Carrier B report available GPU resources. After a new mapping, their computing power metrics are essentially the same. However, Carrier A's resource data update cycle is 30 seconds, with a historical mapping accuracy of 98%; Carrier B's resource data update cycle is 10 minutes, with a historical mapping accuracy of 90%. This implementation identifies these differences through a domain credibility factor mechanism and generates different comprehensive credibility results. The resource scheduling system prioritizes resources from Carrier A, thereby reducing resource status distortion and scheduling failure risks.

[0163] This implementation introduces a domain trust factor mechanism during the cross-domain resource mapping process to achieve a joint evaluation of resource capability mapping results and the trustworthiness of resource sources. Compared to existing schemes that only focus on resource capability mapping, this implementation can more accurately reflect the reliability of resource mapping results in cross-carrier and cross-cloud service provider environments, improving the accuracy and stability of cross-domain resource collaborative scheduling.

[0164] It should be noted that both Implementation Method 1 and Implementation Method 2 are applicable to the resource processing method proposed in this application, the only difference being the application scenario.

[0165] In this way, by quantifying the reliability of the computing resource mapping result and obtaining a quantitative score for the computing resource mapping result based on at least one credibility evaluation index, different decisions can be made for the computing resource based on different quantitative scores, thereby improving the accuracy of computing resource decision-making.

[0166] It should be noted that the descriptions of each step S1 to S13 in this embodiment can be found in the descriptions in the above embodiments, and will not be repeated here.

[0167] It should be noted that the above-described method embodiments, or the various possible implementations of the method embodiments, can be executed individually, or, provided there is no conflict, they can be combined with each other. The specific implementation can be determined according to actual usage requirements, and this application embodiment does not impose any restrictions on this.

[0168] Figure 8 This is a schematic diagram of the structure of a resource processing system provided in an embodiment of this application. Figure 8 As shown, the resource processing system 800 may include: a resource data acquisition module 801, a mapping conversion module 802, a credibility assessment module 803, a credibility identifier generation module 804, and a mapping result output module 805.

[0169] The resource data acquisition module 801 is used to receive resource measurement data from heterogeneous computing resources in the computing network and apply it to the relevant scheme in step 201 above.

[0170] The mapping conversion module 802 is used to convert measurement data from different resource domains, different hardware architectures and different resource types into new resource descriptions according to preset mapping rules, and apply them to the relevant schemes in step 202 above.

[0171] The credibility assessment module 803 is used to calculate the credibility of the mapping transformation result and is applied to the relevant scheme in step 203 above.

[0172] The credibility identifier generation module 804 is used to generate a corresponding credibility level based on the credibility score, which is applied to the relevant scheme in step 204 above.

[0173] The mapping result output module 805 is used to output a mapping tuple containing resource mapping results and credibility information, which is applied to the relevant scheme in step 204 above.

[0174] It should be noted that for a detailed explanation of the steps performed by each module and their beneficial effects, please refer to the description in the above embodiments, which will not be repeated here.

[0175] As can be seen, the above mainly describes the solutions provided by the embodiments of this application from a methodological perspective. To achieve the above functions, the embodiments of this application provide corresponding hardware structures and / or software modules for executing each function. Those skilled in the art should readily recognize that, in conjunction with the modules and algorithm steps of the various examples described in the embodiments disclosed herein, the embodiments of this application can be implemented in hardware or a combination of hardware and computer software. Whether a function is executed in hardware or by computer software driving hardware depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this application.

[0176] This application embodiment can divide the resource processing device into functional modules according to the above method example. For example, each function can be divided into its own functional module, or two or more functions can be integrated into one processing module. The integrated module can be implemented in hardware or as a software functional module. Optionally, the module division in this application embodiment is illustrative and only represents one logical functional division; other division methods may be used in actual implementation.

[0177] In some embodiments, this application also provides a resource processing apparatus. The resource processing apparatus may include one or more functional modules for implementing the resource processing method of the above method embodiments.

[0178] For example, Figure 9 This is a schematic diagram of the structure of a resource processing device provided in an embodiment of this application. Figure 9 As shown, the resource processing device 900 includes: an acquisition module 901, a mapping module 902, a calculation module 903, and a decision module 904.

[0179] The acquisition module 901 is used to acquire first computing power resource information corresponding to each of the at least one first computing power resources; the at least one first computing power resource is the computing power resource required to perform the computing power task; the mapping module 902 is used to map each of the first computing power resource information to obtain second computing power resource information corresponding to each of the first computing power resource information, the second computing power resource information is the resource information of the second computing power resource actually required to perform the computing power task; the calculation module 903 is used to calculate the credibility score of each of the second computing power resource information based on at least one credibility evaluation index, the at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information, and the credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information;

[0180] The aforementioned decision module 904 is used to make decisions based on the credibility score of each of the aforementioned second computing power resource information and the computing power resources corresponding to each of the aforementioned second computing power resource information, and output the decision results.

[0181] The resource processing device provided in this application quantifies the reliability of the computing power resource mapping result and obtains a quantitative score of the computing power resource mapping result based on at least one credibility evaluation index. This allows for different decisions to be made for the computing power resource based on different quantitative scores, thereby improving the accuracy of computing power resource decisions.

[0182] In some embodiments, the decision result includes the resource processing strategy corresponding to the computing power task, and the resource processing strategy is used to instruct the execution of at least one of the following resource processing operations: resource scheduling, resource selection, resource orchestration, and resource management.

[0183] In some embodiments, the decision module 904 is specifically used to: generate a credibility level corresponding to each of the second computing power resource information based on the credibility score of each of the second computing power resource information, wherein the credibility level includes any one of the following: high credibility level, low credibility level, and medium credibility level; make a decision based on the credibility level corresponding to each of the second computing power resource information, and output the decision result, wherein different credibility levels correspond to different resource processing strategies.

[0184] In some embodiments, the aforementioned credibility evaluation indicators include at least one of the following: a data timeliness indicator, which characterizes the time interval between the moment when the first computing power resource information is acquired and the current moment; a measurement accuracy indicator, which characterizes the error range of monitoring the first computing power resource; a resource stability indicator, which characterizes the degree of resource state change between the first computing power resource and the second computing power resource; a mapping reliability indicator, which characterizes the historical accuracy of mapping from the first computing power resource to the second computing power resource using mapping rules; and a historical deviation indicator, which characterizes the degree of deviation between historical mapping results and actual operating results.

[0185] In some embodiments, the above-mentioned calculation module 903 is specifically used for:

[0186] Normalization is performed on each of the at least one credibility evaluation index mentioned above;

[0187] Based on at least one preset weight, each of the normalized credibility evaluation indicators is weighted; the at least one preset weight corresponds one-to-one with the at least one credibility evaluation indicator, and the preset weight is used to characterize the degree of influence of the corresponding credibility evaluation indicator on the accuracy of the mapping result.

[0188] The credibility scores are obtained by merging the normalized and weighted credibility evaluation indicators.

[0189] In some embodiments, the at least one first computing resource is a computing resource in a computing network required to perform the computing task; or, the number of the at least one first computing resource is at least two, and the at least two first computing resources are computing resources in different resource domains required to perform the computing task.

[0190] In some embodiments, when the number of the first computing resources is at least two and the different first computing resources come from different resource domains, the resource processing apparatus further includes: a calculation module, configured to calculate a credibility score of the second computing resource information based on the at least one credibility evaluation index; the calculation module is further configured to calculate a domain credibility factor based on the historical operating data of the resource domain; and a processing module, configured to process the credibility score of each of the second computing resource information based on the domain credibility factor and the credibility score to obtain a comprehensive credibility score.

[0191] It should be noted that the resource processing device can implement all the processes implemented in the above method embodiments and achieve the same beneficial effects. To avoid repetition, it will not be described again here.

[0192] In the case where the functions of the integrated modules described above are implemented in hardware, this application provides a possible structural schematic diagram of the electronic device involved in the above embodiments. For example... Figure 10 As shown, the electronic device 100 includes: a processor 102, a communication interface 103, and a bus 104. Optionally, the electronic device 100 may also include a memory 101.

[0193] Processor 102 may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. Processor 102 may be a central processing unit, a general-purpose processor, a digital signal processor, an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, transistor logic devices, hardware components, or any combination thereof. It may implement or execute various exemplary logic blocks, modules, and circuits described in conjunction with the disclosure of this application. Processor 102 may also be a combination that implements computing functions, such as including one or more microprocessor combinations, a combination of a DSP and a microprocessor, etc.

[0194] Communication interface 103 is used to connect with other devices via a communication network. This communication network can be Ethernet, wireless access network, wireless local area network (WLAN), etc.

[0195] The memory 101 may be a read-only memory (ROM) or other type of static storage device capable of storing static information and instructions, random access memory (RAM) or other type of dynamic storage device capable of storing information and instructions, or electrically erasable programmable read-only memory (EEPROM), disk storage media or other magnetic storage devices, or any other medium capable of carrying or storing desired program code in the form of instructions or data structures and accessible by a computer, but is not limited thereto.

[0196] As one possible implementation, the memory 101 can exist independently of the processor 102. The memory 101 can be connected to the processor 102 via a bus 104 and is used to store instructions or program code. When the processor 102 calls and executes the instructions or program code stored in the memory 101, it can implement the resource processing method provided in the embodiments of this application.

[0197] In another possible implementation, the memory 101 can also be integrated with the processor 102.

[0198] Bus 104 can be an Extended Industry Standard Architecture (EISA) bus, etc. Bus 104 can be divided into address bus, data bus, control bus, etc. For ease of representation, Figure 10 The bus is represented by a single thick line, but this does not mean that there is only one bus or one type of bus.

[0199] Through the above description of the implementation methods, those skilled in the art can clearly understand that, for the sake of convenience and brevity, only the division of the above functional modules is used as an example. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the service calling device can be divided into different functional modules to complete all or part of the functions described above.

[0200] This application embodiment also provides a chip, which includes a processor and a communication interface. The communication interface is coupled to the processor. The processor is used to run programs or instructions to implement the various processes of the above resource processing method embodiments and can achieve the same technical effect. To avoid repetition, it will not be described again here.

[0201] It should be understood that the chip mentioned in the embodiments of this application may also be referred to as a system-on-a-chip, system chip, chip system, or system-on-a-chip, etc.

[0202] This application also provides a readable storage medium storing a program or instructions that, when executed by a computer, implement the resource processing method provided in the above embodiments. It is understood that all or part of the processes in the above method embodiments can be executed by computer instructions instructing related hardware; the readable storage medium can be any of the foregoing embodiments or memory; the readable storage medium can also be an external storage device of the service invocation device, such as a pluggable hard drive, Smart MediaCard (SMC), Secure Digital (SD) card, flash card, etc., equipped on the service invocation device. Further, the readable storage medium can include both internal storage units of the service invocation device and external storage devices. The readable storage medium is used to store the computer program and other programs and data required by the service invocation device. The readable storage medium can also be used to temporarily store data that has been output or will be output.

[0203] This application also provides a computer program product, which is stored in a storage medium and implements the resource processing method provided in the above embodiments when the computer program product is executed by a computer.

[0204] It should be noted that, in this document, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes that element. Furthermore, it should be noted that the scope of the methods and apparatuses in the embodiments of this application is not limited to performing functions in the order shown or discussed, but may also include performing functions substantially simultaneously or in the reverse order, depending on the functions involved. For example, the described methods may be performed in a different order than described, and various steps may be added, omitted, or combined. Additionally, features described with reference to certain examples may be combined in other examples.

[0205] Through the above description of the embodiments, those skilled in the art can clearly understand that the methods of the above embodiments can be implemented by means of software plus necessary general-purpose hardware platforms. Of course, they can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of this application, in essence, or the part that contributes to the prior art, can be embodied in the form of a computer software product. This computer software product is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) and includes several instructions to cause a terminal (which may be a mobile phone, computer, server, or network device, etc.) to execute the methods described in the various embodiments of this application.

[0206] The embodiments of this application have been described above with reference to the accompanying drawings. However, this application is not limited to the specific embodiments described above. The specific embodiments described above are merely illustrative and not restrictive. Those skilled in the art can make many other forms under the guidance of this application without departing from the spirit and scope of the claims, and all of these forms are within the protection scope of this application.

Claims

1. A resource processing method, characterized in that, The resource processing method includes: Obtain the first computing power resource information corresponding to each of the at least one first computing power resources; the at least one first computing power resource is the computing power resource required to perform computing power tasks; Map each of the first computing power resource information to obtain the second computing power resource information corresponding to each of the first computing power resource information, wherein the second computing power resource information is the resource information of the second computing power resources actually required to execute the computing power task; Based on at least one credibility evaluation index, a credibility score is calculated for each of the second computing power resource information. The at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information. The credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information. Decisions are made based on the credibility score of each second computing resource information and the computing resources corresponding to each second computing resource information, and the decision results are output.

2. The resource processing method according to claim 1, characterized in that, The decision result includes the resource processing strategy corresponding to the computing power task. The resource processing strategy is used to instruct the execution of at least one of the following resource processing operations: resource scheduling, resource selection, resource orchestration, and resource management.

3. The resource processing method according to claim 2, characterized in that, The decision-making process based on the credibility score of each second computing resource information and the computing resources corresponding to each second computing resource information, and the output of the decision result, includes: Based on the credibility score of each second computing power resource information, a credibility level corresponding to each second computing power resource information is generated, and the credibility level includes any one of the following: high credibility level, low credibility level, and medium credibility level; Decisions are made based on the credibility level corresponding to each second computing power resource information, and the decision results are output. Different credibility levels correspond to different resource processing strategies.

4. The resource processing method according to claim 1, characterized in that, The credibility evaluation index includes at least one of the following: Data timeliness index, which is used to characterize the time interval between the moment when the first computing power resource information is obtained and the current moment; The measurement accuracy index is used to characterize the error range of monitoring the first computing power resource; Resource stability index, which is used to characterize the degree of change in resource status between the first computing resource and the second computing resource; The mapping reliability index is used to characterize the historical accuracy of mapping from the first computing resource to the second computing resource using the mapping rule. Historical deviation index, which is used to characterize the degree of deviation between historical mapping results and actual operating results.

5. The resource processing method according to claim 1, characterized in that, The calculation of the credibility score for each piece of second computing power resource information based on at least one credibility evaluation index includes: Normalization is performed on each of the at least one credibility evaluation index; Based on at least one preset weight, each normalized credibility evaluation index is weighted; the at least one preset weight corresponds one-to-one with the at least one credibility evaluation index, and the preset weight is used to characterize the degree of influence of the corresponding credibility evaluation index on the accuracy of the mapping result. The normalized and weighted credibility evaluation indicators are then combined to obtain the credibility score.

6. The resource processing method according to claim 1, characterized in that, The at least one first computing resource is a computing resource in the computing network required to perform the computing task; or... The number of the at least one first computing power resource is at least two, and the at least two first computing power resources are computing power resources required to perform the computing power task in different resource domains.

7. The resource processing method according to claim 6, characterized in that, When the number of the first computing resources is at least two, and the different first computing resources come from different resource domains, the resource processing method further includes: Based on the at least one credibility evaluation index, calculate the credibility score of the second computing power resource information; Calculate the domain reliability factor based on the historical operational data of the resource domain; Based on the domain credibility factor and the credibility score, the credibility score of each second computing power resource information is processed to obtain a comprehensive credibility score.

8. A resource processing device, characterized in that, The resource processing device includes: The acquisition module is used to acquire the first computing power resource information corresponding to each of the at least one first computing power resources; the at least one first computing power resource is the computing power resource required to perform computing power tasks; The mapping module is used to map each of the first computing power resource information to obtain the second computing power resource information corresponding to each of the first computing power resource information, wherein the second computing power resource information is the resource information of the second computing power resources actually required to execute the computing power task; The calculation module is used to calculate the credibility score of each second computing power resource information based on at least one credibility evaluation index. The at least one credibility evaluation index is determined based on the first computing power resource information and the second computing power resource information corresponding to the first computing power resource information. The credibility score is used to characterize the accuracy of mapping the first resource information to the second computing power resource information corresponding to the first computing power resource information. The decision module is used to make decisions based on the credibility score of each second computing resource information and the computing resources corresponding to each second computing resource information, and output the decision results.

9. An electronic device, characterized in that, It includes a processor and a memory, the memory storing a program or instructions that can run on the processor, the program or instructions being executed by the processor to implement the resource processing method as described in any one of claims 1-7.

10. A readable storage medium, characterized in that, The readable storage medium stores a program or instructions that, when executed by a computer, implement the resource processing method as described in any one of claims 1-7.

11. A computer program product, characterized in that, The computer program product is stored in a storage medium, and when executed by a computer, the computer program product implements the resource processing method as described in any one of claims 1-7.