Activated carbon adsorption equipment for chemical plant
By introducing spray and condensation mechanisms into activated carbon adsorption equipment for chemical plants and using steam desorption and condensation technology, the problem of insufficient adsorption capacity after activated carbon is saturated has been solved, and efficient purification of chemical waste gas and reuse of water resources have been achieved.
Patent Information
- Application Number
- CN202420278820.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-05
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-05
AI Technical Summary
The adsorption capacity of traditional activated carbon adsorption equipment is close to saturation after the activated carbon is saturated, making it difficult to effectively purify chemical waste gas.
By setting up a spray mechanism in the equipment, using steam to desorb adsorbed harmful substances, and collecting and filtering water vapor through the condensation mechanism, the adsorption capacity of activated carbon and the practicability of the equipment are improved.
It effectively improves the adsorption capacity of activated carbon for chemical waste gas, extends the service life of the equipment, and achieves efficient removal of harmful substances and reuse of water resources.
Smart Images

Figure CN221788747U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of activated carbon adsorption equipment for chemical plants, in particular to an activated carbon adsorption equipment for chemical plants. Background Art
[0002] Activated carbon is a specially treated carbon. The organic raw material is heated in an airtight condition to reduce the non-carbon components, and then reacts with the gas, the surface is corroded, and a structure with developed micropores is produced. Since the activation process is a microscopic process, that is, the surface corrosion of a large number of molecular carbides is point corrosion, the surface of the activated carbon has countless tiny pores. Activated carbon adsorption equipment can be used to treat waste gas generated by chemical plants.
[0003] For example, in a class of prior art represented by the activated carbon adsorption equipment for chemical plants disclosed in the utility model patent with application number 202123128700.3, its main structure includes a purification box, a replacement box, a support chute and a sealing door, etc. The activated carbon adsorption equipment is realized by the coordination of the purification box, the replacement box, the support chute and the sealing door. The traditional activated carbon adsorption equipment replaces the saturated activated carbon after the activated carbon is saturated. When the activated carbon is saturated, the adsorption capacity is also close to saturation, which is not conducive to the purification of exhaust gas. Summary of the invention
[0004] In order to solve the above technical problems, the utility model provides an activated carbon adsorption equipment for a chemical plant. By opening the spray mechanism, steam is formed after heat exchange by the spray mechanism to spray the adsorption mechanism, and harmful substances absorbed by the adsorption mechanism are desorbed, so that the adsorption mechanism can effectively adsorb chemical waste gas. By opening the condensation mechanism, the water vapor after desorption is condensed, and the condensed liquid is collected by the recovery mechanism, thereby improving the practicability of the equipment.
[0005] To achieve the above-mentioned purpose, the factory activated carbon adsorption equipment provided by the utility model includes an equipment cavity; it also includes an air intake mechanism, an adsorption mechanism, a spray mechanism, a condensation mechanism and a recovery mechanism, the air intake mechanism, the adsorption mechanism, the spray mechanism and the condensation mechanism are all installed on the equipment cavity, and the recovery mechanism is located below the equipment cavity; by opening the air intake mechanism, the chemical waste gas enters the equipment cavity through the air intake mechanism, the industrial waste gas is adsorbed by the adsorption mechanism, and the purified gas after adsorption is discharged through the equipment cavity, by opening the spray mechanism, the steam formed after heat exchange by the spray mechanism is sprayed on the adsorption mechanism, and the harmful substances absorbed by the adsorption mechanism are desorbed, so that the adsorption mechanism can effectively adsorb the chemical waste gas, by opening the condensation mechanism, the water vapor after desorption is condensed, the condensed liquid is collected by the recovery mechanism, and the recovery mechanism filters the condensed liquid, and the filtered liquid is reused after treatment.
[0006] Preferably, the equipment cavity includes a bracket, a tower body, an exhaust hopper and an exhaust pipe, the recovery mechanism is installed on the bracket, the bottom end of the tower body is installed on the top of the recovery mechanism, the bottom end of the adsorption mechanism is installed on the top of the tower body, the bottom end of the exhaust pipe is installed on the top of the exhaust hopper, and a cavity is provided inside the tower body, the tower body, the exhaust hopper and the exhaust pipe are connected; the chemical waste gas is adsorbed by the adsorption mechanism in the tower body, and the purified gas after treatment is discharged through the exhaust hopper to the exhaust pipe.
[0007] Preferably, the air intake mechanism includes an air intake pipe, a first control valve and a suction fan, the left end of the air intake pipe is connected to the outer wall of the tower body, the air intake pipe is provided with a first control valve, and the suction fan is installed in the air intake pipe; by opening the first control valve and the suction fan, the chemical waste gas enters the tower body through the suction fan.
[0008] Preferably, the adsorption mechanism includes an activated carbon frame and activated carbon, the outer ring of the activated carbon frame is installed on the inner wall of the tower body, and the activated carbon is installed on the inner ring of the activated carbon frame, and the activated carbon adsorbs harmful substances in the chemical waste gas.
[0009] Preferably, the spray mechanism includes a first support plate, a water pump, a second support plate, a first heat exchanger, a first pipeline, a second pipeline, a spray pipe and a plurality of nozzles, the bottom end of the water pump is installed on the top end of the first support plate, the bottom end of the first heat exchanger is installed on the top end of the second support plate, the input end of the water pump is connected to the output end of the first pipeline, the output end of the water pump is connected to the input end of the first heat exchanger, the output end of the first heat exchanger is connected to the input end of the second pipeline, the output end of the second pipeline is connected to the input end of the spray pipe, the spray pipe is provided with a plurality of output ends, the input ends of the plurality of nozzles are respectively installed on the plurality of output ends of the spray pipe, and the spray pipe is installed inside the tower body; by turning on the water pump, the treated water is passed through the first pipeline to the water pump and then to the first heat exchanger, heat exchange is performed by the water pump to form water vapor, the water vapor is passed through the second pipeline to the spray pipe and is discharged by the plurality of nozzles respectively to desorb harmful substances in the activated carbon.
[0010] Preferably, the condensing mechanism includes a second heat exchanger, a third pipe, a baffle and a fourth pipe, the output end of the second heat exchanger is connected to the input end of the third pipe, the output end of the third pipe is connected to the input end of the baffle, the output end of the baffle is connected to the input end of the fourth pipe, the output end of the fourth pipe is connected to the input end of the second heat exchanger, and the baffle is installed inside the tower body; by opening the second heat exchanger, cold water enters the baffle through the third pipe to condense the water vapor, and the water in the baffle is replaced by cold water in the second heat exchanger through the fourth pipe.
[0011] Preferably, the recovery mechanism includes a drain bucket, a drain pipe, a second control valve, a collecting bucket and a filter plate. The drain bucket is installed on a bracket, the bottom end of the drain pipe is connected to the top end of the drain pipe, the drain pipe is provided with a second control valve, the collecting bucket is located below the drain pipe, and the filter plate is installed in the collecting bucket; by opening the drain pipe, the condensed liquid is discharged into the collecting bucket through the drain bucket to the drain pipe, the filter plate filters the condensate, and after filtration, the liquid is processed by professionals for reuse.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows: by opening the air intake mechanism, chemical waste gas enters the equipment cavity through the air intake mechanism, industrial waste gas is adsorbed by the adsorption mechanism, and the purified gas after adsorption is discharged through the equipment cavity, by opening the spray mechanism, steam is formed after heat exchange by the spray mechanism to spray the adsorption mechanism, and harmful substances absorbed by the adsorption mechanism are desorbed, so that the adsorption mechanism can effectively adsorb chemical waste gas, by opening the condensation mechanism, the desorbed water vapor is condensed, the condensed liquid is collected by the recovery mechanism, and the recovery mechanism filters the condensed liquid, and the filtered liquid is reused after treatment, thereby improving the practicality of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is an axonometric cross-sectional view of the utility model;
[0014] Figure 2 It is an axonometric cross-sectional view of the equipment cavity of the utility model;
[0015] Figure 3 It is a front cross-sectional view of the air intake mechanism of the utility model;
[0016] Figure 4 It is an axonometric schematic diagram of the adsorption mechanism of the utility model;
[0017] Figure 5 It is an axonometric schematic diagram of the spray mechanism of the utility model;
[0018] Figure 6 It is an axonometric schematic diagram of the condensation mechanism of the utility model;
[0019] Figure 7 It is a front cross-sectional view of the collecting mechanism of the utility model.
[0020] Markings in the attached drawings: 01, equipment cavity; 11, bracket; 12, tower body; 13, exhaust hopper; 14, exhaust pipe; 02, air intake mechanism; 21, air intake pipe; 22, first control valve; 23, suction fan; 03, adsorption mechanism; 31, activated carbon rack; 32, activated carbon; 04, spray mechanism; 41, first support plate; 42, water pump; 43, second support plate; 44, first heat exchanger; 45, first pipeline; 46, second pipeline; 47, spray pipe; 48, nozzle; 05, condensation mechanism; 51, second heat exchanger; 52, third pipeline; 53, baffle; 54, fourth pipeline; 06, recovery mechanism; 61, drainage hopper; 62, drainage pipe; 63, second control valve; 64, collection barrel; 65, filter plate. DETAILED DESCRIPTION
[0021] In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively below with reference to the relevant drawings. The utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive.
[0022] Embodiment 1:
[0023] like Figure 1 As shown, it includes an equipment cavity 01; it also includes an air intake mechanism 02, an adsorption mechanism 03, a spray mechanism 04, a condensation mechanism 05 and a recovery mechanism 06, the air intake mechanism 02, the adsorption mechanism 03, the spray mechanism 04 and the condensation mechanism 05 are all installed on the equipment cavity 01, and the recovery mechanism 06 is located below the equipment cavity 01;
[0024] By opening the air intake mechanism 02, the chemical waste gas enters the equipment cavity 01 through the air intake mechanism 02, and the industrial waste gas is adsorbed by the adsorption mechanism 03. The purified gas after adsorption is discharged through the equipment cavity 01. By opening the spray mechanism 04, the steam formed after heat exchange by the spray mechanism 04 is sprayed on the adsorption mechanism 03, and the harmful substances absorbed by the adsorption mechanism 03 are desorbed, so that the adsorption mechanism 03 can effectively adsorb the chemical waste gas. By opening the condensation mechanism 05, the water vapor after desorption is condensed, and the condensed liquid is collected by the recovery mechanism 06, and the recovery mechanism 06 filters the condensed liquid. The filtered liquid is reused after treatment;
[0025] like Figure 2As shown, the equipment cavity 01 includes a bracket 11, a tower body 12, an exhaust hopper 13 and an exhaust pipe 14, the recovery mechanism 06 is installed on the bracket 11, the bottom end of the tower body 12 is installed on the top of the recovery mechanism 06, the bottom end of the adsorption mechanism 03 is installed on the top of the tower body 12, the bottom end of the exhaust pipe 14 is installed on the top of the exhaust hopper 13, and a cavity is provided inside the tower body 12, and the tower body 12, the exhaust hopper 13 and the exhaust pipe 14 are connected;
[0026] like Figure 3 As shown, the air intake mechanism 02 includes an air intake pipe 21, a first control valve 22 and a suction fan 23. The left end of the air intake pipe 21 is connected to the outer wall of the tower body 12. The air intake pipe 21 is provided with a first control valve 22, and the suction fan 23 is installed in the air intake pipe 21.
[0027] The chemical waste gas is adsorbed by the adsorption mechanism 03 in the tower body 12, and the purified gas after treatment is discharged through the exhaust hopper 13 to the exhaust pipe 14. By opening the first control valve 22 and the suction fan 23, the chemical waste gas enters the tower body 12 through the suction fan 23.
[0028] Embodiment 2:
[0029] like Figure 4 As shown, on the basis of Example 1, it also includes an adsorption mechanism 03, the adsorption mechanism 03 includes an activated carbon frame 31 and activated carbon 32, the outer ring of the activated carbon frame 31 is installed on the inner wall of the tower body 12, and the activated carbon 32 is installed on the inner ring of the activated carbon frame 31; the activated carbon 32 adsorbs harmful substances in the chemical waste gas, and the activated carbon frame 31 fixes the activated carbon 32.
[0030] Embodiment 3:
[0031] like Figure 5 , Figure 6 and Figure 7 As shown, on the basis of Example 1, it also includes a spray mechanism 04, a condensation mechanism 05 and a recovery mechanism 06, the spray mechanism 04 includes a first support plate 41, a water pump 42, a second support plate 43, a first heat exchanger 44, a first pipeline 45, a second pipeline 46, a spray pipe 47 and a plurality of nozzles 48, the bottom end of the water pump 42 is installed on the top of the first support plate 41, the bottom end of the first heat exchanger 44 is installed on the top of the second support plate 43, the input end of the water pump 42 is connected to the output end of the first pipeline 45, the output end of the water pump 42 is connected to the input end of the first heat exchanger 44, the output end of the first heat exchanger 44 is connected to the input end of the second pipeline 46, the output end of the second pipeline 46 is connected to the input end of the spray pipe 47, the spray pipe 47 is provided with a plurality of output ends, the input ends of the plurality of nozzles 48 are respectively installed on the plurality of output ends of the spray pipe 47, and the spray pipe 47 is installed inside the tower body 12;
[0032] The condensing mechanism 05 includes a second heat exchanger 51, a third pipeline 52, a baffle 53 and a fourth pipeline 54. The output end of the second heat exchanger 51 is connected to the input end of the third pipeline 52, the output end of the third pipeline 52 is connected to the input end of the baffle 53, the output end of the baffle 53 is connected to the input end of the fourth pipeline 54, the output end of the fourth pipeline 54 is connected to the input end of the second heat exchanger 51, and the baffle 53 is installed inside the tower body 12;
[0033] The recovery mechanism 06 includes a drain bucket 61, a drain pipe 62, a second control valve 63, a collection bucket 64 and a filter plate 65. The drain bucket 61 is installed on the bracket 11. The bottom end of the drain pipe 62 is connected to the top end of the drain pipe 62. The drain pipe 62 is provided with a second control valve 63. The collection bucket 64 is located below the drain pipe 62. The filter plate 65 is installed in the collection bucket 64.
[0034] By opening the water pump 42, the treated water is passed through the first pipe 45 to the water pump 42 and then to the first heat exchanger 44. The water is exchanged by the water pump 42 to form water vapor. The water vapor is passed through the second pipe 46 to the spray pipe 47 and discharged by multiple nozzles 48 to desorb harmful substances in the activated carbon 32. By opening the second heat exchanger 51, cold water is passed through the third pipe 52 to enter the baffle 53 to condense the water vapor. The water in the baffle 53 is passed through the fourth pipe 54 to the second heat exchanger 51 to replace the cold water. By opening the drain pipe 62, the condensed liquid is discharged into the collection bucket 64 through the drain bucket 61 to the drain pipe 62. The filter plate 65 filters the condensate. After filtration, the liquid is processed by professionals and reused.
[0035] like Figures 1 to 7As shown, the present embodiment provides an activated carbon adsorption device for a chemical plant. When it is working, first, the chemical waste gas is adsorbed by the adsorption mechanism 03 in the tower body 12, and the treated purified gas is discharged through the exhaust hopper 13 to the exhaust pipe 14. Then, by opening the first control valve 22 and the suction fan 23, the chemical waste gas enters the tower body 12 through the suction fan 23, and then the activated carbon 32 adsorbs the harmful substances in the chemical waste gas. The activated carbon 32 fixes the activated carbon frame 31, and then by turning on the water pump 42, the treated water is passed through the first pipe 45 to the water pump 42 to the first heat exchanger 44, and then the water pump 42 is turned on. Heat exchange is performed to convert water into water vapor, which is discharged from multiple nozzles 48 through the second pipe 46 to the spray pipe 47 to desorb harmful substances in the activated carbon 32. Then, the second heat exchanger 51 is opened to allow cold water to enter the baffle 53 through the third pipe 52 to condense the water vapor. The water in the baffle 53 is replaced by cold water in the second heat exchanger 51 through the fourth pipe 54. Finally, the drain pipe 62 is opened, and the condensed liquid is discharged into the collection bucket 64 through the drain bucket 61 to the drain pipe 62. The filter plate 65 filters the condensate. After filtration, the liquid is processed by professionals and reused.
[0036] The water pump 42, the first heat exchanger 44 and the second heat exchanger 51 described in this embodiment are purchased on the market, and technicians in the industry only need to install and operate them according to the accompanying instruction manuals, without the need for technicians in this field to make creative efforts.
[0037] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. An activated carbon adsorption device for a chemical plant, comprising a device cavity (01); characterized in that: It also includes an air intake mechanism (02), an adsorption mechanism (03), a spray mechanism (04), a condensation mechanism (05) and a recovery mechanism (06), wherein the air intake mechanism (02), the adsorption mechanism (03), the spray mechanism (04) and the condensation mechanism (05) are all installed on the equipment cavity (01), and the recovery mechanism (06) is located below the equipment cavity (01); The equipment cavity (01) comprises a support (11), a tower body (12), an exhaust hopper (13) and an exhaust pipe (14); the recovery mechanism (06) is mounted on the support (11); the bottom end of the tower body (12) is mounted on the top end of the recovery mechanism (06); the bottom end of the adsorption mechanism (03) is mounted on the top end of the tower body (12); the bottom end of the exhaust pipe (14) is mounted on the top end of the exhaust hopper (13); and a cavity is arranged inside the tower body (12); the tower body (12), the exhaust hopper (13) and the exhaust pipe (14) are in communication; The air intake mechanism (02) comprises an air intake pipe (21), a first control valve (22) and a suction fan (23); the left end of the air intake pipe (21) is connected to the outer wall of the tower body (12); the air intake pipe (21) is provided with the first control valve (22); and the suction fan (23) is installed in the air intake pipe (21); The adsorption mechanism (03) comprises an activated carbon frame (31) and activated carbon (32), wherein the outer ring of the activated carbon frame (31) is mounted on the inner wall of the tower body (12), and the activated carbon (32) is mounted on the inner ring of the activated carbon frame (31); The spray mechanism (04) comprises a first support plate (41), a water pump (42), a second support plate (43), a first heat exchanger (44), a first pipeline (45), a second pipeline (46), a spray pipe (47) and a plurality of spray heads (48); the bottom end of the water pump (42) is mounted on the top end of the first support plate (41); the bottom end of the first heat exchanger (44) is mounted on the top end of the second support plate (43); the input end of the water pump (42) is connected to the output end of the first pipeline (45); the output end of the water pump (42) is connected to the input end of the first heat exchanger (44); the output end of the first heat exchanger (44) is connected to the input end of the second pipeline (46); the output end of the second pipeline (46) is connected to the input end of the spray pipe (47); the spray pipe (47) is provided with a plurality of output ends; the input ends of the plurality of spray heads (48) are respectively mounted on the plurality of output ends of the spray pipe (47); and the spray pipe (47) is mounted inside the tower body (12); The condensing mechanism (05) comprises a second heat exchanger (51), a third pipeline (52), a baffle (53) and a fourth pipeline (54); the output end of the second heat exchanger (51) is connected to the input end of the third pipeline (52), the output end of the third pipeline (52) is connected to the input end of the baffle (53), the output end of the baffle (53) is connected to the input end of the fourth pipeline (54), the output end of the fourth pipeline (54) is connected to the input end of the second heat exchanger (51), and the baffle (53) is installed inside the tower body (12); The recovery mechanism (06) comprises a drainage bucket (61), a drainage pipe (62), a second control valve (63), a collection bucket (64) and a filter plate (65); the drainage bucket (61) is mounted on the bracket (11); the bottom end of the drainage pipe (62) is connected to the top end of the drainage pipe (62); the drainage pipe (62) is provided with a second control valve (63); the collection bucket (64) is located below the drainage pipe (62); and the filter plate (65) is mounted in the collection bucket (64).