Pre-finish rolling equipment for prolonging controlled cooling line
By adding wastewater storage and recycling in the pre-finishing rolling equipment, and combining it with a booster pump to increase the water pressure, the problem of insufficient cooling capacity of the existing equipment is solved, lower temperature cooling and more efficient water resource utilization are achieved, improving the Mechanical properties and production efficiency of rebar.
Patent Information
- Application Number
- CN202420222108.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The cooling capacity of the No. 0 water tank of the existing equipment is insufficient, resulting in the pre-finishing rolling temperature being unable to be lowered to 900°C, affecting the grain growth and size control of the red steel, which in turn affects the mechanical properties and manufacturing cost of the rebar.
By increasing the storage and recycling of waste water, combined with a booster pump to increase water pressure, extend the cooling time and cooling capacity, use water-cooling extension components and storage tanks to increase water source capacity and enhance cooling capacity.
Effectively lower the temperature of red steel to about 900°C, extend the cooling length and time, reduce water waste, and improve product quality and mechanical properties.
Smart Images

Figure CN221790573U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cooling control of rolled pieces, in particular to pre-finishing rolling equipment with an extended cooling control line. Background Art
[0002] At present, due to the limited cooling capacity of the No. 0 water tank of the existing equipment of the double-high rod production line (the water pressure is limited, currently only about 0.5MPa), the temperature before the 13 pre-finishing rolling mills cannot be reduced to 900℃, which has a great impact on the grain growth and size control of red steel. The higher the temperature, the more conducive to grain growth and coarsening. Finally, after rolling, the corresponding refined grains and grain grades cannot be obtained, and the rebar products with improved mechanical properties due to refined grains cannot be obtained.
[0003] The existing referenceable Chinese utility model patent with announcement number: CN 213033262U discloses a rolled piece controlled cooling device, which belongs to the field of rolled piece controlled cooling technology. In this technical scheme, a jet nozzle is installed at the front end of the rolled piece, and the top of the jet nozzle is connected to the rolled piece controlled cooling water pipe. An inlet high-pressure air-sealed water pipe is arranged at the front end of the jet nozzle, and an outlet high-pressure air-sealed water pipe is arranged at the rear end of the rolled piece. An overflow pipe is arranged between the rear end of the rolled piece and the outlet high-pressure air-sealed water pipe of the rolled piece. The overflow pipe is connected to the return pipe through a pipe. The return pipe is installed between the inlet high-pressure air-sealed water pipe and the jet nozzle, and a vent valve is arranged on the pipe. The utility model changes the jet nozzle from spraying at the rolled piece from four directions to spraying in different selected quantities from four to eighteen directions, so that the controlled cooling of the rolled piece is more uniform and consistent, and the stability of product performance is improved.
[0004] Based on the search of the above patents and in combination with the equipment in the prior art, it was found that the cooling capacity of the water tank of the existing equipment is limited, resulting in the pre-finishing rolling temperature being unable to be reduced to 900 degrees Celsius, which has a significant impact on the grain growth and size control of the red steel, and ultimately affects the mechanical properties and quality of the product, resulting in an increase in the manufacturing cost of rebar. A large amount of water is required for water cooling of steel, and when a large amount of water cannot be recycled, it is easy to lead to waste of water resources. The existence of these problems has affected the use of the device. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides a pre-finishing rolling equipment for extending the controlled cooling line, which has the advantages of increasing the water pressure of the booster pump so that the temperature of the red steel can be reduced to about 900°C within the same time, and by adding a water tank, the cooling length and cooling time of the red steel can be extended, and the temperature of the red steel can be further reduced, thereby solving the above-mentioned technical problems.
[0007] (II) Technical solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pre-finishing rolling equipment of an extended controlled cooling line, comprising a steel conveying assembly, a wastewater storage assembly for collecting and storing water-cooled wastewater is installed at the lower end of the steel conveying assembly, and a water-cooling extension assembly for water-cooling steel is installed at the rear end of the wastewater storage assembly;
[0009] The wastewater storage assembly includes a storage box, and a water outlet is connected to the lower right end of the storage box, and a bottom plate is connected and installed at the lower end of the storage box, so that the storage box is convenient for storing wastewater for subsequent recycling;
[0010] The water-cooling extension assembly includes a first extension box, and a quick cooler is fixed at the upper end of the first extension box, a first return pipe is connected to the lower end of the first extension box, and a first booster pump is fixed above the first return pipe, a second extension box is connected to the right side of the first extension box, and a second return pipe is installed at the lower end of the second extension box, and a second booster pump is connected above the second return pipe, and the first extension box and the second extension box increase the water source capacity for subsequent use.
[0011] As a preferred technical solution of the utility model, the steel conveying assembly includes: the rolling shaft, and connecting shafts are connected to both sides of the rolling shaft, rotating blocks are connected and installed on both sides of the connecting shaft, and fixed plates are connected to both sides of the rotating block, and a steel body is installed on the upper end of the rolling shaft, and the connecting shaft facilitates the installation and connection of the rolling shaft at the upper end.
[0012] As a preferred technical solution of the utility model, the wastewater storage component also includes: the recovery box, and the lower end of the recovery box is connected to a slag separator, and the slag separator is convenient for collecting waste residues in the wastewater.
[0013] As the preferred technical solution of the utility model, a water-cooled extension assembly; the water tank, and a delivery pipe is installed at the lower end of the water tank, the lower end of the delivery pipe is connected to a partition plate, and the lower end of the partition plate is connected to a water spray structure, and the delivery pipe delivers water to the upper end of the lower partition plate.
[0014] As a preferred technical solution of the utility model, the steel conveying assembly is installed at the upper end of the recovery tank in the wastewater storage assembly, and the first return pipe and the second return pipe in the water-cooled extension assembly are installed at the upper end of the storage tank in the wastewater storage assembly.
[0015] As a preferred technical solution of the utility model, the fixing plate is a disassembly structure, and the rolling shaft is a structure that is larger outside and smaller inside.
[0016] As the preferred technical solution of the utility model, the inside of the recovery box is equipped with a leak hole, the slag screen is a detachable structure, and the inside of the storage box is equipped with a partition to separate the inside of the storage box.
[0017] As a preferred technical solution of the present utility model, the overall structure of the first extension box is the same as the overall structure of the second extension box, and the first booster pump and the second booster pump are variable frequency automatic boosters.
[0018] Compared with the prior art, the utility model provides a pre-finishing rolling equipment with an extended controlled cooling line, which has the following beneficial effects:
[0019] 1. The utility model sets a wastewater storage component, in which a recovery box is installed. The recovery box collects the wastewater of the water-cooled steel at the upper end, and transports the wastewater to the storage box at the lower end through the leakage hole at the lower end of the recovery box, so as to facilitate subsequent use. This structure facilitates the storage of wastewater for subsequent recycling, effectively preventing the long-term and large-scale use of water and wasting a certain amount of water resources.
[0020] 2. The utility model sets a water-cooled extension component, in which a water tank is installed. The water tank stores the required water source. In order to increase the cooling capacity of the water tank, an extension box is installed at the rear end of the water tank. The extension box is combined with the water tank to increase the capacity and cooling capacity of the water tank. A return pipe is installed at the lower end. The return pipe and the storage box structure are convenient for recycling waste water for secondary use. A booster pump is installed at the lower end. The booster pump is a variable frequency automatic booster to increase the water pressure of the device and reduce the temperature. This structure increases the water tank capacity and the booster pump, improves the overall cooling capacity, and effectively prevents subsequent effects on the mechanical properties and quality of the product, resulting in an increase in the manufacturing cost of rebar. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0022] Figure 2 This is a schematic diagram of the structural steel conveying assembly of the utility model;
[0023] Figure 3 This is a schematic diagram of the wastewater storage component of the utility model structure;
[0024] Figure 4 This is a schematic diagram of the water-cooling extension component of the utility model structure;
[0025] Among them: 1. Steel conveying assembly; 101. Rolling shaft; 102. Connecting shaft; 103. Rotating block; 104. Fixed plate; 105. Steel body; 2. Wastewater storage assembly; 201. Recovery box; 202. Slag screen; 203. Storage box; 204. Water outlet; 205. Bottom plate; 3. Water-cooled extension assembly; 301. Water tank; 302. Conveying pipe; 303. Partition plate; 304. Water spray structure; 305. First extension box; 306. Quick cooler; 307. First return pipe; 308. First booster pump; 309. Second extension box; 310. Second return pipe; 311. Second booster pump. DETAILED DESCRIPTION
[0026] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0027] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] See also Figure 1-Figure 4In this embodiment, a pre-finishing rolling equipment of an extended controlled cooling line includes: a steel conveying component 1, a wastewater storage component 2 is connected and installed at the lower end of the steel conveying component 1, the wastewater storage component 2 includes a storage box 203, and the lower right end of the storage box 203 is connected to a water outlet 204, the lower end of the storage box 203 is connected and installed with a bottom plate 205, and a water-cooled extension component 3 is installed at the rear end of the wastewater storage component 2, the water-cooled extension component 3 includes a first extension box 305, and a quick cooler 306 is fixed to the upper end of the first extension box 305, a first return pipe 307 is connected to the lower end of the first extension box 305, and a first boosting pump 308 is fixed above the first return pipe 307, a second extension box 309 is connected to the right side of the first extension box 305, and a second return pipe 310 is installed at the lower end of the second extension box 309, and a second boosting pump 311 is connected to the upper part of the second return pipe 310.
[0030] Through the above structure: the steel conveying component 1 is convenient for conveying the steel that needs water cooling at the upper end, and is convenient for use in combination with other components. The wastewater storage component 2 stores the used wastewater through the storage box 203 installed at the upper end, which is convenient for subsequent recycling. The water cooling extension component 3 extends the overall water cooling time and reduces the temperature of the upper end of the steel through the internally installed extension box and booster pump.
[0031] See also Figure 1-Figure 4 The steel conveying component 1 includes a rolling shaft 101, and connecting shafts 102 are connected to both sides of the rolling shaft 101, rotating blocks 103 are connected and installed on both sides of the connecting shaft 102, and fixed plates 104 are connected to both sides of the rotating block 103, a steel body 105 is installed on the upper end of the rolling shaft 101, the fixed plate 104 is a disassembly structure, and the rolling shaft 101 is a large outside and small inside structure.
[0032] Through the above structure: the steel body 105 at the upper end is water-cooled by installing the rolling shaft 101, the connecting shaft 102 facilitates the installation and connection of the upper rolling shaft 101, the rotating block 103 drives the connecting shaft 102 to rotate, and the fixing plate 104 fixes the upper rotating block 103.
[0033] See also Figure 1-Figure 4 The wastewater storage component 2 also includes a recovery box 201, and a slag screen 202 is connected to the lower end of the recovery box 201. A leakage hole is installed inside the recovery box 201. The slag screen 202 is a disassembly structure. A partition is installed inside the storage box 203 to separate the interior of the storage box 203.
[0034] Through the above structure: the recovery box 201 is installed to collect the waste water after water cooling at the upper end, the slag separator 202 is convenient for collecting the waste slag in the waste water, the storage box 203 is convenient for storing the waste water for subsequent recycling, the water outlet 204 is convenient for the subsequent discharge of the waste water, and the bottom plate 205 fixes the upper structure.
[0035] See also Figure 1-Figure 4 The water-cooled extension assembly 3 also includes a water tank 301, and a delivery pipe 302 is installed at the lower end of the water tank 301, the lower end of the delivery pipe 302 is connected to a partition plate 303, and the lower end of the partition plate 303 is connected to a water spray structure 304. The overall structure of the first extension tank 305 is the same as the overall structure of the second extension tank 309, and the first boost pump 308 and the second boost pump 311 are variable frequency automatic boosters.
[0036] Through the above structure: the required water source is stored by installing the water tank 301, the delivery pipe 302 delivers the water source to the upper end of the lower partition plate 303, and the water source is delivered to the water spray structure 304 through the partition plate 303 to water-cool the steel at the lower end. The first extension tank 305 and the second extension tank 309 increase the water source capacity for subsequent use. The rapid cooler 306 quickly cools the refluxed water source. The first return pipe 307 and the second return pipe 310 deliver the water source inside the lower storage tank 203. The first booster pump 308 and the second booster pump 311 pump the water source inside the storage tank 203.
[0037] When in use, first, fill the water source inside the water tank 301, the first extension tank 305 and the second extension tank 309 at the upper end of the device, open the quick cooler 306 at the upper end, cool the internal water source, and then install the reflux pipe to the upper end of the storage tank 203. At this time, the steel conveying component 1 is opened through the terminal command, and the red steel is placed on the upper end of the rolling shaft 101. The rotating blocks 103 installed at both ends are rotated, and the rolling shaft 101 is driven to rotate through the connecting shaft 102. When the upper red steel is moving, the water source at the upper end is transported, and the water source in the water tank 301 is transported through the lower end delivery pipe 302 to the lower end. In the water spray structure 304, water is discharged from the nozzle at the lower end of the water spray structure 304 to water-cool the red steel at the lower end. At this time, the used water enters the storage tank 203 at the lower end through the recovery tank 201 at the lower end. The first boost pump 308 is commanded by the terminal to transport the water through the first return pipe 307 to the first extension tank 305 at the upper end. The water is cooled by the quick cooler 306 at the upper end. When the red steel moves to the first extension tank 305, the red steel is water-cooled again. At this time, the second boost pump 311 at the lower end transports the water through the second return pipe 310 to the second extension tank 309 at the upper end for use.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A pre-finishing rolling equipment for an extended controlled cooling line, comprising a steel conveying assembly (1), characterized in that: The lower end of the steel conveying assembly (1) is connected to a wastewater storage assembly (2), the wastewater storage assembly (2) comprises a storage box (203), and the lower right end of the storage box (203) is connected to a water outlet (204), the lower end of the storage box (203) is connected to a bottom plate (205), and the rear end of the wastewater storage assembly (2) is installed with a water cooling extension assembly (3), the water cooling extension assembly (3) comprises a first extension box (305), and the first extension box (306) is connected to a bottom plate (205). 05), a quick cooler (306) is fixed at the upper end of the first extension box (305), a first return pipe (307) is connected to the lower end of the first extension box (305), and a first booster pump (308) is fixed above the first return pipe (307), a second extension box (309) is connected to the right side of the first extension box (305), a second return pipe (310) is installed at the lower end of the second extension box (309), and a second booster pump (311) is connected above the second return pipe (310).
2. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 1, characterized in that: The steel conveying assembly (1) comprises a rolling shaft (101), and connecting shafts (102) are connected to both sides of the rolling shaft (101), rotating blocks (103) are connected and installed to both sides of the connecting shaft (102), and fixed plates (104) are connected to both sides of the rotating block (103), and a steel body (105) is installed at the upper end of the rolling shaft (101).
3. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 1, characterized in that: The wastewater storage component (2) further comprises a recovery box (201), and a slag separator (202) is connected and installed at the lower end of the recovery box (201).
4. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 1, characterized in that: The water-cooling extension assembly (3) also includes a water tank (301), and a delivery pipe (302) is installed at the lower end of the water tank (301), the lower end of the delivery pipe (302) is connected to a partition plate (303), and the lower end of the partition plate (303) is connected to a water spray structure (304).
5. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 1, characterized in that: The steel conveying assembly (1) is installed at the upper end of the recovery tank (201) in the wastewater storage assembly (2), and the first return pipe (307) and the second return pipe (310) in the water-cooling extension assembly (3) are installed at the upper end of the storage tank (203) in the wastewater storage assembly (2).
6. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 2, characterized in that: The fixing plate (104) is a disassembly structure, and the rolling shaft (101) is a structure with a large outer portion and a small inner portion.
7. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 3, characterized in that: The recovery box (201) is provided with a leak hole inside, the slag separator (202) is a detachable structure, and a partition is provided inside the storage box (203) to separate the inside of the storage box (203).
8. The pre-finishing rolling equipment of the extended controlled cooling line according to claim 4, characterized in that: The overall structure of the first extension box (305) is the same as the overall structure of the second extension box (309), and the first booster pump (308) and the second booster pump (311) are variable frequency automatic boosters.