Biochemical pool aeration structure of low-energy-consumption SBR (Sequencing Batch Reactor) process
By using magnetic levitation blowers and electric actuators in the SBR process, one fan can aerate multiple biochemical tanks in turn, which solves the problems of high energy consumption and fixed aeration time in the existing technology, and improves usage efficiency and total water output. Nitrogen removal effect.
Patent Information
- Application Number
- CN202322180945.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The use of multiple blowers in the existing SBR process increases energy consumption and reduces usage efficiency, and the aeration time is fixed and cannot be shortened to improve the total nitrogen removal efficiency of the effluent.
Using magnetic levitation blowers and electric actuators, one fan can aerate multiple biochemical tanks in turn through pipe components and valve components, shortening the aeration time, and controlling the air inlet volume by adjusting the valve opening to increase the anaerobic time of the incoming water.
It reduces the number of equipment, lowers the investment cost, shortens the aeration time, improves the use efficiency, and reduces the total nitrogen of the effluent from 11mg/L to less than 8mg/L.
Smart Images

Figure CN221797196U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of SBR process, and particularly relates to a biochemical pool aeration structure of a low-energy consumption SBR process. Background Art
[0002] SBR is the abbreviation of sequencing batch activated sludge process, which is an activated sludge sewage treatment technology that operates in an intermittent aeration mode. Its main feature is the orderly and intermittent operation in operation. The core of SBR technology is the SBR reaction tank, which integrates the functions of homogenization, primary sedimentation, biodegradation, secondary sedimentation, etc. in one tank, without a sludge return system. It is particularly suitable for occasions with insufficient construction space, intermittent discharge and large flow changes. The existing SBR process mainly uses multiple blowers for 24-hour rotation aeration, but due to the use of multiple blowers, the energy consumed also increases, increasing the cost of use. In the existing technology, most of them use multiple blowers to drive aeration, and do not use fewer blowers to realize the relevant aeration process, which reduces the use efficiency. At the same time, the time for the aeration process is generally 120 minutes, and it is impossible to shorten the aeration time by modifying the relevant program to increase the anaerobic time of the water inlet, thereby reducing the content of the total nitrogen in the effluent. Therefore, the utility model provides a low-energy consumption SBR process biochemical pool aeration structure to solve the problems raised in the above background technology. Utility Model Content
[0003] The purpose of the utility model is to provide a biochemical pool aeration structure of a low-energy SBR process, which can reduce the number of equipment resets, thereby reducing investment costs, and ultimately achieve real energy saving and consumption reduction, shorten the aeration time, increase the water inlet anaerobic time, and at the same time realize aeration of multiple biochemical pools by one fan in turn, thereby improving utilization efficiency.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a biochemical pool aeration structure for a low-energy SBR process, the biochemical pool aeration structure for a low-energy SBR process comprising: a magnetic levitation blower, a pipeline assembly, a valve assembly, and an electric actuator, the magnetic levitation blower is fixed to the top of the ground, the pipeline assembly is connected to the magnetic levitation blower through a pipeline, the valve assembly is sleeved on the surface of the pipeline assembly, and the electric actuator is connected to the valve assembly through an electric wire.
[0005] Furthermore, the pipeline assembly includes a two-way air inlet pipe connected to the magnetic levitation blower pipe, one end of the two-way air inlet pipe is fixedly connected to a first air outlet pipe, the first air outlet pipe has a second air outlet pipe fixedly connected at a symmetrical position with the two-way air inlet pipe as the center of symmetry, the other end of the two-way air inlet pipe is fixed with a third air outlet pipe, and the third air outlet pipe has a fourth air outlet pipe fixedly connected at a symmetrical position with the two-way air inlet pipe as the center of symmetry.
[0006] Furthermore, the valve assembly includes a first electric regulating valve sleeved on the surface of one end of the two-way air inlet pipe, a second electric regulating valve sleeved on the surface of the other end of the two-way air inlet pipe, a fourth electric regulating valve sleeved on the surface of the first air outlet pipe in front of the first electric regulating valve, a third electric regulating valve sleeved on the surface of the second air outlet pipe at a symmetrical position of the fourth electric regulating valve with the one end of the two-way air inlet pipe as the center of symmetry, a fifth electric regulating valve sleeved on the surface of the third air outlet pipe in front of the second electric regulating valve, and a sixth electric regulating valve sleeved on the surface of the fourth air outlet pipe at a symmetrical position of the fifth electric regulating valve with the other end of the two-way air inlet pipe as the center of symmetry.
[0007] Furthermore, the surface of the electric actuator is provided with an adjusting knob corresponding to the valve assembly.
[0008] Furthermore, the pipeline assembly extends into the biochemical pool through a pipeline.
[0009] The beneficial effects of the utility model are:
[0010] 1. Install a magnetic levitation blower and replace two 75-kilowatt Roots blowers with a 100-kilowatt five-magnetic levitation blower. The air volume generated by the magnetic levitation blower can enter two different biochemical pools through pipes for aeration, thereby reducing the number of equipment resets, thereby reducing investment costs and ultimately achieving real energy saving and consumption reduction.
[0011] 2. Set up an electric actuator and close the opening of each electric regulating valve by adjusting all the adjustment knobs of the electric actuator, so that there is no aeration in the first thirty minutes of biochemical water inlet, and the original aeration time is shortened from 120 minutes to 90 minutes, thereby increasing the anaerobic time of water inlet, which is beneficial to the removal of total nitrogen. The total nitrogen in the effluent is reduced from the previous 11 mg / L to the current 8 mg / L or less, which can shorten the aeration time and increase the anaerobic time of water inlet.
[0012] 3. Set up the pipeline assembly and the valve assembly. After the magnetic levitation blower starts to operate and generate wind, manually adjust the adjustment knob on the electric actuator corresponding to the valve assembly so that the electric actuator can electrically adjust the opening size of each valve, thereby controlling the air intake volume of each pipeline in the pipeline assembly, making the aeration size in the biochemical pool different, and realizing the function of aerating multiple biochemical pools. It can realize that one blower can aerate multiple biochemical pools in turn, thereby improving the utilization efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic diagram of the structure of a biochemical pool aeration structure of a low-energy consumption SBR process provided by the utility model;
[0014] Figure 2The utility model provides a low-energy consumption SBR process biochemical pool aeration structure of the first biochemical pool from the beginning of aeration to the end of aeration within 120 minutes of the various biochemical pool states schematic diagram.
[0015] In the figure: 1. Magnetic levitation blower; 2. Two-way air inlet pipe; 3. First air outlet pipe; 4. Second air outlet pipe; 5. Third air outlet pipe; 6. Fourth air outlet pipe; 7. First electric regulating valve; 8. Second electric regulating valve; 9. Fourth electric regulating valve; 10. Third electric regulating valve; 11. Fifth electric regulating valve; 12. Sixth electric regulating valve; 13. Biochemical pool; 14. Pipeline assembly; 15. Valve assembly. DETAILED DESCRIPTION
[0016] In order to further understand the content, features and effects of the utility model, the following embodiments are given as examples and described in detail with reference to the accompanying drawings.
[0017] Please also refer to Figure 1 to Figure 2 The following will describe in detail the aeration structure of the biochemical pool of the low energy consumption SBR process of the utility model embodiment in conjunction with the accompanying drawings.
[0018] refer to Figure 1 to Figure 2 The biochemical pool aeration structure of the low-energy SBR process includes: a magnetic levitation blower 1, a pipeline assembly 14, a valve assembly 15, and an electric actuator. The magnetic levitation blower 1 is fixed to the top of the ground 18, the pipeline assembly 14 is connected to the magnetic levitation blower 1 through a pipeline, the valve assembly 15 is sleeved on the surface of the pipeline assembly 14, and the electric actuator is connected to the valve assembly 15 through an electric wire.
[0019] refer to Figure 1 and Figure 2 The pipeline assembly 14 includes a two-way air inlet pipe 2 connected to the magnetic levitation blower 1 pipeline, one end of the two-way air inlet pipe 2 is fixedly connected to a first air outlet pipe 3, the first air outlet pipe 3 has a second air outlet pipe 4 fixedly connected at a symmetrical position with the two-way air inlet pipe 2 as the symmetrical center, the other end of the two-way air inlet pipe 2 is fixed to a third air outlet pipe 5, the third air outlet pipe 5 has a fourth air outlet pipe 6 fixedly connected at a symmetrical position with the two-way air inlet pipe 2 as the symmetrical center, and the pipeline assembly 14 extends into the biochemical pool 13 through the pipeline.
[0020] When the SBR process is required, the magnetic levitation blower 1 fixed on the ground is manually started, so that the magnetic levitation blower 1 begins to generate a large air volume, and then the air volume begins to enter the two-way air inlet pipe 2 from the magnetic levitation blower 1. Since the electric actuator is integrated with six adjusting knobs, which correspond to the first electric regulating valve 7, the second electric regulating valve 8, the third electric regulating valve 10, the fourth electric regulating valve 9, the fifth electric regulating valve 11, and the fifth electric regulating valve 12 respectively, the adjusting knob corresponding to the first electric regulating valve 7 on the surface of the electric actuator is manually operated, so that the electric actuator controls the valve opening of the first electric regulating valve 7 through the wire connection, and then the air volume generated by the magnetic levitation blower 1 begins to enter the first air outlet pipe 3 and the second air outlet pipe 4. Then the staff manually operates the adjusting knob 15 corresponding to the third electric regulating valve 10 and the fourth electric regulating valve 9 on the surface of the electric actuator, so that the electric actuator controls the valve opening of the third electric regulating valve 10 and the fourth electric regulating valve 9 through the wire connection. , and then the valve opening of the third electric regulating valve 10 is larger than the valve opening of the fourth electric regulating valve 9, so that the air volume from the second air outlet pipe 4 is much larger than the air volume from the first air outlet pipe 3. Since the biochemical pool 13 is provided with four biochemical pools, namely the first biochemical pool, the second biochemical pool, the third biochemical pool, and the fourth biochemical pool, the second air outlet pipe 4 enters the second biochemical pool for high air volume aeration, and the first air outlet pipe 3 enters the first biochemical pool for low air volume aeration. As for the third biochemical pool and the fourth biochemical pool, since there is no air volume Aeration is carried out, and the third biochemical pool is carrying out the relevant sedimentation process, so the larger particles of dirt in the dirt pool water in the third biochemical pool begin to settle to the bottom of the pool by gravity, but the smaller floating particles of dirt cannot settle to the bottom of the pool by gravity. The fourth biochemical pool is carrying out the relevant decanting process, so the fourth biochemical pool is drained periodically through its own decanter, so that the water level in the pool changes during drainage, so as not to disturb the water layers in the pool during drainage, so that the discharged supernatant is always located in the upper layer.
[0021] refer to Figure 1 and Figure 2 The valve assembly 15 includes a first electric regulating valve 7 sleeved on the surface of one end of the two-way air inlet pipe 2, a second electric regulating valve 8 on the surface of the other end of the two-way air inlet pipe 2, a fourth electric regulating valve 9 sleeved on the surface of the first air outlet pipe 3 in front of the first electric regulating valve 7, a third electric regulating valve 10 sleeved on the surface of the second air outlet pipe 4 at a symmetrical position with one end of the two-way air inlet pipe 2 as the symmetrical center, a fifth electric regulating valve 11 sleeved on the surface of the third air outlet pipe 5 in front of the second electric regulating valve 8, and a sixth electric regulating valve 12 sleeved on the surface of the fourth air outlet pipe 6 at a symmetrical position with the other end of the two-way air inlet pipe 2 as the symmetrical center.
[0022] When the latter two biochemical pools need to be aerated, the magnetic levitation blower 1 fixed on the top of the ground is manually started, so that the magnetic levitation blower 1 begins to generate a large amount of air, and then the air begins to enter the two-way air inlet pipe 2 from the magnetic levitation blower 1, and then the adjusting knob corresponding to the second electric regulating valve 8 on the surface of the electric actuator is manually operated, so that the electric actuator controls the valve opening of the second electric regulating valve 8 through the wire connection, and then the air volume generated by the magnetic levitation blower 1 begins to enter the third air outlet pipe 5 and the fourth air outlet pipe 6, and then the staff manually operates the adjusting knob corresponding to the fifth electric regulating valve 11 and the sixth electric regulating valve 12 on the surface of the electric actuator, so that the electric actuator controls the valve opening of the fifth electric regulating valve 11 and the sixth electric regulating valve 12 through the wire connection, and then the valve opening of the fifth electric regulating valve 11 The valve opening is smaller than that of the sixth electric regulating valve 12, and then the air volume from the third air outlet pipe 5 is much smaller than that from the first air outlet pipe 3, so the fourth air outlet pipe 6 enters the fourth biochemical pool for high air volume aeration, and the third air outlet pipe 5 enters the third biochemical pool for low air volume aeration. Since the first biochemical pool and the second biochemical pool have completed aeration, the first biochemical pool then begins to perform a sedimentation process, so all the particulate dirt in the dirt pool water in the first biochemical pool begins to settle to the bottom of the pool by gravity sedimentation, while the second biochemical pool performs a related decanting process, so the fourth biochemical pool begins to use periodic drainage through its own decanter, so that the water level in the pool changes during drainage, so as not to disturb the water layers in the pool during drainage, so that the discharged supernatant is always located in the upper layer. It can be seen that there are two pools aerating at any time, one is settling, and the other is discharging water.
[0023] refer to Figure 1 and Figure 2 The surface of the electric actuator is provided with an adjusting knob 15 corresponding to the valve assembly.
[0024] The electric actuator mainly controls the opening state of the first electric regulating valve 7, the second electric regulating valve 8, the fourth electric regulating valve 9, the third electric regulating valve 10, the fifth electric regulating valve 11 and the sixth electric regulating valve 12 by adjusting the regulating knob corresponding to each electric regulating valve. At the same time, the opening of each electric regulating valve can be closed by adjusting all the regulating knobs of the electric actuator, so that the biochemical water is not aerated for the first thirty minutes, thereby increasing the anaerobic time of the water inlet, which is beneficial to the removal of total nitrogen. The total nitrogen in the effluent is reduced from 11 mg / L in the early stage to below 8 mg / L at present.
[0025] The magnetic levitation blower, electric air valve, and electric air valve angle adjustment switch in the above embodiments can all be purchased and used directly, while the magnetic levitation blower, electric regulating valve, and electric actuator in this embodiment are TB100-1AC, ZFHF-WSDC, and SIERTAL models, respectively.
[0026] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A low energy consumption SBR process biochemical pool aeration structure, It is characterized in that The invention comprises: a magnetic suspension blower (1), a pipeline assembly (14), a valve assembly (15), and an electric actuator, wherein the magnetic suspension blower (1) is fixed to the top of the ground, the pipeline assembly (14) is connected to the magnetic suspension blower (1) through a pipeline, the valve assembly (15) is sleeved on the surface of the pipeline assembly (14), and the electric actuator is connected to the valve assembly (15) through an electric wire.
2. A biochemical pool aeration structure for a low energy consumption SBR process according to claim 1, It is characterized in that The pipeline assembly (14) comprises a two-way air inlet pipe (2) connected to the pipeline of the magnetic suspension blower (1); one end of the two-way air inlet pipe (2) is fixedly connected to a first air outlet pipe (3); the first air outlet pipe (3) has a second air outlet pipe (4) fixedly connected at a symmetrical position with the two-way air inlet pipe (2) as the symmetrical center; the other end of the two-way air inlet pipe (2) is fixedly connected to a third air outlet pipe (5); the third air outlet pipe (5) has a fourth air outlet pipe (6) fixedly connected at a symmetrical position with the two-way air inlet pipe (2) as the symmetrical center.
3. The biochemical pool aeration structure of a low energy consumption SBR process according to claim 1, It is characterized in that The valve assembly (15) comprises a first electric regulating valve (7) sleeved on the surface of one end of the two-way air inlet pipe (2), a second electric regulating valve (8) sleeved on the surface of the other end of the two-way air inlet pipe (2), a fourth electric regulating valve (9) sleeved on the surface of the first air outlet pipe (3) in front of the first electric regulating valve (7), a third electric regulating valve (10) sleeved on the surface of the second air outlet pipe (4) at a symmetrical position with one end of the two-way air inlet pipe (2) as the symmetrical center, a fifth electric regulating valve (11) sleeved on the surface of the third air outlet pipe (5) in front of the second electric regulating valve (8), and a sixth electric regulating valve (12) sleeved on the surface of the fourth air outlet pipe (6) at a symmetrical position with the other end of the two-way air inlet pipe (2) as the symmetrical center.
4. The biochemical pool aeration structure of a low energy consumption SBR process according to claim 1, It is characterized in that The pipeline assembly (14) extends into the biochemical pool (13) through a pipeline.
