Existing bridge pier anti-scouring structure
By wrapping weather-resistant steel tubes on the bridge piers and setting up bite pile groups and lead wire gabion sheets, a comprehensive protection structure is formed, which solves the problems of poor protection effect and poor durability of the existing anti-scouring structure of the bridge piers under specific conditions, and achieves Provide efficient and safe bridge foundation protection.
Patent Information
- Application Number
- CN202420266368.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-04
AI Technical Summary
The existing anti-scouring structure of bridge piers has poor protection effect under the conditions of large terrain height difference, turbulent inflow, thick alluvial layer, and poor cementation of soil particles. Moreover, the traditional structure has poor durability, which can easily lead to the weakening of the bridge foundation and structural failure, resulting in Major safety hazard.
It adopts an inner and outer two-layer protective structure. The inner layer is made of weather-resistant steel tubes wrapped around the piers and filled with cement mortar. The outer layer is composed of an articulating pile group and a lead wire gabion sheet package. The articulating pile group is composed of reinforced concrete and plain concrete, and the lead wire gabion sheet package is laid. On the surface of the river bed, all-round protection is formed.
It effectively resists water damage with large local scour depth and strong erosion ability, avoids the risk of bridge toppling, improves the load-bearing performance of the bridge pier foundation, has good durability, does not require subsequent maintenance, and reduces the impact on the river ecology.
Smart Images

Figure CN221798328U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge engineering, and in particular relates to an anti-scouring structure for an existing bridge pier. Background Art
[0002] Bridge pier scour is the top priority in bridge water damage prevention and has become an important factor in bridge collapse and failure. Scour will erode the soil around the foundation, causing the loss of soil particles that constrain the foundation, thereby reducing the effective burial depth of the foundation, causing the foundation to be exposed, hollow, and unevenly deformed, seriously weakening the foundation's bearing capacity. At the same time, scour is significantly sudden, extremely destructive, and highly concealed. Once a disaster occurs, it will cause the foundation to break and the bridge to collapse, resulting in major accidents with vehicle destruction and loss of life.
[0003] At present, the commonly used anti-scour measures include active protection measures such as retaining rings, ring-wing bridge piers, bridge pier slits, front-row piles of piers, steel sheet piles, and passive protection measures such as riprap, expanded foundations, and concrete armor. When the terrain height difference is large, the incoming flow is turbulent, the alluvial layer is thick, and the soil particles have poor cementation, the above protection measures have obvious shortcomings, mainly manifested as:
[0004] (1) The anti-scouring depth is small, and generally only the surface riverbed around the pier can be protected. When the local scouring depth is large, water damage such as foundation voiding, exposure, and friction loss is difficult to deal with;
[0005] (2) When constructing protective structures, the excavation disturbance effect has a significant impact on the pier foundation (such as expanding the foundation, ring-wing bridge piers, etc.). In order to effectively resist local scour, conventional structures have to dig deep around the pier to construct protective structures. However, large-scale deep excavation can cause uneven deformation of the pier foundation. In addition, the lateral displacement of vehicles on the bridge deck increases the risk of shearing and toppling of the structure.
[0006] (3) Although opening holes in existing structures can increase the water flow area (such as opening slits in bridge piers), reduce scour resistance, and reduce local erosion, it aggravates stress concentration around the holes, deteriorates the foundation force transmission mechanism, and weakens the structural bearing capacity, posing huge risks to important projects.
[0007] (4) Although the horizontal straight-line pile protection on the riverbed in front of the pier can penetrate below the local scour line, the anti-erosion effect around the pier is greatly reduced when the pile row is far away from the pier foundation. When the pile row is close to the pier foundation, the pile group effect is significant, causing a large disturbance to the existing pile foundation under the pier, reducing the friction resistance of the pile foundation and weakening the bearing capacity of the bridge foundation. In addition, there is no bite between the horizontal straight-line piles. Under the action of long-term high-intensity scouring, the vortex effect between the piles is amplified, the erosion intensity is severe, and the soil particles between the piles are accelerated. Loss, resulting in the exposed and ineffective pile row;
[0008] (5) Traditional anti-scour structures have poor durability. After the structure fails, repeated construction will cause great engineering waste and also have serious adverse effects on the river ecology. In particular, the poor durability of steel sheet piles (CN202220893553.4) in erosive environments is more obvious. In addition, the riverbed is often deposited with thick pebbles, gravel or boulders, and steel sheet piles are difficult to drive into such formations, making them less suitable. At the same time, steel sheet piles are usually in the form of rectangular enclosures, which have a large water-blocking effect. Shearing and erosion are prone to occur around the enclosure structure, resulting in the structure being exposed, and there is a risk of local instability causing the anti-scour function to fail.
[0009] Therefore, for existing bridge piers under conditions such as large terrain height difference, turbulent flow, thick alluvial layer, and poor cementation of soil particles, whether a long-term, effective, safe, reliable, economical and environmentally friendly protective structure can be set up has become a key link affecting the safety of bridge operation, and this problem needs to be solved urgently. Utility Model Content
[0010] The utility model aims to provide an existing bridge pier anti-scour structure with strong erosion resistance and good durability to protect the bearing foundation of the bridge in view of the application limitations of the existing bridge pier anti-scour structure.
[0011] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0012] A scour prevention structure for an existing pier, comprising an inner protective structure wrapped around the existing pier and an outer protective structure arranged around the existing pier, wherein the inner protective structure comprises a weathering steel plate tube arranged at the junction of the existing pier and the riverbed, the bottom of the weathering steel plate tube sits on the riverbed, the top is at least 0.5m above the 1% water level, and the gap between the weathering steel plate tube and the existing pier is filled with cement mortar; the outer protective structure comprises an interlocking pile group arranged around the foundation piles under the existing pier, the interlocking pile group consists of reinforced concrete piles and plain concrete piles interlocked with each other in an annular direction, the bottoms of the reinforced concrete piles and the plain concrete piles penetrate at least 2m below the maximum scour line, the tops are provided with an annular crown beam, and the top surface of the annular crown beam is flush with the riverbed surface.
[0013] It also includes wire mesh gabion packages arranged within a range of not less than 10m upstream and downstream of the existing bridge piers. The thickness of the wire mesh gabion packages is not less than 30cm, and the surface is treated with cement mortar.
[0014] The anti-scouring principle of the utility model is:
[0015] First, in order to improve the ability of bridge piers to resist the impact of rapids and floating objects, weathering steel plate tubes are installed at the interface between the existing piers and the riverbed. The bottom is located at the riverbed and the top should be at least 0.5m higher than the 1% water level line. The weathering steel plate tubes are wrapped around the piers and then welded. Since the piers are frustum-shaped and the pier body is an inclined surface, the gap between the cylindrical weathering steel plate and the pier is filled with cement mortar to improve the impact resistance and stability of the weathering steel plate.
[0016] After the weather-resistant steel plate is installed, in order to completely prevent the rapids from scouring and eroding the soil around the pier, according to the on-site terrain, interlocking pile groups are constructed around the pier. The net distance between the interlocking pile group and the pile foundation under the pier should not be less than 4d1; at the same time, in order to improve the economic efficiency of the project and the convenience of construction, the interlocking piles are staggered with reinforced concrete piles and plain concrete piles. The pile diameter is not less than 50cm, the interlocking spacing is not less than 15cm, the plain concrete piles are constructed first, and then the reinforced concrete piles. The pile length is deep into the stable stratum below the maximum scour line, which is determined in combination with geological data.
[0017] After the interlocking pile group is constructed, in order to improve the overall stiffness and coordinated anti-scour ability of the pile, the pile head is polished and cleaned, and a circular crown beam is constructed on the top of the pile. The top surface of the crown beam is flush with the riverbed surface. In order to ensure the effective connection between the crown beam and the pile foundation, the vertical main reinforcement of the pile foundation is extended into the crown beam and firmly welded to the crown beam steel bars.
[0018] Finally, the riverbed site is leveled for water damage, and wire gabion packages with a thickness of not less than 30 cm are evenly laid on the riverbed surface within a range of not less than 10 m upstream and downstream of the bridge piers, and cement mortar is used on the surface of the wire gabions. This not only avoids the risk of traditional riprap loss and impact on the downstream bridge piers, but also reduces the overall water resistance of the riverbed, and further improves the scouring resistance of the riverbed surface. When laying wire gabions on site, the slopes of the upstream and downstream riverbeds should be taken into consideration for smooth connection to ensure smooth water flow.
[0019] Compared with the prior art, the utility model has the following beneficial effects:
[0020] (1) It can effectively resist water damage with large local scouring depth and strong erosion ability, thus avoiding the risk of bridge collapse caused by foundation hollowing, exposure and friction loss;
[0021] (2) Bored piles were used outside the influence range of the pier foundation, which caused almost no disturbance to the pier foundation. This successfully overcame the defect that the pier foundation would shift laterally due to deep excavation of the large foundation pit, causing traffic interruption.
[0022] (3) The lower part of the pier foundation is isolated from scouring by interlocking piles, and the surface layer is made of wire mesh gabions to reduce water resistance. The pier body is reinforced with weather-resistant steel plates to form all-round non-destructive protection for the pier foundation;
[0023] (4) The interlocking piles form a closed retaining structure, which not only stabilizes the soil around the pier, but also prevents the erosion of soil particles between the piles. At the same time, the pile tops are connected by ring beams, which strengthens the overall coordinated protection capability of the structure and prevents the in-line piles from developing into overall failure due to local instability.
[0024] In summary, the utility model has good durability in anti-scour structure, can overcome the shortcomings of the existing structure once and for all, does not require later operation and maintenance, is highly economical, and lays wire mesh gabions along the riverbed to avoid the loss of riprap, affecting the ecological environment, and damaging downstream structures. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0026] Figure 2 for Figure 1 Section view of section Ⅰ-Ⅰ in the figure.
[0027] Figure 3 for Figure 1 Schematic diagram of the occlusion of the mid-occlusal pile group.
[0028] In the figure, 1. bridge, 2. existing bridge piers, 3. weathering steel plate tube, 4. cement mortar layer, 5. cap, 6. foundation piles under the pier, 7. reinforced concrete piles, 8. plain concrete piles, 9. annular crown beam, 10. wire mesh gabion package, 11. maximum scour line; d1 is the pile diameter of the foundation piles under the pier, d2 is the pile diameter of the interlocking piles, and d3 is the interlocking spacing. DETAILED DESCRIPTION
[0029] like Figure 1-3 As shown, an existing bridge pier anti-scour structure includes an inner protective structure wrapped on the existing bridge pier 2 and an outer protective structure arranged around the existing bridge pier 2, the inner protective structure includes a weathering steel plate tube 3 arranged at the junction of the existing bridge pier 2 and the riverbed, the bottom of the weathering steel plate tube 3 is seated on the riverbed, the top is at least 0.5m higher than the 1% water level line, and the gap between the weathering steel plate tube 3 and the existing bridge pier 2 is filled with cement mortar; the outer protective mechanism includes an interlocking pile group arranged around the foundation pile 6 under the pier of the existing bridge pier, the interlocking pile group is composed of reinforced concrete piles 7 and plain concrete piles 8 that are interlocked with each other in a ring shape, the pile diameters of the reinforced concrete piles 7 and the plain concrete piles 8 are equal and not less than 50cm, and the interlocking spacing is not less than 15cm.
[0030] The bottom of the reinforced concrete pile 7 and the plain concrete pile 8 penetrates at least 2m below the maximum scour line, and an annular crown beam 9 is constructed on the top, and the top surface of the annular crown beam 9 is flush with the riverbed surface.
[0031] The distance between the reinforced concrete pile 7 or the plain concrete pile 8 and the foundation pile 6 under the pier is not less than 4 times the pile diameter of the foundation pile 6 under the pier.
[0032] In addition, it also includes wire gabion panels 10 arranged in a range of not less than 10m upstream and downstream of the existing bridge piers, the thickness of the wire gabion panels 10 is not less than 30cm, and the surface of the wire gabion panels 10 is treated with cement mortar.
[0033] The specific implementation process of the utility model is as follows:
[0034] A. First, the weathering steel tube 3 is processed according to the pier shape at the interface between the existing pier 2 and the riverbed. The bottom of the weathering steel tube 3 is located at the riverbed, and the top is not less than 0.5m above the 1% water level (the bridge is a 100-year project, and the design high water level is the water level of 1% of the cumulative frequency of the duration, i.e., the 1% water level); the weathering steel tube 3 wraps the pier and then welds it. Since the pier is in a cone shape and the pier body is an inclined surface, the gap between the weathering steel tube 3 and the pier is filled with cement mortar to improve the impact resistance and stability of the weathering steel tube;
[0035] B. After the weathering steel plate tube 3 is constructed, in order to completely prevent the rapids from scouring and eroding the soil around the pier, according to the on-site terrain, an interlocking pile group is constructed around the pier. The net distance between the interlocking pile group and the pile foundation under the pier should not be less than 4d1 (when the pier foundation is an expanded foundation without a pile foundation, the net distance between the interlocking pile group and the outer edge of the expanded foundation should not be less than 4d2). At the same time, in order to improve the economic efficiency of the project and the convenience of construction, the interlocking pile group consists of reinforced concrete piles 7 and plain concrete piles 8. The pile diameter should not be less than 50cm, and the interlocking spacing d3 should not be less than 15cm. The plain concrete piles 8 are constructed first, and then the reinforced concrete piles 7. The pile length goes deep into the stable stratum below the maximum scouring line 11, which is determined in combination with geological data;
[0036] C. After the construction of the interlocking pile group is completed, in order to improve the overall stiffness and coordinated anti-scour ability of the pile, the pile head is polished and cleaned, and a circular crown beam 9 is constructed on the pile top. The top surface of the crown beam is flush with the riverbed surface. In order to ensure the effective connection between the crown beam and the pile foundation, the vertical main reinforcement of the pile foundation is extended into the crown beam and firmly welded to the crown beam reinforcement;
[0037] D. Finally, the riverbed site is leveled, and wire gabion packs 10 with a thickness of not less than 30 cm are evenly laid on the riverbed surface within a range of not less than 10 m upstream and downstream of the bridge piers, and cement mortar is used to plaster the surface of the wire gabion packs 10. This not only avoids the risk of traditional riprap and impact on the downstream bridge piers, but also reduces the overall water resistance of the riverbed, and further improves the scouring resistance of the riverbed surface. When laying wire gabions on site, the slopes of the upstream and downstream riverbeds should be taken into consideration for smooth connection to ensure smooth water flow.
[0038] The utility model has been applied in the Wanzigou Bridge of the Red Cross Railway. Through regular on-site inspections, the quality of the anti-scouring structure is reliable. After the flood, the bridge piers and the riverbed did not suffer from water damage, which fully proves that the structure of the utility model is reasonable, safe and reliable, can prevent large-scale and high-intensity scouring, and the timeliness and long-term effectiveness of the reinforcement are very good. At the same time, the process is simple, easy to implement, overcomes the problems existing in the existing technology, fills the technical gap in this field, and is highly practical.
Claims
1. An existing bridge pier anti-scour structure, characterized in that: The invention comprises an inner protective structure wrapped around an existing bridge pier and an outer protective structure arranged around the existing bridge pier, wherein the inner protective structure comprises a weathering steel plate tube (3) arranged at the junction of the existing bridge pier and the riverbed, the bottom of the weathering steel plate tube (3) is seated on the riverbed, the top is at least 0.5m above the 1% water level, and the gap between the weathering steel plate tube (3) and the existing bridge pier is filled with cement mortar; the outer protective structure comprises an interlocking pile group arranged around the foundation pile (6) under the existing bridge pier, the interlocking pile group consists of reinforced concrete piles (7) and plain concrete piles (8) interlocking with each other in a ring shape, the bottom of the reinforced concrete piles (7) and the plain concrete piles (8) penetrate at least 2m below the maximum scour line, the top of the reinforced concrete piles (7) and the plain concrete piles (8) are provided with an annular crown beam (9), and the top surface of the annular crown beam (9) is flush with the riverbed surface.
2. The existing bridge pier anti-scour structure according to claim 1, characterized in that: The pile diameters of the reinforced concrete piles (7) and the plain concrete piles (8) are equal and not less than 50 cm, and the interlocking spacing is not less than 15 cm.
3. The existing bridge pier anti-scour structure according to claim 1, characterized in that: The distance between the reinforced concrete pile (7) or the plain concrete pile (8) and the pier foundation pile (6) is not less than 4 times the pile diameter of the pier foundation pile (6).
4. The existing bridge pier anti-scour structure according to claim 1, characterized in that: It also includes a wire gabion sheet package (10) arranged within a range of not less than 10 m upstream and downstream of the existing bridge pier, the wire gabion sheet package (10) having a thickness of not less than 30 cm and a surface treated with cement mortar.