One-time floor leveling device for building construction
By using the device of elevation track and adjustable plate thickness controller in building construction, the construction difficulty and quality problems caused by the thin secondary leveling layer of the floor in traditional construction are solved. One-time leveling is achieved, ensuring the quality of the base and saving money. time and cost.
Patent Information
- Application Number
- CN202323389772.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-12
AI Technical Summary
In the traditional building construction technology, the secondary leveling layer of the floor is thin, which makes the construction difficult and easily causes hollowing and cracking problems.
Design a one-time leveling device for building construction floors, which includes an elevation track, a fixed support and an adjustable plate thickness controller set above the steel mesh. By adjusting the height of the elevation track and the installation of the fixed support, one-time leveling is achieved.
It achieves quality assurance of base construction before self-leveling construction, saves construction time and costs, and improves construction safety and progress.
Smart Images

Figure CN221799206U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a one-time leveling device for a building construction floor. Background Art
[0002] "PVC plastic floor" refers to the floor made of polyvinyl chloride. It is a new type of lightweight floor decoration material that is very popular in the world today, also known as "lightweight floor material". It is widely used, such as indoor homes, hospitals, schools, office buildings, factories, public places, supermarkets, businesses, stadiums and other places. It has many advantages such as light weight, environmental protection, anti-slip, waterproof, sound absorption, and easy construction and installation; but it has a very significant disadvantage, "high construction foundation requirements". How to ensure the construction quality of PVC plastic floor, according to the construction process, base treatment-self-leveling construction-pre-laying-PVC installation-joint welding-cleaning site, because the self-leveling is only 2-3mm, base treatment is the top priority. The traditional method is to carry out secondary leveling layer construction after the concrete floor construction and before the self-leveling construction. Because the secondary leveling layer is thin, the construction is difficult and it is very easy to cause hollowing and cracking in the later stage. Utility Model Content
[0003] In order to overcome the defects of the prior art, the technical problem to be solved by the utility model is to propose a one-time leveling device for building construction floors, in order to solve the common quality problems of secondary leveling of floors in traditional construction processes, such as thin leveling layers, great construction difficulty, and easy hollowing and cracking in the later stage.
[0004] To achieve this purpose, the utility model adopts the following technical solutions:
[0005] The utility model provides a one-time leveling device for a building construction floor, comprising a plurality of elevation tracks arranged above a steel mesh, wherein the highest point of the elevation tracks is the floor elevation, a plurality of fixed supports for fixing the elevation tracks are evenly distributed on one side of the elevation tracks, the fixed supports are fixedly mounted on a template, and an adjustable plate thickness controller for adjusting the height of the elevation tracks is provided at the bottom end of the elevation tracks.
[0006] The preferred technical solution of the utility model is that the elevation track is an L-shaped angle steel, the vertical side of the elevation track is connected to the fixed support, and the bottom end of the horizontal side of the elevation track is in contact with the adjustable plate thickness controller.
[0007] An optimal technical solution of the utility model is that the spacing between the plurality of elevation tracks is 300 cm.
[0008] The preferred technical solution of the utility model is that the fixed support includes a base plate and a support plate, the base plate is fixedly mounted on the template, the support plate is vertically fixed on the base plate, and the elevation track is connected to the support plate.
[0009] An optimal technical solution of the utility model is that both the bottom plate and the support plate are L-shaped angle steels.
[0010] An optimal technical solution of the present utility model is that the interval between the fixed supports is 100 cm.
[0011] The beneficial effects of the utility model are:
[0012] The utility model provides a one-time leveling device for a building construction floor. By setting a fixed support, an elevation track and an adjustable plate thickness controller, the fixed support is installed on a template, and then a steel mesh is laid. Then, the elevation track is placed on the steel mesh, and the adjustable plate thickness controller is temporarily placed near the fixed support. The top end of the adjustable plate thickness controller is against the bottom end of the elevation track. The height of the elevation track is adjusted by adjusting the adjustable plate thickness controller. When the required height is adjusted, the elevation track is welded and fixed to the fixed support. Then, the adjustable plate thickness controller is removed, and concrete is poured. The plasterer uses a square tube or a special finishing tool to finish the plate surface along the top end of the elevation track. Through the above process, leveling can be completed with only one finishing, which not only ensures the base construction quality before self-leveling construction, but also saves construction time, brings great convenience to construction safety and construction progress, speeds up the construction progress, and saves project costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a front view of the leveling device;
[0014] Figure 2 is a top view of the leveling device;
[0015] Figure 3 It is a schematic diagram of the distribution of the leveling device on the template;
[0016] Figure 4 is a top view of the fixed support;
[0017] In the figure:
[0018] 1. Elevation track; 2. Fixed support; 3. Adjustable plate thickness controller; 4. Base plate; 5. Support plate; 6. Formwork; 7. Steel mesh. DETAILED DESCRIPTION
[0019] The technical solution of the utility model is further explained below with reference to the accompanying drawings and through specific implementation methods.
[0020] As shown in the figure, this embodiment provides a one-time leveling device for a construction floor, including a plurality of elevation rails 1 arranged above a steel mesh 7, the spacing between the plurality of elevation rails 1 is 300 cm, the highest point of the elevation rail 1 is the floor elevation, a plurality of fixed supports 2 for fixing the elevation rail 1 are evenly distributed on one side of the elevation rail 1, the fixed supports 2 are fixedly installed on a formwork 6, the spacing between the fixed supports 2 is 100 cm, and an adjustable plate thickness controller 3 for adjusting the height of the elevation rail 1 is provided at the bottom end of the elevation rail 1. Install the fixed support 2 on the template 6, then lay the steel mesh 7, and then place the elevation track 1 on the steel mesh 7, temporarily place the adjustable plate thickness controller 3 near the fixed support 2, and the top of the adjustable plate thickness controller 3 is against the bottom of the elevation track 1. The height of the elevation track 1 is adjusted by adjusting the adjustable plate thickness controller 3. When it is adjusted to the required height, the elevation track 1 is welded and fixed to the fixed support 2, and then the adjustable plate thickness controller 3 is removed and concrete is poured. The masons use square pipes or special finishing tools to finish the plate surface along the top of the elevation track 1.
[0021] The elevation track 1 is an L-shaped angle steel, the vertical side of the elevation track 1 is connected to the fixed support 2 , and the bottom end of the horizontal side of the elevation track 1 is in contact with the adjustable plate thickness controller 3 .
[0022] The fixed support 2 includes a bottom plate 4 and a support plate 5, both of which are L-shaped angle steels. The bottom plate 4 is fixedly mounted on the template 6, the support plate 5 is vertically fixed and welded on the bottom plate 4, and the elevation track 1 is connected to the side of the support plate 5.
[0023] The present invention is described by preferred embodiments, and those skilled in the art will appreciate that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. The present invention is not limited to the specific embodiments disclosed herein, and other embodiments falling within the claims of this application are within the scope of protection of the present invention.
Claims
1. A one-time leveling device for a building construction floor, characterized in that: The invention comprises a plurality of elevation tracks (1) arranged above a steel mesh (7), wherein the highest point of the elevation track (1) is the floor elevation, a plurality of fixed supports (2) for fixing the elevation track (1) are evenly distributed on one side of the elevation track (1), the fixed supports (2) are fixedly mounted on a template (6), and an adjustable plate thickness controller (3) for adjusting the height of the elevation track (1) is provided at the bottom end of the elevation track (1).
2. The one-time leveling device for building construction floor according to claim 1 is characterized in that: The elevation track (1) is an L-shaped angle steel, the vertical side of the elevation track (1) is connected to the fixed support (2), and the bottom end of the horizontal side of the elevation track (1) is in contact with the adjustable plate thickness controller (3).
3. The one-time leveling device for building construction floor according to claim 2 is characterized in that: The spacing between the elevation rails (1) is 300 cm.
4. The one-time leveling device for building construction floor according to claim 3 is characterized in that: The fixed support (2) comprises a base plate (4) and a support plate (5), the base plate (4) is fixedly mounted on a template (6), the support plate (5) is vertically fixed on the base plate (4), and the elevation track (1) is connected to the support plate (5).
5. The one-time leveling device for building construction floor according to claim 4 is characterized in that: The bottom plate (4) and the support plate (5) are both L-shaped angle steels.
6. The one-step leveling device for building construction floor according to claim 5, characterized in that: The distance between the fixed supports (2) is 100 cm.