Energy tower heat pump water supply system

By designing the diverter component and switch valve structure in the energy tower heat pump water supply system, the problem of system shutdown when replacing filter components is solved, uninterrupted water supply is achieved, and work efficiency is improved.

CN221801911UActive Publication Date: 2024-10-01广西申能达智能技术有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323362145.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-11
Publication Date
2024-10-01
Estimated Expiration
2033-12-11

AI Technical Summary

Technical Problem

The existing water supply system needs to stop the entire system when replacing filter components, causing the energy tower heat pump unit to also stop working, affecting normal operation.

Method used

An energy tower heat pump water supply system is designed, which uses a water storage tank, a water pump and a diverter component. Through a pipeline structure composed of a guide pipe, a connecting pipe and a switch valve, it is allowed to close the corresponding switch valve when replacing the filter component to ensure another flow of water. Continue to supply the heat pump unit to avoid downtime.

Benefits of technology

It achieves uninterrupted water supply when replacing filter components, improves the efficiency of the energy tower heat pump system, and avoids the impact on the system during the replacement process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221801911U_ABST
    Figure CN221801911U_ABST
Patent Text Reader

Abstract

The utility model is applicable to the technical field of energy towers, and provides an energy tower heat pump water supply system, which comprises a water storage tank, a water pump and a shunting part, the water storage tank is connected with the water pump, the output end of the water pump is connected with the shunting part, and the shunting part comprises a flow guide pipe, a first connecting pipe and a second connecting pipe. The other end of the diversion pipe communicates with the first connecting pipe and the second connecting pipe. The first connecting pipe and the second connecting pipe are both connected with a first switch valve and a second switch valve, and a detachable filtering part is connected between the first switch valve and the second switch valve. The energy tower heat pump water supply system provided by the utility model can continuously supply water when the filtering part is replaced, namely the output end of the water pump is provided with two sets of water supply pipelines, each pipeline is provided with an independent valve mechanism, and one valve is closed when the filtering part is replaced; therefore, the normal work of the energy tower heat pump is prevented from being influenced when the filtering part is replaced, and the working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of energy towers, and in particular relates to a heat pump water supply system for an energy tower. Background Art

[0002] The energy tower uses the contact between water and air. Winter heating is designed according to the heat exchange area of ​​the heating load capacity. It uses the carrier medium with a freezing point below zero to efficiently extract low-grade heat energy from the air with high relative humidity in a low-temperature environment. By inputting a small amount of high-grade energy into the energy tower heat pump unit, the low-grade heat energy in the low-temperature environment is transferred to high-grade, and the building is heated and hot water is provided. For summer cooling, a device that dissipates the waste heat generated by air conditioning through evaporation, and the energy tower heat pump is generally provided with water by an independent water supply system.

[0003] The applicant believes that:

[0004] Existing water supply systems generally add filtering components (such as filter nets, etc.) to the supply pipes to filter impurities in the water and increase the service life of the pipes and heat pumps. However, staff are required to replace the filtering components regularly. When replacing, staff are required to stop the entire water supply system, which will also stop the heat pump unit and affect the normal operation of the energy tower heat pump. Utility Model Content

[0005] The purpose of the utility model is to provide an energy tower heat pump water supply system to solve the problem in the above-mentioned background technology that when the filter component of the water supply system is replaced, the staff needs to stop the entire water supply system before the replacement, which will also cause the heat pump unit to stop working and affect the normal operation of the energy tower heat pump.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:

[0007] An energy tower heat pump water supply system comprises a water storage tank, a water pump and a diversion component, wherein the water storage tank is connected to the water pump, and the output end of the water pump is connected to the diversion component;

[0008] The flow diversion component includes a guide pipe, a first connecting pipe and a second connecting pipe, one end of the guide pipe is connected to the output end of the water pump, the other end of the guide pipe is respectively connected to one end of the first connecting pipe and one end of the second connecting pipe, the other end of the first connecting pipe and the other end of the second connecting pipe are respectively connected to a water flow output pipe, and the output end of the water flow output pipe is connected to a heat pump unit;

[0009] The first connecting pipe and the second connecting pipe are both connected with a first switch valve and a second switch valve for controlling the flow of water, and a detachable filter component is connected between the first switch valve and the second switch valve.

[0010] Furthermore, the filter component includes a connecting pipe, a first side connecting piece and a second side connecting piece, one end of the connecting pipe is fixedly connected to the first side connecting piece, and the other end of the connecting pipe is fixedly connected to the second side connecting piece;

[0011] The first side connection piece and the first switch valve are connected as well as the second side connection piece and the second switch valve are connected via fasteners.

[0012] Furthermore, the filter component also includes an internal cylinder, a filter plate and a filter net. The internal cylinder is installed in the end of the connecting tube away from the second side connecting member. The inner wall of the internal cylinder is fixedly connected to the filter plate and the filter net. A plurality of holes are opened through the filter plate. The filter net is located on the side of the filter plate away from the first side connecting member.

[0013] Furthermore, the first side connecting member and the second side connecting member are both flanges.

[0014] Furthermore, a fixing ring is fixedly connected to the outer wall of the inner cylinder, a limiting rod is fixedly connected to the outer wall of the fixing ring, the limiting ring is fixed to the inner wall of the first side connecting member, mounting slots are provided at positions corresponding to the limiting ring and the limiting rod, the limiting rod passes through the mounting slots, and the fixing ring rests against the limiting ring.

[0015] Furthermore, at least two limiting rods are provided.

[0016] Furthermore, the first connecting pipe is connected to the first switch valve and the second switch valve through flanges, and the second connecting pipe is connected to the first switch valve and the second switch valve through flanges.

[0017] Furthermore, the first side connection member and the first switch valve, as well as the second side connection member and the second switch valve are connected via flanges.

[0018] Furthermore, at least two water storage tanks are provided and are interconnected.

[0019] Furthermore, a base plate is installed at the lower end of the heat pump unit, and the water storage tank and the water pump are both installed on the base plate.

[0020] Compared with the prior art, the utility model has the following beneficial effects:

[0021] The energy tower heat pump water supply system provided by the utility model can realize uninterrupted water supply when replacing the filter component, that is, the output end of the water pump is two sets of water supply pipelines, and the pipeline itself is equipped with a separate valve mechanism. When replacing the filter component on the first connecting pipe, the first switch valve and the second valve on the first connecting pipe can be closed, and when replacing the filter component on the second connecting pipe, the first switch valve and the second valve on the second connecting pipe can be closed, thereby avoiding affecting the normal operation of the energy tower heat pump when replacing the filter component, and improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the three-dimensional structure of the energy tower heat pump water supply system provided by the embodiment of the utility model;

[0023] Figure 2 yes Figure 1 A schematic diagram of the structure from another angle;

[0024] Figure 3 It is a partial three-dimensional structural diagram of the energy tower heat pump water supply system provided by the embodiment of the utility model;

[0025] Figure 4 yes Figure 3 Schematic diagram of the local decomposition structure in;

[0026] Figure 5 It is a schematic diagram of the partial decomposition structure of the filter component in the energy tower heat pump water supply system provided by the embodiment of the utility model;

[0027] Figure 6 It is a partial exploded structural schematic diagram of another part of the filter component in the energy tower heat pump water supply system provided by the embodiment of the utility model;

[0028] Figure 7 yes Figure 6 Another perspective structural diagram of;

[0029] Figure 8 It is a schematic diagram of the three-dimensional structure of the built-in cylinder of the energy tower heat pump water supply system provided by the embodiment of the utility model;

[0030] Fig. 9 yes Figure 8 The schematic diagram of the cross-sectional structure of the built-in cylinder is shown.

[0031] The reference numerals in the figures are:

[0032] 1. Water storage tank; 2. Water pump; 3. Base plate; 4. Heat pump unit; 5. Water output pipe; 6. Diversion component; 601. Guide pipe; 602. First connecting pipe; 603. Second connecting pipe; 7. First switch valve; 8. Second switch valve; 9. Filter component; 901. Connecting pipe; 902. First side connection piece; 903. Second side connection piece; 904. Built-in cylinder; 905. Limiting ring; 906. Filter plate; 907. Filter net; 10. Fixing ring; 11. Limiting rod. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0034] like Figure 1-9 As shown, an energy tower heat pump water supply system provided by an embodiment of the utility model comprises a water storage tank 1, a water pump 2 and a diverter component 6, wherein the water storage tank 1 is connected to the water pump 2, and the output end of the water pump 2 is connected to the diverter component 6 for uninterrupted water supply. At least two water storage tanks are provided and are interconnected. The diversion component 6 includes a guide pipe 601, a first connecting pipe 602 and a second connecting pipe 603. One end of the guide pipe 601 is connected to the output end of the water pump 2, and the other end of the guide pipe 601 is respectively connected to one end of the first connecting pipe 602 and one end of the second connecting pipe 603. The other end of the first connecting pipe 602 and the other end of the second connecting pipe 603 are respectively connected to a water output pipe 5. The water output pipe 5 is used as the merging end of two pipelines for water source flow output. The output end of the water output pipe 5 is connected to a heat pump unit 4. The heat pump unit 4 can realize the transfer of low-grade thermal energy to high-grade in a low-temperature environment, heat the building and provide hot water. The uninterrupted water supply to the heat pump unit 4 is realized through the diversion component 6.

[0035] The first connecting pipe 602 and the second connecting pipe 603 are both connected with a first switch valve 7 and a second switch valve 8 for controlling the flow of water. A detachable filter component 9 is connected between the first switch valve 7 and the second switch valve 8, and the filter component 9 is used to filter impurities in the water.

[0036] Starting the water pump 2 can output the water source of the water tank 1 to the guide pipe 601, and then the guide pipe 601 outputs the water to the first connecting pipe 602 and the second connecting pipe 603 respectively. When the first switch valve 7 and the second switch valve 8 are closed, the other pipeline can normally supply water.

[0037] The water pump 2 uses the diversion component 6 to perform diversion water supply work, which can achieve uninterrupted water supply when replacing the filter component 9, that is, the output end of the water pump 2 is two sets of water supply pipelines, and the pipeline itself is equipped with a separate valve mechanism. When replacing the filter component 9 on the first connecting pipe 602, the first switch valve 7 and the second valve 8 on the first connecting pipe 602 can be closed, and the filter component 9 will not affect the normal water supply circulation in the second connecting pipe 603 after being removed from the first connecting pipe 602; when replacing the filter component 9 on the second connecting pipe 603, the first switch valve 7 and the second valve 8 on the second connecting pipe 603 can be closed, and the filter component 9 will not affect the normal water supply circulation in the first connecting pipe 602 after being removed from the second connecting pipe 603, thereby avoiding the problem of affecting the normal operation of the energy tower heat pump when replacing the filter component 9, and it is easy to use and improves the normal working efficiency of the energy tower heat pump water supply system. The above-mentioned first switch valve 7 and second switch valve 8 are specifically concealed stem flange gate valves.

[0038] Read also Figure 5-6 As shown, as an embodiment, the above-mentioned filter component 9 includes a connecting pipe 901, a first side connecting piece 902 and a second side connecting piece 903. One end of the connecting pipe 901 is fixedly connected to the first side connecting piece 902, and the other end of the connecting pipe 901 is fixedly connected to the second side connecting piece 903. The first side connecting piece 902 and the first switch valve 7 and the second side connecting piece 903 and the second switch valve 8 are connected by fasteners. Specifically, the first connecting pipe 602 is connected to the first switch valve 7 and the second switch valve 8 by flanges, respectively, the second connecting pipe 603 is connected to the first switch valve 7 and the second switch valve 8 by flanges, and the first side connecting piece 902 and the first switch valve 7 and the second side connecting piece 903 and the second switch valve 8 are connected by flanges.

[0039] like Figure 7-9 As shown, the filter component 9 also includes an internal cylinder 904, a filter plate 906 and a filter screen 907. The internal cylinder 904 is installed in the end of the connecting pipe 901 away from the second side connecting member 903. The inner wall of the internal cylinder 904 is fixedly connected to the filter plate 906 and the filter screen 907. A plurality of holes (not marked in the figure) are opened through the filter plate 906. The filter screen 907 is located on the side of the filter plate 906 away from the first side connecting member 902. The first side connecting member 902 and the second side connecting member 903 are flanges.

[0040] The specific implementation is as follows:

[0041] When the built-in cylinder 904 needs to be replaced, the first switch valve 7 and the second switch valve 8 connected to the first connecting pipe 602 or the second connecting pipe 603 are rotated to close them, thereby blocking the flow of water in one of the routes, while the water flow in the other route is kept in a normal supply state. At this time, several fasteners of the first side connection member 902 and the second side connection member 903 on both sides of the connecting pipe 901 are loosened, and the connecting pipe 901 is removed, and then the built-in cylinder 904 is taken out. The filter plate 906 and the filter net 907 inside the built-in cylinder 904 can filter most of the impurities well, effectively improving the filtering effect. Secondly, when the built-in cylinder 904 is replaced, it is fixed in the connecting pipe 901 by a snap-fit ​​installation method, thereby saving replacement time.

[0042] As an implementation mode, a fixing ring 10 is welded and fixed to the outer wall of the inner cylinder 904, a limiting rod 11 is fixed to the outer wall of the fixing ring 10, a limiting ring 905 is welded and fixed to the inner wall of the first side connection member 902, at least two limiting rods 11 are provided, and mounting slots (not shown in the figure) are provided at corresponding positions of the limiting ring 905 and the limiting rod 11, the limiting rod 11 passes through the mounting slots, and the fixing ring 10 abuts against the limiting ring 905, thereby connecting and fixing the inner cylinder 904 and the first side connection member 902 to each other, and the end of the inner cylinder 904 away from the fixing ring 10 is inserted into the connecting pipe 901.

[0043] As an implementation mode, a base plate 3 is installed at the lower end of the heat pump unit 4. The base plate 3 is used for installing the above-mentioned equipment and is supported by cement mixture. The water tank 1 and the water pump 2 are both installed on the base plate 3.

[0044] In summary, the working principle of the energy tower heat pump water supply system is as follows: first, fill the water tank 1 with water, and the water inside the water tank 1 is output to the guide pipe 601 by the water pump 2. Start the water pump 2 to output the water from the water tank 1 to the guide pipe 601, and then output the water from the guide pipe 601 to the first connecting pipe 602 and the second connecting pipe 603 respectively, and then output to the heat pump unit 4 through the water flow output pipe 5 after passing through the filter component 9; when the first switch valve 7 and the second switch valve 8 of one of the routes are closed, the other route can normally supply water, and the first side connection member 902 and the first switch valve 7 are fastened together. The first and second side connecting pieces 902 and 903 are connected with each other by fasteners. When the filter component 9 needs to be replaced, the first and second switch valves 7 and 8 on one of the pipelines (such as the first connecting piece 602) are closed. At this time, several fasteners of the first and second side connecting pieces 902 and 903 connected on both sides of the connecting pipe 901 are loosened to disassemble the filter component. At this time, the water flow of the other pipeline (such as the second connecting piece 603) remains in a normal supply state, thereby avoiding affecting the normal operation of the energy tower heat pump when replacing the filter component 9, thereby improving the normal working efficiency of the energy tower heat pump water supply system.

[0045] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An energy tower heat pump water supply system, including a water storage tank, a water pump and a diversion component, It is characterized in that The water storage tank is connected to a water pump, and the output end of the water pump is connected to a flow dividing component; The flow diversion component includes a guide pipe, a first connecting pipe and a second connecting pipe, one end of the guide pipe is connected to the output end of the water pump, the other end of the guide pipe is respectively connected to one end of the first connecting pipe and one end of the second connecting pipe, the other end of the first connecting pipe and the other end of the second connecting pipe are respectively connected to a water flow output pipe, and the output end of the water flow output pipe is connected to a heat pump unit; The first connecting pipe and the second connecting pipe are both connected with a first switch valve and a second switch valve for controlling the flow of water, and a detachable filter component is connected between the first switch valve and the second switch valve.

2. An energy tower heat pump water supply system according to claim 1, It is characterized in that The filter component comprises a connecting pipe, a first side connecting piece and a second side connecting piece, one end of the connecting pipe is fixedly connected to the first side connecting piece, and the other end of the connecting pipe is fixedly connected to the second side connecting piece; The first side connection piece and the first switch valve are connected as well as the second side connection piece and the second switch valve are connected via fasteners.

3. An energy tower heat pump water supply system according to claim 2, It is characterized in that The filter component also includes an internal cylinder, a filter plate and a filter net. The internal cylinder is installed in the end of the connecting tube away from the second side connecting member. The inner wall of the internal cylinder is fixedly connected to the filter plate and the filter net. A plurality of holes are opened through the filter plate. The filter net is located on the side of the filter plate away from the first side connecting member.

4. An energy tower heat pump water supply system according to claim 3, It is characterized in that The first side connecting member and the second side connecting member are both flanges.

5. An energy tower heat pump water supply system according to claim 4, It is characterized in that A fixing ring is fixedly connected to the outer wall of the inner cylinder, a limiting rod is fixedly connected to the outer wall of the fixing ring, a limiting ring is fixed to the inner wall of the first side connecting piece, mounting slots are opened at corresponding positions of the limiting ring and the limiting rod, the limiting rod passes through the mounting slots, and the fixing ring rests on the limiting ring.

6. An energy tower heat pump water supply system according to claim 5, It is characterized in that At least two limiting rods are provided.

7. The energy tower heat pump water supply system according to claim 2, It is characterized in that The first connecting pipe is connected to the first switch valve and the second switch valve through flanges, and the second connecting pipe is connected to the first switch valve and the second switch valve through flanges.

8. An energy tower heat pump water supply system according to claim 7, It is characterized in that The first side connection piece and the first switch valve are connected via flanges, as are the second side connection piece and the second switch valve.

9. The energy tower heat pump water supply system according to claim 1, It is characterized in that At least two water storage tanks are provided and are interconnected.

10. The energy tower heat pump water supply system according to claim 1, It is characterized in that A base plate is installed at the lower end of the heat pump unit, and the water storage tank and the water pump are both installed on the base plate.