Anti-overpressure waste pot annular cavity sealing device
By using the combined design of a labyrinth seal stuffing box and a pressure equalizing tube in the waste boiler annular cavity in the coal chemical industry, the problems of lax ring cavity sealing and overpressure in traditional quench gasifiers are solved, and the waste boiler annular cavity pressure is achieved Improved stability and service life.
Patent Information
- Application Number
- CN202420428908.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-03-06
AI Technical Summary
In the coal chemical industry, traditional chilled gasifiers waste a lot of heat when washing high-temperature syngas and ash, and the ring cavity in the semi-waste boiler technology is not tightly sealed, which is prone to overpressure damage and affects the operation cycle and Production is stable.
A waste boiler ring cavity sealing device to prevent overpressure is designed. The protective gas is passed into the quenching section through the labyrinth seal stuffing box to ensure that the pressure in the waste boiler section is slightly higher than that of the quenching section. A pressure equalizing pipe is set up to prevent extreme working conditions. In case of overpressure, micro explosion-proof panels are used to break when the pressure exceeds the limit to prevent damage, and at the same time, the uniform flow tube is used to prevent fly ash from clogging.
It effectively avoids overpressure in the waste boiler annular cavity, reduces maintenance costs, increases the service life of the equipment, and ensures the stability of the pressure in the waste boiler annular cavity.
Smart Images

Figure CN221810351U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a waste boiler ring cavity sealing device for preventing overpressure. Background Art
[0002] At present, the coal chemical industry has higher and higher requirements for heat utilization. The traditional quenching type gasifier uses quenching water to wash the high-temperature synthesis gas and ash, which requires a large amount of quenching water and wastes some heat, which is not in line with the current development trend of energy conservation and consumption reduction. Under this situation, the semi-waste boiler technology came into being. Although the semi-waste boiler technology solves the problem of heat recovery, the ring cavity is not tightly sealed and the ring cavity is prone to overpressure and damage to the waste boiler during the operation of the semi-waste boiler, which seriously affects the operation cycle of the semi-waste boiler and the continuous and stable production. Therefore, it is imperative to provide a waste boiler ring cavity sealing device that can prevent overpressure. Utility Model Content
[0003] The purpose of the utility model is to pass the protective gas in the waste boiler annular cavity into the quenching section through the labyrinth sealing stuffing box 3 to ensure that the pressure of the waste boiler section is always slightly greater than that of the quenching section; at the same time, a pressure equalizing pipe 4 is provided to prevent the occurrence of overpressure in the waste boiler annular cavity under extreme working conditions.
[0004] The purpose of the utility model is achieved in this way:
[0005] An overpressure-proof waste boiler annular cavity sealing device comprises a protective gas inlet pipe 1, a partition sealing plate upper plate 2, a labyrinth sealing stuffing box 3, a pressure-equalizing pipe 4, a partition sealing plate lower plate 5, and a micro explosion-proof plate 6;
[0006] The protective gas inlet pipe 1 passes through the gasifier shell and the end thereof extends into the waste boiler annular cavity formed by the gasifier shell, the waste boiler tube array and the waste boiler header;
[0007] The upper plate 2 of the partition sealing plate and the lower plate 5 of the partition sealing plate are located at the lower part of the waste boiler annular cavity and below the end of the protective gas inlet pipe 1;
[0008] The upper plate 2 of the partition sealing plate is connected to the waste boiler header, leaving a gap at the furnace wall;
[0009] The lower plate 5 of the partition sealing plate is connected to the furnace wall, leaving a gap at the waste boiler header;
[0010] The labyrinth seal stuffing box 3 is installed between the upper plate 2 of the partition seal plate and the lower plate 5 of the partition seal plate;
[0011] The pressure equalizing pipe 4 is located inside the lower plate 5 of the partition sealing plate and passes through the upper plate 2 of the partition sealing plate;
[0012] The micro explosion-proof plate 6 is installed on the top of the equalizing pressure pipe 4;
[0013] There are 8 equalizing pipes 4, with a diameter of DN15, evenly distributed on the inner side of the lower plate 5 of the partition sealing plate, welded to the upper plate 2 of the sealing plate and passing through the upper plate 2 of the partition sealing plate;
[0014] A micro explosion-proof plate 6 is installed on the top of each pressure-equalizing tube 4 .
[0015] The protective gas is continuously introduced into the waste boiler annular cavity formed by the combination of the gasifier shell, the waste boiler tube array and the waste boiler header through the protective gas inlet pipe 1;
[0016] A partition sealing plate upper plate 2 and a partition sealing plate lower plate 5 are installed at the lower part of the waste boiler annular cavity and below the end of the protective gas inlet pipe 1. A labyrinth sealing stuffing box 3 is installed between the partition sealing plate upper plate 2 and the partition sealing plate lower plate 5. The protective gas continuously enters the lower quenching chamber through the labyrinth sealing stuffing box 3 to ensure that the pressure of the waste boiler section is always higher than the pressure of the gasification section.
[0017] At the same time, the labyrinth seal stuffing box 3 can prevent the high-temperature flue gas from flowing back into the annular space; in order to prevent the fly ash from causing the labyrinth seal stuffing box 3 to become blocked and fail, a flow-distributing pipe 4 is provided;
[0018] A micro explosion-proof plate 6 is provided on the top of the uniform flow pipe 4. When the pressure is greater than the set pressure, the micro explosion-proof plate 6 ruptures to effectively prevent the waste boiler from being damaged by overpressure. At the same time, due to the continuous introduction of protective gas, the high-temperature synthesis gas can be prevented from flowing back to the annular space when ruptured, and the pressure stability of the waste boiler annular cavity is also ensured. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Attached Figure 1 A vertical cross-sectional schematic diagram of a waste boiler annular cavity sealing device for preventing overpressure is shown;
[0020] Attached Figure 2 It shows a partial enlarged schematic diagram of the upper plate 2 of the separation sealing plate;
[0021] Attached Figure 3 A partial enlarged schematic diagram of a labyrinth seal stuffing box 3 is shown;
[0022] Attached Figure 4 A partial enlarged schematic diagram of the voltage-equalizing tube 4 is shown;
[0023] Attached Figure 5 A partial enlarged schematic diagram of the lower plate 5 of the separation sealing plate is shown;
[0024] Attached Figure 6 A partial enlarged schematic diagram of the miniature explosion-proof panel 6 is shown.
[0025] Description of reference numerals: Figure 1-6 Middle: 1. Protective gas inlet pipe, 2. Upper plate of the partition sealing plate, 3. Labyrinth seal stuffing box, 4. Pressure equalizing pipe, 5. Lower plate of the partition sealing plate, 6. Micro explosion-proof plate. DETAILED DESCRIPTION
[0026] The following is combined with Figure 1-6 The utility model is further described as a waste boiler ring cavity sealing device for preventing overpressure.
[0027] Working principle:
[0028] The protective gas is continuously introduced into the waste boiler annular cavity formed by the combination of the gasifier shell, the waste boiler tube array and the waste boiler header through the protective gas inlet pipe 1;
[0029] At the lower part of the waste boiler annular cavity and below the end of the protective gas inlet pipe 1, there are a partition sealing plate upper plate 2 and a partition sealing plate lower plate 5. A labyrinth sealing stuffing box 3 is installed between the partition sealing plate upper plate 2 and the partition sealing plate lower plate 5. The protective gas continuously enters the lower quenching chamber through the labyrinth sealing stuffing box 3 to ensure that the pressure of the waste boiler section is always higher than the pressure of the gasification section.
[0030] At the same time, the labyrinth seal stuffing box 3 can prevent the high-temperature flue gas from flowing back into the annular space;
[0031] In order to prevent the fly ash from causing the labyrinth seal stuffing box 3 to become blocked and fail, a flow equalizer 4 is provided;
[0032] A micro explosion-proof plate 6 is provided on the top of the flow-distributing pipe 4. When the pressure is greater than the set pressure, the micro explosion-proof plate 6 ruptures to effectively prevent the waste boiler from being damaged by overpressure.
[0033] At the same time, due to the continuous introduction of protective gas into the annular cavity, the high-temperature synthesis gas can be prevented from flowing back to the annular space during rupture, and the pressure stability of the waste boiler annular cavity is also guaranteed.
[0034] The utility model is characterized by simple structure, convenient on-site installation and production, and capable of avoiding the phenomenon of overpressure in the waste boiler ring cavity to a great extent, thus reducing maintenance costs and prolonging the service life of the equipment.
Claims
1. A waste boiler ring cavity sealing device for preventing overpressure, characterized in that: The invention comprises a protective gas inlet pipe (1), a partition sealing plate upper plate (2), a labyrinth sealing stuffing box (3), a pressure equalizing pipe (4), a partition sealing plate lower plate (5), and a micro explosion-proof plate (6). The protective gas inlet pipe (1) passes through the gasifier shell and the end thereof extends into the waste boiler annular cavity formed by the gasifier shell, the waste boiler tube array, and the waste boiler header; the partition sealing plate upper plate (2) and the partition sealing plate lower plate (5) are located at the lower part of the waste boiler annular cavity and below the end of the protective gas inlet pipe (1); the partition sealing plate upper plate (2) is connected to the waste boiler header, and a gap is left at the furnace wall; the partition sealing plate lower plate (5) is connected to the furnace wall, and a gap is left at the waste boiler header; the labyrinth sealing stuffing box (3) is installed between the partition sealing plate upper plate (2) and the partition sealing plate lower plate (5); the pressure equalizing pipe (4) is located on the inner side of the partition sealing plate lower plate (5) and passes through the partition sealing plate upper plate (2); and the micro explosion-proof plate (6) is installed on the top of the pressure equalizing pipe (4).
2. The waste boiler annular cavity sealing device for preventing overpressure according to claim 1 is characterized in that: There are 8 equalizing pipes (4) in total, each having a diameter of DN15, which are evenly distributed on the inner side of the lower plate (5) of the partition sealing plate, welded to the upper plate (2) of the sealing plate and pass through the upper plate (2) of the partition sealing plate; a micro explosion-proof plate (6) is installed on the top of each equalizing pipe (4).
Citation Information
Cited By
Gasification furnace ring cavity protection method and device
CN122278516A