Pile foundation and pile casing precision positioning device
By using precision positioning devices such as annular disks and positioning rods during pile foundation construction, the problems of inaccurate positioning of the casing and large soil disturbance are solved, the construction accuracy and qualification rate are improved, and it is suitable for different types of piles. Foundation construction.
Patent Information
- Application Number
- CN202323491914.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2033-12-21
AI Technical Summary
In traditional pile foundation construction, the positioning of the casing is inaccurate, resulting in large soil disturbance and loose filling. There are also deviations in the positioning of the steel cage, which affects the construction accuracy and qualification rate.
A precision positioning device including an annular disc, a positioning rod, a pile position positioning panel and a detachable anchoring bar is designed. It is connected through cross pay-out holes and bolts to ensure accurate positioning, and replaceable guide rings are used to adapt to different piles. diameter to improve installation efficiency and stability.
The precise positioning of the casing and steel cage is achieved, soil disturbance is reduced, construction accuracy and qualification rate are improved, and the device is installed quickly and can be used multiple times.
Smart Images

Figure CN221810586U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation construction, in particular to a precise positioning device for a pile foundation and a casing. Background Art
[0002] In traditional pile foundation construction, due to the limitation of construction technology, measurement and layout are carried out before pile foundation construction. After the layout is completed, the position of the casing is laid out using a cross-method line, and the casing is buried. When the casing is buried, the pile position can only be observed through the cross, and most of the casings have deviations after burial. In addition, due to the uncertainty of the casing position, the surrounding soil is over-drilled. After the casing is buried, it is necessary to fill the soil and cannot be compacted. In addition, due to the uncontrollable deformation of the casing, the pile position needs to be re-measured at all times during drilling to ensure that the pile position and subsequent steel cage meet the deviation requirements.
[0003] Therefore, there is an urgent need for a pile foundation and casing precision positioning device with high pile casing and steel cage positioning accuracy and little casing disturbance to the surrounding soil. Summary of the invention
[0004] In view of the above situation, in order to overcome the defects of the prior art, the utility model provides a precise positioning device for pile foundation and casing to solve the problems of large positioning deviation of pile casing and steel cage, large disturbance of surrounding soil by casing, and sinking of casing caused by loose secondary backfill.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a precise positioning device for pile foundation and casing, comprising an annular disc, a plurality of positioning rods arranged on the outer circumference of the annular disc, a pile position positioning panel arranged inside the annular disc, a cross-line hole is arranged at the center of the pile position positioning panel, and a fixing ring is arranged at the end of the positioning rod;
[0006] The annular disc is provided with a plurality of anchor holes, and the anchor holes are provided with detachable anchor ribs, and the detachable anchor ribs are used to fix the annular disc to the base layer.
[0007] Furthermore, a positioning rod fixing groove is provided on the outer circumferential side of the annular disc, and bolt holes are provided in the positioning rod fixing groove and at the end of the positioning rod. Bolts are provided in the bolt holes, and the bolts are used to fix the positioning rod and the annular disc and make the lower end surfaces of the positioning rod and the annular disc flush.
[0008] Furthermore, a disc handle is provided on the upper end surface of the annular disc, and a panel handle is provided on the upper end surface of the pile position positioning panel.
[0009] Furthermore, it also includes a replaceable guide ring arranged inside the annular disc.
[0010] Furthermore, the replaceable guide ring and the annular disc are both provided with latch holes, and latches are provided in the latch holes, and the latches fix the replaceable guide ring and the annular disc into one body.
[0011] Furthermore, there are more than four positioning rods, which are evenly arranged on the outer circumference of the annular disk.
[0012] Furthermore, a flared steel nail is provided in the fixing ring, and the flared steel nail fixes the positioning rod to the base layer.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] The utility model solves the problems of inaccurate positioning of pile casing, loose soil around casing after burial, and inaccurate positioning of steel cage, thereby ensuring the accuracy of pile formation. In addition, the device is quick to install and can be recycled for many times, suitable for different types of pile foundation construction, and greatly improves the qualified rate of pile foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the top view of the structure of Example 1 of the utility model;
[0016] Figure 2 This is a schematic structural diagram of a pile position positioning panel according to Embodiment 1 of the present utility model;
[0017] Figure 3 This is a schematic structural diagram of an annular disc according to Embodiment 1 of the present utility model;
[0018] Figure 4 This is a schematic structural diagram of a positioning rod according to Embodiment 1 of the present utility model;
[0019] Figure 5 This is a schematic diagram of the structure of the expanded steel nail according to Example 1 of the utility model;
[0020] Figure 6 This is a schematic structural diagram of a replaceable guide ring in Embodiment 2 of the present utility model;
[0021] In the figure:
[0022] 1. Fixed ring; 2. Positioning rod; 3. Annular disc; 4. Pile positioning panel; 5. Removable anchor bar; 6. Panel handle; 7. Disc handle; 8. Cross-line point; 9. Bolt; 10. Expanded steel nail; 11. Pin; 12. Replaceable guide ring; 13. Pin hole. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0024] Embodiment 1:
[0025] Depend on Figure 1-5 As shown, a precise positioning device for pile foundation and casing includes an annular disc 3, a plurality of positioning rods 2 arranged on the outer circumference of the annular disc 3, and a pile position positioning panel 4 arranged inside the annular disc 3. The pile position positioning panel 4 is placed at the center of the annular disc 3. By fitting the lower convex part of the pile position positioning panel 4 with the center of the annular disc 3, it is ensured that the center of the pile position positioning panel 4 is the center of the annular disc 3. The size of the annular disc 3 is larger than that of the casing, ensuring that the annular disc 3 does not need to be disassembled when the casing is lowered.
[0026] A cross-line hole 8 is provided at the center of the pile position positioning panel 4, so that positioning is more accurate; a panel handle 6 is provided on the upper end surface of the pile position positioning panel 4 for lifting, installation, removal and transportation.
[0027] A fixing ring 1 is provided at the end of the positioning rod 2, and a flared steel nail 10 is provided inside the fixing ring 1. The flared steel nail 10 fixes the positioning rod 2 to the base layer. The top surface area of the nail is large, ensuring that the ring is firmly fixed. There are more than 4 positioning rods 2, which are evenly arranged on the outer peripheral side of the annular disk 3.
[0028] The annular disc 3 is provided with a plurality of anchor holes, and the anchor holes are provided with detachable anchor bars 5, which are used to fix the annular disc 3 to the base layer. The annular disc 3 and the detachable anchor bars 5 are connected in an embedded manner by threading to ensure the stability of the annular disc 3. The outer circumference of the annular disc 3 is provided with a positioning rod fixing groove, and bolt holes are provided in the positioning rod fixing groove and at the end of the positioning rod 2. Bolts 9 are provided in the bolt holes, and the bolts 9 are used to fix the positioning rod 2 and the annular disc 3, and make the lower end faces of the positioning rod 2 and the annular disc 3 flush. After installation, the positioning rod 2 has a large contact area with the soil and is firmly fixed. The upper end face of the annular disc 3 is provided with a disc handle 7, which is used for lifting rings, installation and transportation.
[0029] Before stakeout of the pile position, all fixed rings 1 and positioning rods 2 are rigidly connected, and the whole is connected to the annular disc 3 from four directions by bolts 9. Then the detachable anchor bar 5 is embedded and connected to the annular disc 3. Then the annular disc 3 is placed at the approximate pile position through the disc handle 7, and the pile position positioning panel 4 is placed at the center of the annular disc 3 through the panel handle 6. After the precise pile position is determined at the cross stakeout point 8 by RTK, after the position of the annular disc 3 is adjusted, the annular disc 3, the positioning rod 2, the fixed ring 1, and the detachable anchor bar 5 are fixed to the base layer by the flared steel nails 10, and then the pile position is verified by the cross stakeout point 8.
[0030] Embodiment 2:
[0031] The similarities between this embodiment and embodiment 1 are not repeated here, but the differences are as follows:
[0032] Depend on Figure 3 , 6 As shown, it also includes a replaceable guide ring 12 arranged inside the annular disc 3. The replaceable guide ring 12 and the annular disc 3 are both provided with a latch hole 13, and a latch 11 is arranged in the latch hole 13. The replaceable guide ring 12 is placed on the upper part of the annular disc 3, and the latch holes 13 at the two places overlap. After the latch 11 is inserted, the latch 11 fixes the replaceable guide ring 12 and the annular disc 3 as a whole. The replaceable guide ring 12 is selected according to different pile diameters.
[0033] After the laying of the wires is completed, the pile positioning panel 4 is taken away, and replaceable guide rings 12 of different pile diameters and casing sizes are selected and connected to the annular disc 3 through the pin 11, and the casing is buried, the drilling construction and the steel cage hoisting are carried out. After the pile foundation construction is completed, they are dismantled one by one.
[0034] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A precision positioning device for pile foundation and casing, characterized in that: It includes an annular disc, a plurality of positioning rods arranged on the outer circumference of the annular disc, a pile position positioning panel arranged inside the annular disc, a cross-line hole is arranged at the center of the pile position positioning panel, and a fixing ring is arranged at the end of the positioning rod; The annular disc is provided with a plurality of anchor holes, and the anchor holes are provided with detachable anchor ribs, and the detachable anchor ribs are used to fix the annular disc to the base layer.
2. The pile foundation and casing precision positioning device according to claim 1 is characterized in that: A positioning rod fixing groove is provided on the outer circumference of the annular disc, and bolt holes are provided in the positioning rod fixing groove and at the end of the positioning rod. Bolts are provided in the bolt holes, and the bolts are used to fix the positioning rod and the annular disc and make the lower end surfaces of the positioning rod and the annular disc flush.
3. The pile foundation and casing precision positioning device according to claim 1 is characterized in that: The upper end surface of the annular disc is provided with a disc handle, and the upper end surface of the pile position positioning panel is provided with a panel handle.
4. The pile foundation and casing precision positioning device according to claim 1 is characterized in that: Also included is a replaceable guide ring disposed inside the annular disk.
5. The pile foundation and casing precision positioning device according to claim 4 is characterized in that: The replaceable guide ring and the annular disc are both provided with latch holes, and latches are arranged in the latch holes. The latches fix the replaceable guide ring and the annular disc into one body.
6. The pile foundation and casing precision positioning device according to claim 1 is characterized in that: There are more than four positioning rods, which are evenly arranged on the outer circumference of the annular disk.
7. The device for precise positioning of pile foundation and casing according to claim 1, characterized in that: An expanded steel nail is arranged in the fixing ring, and the expanded steel nail fixes the positioning rod to the base layer.