Road-crossing cable pipe burying structure
By using components such as embedded frames, partitions, placement troughs, and steel bars in the cable tube buried structure, the cable tube can be quickly connected and limited, solving the troublesome construction problems in the existing technology, and improving construction efficiency and resistance. pressure performance.
Patent Information
- Application Number
- CN202420207998.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-01-29
AI Technical Summary
In the existing technology, the cable pipe buried structure on the road needs to dig cable trenches and hoist multiple cable pipes during construction, which increases the construction time and trouble.
Adopt a structure including embedded frames, partitions, placement troughs, hangers, vertical steel bars and reinforced steel bars. The cable tubes are quickly connected and limited through welding points and bolts, and the cable tubes are quickly lifted using the hangers and lifting equipment. Place in cable trench.
It simplifies the installation and burying process of cable tubes, reduces the workload of staff, improves construction efficiency, and enhances the compressive resistance of the buried structure through reinforced steel bars.
Smart Images

Figure CN221812286U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of cable pipe burial, in particular to a cable pipe burial structure for a road. Background Art
[0002] Cable duct, also known as protective tube or conduit, is a pipe used to protect the wiring of wires and cables in electrical installations, allowing the insertion and replacement of wires and cables. When burying cable ducts in the road surface, it is necessary to use an burying structure to bury the cable duct.
[0003] After searching, the application number is "202320908957.0", a cable pipe burying structure across the road. When in use, each cable buried pipe is fixedly connected by electric welding, and then the fixed cable buried pipe is placed in the cable trench. A certain gap is left between each row of cable buried pipes so that the concrete filling layer can fill the gap between the cable buried pipes. After the concrete filling layer 5 is completed and filled, it is cured to a certain strength and then the road surface can be poured.
[0004] The above-mentioned multiple welded cable pipes are placed in the cable trench to facilitate the later pouring. However, during the construction of this structure, it is necessary to dig the cable trench and then hang the multiple cable pipes in the cable trench. The multiple cable pipes are hung in the cable trench, which increases the construction time and is troublesome. Utility Model Content
[0005] In order to overcome the disadvantages of the prior art that multiple cable tubes are placed in a cable trench, which causes troublesome operation, one of the purposes of the utility model is to provide a cable tube burying structure for a road.
[0006] One of the purposes of the utility model is achieved by adopting the following technical solution: a cable pipe burying structure for a road, comprising a burying frame: a burying unit is arranged inside the burying frame, and a road surface body is arranged on the upper side of the burying frame;
[0007] The embedded unit includes a partition, which is fixedly connected to the inner side of the embedded frame, a hanging handle is fixedly connected to the upper side of the partition, a plurality of placement grooves are opened on the outer side of the partition, a plurality of cable tube bodies are arranged on the inner sides of the plurality of placement grooves, vertical steel bars are fixedly connected to the upper side of the embedded frame, and reinforcing steel bars are fixedly connected to the outer sides of the vertical steel bars.
[0008] According to the cable tube buried structure for a road crossing, welding points are provided between the cable tube bodies at the upper and lower sides, so as to facilitate connecting a plurality of cable tube bodies together.
[0009] According to the cable pipe burying structure for a crossing road, bolts are arranged between the partition plate and the upper cable pipe body, so as to limit the position of the cable pipe body.
[0010] According to the cable pipe burying structure for a crossing road, the reinforcing steel bars pass through the outer side of the partition.
[0011] According to the cable tube burying structure for a road crossing, a gap is provided between the placement groove and the cable tube body.
[0012] According to the cable pipe buried structure for a road crossing, the number of the vertical steel bars and the reinforcement steel bars are both multiple, which facilitates the reinforcement of the buried structure.
[0013] Beneficial effects:
[0014] By providing an embedding frame, a partition, a plurality of placement grooves and a cable tube body, it is convenient to install a plurality of cable tube bodies inside the embedding frame, and the plurality of cable tube bodies can be quickly embedded in the cable trench through a hanging handle, which simplifies the construction and reduces the workload of the staff.
[0015] Additional aspects and advantages of the present invention will be given in part in the following description, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments;
[0017] Figure 1 This is an overall three-dimensional structural diagram of a cable pipe buried structure for a road crossing according to the utility model;
[0018] Figure 2 This is a three-dimensional structural diagram of a cable pipe burying structure for a road crossing according to the utility model, with the main body of the road surface removed;
[0019] Figure 3 for Figure 2 The enlarged view of point A in the middle;
[0020] Figure 4 This is a three-dimensional structural diagram from another perspective of a cable pipe buried structure for crossing a road according to the utility model, with the road surface main body removed.
[0021] Legend:
[0022] 1. Embedding frame; 2. Pavement body; 3. Embedding unit; 301. Partition; 302. Hanger; 303. Bolt; 304. Placement groove; 305. Cable tube body; 306. Welding point; 307. Vertical steel bar; 308. Reinforcement steel bar. DETAILED DESCRIPTION
[0023] This section will describe in detail the specific embodiments of the utility model. The preferred embodiments of the utility model are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the utility model, but it cannot be understood as a limitation on the protection scope of the utility model.
[0024] Reference Figure 1-4 A cable pipe burying structure for a road, including a burying frame 1: a burying unit 3 is arranged on the inner side of the burying frame 1, and a road surface body 2 is arranged on the upper side of the burying frame 1. When burying, a cable trench is dug on the road surface, and then the burying frame 1 is directly placed in the cable trench for pouring, which saves time.
[0025] The embedding unit 3 includes a partition 301, which is fixedly connected to the inner side of the embedding frame 1, and a hanger 302 is fixedly connected to the upper side of the partition 301. A plurality of placement grooves 304 are provided on the outer side of the partition 301, and a plurality of cable tube bodies 305 are provided on the inner sides of the plurality of placement grooves 304. A vertical steel bar 307 is fixedly connected to the upper side of the embedding frame 1, and a reinforcing steel bar 308 is fixedly connected to the outer side of the vertical steel bar 307. A gap is provided between the placement groove 304 and the cable tube body 305, and a welding point 306 is provided between the cable tube bodies 305 on the upper and lower sides. The reinforcing steel bar 308 passes through the outer side of the partition 301. There are multiple vertical steel bars 307 and reinforcing steel bars 308. When installing, multiple cables are connected. The cable tube body 305 is welded together, and then the cable tube body 305 is placed in the placement groove 304, wherein the number of partitions 301 and the placement groove 304 are both provided in plurality, so as to facilitate the placement and positioning of the cable tube body 305 of a certain length, and then the lifting handle 302 is used to connect the lifting equipment, so as to facilitate the placement of the embedding frame 1 directly in the cable trench, and facilitate the rapid placement of multiple cable tube bodies 305 in the cable trench, and then concrete is used for pouring, and the concrete is in the gap of the placement groove 304 and the embedding frame 1, so as to facilitate the positioning of the cable tube body 305, and through multiple vertical steel bars 307 and reinforcing steel bars 308, the compressive resistance of the embedded structure is increased, and the influence of external stress on the cable tube body 305 is reduced.
[0026] Bolts 303 are provided between the partition plate 301 and the upper cable tube body 305 , and the bolts 303 are convenient for initially limiting the cable tube body 305 , so that the cable tube body 305 can be limited again by concrete later.
[0027] Working principle: When in use, first weld multiple cable tube bodies 305 together, then place the welded cable tube bodies 305 in the placement groove 304, then use bolts 303 to limit the cable tube body 305, then use the lifting handle 302 to lift the buried frame 1 into the cable trench, then use concrete poured in the buried frame 1 to limit the cable tube body 305, and then lay the pavement body 2, which increases the construction speed of multiple cable tube bodies 305 and saves time, and increases the compressive resistance of the buried structure through vertical steel bars 307 and reinforcing steel bars 308.
[0028] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A cable pipe burying structure for a road, characterized in that: It comprises an embedding frame (1): an embedding unit (3) is arranged on the inner side of the embedding frame (1), and a pavement body (2) is arranged on the upper side of the embedding frame (1); The embedding unit (3) comprises a partition (301), the partition (301) is fixedly connected to the inner side of the embedding frame (1), a hanger (302) is fixedly connected to the upper side of the partition (301), a plurality of placement grooves (304) are provided on the outer side of the partition (301), a plurality of cable tube bodies (305) are provided on the inner side of each of the plurality of placement grooves (304), a vertical steel bar (307) is fixedly connected to the upper side of the embedding frame (1), and a reinforcing steel bar (308) is fixedly connected to the outer side of the vertical steel bar (307).
2. The cable pipe buried structure for a road crossing according to claim 1, characterized in that: A welding point (306) is provided between the cable tube bodies (305) at the upper and lower sides.
3. The cable pipe buried structure for a road crossing according to claim 1, characterized in that: Bolts (303) are provided between the partition plate (301) and the upper cable tube body (305).
4. The cable pipe buried structure for a road crossing according to claim 1, characterized in that: The reinforcing steel bars (308) pass through the outer side of the partition (301).
5. The cable pipe buried structure for a road crossing according to claim 1, characterized in that: A gap is provided between the placement groove (304) and the cable tube body (305).
6. The cable pipe buried structure for a road crossing according to claim 1, characterized in that: The vertical steel bars (307) and the reinforcing steel bars (308) are both provided in plural numbers.