Portable drilling device for constructional engineering

By designing the combined structure of the portable drilling device, the problems of inconvenient carrying and missing accessories are solved, work efficiency and drilling stability are improved, and debris is collected through the debris box, which protects the environment and simplifies maintenance.

CN221818035UInactive Publication Date: 2024-10-11HEBEI HONGCHUANG ENG PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420359844.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Drilling devices in construction projects are inconvenient to carry, and their accessories are numerous and easy to lose, which reduces work efficiency.

Method used

A portable drilling device is designed. Through the combined structure of the body shell, the first shell, the buckle, the second shell, the first bracket, the handle, the second bracket, the machine head, the baffle and the debris box, the drill bit is realized. It is securely fixed and convenient to carry, reducing operating shaking, and collects debris generated by drilling through a debris box.

Benefits of technology

It improves the portability and work efficiency of the device, enhances the stability of drilling, protects the environment and the health of workers, and simplifies the cleaning and maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221818035U_ABST
    Figure CN221818035U_ABST
Patent Text Reader

Abstract

The utility model discloses a portable drilling device for constructional engineering, which comprises a machine body shell, one side of the machine body shell is sleeved with a first shell, two sides of the first shell are both fixedly provided with buckles, one side of the first shell is provided with a second shell, two sides of the second shell are both fixedly provided with clamping sleeves, and the first shell and the second shell are provided with clamping grooves. The other side of the machine body shell is sleeved with a first support, a sliding groove is formed in the inner side of the first support, a second support is fixedly connected to one side of the first support, and a machine head is installed on one side of the machine body shell; through the arrangement of the machine body shell, the first shell, the buckle, the second shell, the clamping sleeve and the drill bit, in the using process of the device, the drill bit is taken down from the machine head and put into the first shell, then the machine body shell is installed into the second shell through the first shell, and then the buckle is fixed through the clamping sleeve, so that accessories are prevented from being lost in the carrying process, and the portability of the device is improved; and the working efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field related to construction engineering, in particular to a portable drilling device for construction engineering. Background Art

[0002] A construction project refers to an engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. Before the construction of a construction project, positioning and measurement work is required to ensure the accuracy and safety of the construction. The drilling device plays an important role in this process. Holes can be drilled on the exterior wall or internal structure of the building through the drilling device to install measuring targets, measuring prisms and other equipment, and provide reference points for measuring instruments such as total stations, facilitating construction positioning and measurement.

[0003] The drilling device for construction engineering is inconvenient to carry, and the drilling device has many accessories, which are easy to lose when carried, reducing work efficiency. Therefore, it is necessary to propose a portable drilling device for construction engineering. Utility Model Content

[0004] The purpose of the utility model is to provide a portable drilling device for construction engineering to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a portable drilling device for construction engineering, comprising a body shell, a first shell is sleeved on one side of the body shell, buckles are fixed on both sides of the first shell, a second shell is installed on one side of the first shell, sleeves are fixed on both sides of the second shell, a first bracket is sleeved on the other side of the body shell, a slide groove is provided on the inner side of the first bracket, a second bracket is fixedly connected to one side of the first bracket, a machine head is installed on one side of the body shell, a fixed sleeve is sleeved on one side of the machine head, sliders are fixed on both sides of the fixed sleeve, a baffle is sleeved on the other side of the machine head, and a drill bit is installed on one end of the machine head.

[0006] Preferably, the first shell is snap-connected to the second shell via a buckle, and the buckle is symmetrically arranged with respect to the central axis of the first shell.

[0007] Preferably, a handle is installed below the first bracket, and the upper end of the handle is threaded.

[0008] Preferably, the first bracket and the second bracket are both made of PC board material, and the first bracket and the second bracket are integrally formed.

[0009] Preferably, the machine head forms a sliding structure with the first bracket through a slider, and the slider is arranged in an "I"-shaped structure.

[0010] Preferably, a debris box is installed below the second bracket, and bolts penetrate the surface of the debris box.

[0011] Preferably, the debris box is threadably connected to the second bracket via bolts, and the bolts are symmetrically arranged with respect to the central axis of the debris box.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. A portable drilling device for construction engineering, through the arrangement of a body shell, a first shell, a buckle, a second shell, a ferrule and a drill bit, during the use of the device, the drill bit is removed from the head and placed in the first shell, and then the first shell and the body shell are installed in the second shell, and then the buckle is fixed by the ferrule, so as to avoid the loss of accessories during carrying, improve the portability of the device, and effectively improve the work efficiency;

[0014] 2. A portable drilling device for construction engineering, through the arrangement of a first bracket, a handle, a second bracket and a drill bit, during the use of the device, after the drill bit is aligned with the position to be drilled, the first bracket is pushed by the handle, and the first bracket makes the second bracket stick to the plane to be drilled, and the second bracket is supported by the plane to be drilled, thereby reducing shaking during operation and improving drilling stability;

[0015] 3. This portable drilling device for construction projects is equipped with a second bracket, a machine head, a baffle, a debris box and bolts. During the use of the device, the second bracket is used to prevent the spread of debris generated by drilling, thereby protecting the environment and the health of workers. The baffle is pushed by the machine head to move along the direction of drilling, pushing the debris into the debris box. After the drilling is completed, the bolts are removed, the debris box is removed, and the debris is processed. The collected debris can be processed in a centralized manner, which is convenient for cleaning and maintenance, and reduces the workload of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the head structure of the utility model;

[0018] Figure 3 This is a schematic diagram of the first bracket structure of the utility model;

[0019] Figure 4 This is a schematic diagram of the cross-sectional structure of the second bracket of the utility model;

[0020] Figure 5 This is a schematic diagram of the structure of the debris box of the utility model.

[0021] In the figure: 1, body shell; 2, first shell; 3, buckle; 4, second shell; 5, sleeve; 6, first bracket; 7, slide groove; 8, handle; 9, second bracket; 10, head; 11, fixing sleeve; 12, slide block; 13, baffle; 14, drill bit; 15, debris box; 16, bolt. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-4 The utility model provides a technical solution: a portable drilling device for construction engineering, including a body shell 1, a first shell 2 is sleeved on one side of the body shell 1, buckles 3 are fixed on both sides of the first shell 2, a second shell 4 is installed on one side of the first shell 2, and sleeves 5 are fixed on both sides of the second shell 4, the first shell 2 is snap-fitted and connected with the second shell 4 through the buckle 3, the buckle 3 is symmetrically arranged with the central axis of the first shell 2, the drill bit 14 is removed from the head 10, put into the first shell 2, and then the first shell 2 and the body shell 1 are installed into the second shell 4, and then the buckle 3 is fixed by the sleeve 5, so as to avoid losing accessories during carrying, improve the portability of the device, and effectively improve the work efficiency, a first bracket 6 is sleeved on the other side of the body shell 1, a slide groove 7 is opened on the inner side of the first bracket 6, and a second bracket 9 is fixedly connected to one side of the first bracket 6, and a handle 8 is installed below the first bracket 6, and the upper end of the handle 8 is threaded. After the drill bit 14 is aligned with the position to be drilled, the handle 8 is used to push the second bracket 9. A bracket 6, the first bracket 6 makes the second bracket 9 stick to the plane to be drilled, and the support of the second bracket 9 by the plane to be drilled can reduce the shaking during operation and improve the drilling stability. The first bracket 6 and the second bracket 9 are both made of PC board material, and the first bracket 6 and the second bracket 9 are integrally formed. The PC board material has the characteristics of high transparency, light weight, impact resistance, sound insulation, etc., so as to avoid the position of the hole to be drilled being unable to be seen due to the position of the first bracket 6 and the second bracket 9, and can reduce the intensity of noise, reduce noise pollution to the surrounding environment, improve the working environment, and reduce the hearing burden of the staff. A machine head 10 is installed on one side of the fuselage shell 1, and a fixing sleeve 11 is provided on one side of the machine head 10. Slide blocks 12 are fixed on both sides of the fixing sleeve 11. The machine head 10 forms a sliding structure with the first bracket 6 through the slide block 12. The slide block 12 is an "I"-shaped structure, so that the machine head 10 can slide in the first bracket 6. A baffle 13 is provided on the other side of the machine head 10, and a drill bit 14 is installed at one end of the machine head 10.

[0024] See also Figure 5 A debris box 15 is installed below the second bracket 9. Bolts 16 penetrate the surface of the debris box 15. The debris box 15 is threadedly connected to the second bracket 9 through the bolts 16. The bolts 16 are symmetrically arranged with the central axis of the debris box 15. The second bracket 9 is used to prevent the diffusion of debris generated by drilling, thereby protecting the environment and the health of the staff. The baffle 13 is driven to move through the fuselage shell 1 to push the debris into the debris box 15. After the drilling is completed, the bolts 16 are removed, the debris box 15 is removed, and the debris is processed. The collected debris can be processed in a centralized manner, which is convenient for cleaning and maintenance, and reduces the workload of the staff.

[0025] Working principle: When using the portable drilling device for construction engineering, first turn on the external power supply, then after the drill bit 14 is aligned with the position to be drilled, push the first bracket 6 through the handle 8, the first bracket 6 makes the second bracket 9 stick to the plane to be drilled, and the support of the second bracket 9 by the plane to be drilled can reduce the shaking during operation, turn on the switch of the machine head 10, and make the drill bit 14 drill the position to be drilled. When drilling, the second bracket 9 is used to prevent the spread of debris generated by drilling. As the drilling goes deeper, the machine head 10 slides in the first bracket 6 through the slider 12, and the direction of movement of the machine head 10 is the direction of drilling. The machine head 10 pushes the block Plate 13 is used to move it in the direction of drilling and push the debris into the debris box 15. After the drilling is completed, the bolts 16 are removed and the debris box 15 is taken down. The collected debris can be processed centrally. When the device needs to be transferred to other places for work, the body shell 1 is installed into the second shell 4 through the first shell 2, and the buckle 3 is fixed by the clamping sleeve 5. At this time, the staff can move the device from one place to another and cut off the external power supply of the device when the device is not in use. The model of the head 10 is DCD701C1-A9. In this way, the use process of the portable drilling device for construction engineering is completed.

[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A portable drilling device for construction engineering, comprising a body shell (1), characterized in that: A first shell (2) is sleeved on one side of the fuselage shell (1), buckles (3) are fixed on both sides of the first shell (2), a second shell (4) is installed on one side of the first shell (2), clamps (5) are fixed on both sides of the second shell (4), a first bracket (6) is sleeved on the other side of the fuselage shell (1), a slide groove (7) is provided on the inner side of the first bracket (6), a second bracket (9) is fixedly connected to one side of the first bracket (6), a head (10) is installed on one side of the fuselage shell (1), a fixed sleeve (11) is sleeved on one side of the head (10), sliders (12) are fixed on both sides of the fixed sleeve (11), a baffle (13) is sleeved on the other side of the head (10), and a drill bit (14) is installed at one end of the head (10).

2. A portable drilling device for construction engineering according to claim 1, characterized in that: The first shell (2) is snap-connected to the second shell (4) via a buckle (3), and the buckle (3) is symmetrically arranged with respect to the central axis of the first shell (2).

3. A portable drilling device for construction engineering according to claim 1, characterized in that: A handle (8) is installed below the first bracket (6), and the upper end of the handle (8) is threaded.

4. A portable drilling device for construction engineering according to claim 1, characterized in that: The first bracket (6) and the second bracket (9) are both made of PC board material, and the first bracket (6) and the second bracket (9) are integrally formed.

5. A portable drilling device for construction engineering according to claim 1, characterized in that: The machine head (10) forms a sliding structure with the first bracket (6) via a sliding block (12), and the sliding block (12) is arranged in an "I"-shaped structure.

6. A portable drilling device for construction engineering according to claim 1, characterized in that: A debris box (15) is installed below the second bracket (9), and bolts (16) penetrate the surface of the debris box (15).

7. A portable drilling device for construction engineering according to claim 6, characterized in that: The debris box (15) is threadably connected to the second bracket (9) via bolts (16), and the bolts (16) are symmetrically arranged with respect to the central axis of the debris box (15).