Super-large-span bow-shaped hanging bracket
By designing an ultra-large-span bow-type hanger, the problem of multiple construction skylights and a large amount of labor required to replace switches and steel parts in the railway system has been solved, achieving efficient and safe hoisting, reducing costs and expanding the application prospects of prefabricated buildings.
Patent Information
- Application Number
- CN202420593933.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-26
AI Technical Summary
Replacing switches and steel parts in the existing railway system requires multiple construction skylights, a large amount of labor, and is labor-intensive, resulting in an increase in welded joints and affecting track integrity and lifespan.
Design a super-large-span bow-type hanger, including the main body of the bow-type hanger, multiple grab chain points, lifting points and insurance wires. It adopts flange node connection and lower chord two-way bow-type tension steel wire design to achieve large-span loading. Powerful and efficient lifting.
It greatly shortens on-site hoisting operation time, improves safety and efficiency, reduces costs, and provides a convenient and efficient hoisting solution suitable for large-span hoisting and prefabricated construction markets.
Smart Images

Figure CN221821644U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of replacing turnout steel parts of railways, and in particular relates to an ultra-large span bow-shaped hanger. Background Art
[0002] The existing railway system has the following problems in replacing turnouts and steel parts: First, turnouts and steel parts are often replaced in groups manually, and multiple construction windows are required during the construction process; second, there is a problem that replacing turnouts and steel parts requires a large amount of labor and the labor intensity is high; third, due to the influence of lifting capacity, turnouts need to be replaced in small sections one by one, so the number of on-site joints of the track increases, resulting in an increase in joint methods such as welding, which changes the integrity of the turnout and causes problems with the track line shape and track life.
[0003] Therefore, the utility model proposes an ultra-large span bow-shaped hanger, which can greatly shorten the on-site lifting operation time, is safe and reliable, and reduces costs and increases efficiency. Utility Model Content
[0004] In view of the problems raised by the above background technology, the purpose of the utility model is to provide a super-large span bow-shaped hanger.
[0005] In order to achieve the above technical purpose, the technical solution adopted by the utility model is as follows:
[0006] A super-large span bow-shaped hanger comprises a hanger body, which is bow-shaped as a whole, a plurality of chain grabbing points are arranged at the bottom of the hanger body, a lifting point is respectively arranged at both ends of the hanger body, the hanger body comprises a front section, a middle section and a rear section, two lifting points are respectively arranged on the front section and the rear section, the front section is connected to the middle section by a flange node, the middle section is connected to the rear section by a flange node, and the hanger body adopts a lower chord bidirectional bow-shaped tensioning wire design.
[0007] It is further defined that the span between the two lifting points is not less than 27m.
[0008] It is further defined that the total force-bearing span of the hanger body is greater than or equal to 30m.
[0009] It is further defined that the number of the grab chain tie points is 8, and the distance between two adjacent grab chain tie points is not less than 4.28m. With such a structural design, the design of multiple groups of grab chain tie points 2 can carry out construction operations at the same time, thereby improving production efficiency.
[0010] It is further defined that the load-bearing capacity of the grab chain tie point is 1 ton. Such a structural design can improve the load-bearing capacity of the grab chain tie point 2.
[0011] Further defined, the front section and the rear section are directly connected with a safety wire. With such a structural design, the safety wire 3 is provided with two groups, the specification is φ10mm, 1 ton level, and can be fixed with two groups of 0U / M16 / M level turnbuckle screws.
[0012] Beneficial effects of the utility model:
[0013] 1. This solution solves the problem of lifting and hoisting tools for super-long prefabricated tracks of 38m and above, and the problem of controlling the downward deformation of super-long longitudinal rods with super-long spans. It also solves the safety problem of eccentric instability of special-shaped structures. The lifting tools and equipment with limited lifting capacity in limited space are lightweight in design, easy to use and efficient, which can greatly shorten the on-site lifting operation time, is safe and reliable, and reduces costs and increases efficiency.
[0014] 2. This solution is easy to operate, efficient in production, simple to maintain and low in cost. It provides important ideas for domestic large-span hoisting or lifting construction, and has broad prospects in the prefabricated building hoisting market. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention can be further described by the non-limiting embodiments given in the accompanying drawings;
[0016] Figure 1 It is a structural schematic diagram of an embodiment of a super-large span bow-shaped hanger of the utility model;
[0017] Figure 2 This is a structural drawing of a hanger body 1 of an embodiment of a super-large span bow-shaped hanger of the utility model;
[0018] Figure 3 This is a single-piece split force eccentricity diagram of an embodiment of a super-large span bow-shaped hanger of the utility model;
[0019] The symbols of the main components are explained as follows: hanger body 1, grab chain tie point 2, safety wire 3, lifting point 4, flange node 5, front section 6, middle section 7, rear section 8. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0021] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back...) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0022] In addition, the descriptions of "first", "second", etc. in the present utility model are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present utility model. It should be understood that the specific embodiments described here are only used to explain the present utility model and are not used to limit the present utility model.
[0023] like Figure 1 As shown, an ultra-large span bow-shaped hanger of the utility model comprises a hanger body 1, the hanger body 1 is bow-shaped as a whole, a plurality of chain grabbing points 2 are arranged at the bottom of the hanger body 1, a lifting point 4 is respectively arranged at both ends of the hanger body 1, the hanger body 1 comprises a front section 6, a middle section 7 and a rear section 8, two lifting points 4 are respectively arranged on the front section 6 and the rear section 8, the front section 6 is connected to the middle section 7 by a flange node, the middle section 7 is connected to the rear section 8 by a flange node, and the hanger body adopts a lower chord bidirectional bow-shaped tensioning wire design.
[0024] It is worth noting that the hanger structure of this scheme is designed for large-span force, and the longitudinal downward disturbance under non-uniform load conditions is no more than 300mm; the height of the hanger body hanging point is no more than 800mm, and the lateral torsional deformation of the structure shall not be greater than 100mm.
[0025] As attached Figure 2 As shown in the structural drawing, the three steel frames in the hanger body 1 are in a triangular shape and are fixed to each other by welding. Such a design can improve the stability of the structure.
[0026] As attached Figure 3 The eccentric force diagram of a single-strand break of the structure shown in the figure shows that the total mass of the human-shaped structure in the hanger body 1 is 6.8 tons.
[0027] In addition, during the overhaul of turnouts in railway work sections, the cost savings for a single set can reach approximately 30,000 yuan, and the cost savings for a public section area can reach 1 million yuan, which is a considerable benefit.
[0028] Preferably, the span between the two lifting points 4 is not less than 27 m.
[0029] Preferably, the total force span of the hanger body 1 is greater than or equal to 30m.
[0030] Preferably, the number of the grab chain tie points 2 is 8, and the distance between two adjacent grab chain tie points 2 is not less than 4.28 m. With such a structural design, multiple groups of grab chain tie points 2 can be designed to perform construction operations simultaneously, thereby improving production efficiency.
[0031] Preferably, the load-bearing capacity of the grab chain tie point 2 is 1 ton. Such a structural design can improve the load-bearing capacity of the grab chain tie point 2.
[0032] Preferably, the front section 6 and the rear section are directly connected with a safety wire 3. With such a structural design, the safety wire 3 is provided with two groups, with a specification of φ10mm and 1 ton level, and can be fixed with two groups of 0U / M16 / M level turnbuckle screws.
[0033] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the relevant technical field without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.
Claims
1. An ultra-large span bow-shaped hanger, characterized in that: The invention comprises a hanger body (1), wherein the hanger body (1) is in a bow shape as a whole, a plurality of chain grabbing points (2) are arranged at the bottom of the hanger body (1), a lifting point (4) is arranged at each end of the hanger body (1), the hanger body (1) comprises a front section (6), a middle section (7) and a rear section (8), two lifting points (4) are arranged on the front section (6) and the rear section (8), respectively, the front section (6) and the middle section (7) are connected via a flange node, the middle section (7) and the rear section (8) are connected via a flange node, and the hanger body adopts a lower chord bidirectional bow-shaped tensioning steel wire design.
2. The super-large span bow-shaped hanger according to claim 1, characterized in that: The span between the two lifting points (4) is not less than 27m.
3. The super-large span bow-shaped hanger according to claim 2, characterized in that: The total load-bearing span of the hanger body (1) is greater than or equal to 30m.
4. The super-large span bow-shaped hanger according to claim 1, characterized in that: The number of the grab chain tie points (2) is 8, and the distance between two adjacent grab chain tie points (2) is not less than 4.28 m.
5. The super-long span bow-shaped hanger according to claim 4, characterized in that: The load-bearing capacity of the grab chain tie point (2) is 1 ton.
6. The super-large span bow-shaped hanger according to claim 1, characterized in that: The front section (6) and the rear section are directly connected by a safety wire (3).