Formwork special for preventing slurry leakage of water and electricity casing pipe

By embedding blocking blocks and sealing rings on the basement wall forming formwork, a square channel is formed to seal the water and electricity embedded casing, which solves the problem of concrete overflow and leakage caused by the gap between the water and electricity embedded casing and the wall forming formwork. , improving the concrete forming quality and wall flatness.

CN221823388UActive Publication Date: 2024-10-11CHINA RAILWAY GUANGZHOU ENG BUREAU GRP MUNICIPAL ENVIRONMENTAL PROTECTION ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323480552.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-11
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

During the concrete pouring process of the basement wall, the gap between the embedded water and electricity casing and the wall forming formwork leads to the risk of concrete overflow and later leakage, which is difficult to effectively solve with existing technology.

Method used

Design a special template for anti-leakage slurry for water and electricity casings. By opening square holes in the wall forming template and embedding appropriate sealing blocks, combined with sealing rings and elastic leak-proof strips, a square channel is formed to seal the water and electricity embedded casings. pipe to ensure that the formwork is flush with the wall molding surface to reduce gap leakage.

Benefits of technology

It effectively reduces the risk of facade defects and concrete leakage during basement wall pouring, improves the molding quality of concrete at gaps, reduces later repair work, and ensures the smoothness of the wall facade.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823388U_ABST
    Figure CN221823388U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of forming formworks, in particular to a special formwork for preventing slurry leakage of a water and electricity casing pipe, which comprises two wall body forming formworks which are arranged in parallel and define a wall body pouring cavity; the two plugging blocks are embedded in the wall forming formwork, the inner walls of the plugging blocks are flush with the working face of the wall forming formwork, the cross section of each plugging block is square, the water and electricity embedded sleeve penetrates through the two plugging blocks, and the water and electricity embedded sleeve is connected with the plugging blocks in a clamped mode; the construction method has the beneficial effects that the possibility that defects such as honeycombs, pitted surfaces, bubbles and holes appear on the outer vertical face of the basement wall is reduced, and the possibility that concrete leaks through gaps can be reduced by changing circular holes between the water and electricity pre-buried sleeve and the wall forming formwork into square holes matched with the plugging blocks; and through the inner wall of the plugging block flush with the working face of the wall forming formwork, the forming quality of concrete at the gap can be improved, and the effect that a large amount of repairing work needs to be conducted after formwork removal is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of forming templates, and in particular to a special template for preventing leakage of slurry from hydropower casings. Background Art

[0002] When pouring concrete for basement walls, it is necessary to pre-embed the water and electricity casings according to the water and electricity needs of the basement. In order to avoid potential damage to the steel bars in the basement walls during later drilling, the drilling location and size may not be consistent with the initial planning and design. This will facilitate the later construction of water and electricity circuits.

[0003] Since the pre-buried water and electricity casing generally uses round tubes, and the basement wall forming templates are mostly standardized wooden templates or aluminum templates, there will be a certain gap between the round holes opened manually or by machines and the pre-buried water and electricity casing, resulting in concrete overflow. At present, in order to solve this problem, wire mesh or cloth is usually used to block the gap between the pre-buried water and electricity casing and the wall forming template when pouring concrete.

[0004] However, when using this method to prevent overflow, since the concrete needs to be vibrated after pouring, after the concrete solidifies and the formwork is removed, it is found that the concrete molding quality in the gap between the embedded water and electricity casing and the wall forming formwork is poor, and there is a risk of leakage in the later stage. Utility Model Content

[0005] In order to facilitate the installation of pre-buried hydropower casing and improve the quality of concrete forming at the gap, the present application provides a special template for preventing leakage of hydropower casing.

[0006] The special template for preventing leakage of hydropower casing provided in this application adopts the following technical solution:

[0007] A special template for preventing leakage of hydropower casing, comprising

[0008] Two wall forming templates, the two wall forming templates are arranged in parallel and surround a wall casting cavity;

[0009] Two blocking blocks are embedded in the wall forming template, and the inner wall of the blocking block is flush with the working surface of the wall forming template. The cross-sectional shape of the blocking block is square, and the water and electricity embedded sleeve passes through the two blocking blocks and is clamped with the blocking block.

[0010] By adopting the above technical scheme, a square hole is opened at the position where the water and electricity pre-buried casing needs to be passed through on the wall forming template, and then a sealing block of suitable size is precisely processed according to the size of the square hole, and a through hole matching the shape and size of the water and electricity pre-buried casing is processed on the sealing block, and then the sealing block is embedded in the square hole opened on the wall forming template, and at the same time, the inner wall of the sealing block is made flush with the working surface of the wall forming template, so as to reduce the possibility of defects such as honeycomb, rough surface, bubbles and holes on the facade of the cast basement wall, and by changing the circular hole between the water and electricity pre-buried casing and the wall forming template into a square hole between the sealing block, the possibility of concrete leakage through the gap can be reduced, and the inner wall of the sealing block flush with the working surface of the wall forming template can also improve the molding quality of concrete at the gap, avoiding the need for a large amount of repair work after demolding.

[0011] In a specific embodiment, the blocking block comprises

[0012] A positioning frame, the positioning frame is embedded in the wall forming template, the positioning frame is hollow and has openings at both ends;

[0013] The profiling block is located in the inner cavity of the positioning frame, and the profiling block is detachably fixedly connected to the positioning frame. The profiling block is provided with a mounting hole for passing the water and electricity embedded bushing.

[0014] By adopting the above technical solution, the positioning frame can be connected to the wall forming template, the profiling block can be assembled with the positioning frame to form a blocking block, and the profiling block is in contact with the water and electricity embedded casing. When the wear is more serious, the profiling block can be replaced separately.

[0015] In a specific possible implementation manner, at least one sealing ring is coaxially embedded on the hole wall of the mounting hole.

[0016] By adopting the above technical solution, the gap between the profiling block and the water and electricity pre-buried casing can be blocked.

[0017] In a specific possible implementation manner, the sealing ring is made of an elastic material, and the inner diameter of the sealing ring is smaller than the outer diameter of the water and electricity pre-buried bushing.

[0018] By adopting the above technical solution, the gap between the profiling block and the water and electricity embedded bushing can be further blocked.

[0019] In a specific possible implementation scheme, it also includes a blocking ring, which is detachably connected to the outer side of the wall forming template, and the projection of the gap between the wall forming template and the blocking block in the horizontal direction falls on the blocking ring.

[0020] By adopting the above technical solution, the designed blocking ring can prevent concrete from squeezing the blocking block during pouring, causing relative displacement between the blocking block and the wall forming template, thereby causing an uneven wall facade.

[0021] In a specific implementation scheme, a groove is opened on the sealing ring, and an elastic sealing strip is embedded in the groove. The thickness of the elastic sealing strip is greater than the depth of the groove, and the elastic sealing strip is used to seal the gap between the wall forming template and the sealing block.

[0022] By adopting the above technical solution, the possibility of leakage from the gap between the concrete self-sealing block and the wall forming template can be reduced by the elastic sealing strip.

[0023] In a specific possible implementation mode, an annular groove is opened on the peripheral side of the blocking block, and a telescopic airbag ring is sleeved in the annular groove. An air nozzle is connected to the outer side of the blocking block, and the air nozzle is communicated with the telescopic airbag ring.

[0024] By adopting the above technical solution, after gas is introduced into the telescopic airbag ring, the gap between the blocking block and the wall forming template will be blocked, thereby reducing the possibility of concrete leaking from the gap between the blocking block and the wall forming template.

[0025] In a specific possible implementation manner, the size of the blocking block gradually increases toward one end of the other blocking block.

[0026] By adopting the above technical solution, during pouring, it is possible to avoid concrete squeezing the blocking block, causing relative displacement between the blocking block and the wall forming template, thereby resulting in an uneven wall facade; and it is also possible to facilitate the assembly between the blocking block and the wall forming template.

[0027] In summary, the present application includes at least one of the following beneficial technical effects:

[0028] 1. The specially designed template for preventing leakage of water and electricity casing can reduce the possibility of defects such as honeycomb, rough surface, bubbles and holes on the facade of the basement wall casting. In addition, by changing the circular hole between the embedded water and electricity casing and the wall forming template into a square hole between the blocking block, the possibility of concrete leakage through the gap can be reduced. The inner wall of the blocking block flush with the working surface of the wall forming template can also improve the molding quality of concrete at the gap, avoiding the need for a lot of repair work after demolding.

[0029] 2. The specially designed template for preventing leakage of water and electricity casing can be connected with the wall forming template through the positioning frame. The profiling block can be assembled with the positioning frame to form a blocking block, and the profiling block is in contact with the water and electricity embedded casing. When the wear is serious, the profiling block can be replaced separately.

[0030] 3. The special template designed for preventing leakage of water and electricity casing can prevent the concrete from squeezing the blocking block during pouring, causing relative displacement between the blocking block and the wall forming template, which in turn leads to uneven wall facade; and it can also facilitate the assembly between the blocking block and the wall forming template. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a structural schematic diagram of a special template for preventing leakage of hydropower casing slurry in Example 1 of the present application.

[0032] Figure 2 yes Figure 1 sectional view of .

[0033] Figure 3 It is a structural schematic diagram of the special template for preventing leakage of hydropower casing slurry in Example 2 of the present application.

[0034] Figure 4 yes Figure 3 Schematic diagram of part of the structure.

[0035] Figure 5 It is a structural schematic diagram of the special template for preventing leakage of hydropower casing slurry in Example 3 of the present application.

[0036] Figure 6 It is a structural schematic diagram of a special template for preventing leakage of hydropower casing slurry in Example 4 of the present application.

[0037] Figure 7 It is a structural schematic diagram of the special template for preventing leakage of hydropower casing slurry in Example 5 of the present application.

[0038] Figure 8 yes Figure 7 A cross-sectional view showing the additional sealing ring.

[0039] Explanation of the reference numerals: 01, embedded water and electricity casing; 1, wall forming template; 2, sealing block; 21, positioning frame; 22, profiling block; 221, mounting hole; 23, ring groove; 3, sealing ring; 4, sealing ring; 41, sink groove; 5, elastic plugging strip; 6, telescopic airbag ring; 7, air nozzle. DETAILED DESCRIPTION

[0040] The following is combined with Figure 1-8 This application is described in further detail.

[0041] The embodiment of the present application discloses a special template for preventing leakage of slurry from hydropower casing.

[0042] Example 1

[0043] Reference Figure 1 and Figure 2A special template for preventing leakage of water and electricity casing includes a wall forming template 1 and a blocking block 2. There are two wall forming templates 1, which are parallel and vertically arranged to each other, and a wall casting cavity is formed between the two wall forming templates 1; there are two blocking blocks 2, which are respectively embedded in the two wall forming templates 1, and the inner wall of the blocking block 2 is flush with the working surface of the wall forming template 1 to ensure the flatness of the wall facade; in order to reduce the accuracy requirement of the opening on the wall forming template 1, the cross-sectional shape of the blocking block 2 is square, that is, the blocking block 2 is a square block, and the two ends of the water and electricity embedded casing 01 are respectively passed through the blocking blocks 2, and the water and electricity embedded casing 01 and the blocking block 2 are clamped and fixed, and sealed by the leak-proof glue.

[0044] Example 2

[0045] Reference Figure 3 Based on Example 1, this embodiment also includes a blocking ring 4 to prevent the concrete from exerting force on the blocking block 2 during pouring, causing relative displacement between the blocking block 2 and the wall forming formwork 1. The blocking ring 4 is detachably connected to the outer side of the wall forming formwork 1, and the projection of the gap between the wall forming formwork 1 and the blocking block 2 in a direction perpendicular to the wall forming formwork 1 falls on the blocking ring 4; in this application, the blocking ring 4 is bolted to the wall forming formwork 1.

[0046] Reference Figure 4 In order to further seal the gap between the wall forming template 1 and the blocking block 2 and reduce the possibility of leakage, a sinking groove 41 is opened on the blocking ring 4, and an elastic sealing strip 5 is embedded in the sinking groove 41, and the elastic sealing strip 5 is bonded and fixed to the blocking ring 4. The thickness of the elastic sealing strip 5 is greater than the opening depth of the sinking groove 41, and the elastic strips are used to seal the gap between the wall forming template 1 and the blocking block 2.

[0047] Example 3

[0048] Reference Figure 5 On the basis of Example 1, this embodiment also includes a telescopic airbag ring 6 in order to reduce the possibility of relative displacement between the blocking block 2 and the wall forming template 1 caused by the concrete exerting force on the blocking block 2 during pouring, and to reduce the probability of leakage. An annular groove 23 is provided on the outer peripheral side of the blocking block 2, and the annular groove 23 is provided near the middle area in the width direction of the blocking block 2. The telescopic airbag ring 6 is sleeved in the annular groove 23, and an air nozzle 7 is connected to the outer side of the blocking block 2 through a thread. An air passage is provided in the blocking block 2, and the air nozzle 7 is connected to the telescopic airbag ring 6 through the air passage. After the blocking block 2 is installed in place, air is supplied to the telescopic airbag ring 6 through the air nozzle 7, and the telescopic airbag ring 6 is inflated to seal the gap.

[0049] Example 4

[0050] Reference Figure 6In this embodiment, based on the first embodiment, in order to reduce the possibility of concrete exerting force on the blocking block 2 and causing relative displacement between the blocking block 2 and the wall forming formwork 1 during pouring, the size of the blocking block 2 gradually increases from the outside of the wall forming formwork 1 toward the other end of the blocking block 2.

[0051] Example 5

[0052] Reference Figure 7 Based on Example 1, in order to reduce the possibility of wear on the blocking block 2 and thus leakage when installing the embedded water and electricity casing 01, this embodiment further discloses that the blocking block 2 includes a positioning frame 21 and a contour block 22. The positioning frame 21 is embedded in the wall forming template 1, and the positioning frame 21 is hollow and has openings at both ends. In this application, the outer contour of the positioning frame 21 is square, and preferably a square in this embodiment.

[0053] Reference Figure 7 The profiling block 22 is located in the inner cavity of the positioning frame 21, and the profiling block 22 is detachably fixedly connected to the positioning frame 21. A mounting hole 221 for the water and electricity pre-buried casing 01 to pass through is provided on the profiling block 22. The size of the mounting hole 221 is adapted to the size of the water and electricity pre-buried casing 01 to reduce the size of the gap. In this application, the profiling block 22 is connected to the positioning frame 21 by countersunk bolts.

[0054] Reference Figure 8 In order to reduce the possibility of concrete slurry leaking through the gap between the profiling block 22 and the outer wall of the water and electricity pre-buried casing 01, at least one sealing ring 3 is coaxially embedded on the hole wall of the mounting hole 221. In this embodiment, the number of sealing rings 3 is two, and the two sealing rings 3 are distributed along the axial direction of the water and electricity pre-buried casing 01; in order to further improve the sealing performance, the sealing ring 3 is made of elastic material such as rubber, and the inner diameter of the sealing ring 3 is smaller than the outer diameter of the water and electricity pre-buried casing 01.

[0055] The implementation principle of a special template for preventing leakage of water and electricity casing in an embodiment of the present application is as follows: a square hole is opened on the wall forming template 1 at the position where the water and electricity pre-buried casing 01 needs to be passed through, and then a blocking block 2 of a matching size is precisely processed according to the size of the square hole, and a through hole matching the shape and size of the water and electricity pre-buried casing 01 is processed on the blocking block 2, and then the blocking block 2 is embedded in the square hole opened on the wall forming template 1, and at the same time, the inner wall of the blocking block 2 is made flush with the working surface of the wall forming template 1, and then the water and electricity pre-buried casing 01 is inserted, and concrete pouring begins, and the formwork can be removed after the concrete solidifies.

[0056] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A special template for preventing leakage of hydropower casing, characterized by: include Two wall forming templates (1), the two wall forming templates (1) are arranged in parallel and surround a wall casting cavity; Two blocking blocks (2) are embedded in the wall forming template (1), and the inner wall of the blocking block (2) is flush with the working surface of the wall forming template (1); the cross-sectional shape of the blocking block (2) is square; the water and electricity pre-buried bushing (01) passes through the two blocking blocks (2), and the water and electricity pre-buried bushing (01) is clamped with the blocking block (2).

2. The special template for preventing leakage of water and electricity casing according to claim 1 is characterized in that: The blocking block (2) comprises A positioning frame (21), wherein the positioning frame (21) is embedded in the wall forming template (1), and the positioning frame (21) is hollow and has openings at both ends; A profiling block (22), the profiling block (22) is located in the inner cavity of the positioning frame (21), and the profiling block (22) is detachably fixedly connected to the positioning frame (21), and the profiling block (22) is provided with a mounting hole (221) for the water and electricity pre-buried bushing (01) to pass through.

3. The special template for preventing leakage of water and electricity casing according to claim 2 is characterized by: At least one sealing ring (3) is coaxially embedded on the hole wall of the mounting hole (221).

4. The special template for preventing leakage of water and electricity casing according to claim 3 is characterized by: The sealing ring (3) is made of elastic material, and the inner diameter of the sealing ring (3) is smaller than the outer diameter of the water and electricity pre-buried bushing (01).

5. The special template for preventing leakage of water and electricity casing according to claim 1 is characterized in that: It also comprises a blocking ring (4), which is detachably connected to the outside of the wall forming template (1), and the projection of the gap between the wall forming template (1) and the blocking block (2) in the horizontal direction falls on the blocking ring (4).

6. The special template for preventing leakage of water and electricity casing according to claim 5 is characterized in that: The sealing ring (4) is provided with a recessed groove (41), and an elastic leak-proof strip (5) is embedded in the recessed groove (41). The thickness of the elastic leak-proof strip (5) is greater than the depth of the recessed groove (41), and the elastic leak-proof strip (5) is used to seal the gap between the wall forming template (1) and the sealing block (2).

7. The special template for preventing leakage of water and electricity casing according to claim 1 is characterized by: The sealing block (2) is provided with an annular groove (23) on its circumference, and a telescopic airbag ring (6) is sleeved in the annular groove (23). The outer side of the sealing block (2) is connected with an air nozzle (7), and the air nozzle (7) is in communication with the telescopic airbag ring (6).