Pipeline pre-burying device for water conservancy construction
By designing a pipe pre-embedded device including a sliding frame, a threaded rod and a clamping component in water conservancy construction, the problem of poor installation adaptability of bent pipes is solved, and effective clamping and buffering support of bent pipes are achieved. Improved applicability and safety of construction.
Patent Information
- Application Number
- CN202420007374.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-03
AI Technical Summary
When installing pipelines with bending curvature, existing pipeline embedded devices for water conservancy construction have poor adapting and clamping effects, making it difficult to meet the connection needs of pipelines of different specifications.
A pipe pre-embedding device including a mounting frame, a sliding frame, a two-way threaded rod, a connecting frame, a clamping component and a torsion spring is designed. The placement and clamping of the bent pipe is achieved through the cooperation of the second sliding frame and the rotating frame. limit, and provide buffering support through the cooperation of telescopic rods and springs to avoid pipe wear.
It significantly improves the applicability and safety of pipe laying and embedding, and can effectively clamp and install pipes with bending arcs to avoid wear and tear with the installation frame.
Smart Images

Figure CN221824644U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy construction, in particular to a pipeline pre-buried device for water conservancy construction. Background Art
[0002] Water conservancy construction refers to a series of engineering activities carried out to solve the development, utilization and management of water resources, as well as the protection of the water environment. This includes water resources engineering, water conservancy and hydropower engineering, water environment engineering and other aspects. In water construction, it is often necessary to pre-install pipes underground or in buildings to keep the underground pipeline network unobstructed.
[0003] The pipe pre-buried device for water conservancy construction described in patent publication number CN217815377U includes a base, a bidirectional screw is rotatably installed in the base cavity, one side of the base is rotatably installed on a torsion block, the torsion block is fixedly connected to the bidirectional screw near one end of the bidirectional screw, both ends of the bidirectional screw are sleeved with vertical plates, each vertical plate is threadedly connected to the bidirectional screw, but due to the different specifications of the pipes, it is often necessary to use pipes with a bending curvature to connect with other pipes when laying the pipe network. When the device is installed and pre-buried for pipes with a bending curvature, the adaptation and clamping effect is poor.
[0004] Therefore, a pipeline pre-buried device for water conservancy construction with stronger applicability is now developed to address the above problems. Utility Model Content
[0005] In order to overcome the problem that due to the different specifications of pipelines, it is often necessary to use pipelines with bending curvatures to connect with other pipelines when laying the pipeline network. When the device is installed and pre-buried for the pipelines with bending curvatures, the adaptation and clamping effect is poor. The utility model provides a pipeline pre-buried device with stronger applicability for water conservancy construction.
[0006] The technical scheme of the utility model is: a pipeline pre-buried device for water conservancy construction, including a mounting frame, a first sliding frame, a bidirectional threaded rod, a connecting frame, a first clamping assembly and a first torsion spring, the upper parts of the left and right parts of the mounting frame are both slidably connected to the first sliding frame, the middle part of the mounting frame is rotatably connected to the bidirectional threaded rod, the left and right parts of the bidirectional threaded rod are both threadedly connected to the lower part of the adjacent first sliding frame, the upper sides of the front and rear parts of the first sliding frame are both connected to the connecting frame, the upper parts of the connecting frames on the same first sliding frame are rotatably connected to the first clamping assembly, and the first clamping assembly is connected to the adjacent connecting frame Two first torsion springs are connected between them, and a steering mechanism is also included. The steering mechanism includes a guide frame, a second sliding frame, a rotating frame, a second clamping assembly and a second torsion spring. The upper sides of the rear portions of the left and right parts of the mounting frame are connected to the guide frames, the upper middle portion of the mounting frame is slidably connected to the second sliding frame, the upper side of the second sliding frame near the mounting frame between the guide frames is slidably connected to the second sliding frame, the outer side of the second sliding frame is rotatably connected to the rotating frame, the upper portions of the left and right parts of the rotating frame are rotatably connected to the second clamping assemblies, and the second clamping assemblies are connected to two second torsion springs between the upper portions of the adjacent rotating frames.
[0007] In one embodiment, a supporting mechanism is also included, which includes a mounting base, a telescopic rod, a placement plate and a spring. The mounting base is connected to the upper middle side of the mounting frame, the upper front and rear sides of the mounting base are connected to the telescopic rod, the placement plate is connected between the upper parts of the telescopic rods, and the lower front and rear sides of the placement plate are connected to the middle parts of adjacent telescopic rods.
[0008] In one of the embodiments, the right portion of the bidirectional threaded rod passes through the right portion of the mounting frame and is connected to a turning handle.
[0009] In one embodiment, the first clamping assembly includes a limiting block, a rotating plate, a clamping plate and a reset member. The outer side of the upper part of the connecting frame is connected to the limiting block by bolts, the upper part of the connecting frame is rotatably connected to the rotating plate, the limiting plates are slidably connected between the front and rear adjacent rotating plates, and the reset members are connected between the upper sides of the front and rear parts of the limiting member and the adjacent rotating plates.
[0010] In one embodiment, the second clamping assembly includes a limit block, a rotating plate, a limit piece and a buffer piece. The upper outer sides of the left and right parts of the rotating frame are connected to the limit blocks by bolts. The upper parts of the left and right parts of the rotating frame are rotatably connected to the rotating plates. The rotating plates are slidably connected to the limit pieces symmetrical on the left and right. The limit pieces are connected to a part adjacent to the rotating frame with a buffer piece.
[0011] In one embodiment, the placement plate is arc-shaped, and a plurality of anti-slip grooves are connected to the upper portion of the placement plate.
[0012] The beneficial effects are: 1. The utility model places and installs pipes with a curved curvature by cooperating between the second sliding frame and the rotating frame, so that the second clamping components clamp and limit the outer surface of the pipe, greatly improving the applicability of pre-embedded pipe laying.
[0013] 2. The utility model provides a buffer for placing the pipe on the placement plate by cooperating between the telescopic rod and the spring, thereby avoiding wear between the pipe and the mounting frame during placement, thereby improving the safety of pipe placement. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a three-dimensional structural schematic diagram of the utility model.
[0015] Figure 2 It is a partial three-dimensional structural schematic diagram of the utility model.
[0016] Figure 3 It is a schematic diagram of the first three-dimensional structure of the steering mechanism of the utility model.
[0017] Figure 4 It is a schematic diagram of the second three-dimensional structure of the steering mechanism of the utility model.
[0018] Figure 5 It is a three-dimensional structural schematic diagram of the support mechanism of the utility model.
[0019] In the accompanying drawings: 1-mounting frame, 2-first sliding frame, 3-bidirectional threaded rod, 4-connecting frame, 5-first clamping assembly, 6-first torsion spring, 7-steering mechanism, 71-guide frame, 72-second sliding frame, 73-rotating frame, 74-second clamping assembly, 75-second torsion spring, 8-support mechanism, 81-mounting base, 82-telescopic rod, 83-placing plate, 84-spring. DETAILED DESCRIPTION
[0020] The embodiments of the present utility model are described in detail below with reference to the accompanying drawings.
[0021] A pipeline pre-buried device for water conservancy construction, such as Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, it includes a mounting frame 1, a first sliding frame 2, a bidirectional threaded rod 3, a connecting frame 4, a first clamping assembly 5 and a first torsion spring 6. The upper parts of the left and right parts of the mounting frame 1 are both slidably connected to the first sliding frame 2. The middle part of the mounting frame 1 is rotatably connected to the bidirectional threaded rod 3 for rotatably adjusting the position of the first sliding frame 2. The right part of the bidirectional threaded rod 3 passes through the right part of the mounting frame 1 and is connected to a handle. The left and right parts of the bidirectional threaded rod 3 are both threadedly connected to the lower part of the adjacent first sliding frame 2. The upper sides of the front and rear parts of the first sliding frame 2 are both connected to the connecting frame 4. The upper part of the same first sliding frame 2 The upper parts of the connecting frames 4 are rotatably connected with the first clamping assembly 5 for clamping the limited pipe. The first clamping assembly 5 includes a limited block, a rotating plate, a clamping plate and a reset member. The outer sides of the upper parts of the connecting frames 4 are connected to the limited blocks by bolts. The upper parts of the connecting frames 4 are rotatably connected with the rotating plates. The limited plates are slidably connected between the front and rear adjacent rotating plates. The upper sides of the front and rear parts of the limiting members are connected to the adjacent rotating plates with reset members. The first clamping assembly 5 is connected to the adjacent connecting frames 4 with two first torsion springs 6, and also includes a steering mechanism 7. The steering mechanism The mounting frame 7 comprises a guide frame 71, a second sliding frame 72, a rotating frame 73, a second clamping assembly 74 and a second torsion spring 75. The upper rear sides of the left and right parts of the mounting frame 1 are connected with guide frames 71 for sliding guidance. The upper middle part of the mounting frame 1 is slidably connected with a second sliding frame 72 for sliding adaptation. The upper side of the second sliding frame 72 on the mounting frame 1 between the guide frames 71 is slidably connected with the second sliding frame 72. The outer side of the second sliding frame 72 is rotatably connected with a rotating frame 73 for installing and guiding the bending position of the pipeline. The upper left and right parts of the rotating frame 73 are connected to the second sliding frame 72. The second clamping assembly 74 for clamping and limiting the bending position of the pipeline is rotatably connected to each other. The second clamping assembly 74 includes a limit block, a rotating plate, a limit piece and a buffer piece. The upper outer sides of the left and right parts of the rotating frame 73 are connected to the limit block by bolts. The upper parts of the left and right parts of the rotating frame 73 are rotatably connected to the rotating plates. The rotating plates are slidably connected to the limit pieces symmetrical on the left and right. The limit pieces are connected to a part adjacent to the rotating frame 73 with a buffer piece. The second clamping assembly 74 is connected to the upper part of the adjacent rotating frame 73 with two second torsion springs 75.
[0022] The device can be used when pre-buried installation of pipelines for water conservancy construction. It should be noted that, first, a pre-buried pit is dug at the location where the pipeline needs to be laid in the water construction, and the device is placed in the pre-buried pit. Then the first clamping components 5 are rotated outward to open. At this time, the first torsion springs 6 are rotated under force, and the pipeline is placed between the lower sides of the first clamping components 5. Then the two-way threaded rod 3 is rotated, so that the left and right parts of the two-way threaded rod 3 drive the adjacent first sliding frames 2 to slide inward along the mounting frame 1, and the two first clamping components 5 are loosened at the same time. At this time, the first torsion springs 6 drive the adjacent first clamping components 5 to rotate in the opposite direction and fit the upper outer surface of the pipeline, so that the first sliding frame 2 drives the first clamping components 5 to clamp and limit the upper outer surface of the pipeline. At this time, the first clamping components 5 slide outward to the limit position. When it is necessary to install a pipeline with a bending curvature, Two second sliding frames 72 are installed on the mounting frame 1, and the second sliding frames 72 are slid outward and opened at the same time, and then the angles of the adjacent rotating frames 73 are adjusted according to the bending curvature of the front and rear parts of the pipe. Then, when placing and installing the pipe, the first clamping assembly 5 and the second clamping assembly 74 are rotated outward and opened, and the pipe can be placed between the first clamping assembly 5 and the second clamping assembly 74, and then the first clamping assembly 5 and the second clamping assembly 74 are loosened, so that the first clamping assembly 5 and the second clamping assembly 74 are both clamped and limited to the upper outer surface of the pipe, and then the embedded pit can be poured. In summary, through the cooperation between the second sliding frame 72 and the rotating frame 73, the pipe with a bending curvature can be placed and installed, and the second clamping assembly 74 is clamped and limited to the outer surface of the pipe, which greatly improves the applicability of pipeline laying and embedding.
[0023] like Figure 1 and Figure 5 As shown, a supporting mechanism 8 is also included, and the supporting mechanism 8 includes a mounting base 81, a telescopic rod 82, a placement plate 83 and a spring 84. The mounting base 81 is connected to the upper middle side of the mounting frame 1, and the telescopic rod 82 is connected to the upper sides of the front and rear parts of the mounting base 81. A placement plate 83 for placing pipes is connected between the upper parts of the telescopic rods 82. The placement plate 83 is arc-shaped, and a plurality of anti-slip grooves are connected to the upper part of the placement plate 83. Springs 84 are connected between the lower sides of the front and rear parts of the placement plate 83 and the middle parts of the adjacent telescopic rods 82.
[0024] It should be noted that when the pipe is placed and installed between the first clamping components 5, the first clamping component 5 is rotated outward to open, and then the pipe is placed on the placement plate 83. At this time, the pipe presses the placement plate 83 downward due to its large mass. At this time, the telescopic rod 82 contracts downward, and the spring 84 contracts under force, so that the telescopic rod 82 and the spring 84 both buffer the pipe on the placement plate 83 to avoid wear between the pipe and the mounting frame 1 during placement. Then the two first clamping components 5 can be loosened to clamp the upper surface of the pipe. In summary, through the cooperation between the telescopic rod 82 and the spring 84, the pipe on the placement plate 83 is placed buffered, thereby avoiding wear between the pipe and the mounting frame 1 during placement, thereby improving the safety of pipe placement.
[0025] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A pipeline pre-buried device for water conservancy construction, comprising a mounting frame (1), a first sliding frame (2), a bidirectional threaded rod (3), a connecting frame (4), a first clamping assembly (5) and a first torsion spring (6), wherein the upper parts of the left and right parts of the mounting frame (1) are both slidably connected to the first sliding frame (2), the middle part of the mounting frame (1) is rotatably connected to the bidirectional threaded rod (3), the left and right parts of the bidirectional threaded rod (3) are both threadedly connected to the lower part of the adjacent first sliding frame (2), the upper sides of the front and rear parts of the first sliding frame (2) are both connected to the connecting frame (4), the upper parts of the connecting frames (4) on the same first sliding frame (2) are both rotatably connected to the first clamping assembly (5), and the first clamping assembly (5) is connected to two first torsion springs (6) between the adjacent connecting frames (4), characterized in that: The invention also comprises a steering mechanism (7), which comprises a guide frame (71), a second sliding frame (72), a rotating frame (73), a second clamping assembly (74) and a second torsion spring (75). The upper sides of the rear parts of the left and right parts of the mounting frame (1) are both connected to the guide frame (71), the upper side of the middle part of the mounting frame (1) is slidably connected to the second sliding frame (72), the upper side of the second sliding frame (72) between the guide frames (71) and close to the mounting frame (1) is slidably connected to the second sliding frame (72), the outer part of the second sliding frame (72) is rotatably connected to the rotating frame (73), the upper parts of the left and right parts of the rotating frame (73) are both rotatably connected to the second clamping assembly (74), and two second torsion springs (75) are connected between the second clamping assembly (74) and the upper part of the adjacent rotating frame (73).
2. A pipeline pre-buried device for water conservancy construction as claimed in claim 1, characterized in that: The mounting frame (1) further comprises a support mechanism (8), the support mechanism (8) comprising a mounting base (81), a telescopic rod (82), a placement plate (83) and a spring (84); the middle upper side of the mounting frame (1) is connected to the mounting base (81); the upper sides of the front and rear parts of the mounting base (81) are both connected to the telescopic rod (82); the placement plate (83) is connected between the upper parts of the telescopic rod (82); the lower sides of the front and rear parts of the placement plate (83) are both connected to the middle parts of the adjacent telescopic rods (82) with springs (84).
3. The pipeline pre-buried device for water conservancy construction according to claim 1, characterized in that: The right part of the bidirectional threaded rod (3) passes through the right part of the mounting frame (1) and is connected to a turning handle.
4. A pipeline pre-buried device for water conservancy construction as claimed in claim 1, characterized in that: The first clamping assembly (5) comprises a limit block, a rotating plate, a clamping plate and a reset member. The outer side of the upper portion of the connecting frame (4) is connected to the limit block by bolts. The upper portion of the connecting frame (4) is rotatably connected to the rotating plate. The limit plates are slidably connected between the front and rear adjacent rotating plates. The upper sides of the front and rear portions of the limit member are connected to the reset member between the adjacent rotating plates.
5. The pipeline pre-buried device for water conservancy construction according to claim 1, characterized in that: The second clamping assembly (74) comprises a limit block, a rotating plate, a limit piece and a buffer piece. The upper outer sides of the left and right parts of the rotating frame (73) are connected to the limit block by bolts. The upper parts of the left and right parts of the rotating frame (73) are rotatably connected to the rotating plates. The rotating plates are slidably connected to the limit pieces symmetrically on the left and right sides. The limit pieces are connected to a part adjacent to the rotating frame (73) with a buffer piece.
6. A pipeline pre-buried device for water conservancy construction as claimed in claim 2, characterized in that: The placement plate (83) is arc-shaped, and a plurality of anti-slip grooves are connected to the upper portion of the placement plate (83).