Material pouring system for high-purity oxygen steel cylinder
By introducing components such as a vacuum unit, a helium filling unit and a cleaning unit into the pouring system, the problems of explosion and substandard purity during high-purity oxygen pouring are solved, and efficient nitrogen replacement and oxygen purity assurance are achieved.
Patent Information
- Application Number
- CN202323065891.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-14
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-11-14
AI Technical Summary
High-purity oxygen easily explodes with organic matter or lipids during the pouring process. The nitrogen purge and replacement used in traditional pouring pipelines does not work well, resulting in product purity that does not meet standards.
A dumping system including a vacuum unit, a helium filling unit, a venting pipeline, an analysis unit, a pressure detection unit, a cleaning unit and a flow limiting unit is designed. It is removed through vacuum pumping, helium replacement, flow limiting control and cleaning units. Organic matter to ensure the quality and purity of high-purity oxygen.
It effectively avoids the explosion of high-purity oxygen and organic matter, ensures clean nitrogen replacement, limits the oxygen circulation rate, ensures the purity of high-purity oxygen, and solves the problems of nitrogen residue and substandard product purity in traditional dumping systems.
Smart Images

Figure CN221825173U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of high-purity oxygen production, in particular to a material pouring system for high-purity oxygen cylinders. Background Art
[0002] With the development of society and the progress of economy, industry has gradually transformed from rough processing to precision manufacturing, and the demand for high-purity gases has become increasingly greater. High-purity oxygen is increasingly used in the electronics, crystalline silicon and other industries. High-purity oxygen can be used for chemical vapor deposition of silicon dioxide, as an oxidation source and reactant to produce high-purity water, dry oxidation, and mixed with carbon tetrafluoride for plasma etching, etc.
[0003] In the process of using steel cylinders, the following problems are inevitable: (1) Due to different needs, there will be different requirements for steel cylinder types, cylinder valve models, etc.; (2) Steel cylinders have defects and cannot be used normally, and need to be re-purified. In order to avoid waste caused by re-purification and to meet the needs of different steel cylinder types and cylinder valve models, in the prior art, a material transfer pipeline is usually set up for the material transfer operation between steel cylinders to solve the above problems.
[0004] However, the traditional material discharging pipeline only performs purge replacement, which cannot solve the problem of explosion of high-purity oxygen when encountering organic matter, especially lipids. In addition, the traditional material discharging pipeline often uses nitrogen purge replacement, which often fails to achieve the required replacement effect. At the same time, the density of oxygen is slightly higher than that of nitrogen. When the high-purity oxygen is discharged after purge replacement, there is usually nitrogen residue. Oxygen has strong polarity and oxidizing properties, so it is very easy to wash out the trace organic matter adsorbed by capillary action in the pipeline, resulting in the product purity not meeting the requirements. Utility Model Content
[0005] The utility model aims to provide a material discharging system for high-purity oxygen cylinders to solve the problems in the prior art that high-purity oxygen is prone to explosion when encountering organic matter or lipids, nitrogen purge replacement cannot achieve the required effect, and nitrogen residue and trace organic matter adsorbed by capillary action in the high-purity oxygen flushing pipeline lead to substandard product purity.
[0006] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0007] A material discharging system for a high-purity oxygen cylinder, comprising:
[0008] Supply cylinder, used to supply high-purity oxygen;
[0009] A receiving cylinder, used for receiving the high-purity oxygen;
[0010] A material pouring pipe, both ends of which are connected to the supply cylinder and the receiving cylinder respectively, a first valve is arranged on one end of the material pouring pipe close to the supply cylinder, and a second valve is arranged on one end of the material pouring pipe close to the receiving cylinder;
[0011] A vacuum unit, used for evacuating the pouring pipe and the receiving steel cylinder, the vacuum unit comprising a vacuum pipe and a vacuum generating device arranged on the vacuum pipe, one end of the vacuum pipe is connected between the supply steel cylinder and the first valve and is provided with a third valve, and the other end of the vacuum pipe is connected between the receiving steel cylinder and the second valve and is provided with a fourth valve;
[0012] A helium filling unit, used for filling helium into the material discharge pipe, the helium filling unit comprises a helium pipe and a helium generating device connected to the tail end of the helium pipe, the head end of the helium pipe is connected to the material discharge pipe and is located between the vacuum unit and the receiving cylinder, and a fifth valve is provided on the helium pipe;
[0013] a venting pipe, used for releasing the nitrogen in the receiving steel cylinder, the venting pipe communicating with the pouring pipe and the external environment, and being located between the helium filling unit and the receiving steel cylinder, and a sixth valve being provided on the venting pipe;
[0014] An analysis unit, used for bottom gas analysis, comprising an analysis pipeline and an analysis device connected to the end of the analysis pipeline, the head end of the analysis pipeline is connected to the pouring pipeline and is located between the venting pipeline and the receiving cylinder, and a seventh valve is provided on the analysis pipeline;
[0015] The pressure detection unit comprises a first pressure detection member and a second pressure detection member, wherein the first pressure detection member is arranged on the material discharge pipe and is located between the analysis unit and the receiving cylinder, and the second pressure detection member is arranged on the material discharge pipe and is located between the vacuum unit and the supply cylinder;
[0016] a cleaning unit, used for cleaning the material pouring pipe, wherein the outlet of the cleaning unit is connected to the material pouring pipe and is located between the helium filling unit and the gas discharge pipe, and the inlet of the cleaning unit is connected to the material pouring pipe and is located between the vacuum unit and the supply cylinder; and
[0017] The flow limiting unit is arranged in the pouring pipe and is located between the inlet of the cleaning unit and the supply cylinder. The flow limiting unit includes a flow limiting orifice plate and a flow detection component.
[0018] Furthermore, the material pouring system also includes a first weighing member for weighing the weight of the supplied steel cylinder.
[0019] Furthermore, the material unloading system also includes a second weighing member for weighing the weight of the receiving cylinder.
[0020] Furthermore, the supply cylinder is provided with a supply valve, and the receiving cylinder is provided with a receiving valve.
[0021] Furthermore, the material discharge pipe is detachably connected to the venting pipe, the helium pipe, the vacuum pipe, and the analysis pipe respectively.
[0022] Furthermore, the material discharge pipeline includes a main pipe, a supply pipe connecting the main pipe with the supply cylinder, and a receiving pipe connecting the main pipe with the receiving cylinder. The main pipe is detachably connected to the supply pipe and the receiving pipe, respectively. The first valve is arranged between the main pipe and the supply pipe, and the second valve is arranged between the main pipe and the receiving pipe.
[0023] Furthermore, the material pouring system also includes a heating box for heating the supply cylinder.
[0024] Furthermore, the material unloading system also includes a cooling box for cooling the receiving cylinder.
[0025] Furthermore, the material dumping system also includes a waste gas recovery cylinder, and the waste gas recovery cylinder is connected to the material dumping pipe through the venting pipe.
[0026] Furthermore, the first pressure detection component and the second pressure detection component are both vacuum pressure gauges.
[0027] Due to the application of the above technical solution, the beneficial effects of the present application compared with the prior art are:
[0028] The material discharging system provided in the present application cleans the material discharging pipeline by setting a cleaning unit to remove organic matter and grease in the material discharging pipeline to avoid contact with high-purity oxygen and causing explosion. Helium is filled into the material discharging pipeline by setting a helium filling unit to prevent nitrogen from exceeding the standard, so that the nitrogen is replaced cleanly to ensure the quality of high-purity oxygen. The flow rate of high-purity oxygen is limited by setting a current limiting unit to avoid flushing trace organic matter adsorbed by capillary action in the material discharging pipeline, thereby ensuring the purity of high-purity oxygen. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 It is a structural schematic diagram of the material pouring system in the embodiment of the utility model.
[0031] Description of reference numerals:
[0032] 1-first valve; 2-second valve; 3-third valve; 4-fourth valve; 5-fifth valve; 6-sixth valve; 7-seventh valve; 8-vacuum pipe; 9-flow limiting orifice; 10-supply cylinder; 101-supply valve; 20-receiving cylinder; 201-receiving valve; 30-heating box; 40-cooling box; 50-discharging pipe; 60-venting pipe; 70-analysis pipe; 801-first pressure detection part; 802-second pressure detection part; 901-inlet; 902-outlet; 100-helium pipe. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0034] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0035] See also Figure 1 The present embodiment provides a material discharging system for a high-purity oxygen cylinder, which includes a supply cylinder 10 for supplying high-purity oxygen, a receiving cylinder 20 for receiving high-purity oxygen, a material discharging pipe 50 whose two ends are respectively connected to the supply cylinder 10 and the receiving cylinder 20, a vacuum unit for evacuating the material discharging pipe 50 and the receiving cylinder 20, a helium filling unit for filling helium into the material discharging pipe 50, a venting pipe 60 for releasing nitrogen in the receiving cylinder 20, an analysis unit for bottom gas analysis, a pressure detection unit, a cleaning unit and a current limiting unit for cleaning the material discharging pipe 50. It should be noted that the supply cylinder 10 and the receiving cylinder 20 are both high-purity oxygen cylinders, the supply cylinder 10 is provided with a supply valve 101, and the receiving cylinder 20 is provided with a receiving valve 201. It is a conventional structure.
[0036] Specifically, a first valve 1 is provided on one end of the pouring pipe 50 close to the supply cylinder 10 , and a second valve 2 is provided on one end of the pouring pipe 50 close to the receiving cylinder 20 .
[0037] The vacuum unit includes a vacuum pipe 8 and a vacuum generating device (not shown) arranged on the vacuum pipe 8. One end of the vacuum pipe 8 is connected between the supply cylinder 10 and the first valve 1 and is provided with a third valve 3. The other end of the vacuum pipe 8 is connected between the receiving cylinder 20 and the second valve 2 and is provided with a fourth valve 4.
[0038] The helium filling unit includes a helium pipeline 100 and a helium generating device (not shown) connected to the tail end of the helium pipeline 100 . The head end of the helium pipeline 100 is connected to the pouring pipeline 50 and is located between the vacuum unit and the receiving cylinder 20 . A fifth valve 5 is provided on the helium pipeline 100 .
[0039] The deflation pipeline 60 communicates with the discharge pipeline 50 and the external environment and is located between the helium filling unit and the receiving cylinder 20 . A sixth valve 6 is provided on the deflation pipeline 60 .
[0040] The analysis unit includes an analysis pipeline 70 and an analysis device (not shown) connected to the end of the analysis pipeline 70. The head end of the analysis pipeline 70 is connected to the material discharge pipeline 50 and is located between the venting pipeline 60 and the receiving cylinder 20. The analysis pipeline 70 is provided with a seventh valve 7.
[0041] The pressure detection unit includes a first pressure detection member 801 and a second pressure detection member 802. The first pressure detection member 801 is arranged on the material discharge pipe 50 and is located between the analysis unit and the receiving cylinder 20. The second pressure detection member 802 is arranged on the material discharge pipe 50 and is located between the vacuum unit and the supply cylinder 10. In this embodiment, the first pressure detection member 801 and the second pressure detection member 802 are both vacuum pressure gauges.
[0042] A cleaning unit, wherein the outlet 902 of the cleaning unit is connected to the material pouring pipe 50 and is located between the helium filling unit and the gas discharge pipe 60, and the inlet 901 of the cleaning unit is connected to the material pouring pipe 50 and is located between the vacuum unit and the supply cylinder 10;
[0043] The flow limiting unit is arranged in the pouring pipe 50 and is located between the inlet 901 of the cleaning unit and the supply cylinder 10. The flow limiting unit includes a flow limiting orifice plate 9 and a flow detection element (not shown).
[0044] In order to facilitate subsequent use, in this embodiment, the material pouring pipe 50 is detachably connected to the venting pipe 60, the helium pipe 100, the vacuum pipe 8, and the analysis pipe 70. So that the material pouring pipe 50 can be replaced after each material pouring to ensure the replacement effect each time. Specifically, adjacent pipe parts can be connected by threaded connection or by pipe connectors (not shown), which is a conventional setting.
[0045] In order to facilitate the replacement of the material discharge pipe 50, in this embodiment, the material discharge pipe 50 includes a main pipe (unnumbered), a supply pipe (unnumbered) connecting the main pipe with the supply cylinder 10, and a receiving pipe (unnumbered) connecting the main pipe with the receiving cylinder 20. The main pipe is detachably connected to the supply pipe and the receiving pipe, respectively. The first valve 1 is arranged between the main pipe and the supply pipe, and the second valve 2 is arranged between the main pipe and the receiving pipe.
[0046] In order to improve the pouring effect, in this embodiment, the pouring system also includes a first weighing piece (not shown) for weighing the weight of the supply cylinder 10 and a second weighing piece (not shown) for weighing the weight of the receiving cylinder 20. Specifically, the first weighing piece is arranged at the bottom of the supply cylinder 10 and is located in the heating box 30, and the second weighing piece is arranged at the bottom of the receiving cylinder 20 and is located in the cooling box 40. By setting the first weighing piece and the second weighing piece, the weight of the material in the supply cylinder 10 and the receiving cylinder 20 can be known in real time. Specifically, the first weighing piece and the second weighing piece are both electronic scales. Further, the pouring system also includes a heating box 30 for heating the supply cylinder 10 and a cooling box 40 for cooling the receiving cylinder 20.
[0047] In order to reduce the impact of the gas discharged from the material dumping system on the external environment, the material dumping system also includes a waste gas recovery cylinder (not shown), which is connected to the material dumping pipeline 50 through the venting pipeline 60 to recover the gas discharged from the material dumping system for unified treatment.
[0048] Taking this embodiment as an example, the material discharging process of the material discharging system in this application is as follows:
[0049] Step 1: Connect the supply cylinder 10, the receiving cylinder 20, the material discharge pipeline 50, the vacuum unit, the helium filling unit, the gas discharge pipeline 60, the analysis unit, the pressure detection unit, the cleaning unit and the current limiting unit, and check the air tightness of each pipeline to ensure that each valve is in a closed state, then open the first valve 1 and the second valve 2, and clean the material discharge pipeline 50 through the cleaning unit;
[0050] Step 2: Open the receiving valve 201 and the sixth valve 6 of the receiving cylinder 20 in sequence to release the nitrogen in the receiving cylinder 20 until the nitrogen is exhausted, and then close the receiving valve 201 and the sixth valve 6 of the receiving cylinder 20 in sequence;
[0051] Step 3: Start the vacuum generating device, and open the third valve 3, the fourth valve 4, the second valve 2, the first valve 1, and the receiving valve 201 of the receiving cylinder 20 in sequence, and evacuate the receiving cylinder 20 and the material discharge pipe 50 until the detection result of the first pressure detection component 801 is -10Pa;
[0052] Step 4: Close the receiving valve 201, the third valve 3, the fourth valve 4, and the vacuum generating device of the receiving cylinder 20 in sequence;
[0053] Step 5: Open the fifth valve 5 and the receiving valve 201 of the receiving steel cylinder 20, start the helium generating device, and fill the receiving steel cylinder 20 and the material pouring pipe 50 with helium until the detection result of the first pressure detection component 801 is 0.05 MPa, and then close the fifth valve 5;
[0054] Step 6: Repeat steps 3 to 4 twice, performing the second and third gas replacement respectively;
[0055] Step 7: After completing the second and third gas replacements, repeat step 3 to perform the fourth vacuuming, and continue vacuuming for 5 hours after the detection result of the first pressure detection component 801 is -10Pa;
[0056] Step 8: Close the receiving valve 201, the first valve 1, the second valve 2, the third valve 3, the fourth valve 4, and the vacuum generating device of the receiving cylinder 20 in sequence;
[0057] Step nine: Open the receiving valve 201, the second valve 2, the first valve 1, and the outlet valve 101 of the outlet cylinder 10 of the receiving cylinder 20 in sequence to fill the receiving cylinder 20 with high-purity oxygen until the test result of the first pressure detection component 801 is 0.2MPa, passivate for 24 hours, then open the seventh valve 7, perform bottom gas analysis, repeat step nine until the analysis data meets the standard, and close all valves;
[0058] Step 10: Confirm the initial weighing result of the first weighing piece, turn on the cooling box 40 and confirm the temperature of the cooling box 40, open the supply valve 101, the first valve 1, and the second valve 2 of the supply cylinder 10 in sequence, and then slowly open the receiving valve 201 of the receiving cylinder 20 to start the material, and record the data of the first weighing piece, the first pressure detection piece 801, the second pressure detection piece 802, and the second weighing piece every half an hour. When the values of the first weighing piece and the second pressure detection piece 802 do not change significantly, turn on the heating box 30 and confirm the temperature of the heating box 30;
[0059] Step 11: When the values of the first weighing piece and the second pressure detection piece 802 have no obvious change again, close the first valve 1 and the second valve 2 in turn, replace the main pipe of the discharge pipe 50, and maintain a slight positive pressure. After the replacement is completed, close the receiving valve 201 of the receiving cylinder 20, the supply valve 101 of the supply cylinder 10, the heating box 30, and the cooling box 40 in turn, and then disconnect the connection between the supply cylinder 10 and the supply pipe, and the connection between the receiving cylinder 20 and the receiving pipe, and weigh the receiving cylinder 20.
[0060] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A material discharging system for high-purity oxygen cylinders, characterized in that: include: Supply cylinder, used to supply high-purity oxygen; A receiving cylinder, used for receiving the high-purity oxygen; A material pouring pipe, both ends of which are connected to the supply cylinder and the receiving cylinder respectively, a first valve is arranged on one end of the material pouring pipe close to the supply cylinder, and a second valve is arranged on one end of the material pouring pipe close to the receiving cylinder; A vacuum unit, used for evacuating the pouring pipe and the receiving steel cylinder, the vacuum unit comprising a vacuum pipe and a vacuum generating device arranged on the vacuum pipe, one end of the vacuum pipe is connected between the supply steel cylinder and the first valve and is provided with a third valve, and the other end of the vacuum pipe is connected between the receiving steel cylinder and the second valve and is provided with a fourth valve; A helium filling unit, used for filling helium into the material discharge pipe, the helium filling unit comprises a helium pipe and a helium generating device connected to the tail end of the helium pipe, the head end of the helium pipe is connected to the material discharge pipe and is located between the vacuum unit and the receiving cylinder, and a fifth valve is provided on the helium pipe; a venting pipe, used for releasing the nitrogen in the receiving steel cylinder, the venting pipe communicating with the pouring pipe and the external environment, and being located between the helium filling unit and the receiving steel cylinder, and a sixth valve being provided on the venting pipe; An analysis unit, used for bottom gas analysis, comprising an analysis pipeline and an analysis device connected to the end of the analysis pipeline, the head end of the analysis pipeline is connected to the pouring pipeline and is located between the venting pipeline and the receiving cylinder, and a seventh valve is provided on the analysis pipeline; The pressure detection unit comprises a first pressure detection member and a second pressure detection member, wherein the first pressure detection member is arranged on the material discharge pipe and is located between the analysis unit and the receiving cylinder, and the second pressure detection member is arranged on the material discharge pipe and is located between the vacuum unit and the supply cylinder; A cleaning unit, used for cleaning the material pouring pipe, wherein the outlet of the cleaning unit is connected to the material pouring pipe and is located between the helium filling unit and the gas discharge pipe, and the inlet of the cleaning unit is connected to the material pouring pipe and is located between the vacuum unit and the supply cylinder; as well as The flow limiting unit is arranged in the pouring pipe and is located between the inlet of the cleaning unit and the supply cylinder. The flow limiting unit includes a flow limiting orifice plate and a flow detection component.
2. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The material pouring system also includes a first weighing member for weighing the weight of the supply cylinder.
3. A material discharging system for high-purity oxygen cylinders as claimed in claim 2, characterized in that: The pouring system further comprises a second weighing member for weighing the receiving cylinder.
4. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The supply cylinder is provided with a supply valve, and the receiving cylinder is provided with a receiving valve.
5. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The material discharge pipeline is detachably connected to the venting pipeline, the helium pipeline, the vacuum pipeline and the analysis pipeline respectively.
6. A material discharging system for high-purity oxygen cylinders as claimed in claim 5, characterized in that: The material discharge pipeline includes a main pipe, a supply pipe connecting the main pipe with the supply cylinder, and a receiving pipe connecting the main pipe with the receiving cylinder. The main pipe is detachably connected to the supply pipe and the receiving pipe, respectively. The first valve is arranged between the main pipe and the supply pipe, and the second valve is arranged between the main pipe and the receiving pipe.
7. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The pouring system also includes a heating box for heating the supply cylinder.
8. A material discharging system for high-purity oxygen cylinders as claimed in claim 7, characterized in that: The dumping system also includes a cooling box for cooling the receiving cylinder.
9. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The material dumping system also includes a waste gas recovery cylinder, and the waste gas recovery cylinder is connected to the material dumping pipeline through the venting pipeline.
10. A material discharging system for high-purity oxygen cylinders as claimed in claim 1, characterized in that: The first pressure detection component and the second pressure detection component both adopt vacuum pressure gauges.