Water supply and drainage system of energy-saving gas-fired boiler
By rationally configuring the water supply and drainage pipelines in energy-saving gas boilers, using high-temperature flue gas to heat the water supply, and optimizing the valve opening through the detection system, the problems of low boiler thermal efficiency and poor water quality are solved, and efficient energy saving and reduction are achieved. A safe and stable water supply and drainage system.
Patent Information
- Application Number
- CN202323387439.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-12
AI Technical Summary
The water supply and drainage system of the existing energy-saving gas boiler cannot effectively utilize high-temperature flue gas to heat the water, resulting in low thermal efficiency of the boiler and insufficient safety and stability of the water supply and drainage system, affecting the boiler water quality.
By rationally configuring the water supply and drainage pipelines of the boiler body, primary economizer, secondary energy economizer, and air preheater, designing continuous water supply pipelines and regular sewage drainage pipelines, using high-temperature flue gas to heat the water supply, and adjusting through the detection system Valve opening ensures water supply quality and drainage safety.
It improves the thermal efficiency of the boiler, ensures high water quality, improves the safety and stability of the water supply and drainage system, and achieves energy saving and emission reduction.
Smart Images

Figure CN221825386U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water supply and drainage of energy-saving gas boilers, in particular to a water supply and drainage system of an energy-saving gas boiler. Background Art
[0002] Boilers are commonly used equipment in industrial production. Their function is to heat water into steam to provide power for production. During the operation of the boiler, water supply and drainage are very important links, which directly affect the operating efficiency and safety of the boiler. The boiler water supply mainly consists of a deaerator tank, a water supply pump, a water supply pipeline, a water supply regulating valve, etc. The main function of the water supply is to replenish the water in the boiler and ensure the normal operation of the boiler. It has strict requirements on water quality, water quantity, and temperature. The boiler drainage system mainly consists of a drain valve, a continuous drain pipe, a periodic drain pipe, a water distribution pipe, etc. The main function of the drainage is to discharge the sewage in the boiler to ensure the cleanliness and safety of the boiler. It has strict requirements on the drainage cycle, drainage volume, and drainage method.
[0003] For energy-saving gas-fired boilers, it is necessary to fully consider the distribution of feedwater to the economizer, air preheater, and boiler itself to ensure that each heat exchanger fully utilizes the waste heat. Furthermore, it is necessary to consider the safety of wastewater drainage, such as continuous and periodic boiler blowdown, flue gas condensate, and water level gauges. Therefore, a water supply and drainage system for energy-saving gas-fired boilers is needed to ensure sufficient heat exchange between the feedwater pipeline and the high-temperature flue gas, improve the thermal efficiency of the boiler, and enhance the safety and stability of the water supply and drainage system. Utility Model Content
[0004] In response to the above problems, the utility model provides a water supply and drainage system for an energy-saving gas boiler. By rationally configuring the water supply and drainage pipelines of the boiler body, the first-level economizer, the second-level economizer, and the air preheater, the safety and stability of the water supply and drainage system are improved, the quality of the boiler water is ensured to be excellent, and the water supply pipeline and the high-temperature flue gas are fully exchanged for heat to recover the waste heat to improve the thermal efficiency of the boiler, thereby achieving energy saving and emission reduction.
[0005] Specifically, the utility model is achieved as follows:
[0006] A water supply and drainage system for an energy-saving gas boiler, comprising:
[0007] One end of the continuous water supply pipeline is connected to the boiler water supply main pipe, and the other end is connected to the air preheater and the lower heat exchanger of the first-stage economizer through the air preheater water supply three-way valve;
[0008] The air preheater water supply pipe is connected to the air preheater at one end and to the upper heat exchanger of the first-stage economizer at the other end;
[0009] The main feed water pipe of the boiler is connected to the three-way valve of the air preheater feed water at one end and to the lower heat exchanger of the first-stage economizer at the other end; the upper heat exchanger of the first-stage economizer is connected to the main feed water pipe of the boiler via a feed water branch; the water in the feed water pipe of the air preheater passes through the upper heat exchanger of the first-stage economizer and is then transported to the main feed water pipe of the boiler via the feed water branch;
[0010] A secondary economizer pipeline, comprising a secondary economizer water supply pipe and a secondary economizer water outlet pipe connected to the secondary economizer, wherein the secondary economizer water supply pipe is connected to the boiler normal temperature demineralized water pipe, and the secondary economizer water outlet pipe is connected to the boiler demineralized water return pipe;
[0011] Continuous blowdown pipe, one end of which is connected to the boiler body and the other end is connected to the continuous expansion tank;
[0012] The regular sewage discharge pipeline is connected to the boiler body, the fixed discharge expansion tank and the secondary economizer water supply pipe respectively.
[0013] Furthermore, the continuous water supply pipeline includes:
[0014] A continuous water supply main line, one end of which is connected to the boiler water supply main pipe, and the other end of which is connected to the air preheater water supply pipeline and the boiler main water supply pipeline respectively through the air preheater water supply three-way valve, on which a first stop valve, a second stop valve, a water supply three-way valve and an emergency shut-off valve are provided, and the water supply three-way valve and the emergency shut-off valve are located between the first stop valve and the second stop valve;
[0015] A continuous water supply bypass, one end of which is connected to the upstream pipeline of the first stop valve and the other end is connected to the downstream pipeline of the second stop valve, and a third stop valve is provided on the bypass;
[0016] The feed water circulation pipeline has one end connected to the boiler feed water circulation pipe and the other end connected to the feed water three-way valve, and is provided with a first check valve and a fourth stop valve.
[0017] Furthermore, a fifth stop valve is provided between the air preheater water feed three-way valve and the air preheater, and a sixth stop valve, a first pressure gauge, a first temperature gauge, a first temperature sensor, a first safety valve and a seventh stop valve are provided on the air preheater water feed pipeline.
[0018] Furthermore, the boiler main water supply pipeline is provided with a second check valve, a third check valve, an eighth stop valve and a first-stage economizer vent pipeline, and the water supply branch is located between the second check valve and the third check valve;
[0019] One end of the first-stage economizer vent pipeline is connected to the boiler main feed water pipeline, and the other end is connected to the atmosphere, and a ninth stop valve is provided on the vent pipeline.
[0020] Furthermore, the water supply branch is provided with a second pressure gauge, a second temperature gauge and a tenth stop valve.
[0021] Furthermore, a three-way regulating valve, a flow limiting valve and a third thermometer are provided on the water supply pipe of the secondary economizer. The three-way regulating valve is connected to the water outlet pipe of the secondary economizer. The water outlet pipe of the secondary economizer is provided with a third pressure gauge, a second safety valve, an electric switching valve, a second temperature limiter and a second temperature sensor.
[0022] Furthermore, the periodic sewage discharge pipeline is connected to the secondary economizer water supply pipe through the secondary economizer vent pipeline, and the secondary economizer vent pipeline is provided with a vent valve.
[0023] Furthermore, a continuous solenoid valve is provided on the continuous sewage discharge pipeline.
[0024] Furthermore, the emergency shut-off valve is a pneumatic control valve, which is connected to the air pressure pipe.
[0025] The working principle of this utility model:
[0026] Heating of normal temperature desalted water: Normal temperature desalted water enters the secondary economizer at the tail of the boiler through the secondary economizer water feed pipe and exchanges heat with the tail flue gas. After being heated, the normal temperature desalted water returns from the secondary economizer outlet pipe to the desalted water return pipe and then enters the deaerator.
[0027] Boiler feed water: Boiler feed water passes through the deaerator through the water supply main pipe and enters the continuous water supply pipeline. It passes through the air preheater water supply three-way electric regulating valve, passes through the boiler main feed water pipeline and the lower heat exchanger of the first-stage economizer, and flows to the air preheater. After the feed water enters the air preheater to heat the air, the water temperature drops. Then it enters the upper heat exchanger of the first-stage economizer and is heated by the flue gas. After that, it mixes with the boiler main feed water pipeline and enters the lower heat exchanger of the first-stage economizer to exchange heat with the flue gas before entering the boiler.
[0028] Continuous sewage discharge: When the conductivity detected by the conductivity detector on the boiler reaches the set upper limit, the continuous sewage discharge solenoid valve opens to carry out continuous sewage discharge to reduce the conductivity of the boiler water to ensure the quality of the boiler water. The continuously discharged sewage is connected to the continuous sewage expansion tank through the continuous sewage discharge pipeline to expand the capacity and reduce the pressure before discharge. When the conductivity reaches the set lower limit, the continuous sewage discharge solenoid valve is closed.
[0029] Regular sewage discharge: Regular sewage discharge mainly discharges impurities at the bottom of the boiler to ensure the quality of boiler water. The regular sewage discharge cycle is determined according to the actual operation of the boiler. The regular sewage is connected to the fixed sewage expansion tank through the regular sewage pipe to expand the capacity and reduce the pressure before being discharged.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] The energy-saving gas boiler water supply and drainage system provided by this utility model utilizes high-temperature flue gas to heat the boiler feed water, improving boiler thermal efficiency by recovering waste heat and achieving energy conservation and emission reduction. Furthermore, by effectively monitoring the feed water temperature and pressure, valve openings can be adjusted based on the test data. The design of both periodic and continuous wastewater drainage lines improves the safety and stability of the water supply and drainage system, ensuring high-quality boiler water. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 Schematic diagram of the water supply and drainage system of the energy-saving gas boiler in Example 1.
[0033] Reference numerals:
[0034] 11 - continuous water supply main line; 11a - first stop valve; 11b - water supply three-way valve; 11c - emergency shut-off valve; 11d - second stop valve; 12 - continuous water supply bypass; 12a - third stop valve; 13 - water supply circulation line; 13a - first check valve; 13b - fourth stop valve;
[0035] 2 - air preheater feed water three-way valve; 3 - air preheater; 31 - fifth stop valve; 32 - air preheater feed water pipeline; 32a - sixth stop valve; 32b - first pressure gauge; 32c - first thermometer; 32d - first temperature sensor; 32e - first safety valve; 32f - seventh stop valve;
[0036] 4 - Boiler main water feed line; 4a - Second check valve; 4b - Third check valve; 4c - Eighth stop valve; 4d - Ninth stop valve; 41 - Water feed branch; 41a - Second pressure gauge; 41b - Second thermometer; 41c - Tenth stop valve; 42 - First-stage economizer outlet pipe; 42a - Fourth thermometer;
[0037] 51 - Secondary economizer water supply pipe; 51a - Three-way regulating valve; 51b - Flow limiting valve; 51c - Third thermometer; 52 - Secondary economizer water outlet pipe; 52a - Third pressure gauge; 52b - Second safety valve; 52c - Electric on / off valve; 52d - Second temperature limiter; 52e - Second temperature sensor; 53 - Secondary economizer vent pipe; 53a - Vent valve;
[0038] 6-continuous sewage pipe; 6a-continuous solenoid valve; 6b-sprinkler valve;
[0039] 7-regular sewage discharge pipeline; 7a-fourth check valve; 7b-twelfth stop valve;
[0040] 8-Boiler body; 81-First-stage economizer; 82-Second-stage economizer; 83-Flue; 83-Flue gas bypass damper; 84-Chimney; 85-Conductivity detector; 86-Glass plate water level gauge; 87-Deaerator; 88-Fixed-row expansion tank; 89-Continuous-row expansion tank;
[0041] K-air compressor pipe; g-water supply pipe; g h - water circulation pipe; R- normal temperature desalted water pipe; R x - demineralized water return pipe; d p -Fixed row of pipes; p - continuous row of pipes; DETAILED DESCRIPTION
[0042] The present invention will be further described in detail below through specific implementations in conjunction with the accompanying drawings.
[0043] Example 1
[0044] like Figure 1 As shown, this embodiment provides a water supply and drainage system for an energy-saving gas boiler, including: a continuous water supply pipeline, an air preheater water supply pipeline 32, a boiler main water supply pipeline 4, a secondary economizer pipeline, a continuous sewage discharge pipeline 6 and a periodic sewage discharge pipeline 7, wherein one end of the continuous water supply pipeline is connected to the boiler's water supply main pipe g, and the other end is connected to the air preheater 3 and the boiler main water supply pipeline 4 through the air preheater water supply three-way valve 2, for supplying water to the boiler.
[0045] The continuous water supply pipeline includes: a continuous water supply main line 11, a continuous water supply bypass 12 and a water supply circulation pipeline 13. One end of the continuous water supply main line 11 is connected to the water supply main pipe g, and the other end is connected to the air preheater 3 and the boiler main water supply pipeline 4 respectively through the air preheater water supply three-way valve 2. It is provided with a first stop valve 11a, a second stop valve 11d, a water supply three-way valve 11b and an emergency shut-off valve 11c. The water supply three-way valve 11b and the emergency shut-off valve 11c are located between the first stop valve 11a and the second stop valve 11d and are connected to the water supply circulation pipeline 13. The other end of the water supply circulation pipeline 13 is connected to the water supply circulation pipe g. h The feed water three-way valve 11b is controlled by the boiler steam flow, boiler liquid level, and feed water flow to maintain a constant liquid level inside the boiler. The feed water circulation pipeline 13 is provided with a first check valve 13a and a fourth stop valve 13b. The feed water circulation pipeline 13 is connected to the feed water circulation pipe g. h The water flows to the deaerator 87 to ensure that there is water circulation in the continuous water supply pipeline when the boiler is replenished with water at a small flow rate, thereby preventing cavitation in the water supply pump.
[0046] The emergency shut-off valve 11c is a pneumatically controlled valve connected to the air pressure pipe K, which provides air pressure as power. The continuous water feed bypass 12 has one end connected to the upstream pipeline of the first shut-off valve 11a and the other end connected between the second shut-off valve 11d and the air preheater feedwater three-way valve 2. A third shut-off valve 12a is installed on it. If the feedwater three-way valve 11b fails, the first shut-off valve 11a and the second shut-off valve 11d before and after it can be closed, and the third shut-off valve 12 of the bypass can be opened to manually feed water to the boiler.
[0047] The outlet water of the continuous water supply pipeline is divided into two paths by the air preheater water supply three-way valve 2, one path flows to the lower heat exchanger of the first-stage economizer 81, and the other path flows to the air preheater 3.
[0048] A fifth stop valve 31 is provided between the air preheater water supply three-way valve 2 and the air preheater 3. The air preheater 3 is connected to the upper heat exchanger of the first-level energy saver 81 through the air preheater water supply pipeline 32, on which a sixth stop valve 32a, a first pressure gauge 32b, a first temperature gauge 32c, a first temperature sensor 32d, a first safety valve 32e and a seventh stop valve 32f are provided. The first pressure gauge 32b is used to detect the water pressure in the preheater water supply pipeline 32, and the first temperature sensor 32d is used to detect the temperature in the preheater water supply pipeline 32. The air preheater water supply three-way valve 2 is an electrically adjustable valve, and its opening is determined by the temperature in the preheater water supply pipeline 32.
[0049] One end of the boiler main feedwater pipeline 4 is connected to the air preheater feedwater three-way valve 2, and the other end is connected to the lower heat exchanger of the first-stage economizer 81. A second check valve 4a, a third check valve 4b, and an eighth stop valve 4c are installed on the pipeline. The second check valve 4a and the third check valve 4b are used to prevent backflow of water from the upper heat exchanger of the first-stage economizer 81. The upper heat exchanger of the first-stage economizer 81 is connected between the second check valve 4a and the third check valve 4b via a feedwater branch line 41. After entering the air preheater 3 to heat the air, the water temperature drops. The water then enters the upper heat exchanger of the first-stage economizer 81, where it is heated by the flue gas and mixed with the boiler main feedwater pipeline 4. Together, the water enters the lower heat exchanger of the first-stage economizer 81, exchanges heat with the flue gas, and then enters the boiler body 8. The water feed branch 41 is equipped with a second pressure gauge 41a, a second thermometer 41b, and a tenth shut-off valve 41c. The second pressure gauge 41a is used to detect the water pressure within the water feed branch 41, and the second thermometer 41b is used to display the temperature within the water feed branch 41. The lower heat exchanger of the first-stage economizer 81 is connected to the boiler body 8 via the first-stage economizer outlet pipe 42. The first-stage economizer outlet pipe 42 is equipped with a fourth thermometer 42a, which is used to display the final boiler feed water temperature.
[0050] A first-stage economizer venting pipe is provided on the boiler main feed water pipe (4), which is connected to the outside atmosphere and is provided with a ninth stop valve (4d). When residual air in the boiler main feed water pipe (4) blocks the flow of boiler feed water, the ninth stop valve (4d) is opened to release the air in the pipe, thereby eliminating the air blockage phenomenon.
[0051] The secondary economizer pipeline includes a secondary economizer water supply pipe 51 and a secondary economizer outlet pipe 52 connected to the secondary economizer 82. The secondary economizer water supply pipe 51 is connected to the boiler normal temperature desalted water pipe R. Normal temperature desalted water passes through the normal temperature desalted water pipe R and the secondary economizer water supply pipe 51 into the secondary economizer 82 at the tail of the boiler and enters heat exchange with the tail flue gas. After being heated, the normal temperature desalted water returns to the desalted water return pipe R through the secondary economizer outlet pipe 52. x Then it enters the deaerator 87, and then enters the water supply main pipe g from the deaerator 87 to be used as boiler water.
[0052] The secondary economizer water supply pipe 51 is equipped with a three-way regulating valve 51a, a flow limiting valve 51b, and a third thermometer 51c. The three-way regulating valve 51a is connected to the secondary economizer water outlet pipe 52, which is equipped with a third pressure gauge 52a, a second safety valve 52b, an electric on-off valve 52c, a second temperature limiter 52d, and a second temperature sensor 52e. When the outlet water temperature is too high or the water flow rate is too low, the three-way regulating valve 51a stops the water from entering the secondary economizer 82. The desalted water passes through the three-way regulating valve 51a, bypassing the secondary economizer 82 and returning to the deaerator 87. Simultaneously, the electric on-off valve 52c on the secondary economizer water outlet pipe 52 closes, and the flue gas bypass damper 83a inside the secondary economizer 82 closes, preventing the flue gas from exchanging heat with the heat exchanger within the secondary economizer 82. The three-way regulating valve 51a is controlled by the outlet water temperature. The outlet water temperature controls the opening of the three-way regulating valve 51a, regulating the inflow of water to exchange heat with the flue gas and ensuring a constant outlet water temperature.
[0053] One end of the continuous sewage pipe 6 is connected to the boiler body 8, and the other end is connected to the continuous expansion tank 89. It is equipped with a continuous sewage solenoid valve 6a. When the conductivity detected by the conductivity detector 85 on the boiler body 8 reaches the set upper limit, the continuous sewage solenoid valve 6a opens, and continuous sewage is discharged to reduce the conductivity of the boiler water and ensure the quality of the boiler water. The continuous sewage is connected to the continuous expansion tank 89 for expansion and pressure reduction before being discharged. When the conductivity reaches the set lower limit, the continuous sewage solenoid valve 6a closes. Two sets of on-site glass plate water level gauges 86 on the boiler body 8 are connected to the continuous sewage pipe 6, and the water used to flush the glass plate water level gauges 86 is connected to the continuous sewage pipe 1. p discharge.
[0054] The regular sewage discharge pipeline 7 is connected to the boiler fixed discharge expansion tank 88, the secondary economizer water supply pipe 51 and the fixed discharge port at the bottom of the boiler body 8 respectively. The two fixed discharge ports at the bottom of the boiler body 8 are equipped with two sets of regular sewage discharge valves, consisting of a ball valve and a stop valve. Regular sewage discharge mainly discharges impurities at the bottom of the boiler body 8 to ensure the quality of boiler water. The regular sewage discharge cycle is determined according to the actual operation of the boiler. The regular sewage is discharged through the fixed discharge pipe l p Connect to a fixed sewage expansion tank to expand the capacity and reduce the pressure before discharge.
[0055] The regular sewage pipe 7 is connected to the secondary economizer water supply pipe 51 through the secondary economizer vent pipe 53. The secondary economizer vent pipe 53 is provided with a vent valve 53a. When it is necessary to inspect and drain the water in the vent pipe, open the vent valve 53a and connect it to the regular drainage pipe d. p .
[0056] The above examples are used to illustrate the present invention, which are only used to help understand the present invention and are not intended to limit the present invention. Those skilled in the art of the present invention can make some simple deductions, modifications or substitutions based on the concept of the present invention.
Claims
1. A water supply and drainage system for an energy-saving gas boiler, characterized in that: include: A continuous water supply pipeline, one end of which is connected to the boiler water supply main pipe (g), and the other end of which is connected to the air preheater (3) and the lower heat exchanger of the first-stage economizer (81) respectively through the air preheater water supply three-way valve (2); An air preheater water supply pipeline (32), one end of which is connected to the air preheater (3), and the other end of which is connected to the upper heat exchanger of the first-stage economizer (81); The main boiler water supply pipeline (4) has one end connected to the air preheater water supply three-way valve (2) and the other end connected to the lower heat exchanger of the primary economizer (81); the upper heat exchanger of the primary economizer (81) is connected to the main boiler water supply pipeline (4) via a water supply branch (41); water in the air preheater water supply pipeline (32) passes through the upper heat exchanger of the primary economizer (81) and is then transported to the main boiler water supply pipeline (4) via the water supply branch (41); The secondary economizer pipeline comprises a secondary economizer water supply pipe (51) and a secondary economizer water outlet pipe (52) connected to the secondary economizer (82), wherein the secondary economizer water supply pipe (51) is connected to a boiler normal temperature demineralized water pipe (R), and the secondary economizer water outlet pipe (52) is connected to a boiler demineralized water return pipe (R x )connect; A continuous sewage discharge pipeline (6), one end of which is connected to the boiler body (8) and the other end of which is connected to the continuous expansion container (89); The regular sewage discharge pipeline (7) is respectively connected to the boiler body (8), the fixed discharge expansion container (88) and the secondary economizer water supply pipe (51).
2. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: The continuous water supply pipeline comprises: A continuous water supply main line (11), one end of which is connected to the boiler water supply main pipe (g), and the other end of which is respectively connected to the air preheater water supply pipeline (32) and the boiler main water supply pipeline (4) through the air preheater water supply three-way valve (2), and is provided with a first stop valve (11a), a second stop valve (11d), a water supply three-way valve (11b) and an emergency shut-off valve (11c), wherein the water supply three-way valve (11b) and the emergency shut-off valve (11c) are located between the first stop valve (11a) and the second stop valve (11d); A continuous water supply bypass (12), one end of which is connected to the upstream pipeline of the first stop valve (11a), and the other end of which is connected to the downstream pipeline of the second stop valve (11d), and a third stop valve (12a) is provided on the bypass; The feed water circulation pipeline (13) has one end connected to the boiler feed water circulation pipe (g h ) and the other end is connected to a water supply three-way valve (11b), on which a first check valve (13a) and a fourth stop valve (13b) are provided.
3. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: A fifth stop valve (31) is provided between the air preheater water supply three-way valve (2) and the air preheater (3), and a sixth stop valve (32a), a first pressure gauge (32b), a first temperature gauge (32c), a first temperature sensor (32d), a first safety valve (32e) and a seventh stop valve (32f) are provided on the air preheater water supply pipeline (32).
4. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: The boiler main water supply pipeline (4) is provided with a second check valve (4a), a third check valve (4b), an eighth stop valve (4c) and a primary economizer vent pipeline, and the water supply branch (41) is located between the second check valve (4a) and the third check valve (4b); One end of the primary economizer vent pipeline is connected to the boiler main feed water pipeline (4), and the other end is connected to the atmosphere, and a ninth stop valve (4d) is provided on the pipeline.
5. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: The water supply branch (41) is provided with a second pressure gauge (41a), a second temperature gauge (41b) and a tenth stop valve (41c).
6. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: A three-way regulating valve (51a), a flow limiting valve (51b) and a third temperature gauge (51c) are provided on the secondary economizer water supply pipe (51); the three-way regulating valve (51a) is connected to the secondary economizer water outlet pipe (52); and the secondary economizer water outlet pipe (52) is provided with a third pressure gauge (52a), a second safety valve (52b), an electric switch valve (52c), a second temperature limiter (52d) and a second temperature sensor (52e).
7. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: The periodic sewage discharge pipeline (7) is connected to the secondary economizer water supply pipe (51) through the secondary economizer vent pipeline (53), and the secondary economizer vent pipeline (53) is provided with a vent valve (53a).
8. The water supply and drainage system of the energy-saving gas boiler according to claim 1, characterized in that: The continuous sewage discharge pipeline (6) is provided with a continuous electromagnetic valve (6a).
9. The water supply and drainage system of the energy-saving gas boiler according to claim 2, characterized in that: The emergency shut-off valve (11c) is a pneumatic control valve connected to the air pressure pipe (K).