Architectural engineering plumb bob

By designing the installation box and the meshing gear structure, the storage and extension process of the falling wire is simplified, the problem of numerous falling wire operations in the existing technology is solved, and the work efficiency and measurement accuracy of the construction project are improved.

CN221826180UActive Publication Date: 2024-10-11HUBEI NENGRUI ELECTRICAL TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323537098.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-11
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

Existing construction engineering wire fall has many steps when it is necessary to extend or store the wire fall, which affects the efficiency of the project.

Method used

A construction engineering line pendant including a mounting box, a scale, a measuring structure, an adjusting structure and a meshing gear is designed. The measuring structure is fixed through the installation box, and the rotating shaft and meshing gear are used to realize the storage and extension of the pendant rope at the same speed. The adjustment structure facilitates the adjustment of the length of the falling rope.

Benefits of technology

It simplifies the storage and extension process of falling wires, improves work efficiency, reduces the stacking of falling wires, and ensures the accuracy and efficiency of verticality measurement in construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221826180U_ABST
    Figure CN221826180U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a constructional engineering line pendant which comprises an installation box. A scale; the measuring structure comprises two falling ropes, and constructional engineering vertical detection is carried out through the measuring structure; the number of the adjusting structures is two, and the measurement height can be conveniently adjusted through the two adjusting structures; according to the device, two rotating shafts are respectively fixed through four rotating holes formed in the mounting box, two falling ropes are respectively mounted and wound through the two rotating shafts, and the falling ropes are pulled to be vertically downward through a balancing weight, so that perpendicularity measurement of constructional engineering is realized, in the using process, the corresponding rotating shafts are rotated by rotating a holding rod, and the perpendicularity of the constructional engineering is measured. The two rotating shafts rotate together through mutual cooperation of the two meshing gears, so that the two pendant ropes extend in the storage box at the same speed, and meanwhile, the two fixing plates slide on the corresponding pendant ropes to achieve storage of the pendant ropes with different lengths, so that the pendant ropes can be adjusted conveniently, and the height can be measured conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a plumb bob for construction engineering. Background Art

[0002] In the field of construction engineering technology, a plumb line is a device for measuring verticality by using a counterweight to pull a plumb line vertically downward under the force of gravity, thereby straightening the plumb line. Using a plumb line in the construction process can effectively ensure the quality of the project. Therefore, the present application discloses a plumb line for construction engineering, which is used to provide a device for measuring verticality during the construction process.

[0003] According to the utility model disclosed in patent publication number CN217005839U, a plumb bob for construction engineering includes a shell, a storage roller located at a middle position inside the shell, and a through rod located at the top of one side of the shell. The shell includes a storage groove arranged inside the shell, and a handle is arranged at a middle position on the top of the shell. Limit plates are arranged at both ends of the outer side of the storage roller, and a rotating shaft that penetrates through both ends of the shell is arranged at a middle position inside the storage roller, and a rotating handle is arranged at one end of the rotating shaft. The rotating shaft and the shell can be rotated by a bearing, and the storage roller and the rotating shaft are fixed by a mounting hole to realize synchronous rotation of the rotating shaft and the storage roller. The rotating shaft and the storage roller are driven to rotate by rotating the rotating handle, so that the plumb line can be wound around the outer side of the storage roller for storage, thereby storing the plumb line in the storage groove.

[0004] Although the above-mentioned device proposes a device for measuring verticality in the field of construction engineering, when the plumb line needs to be extended or stored, the device needs to rotate the rotating shaft and the storage roller by rotating the bearing, and then the plumb line is stored. The use of the device involves many steps, which may have a certain impact on the efficiency of the construction project. Utility Model Content

[0005] 1. Technical issues to be resolved

[0006] In view of the deficiencies in the prior art, the utility model provides a plumb line for construction engineering to solve the problem in the background art that it is troublesome to extend or store the plumb line.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a plumb bob for construction engineering, comprising: an installation box; a scale: the scale is fixedly connected to the bottom end of the installation box; a measuring structure: the measuring structure is installed in the installation box, the measuring structure includes two plumb ropes, and the vertical detection of the construction engineering is performed through the measuring structure; an adjustment structure: there are two adjustment structures, and the two adjustment structures are respectively installed on the two plumb ropes, and the measuring height can be easily adjusted through the two adjustment structures.

[0009] By adopting the above technical solution, the measuring structure is installed through the installation box, and the verticality of the construction project is measured through the measuring structure. The two adjustment structures facilitate the folding of the two pendants, thereby adjusting the length of the pendants and reducing the stacking of the stored or stretched pendants, and the verticality comparison is carried out through a ruler.

[0010] Optionally, the measuring structure also includes two rotating shafts and two meshing gears. The mounting box is penetrated by four rotating holes. The two rotating shafts are rotatably connected in the corresponding two rotating holes. The two meshing gears are respectively mounted on the two rotating shafts. The two meshing gears are meshed with each other. The two pendant ropes are respectively fixed and wound around the two rotating shafts. Two extension openings are provided at the bottom end of the mounting box. Counterweights are installed on the two pendant ropes. Limit blocks are installed on the ends of the two pendant ropes away from the rotating shafts.

[0011] By adopting the above technical solution, the rotating shaft is rotated to drive the corresponding meshing gear to rotate, and the two meshing gears cooperate with each other to keep the two rotating shafts rotating at the same speed, so that the two rotating shafts can simultaneously store and extend the two pendant ropes, and the counterweight block is used to pull the pendant rope vertically downward to achieve the verticality measurement of the construction project, and the limit block is used to achieve the limit, so as to prevent the counterweight block from falling off the pendant rope.

[0012] Optionally, a holding rod is fixedly connected to both rotating shafts.

[0013] By adopting the above technical solution, it is convenient for the staff to rotate the rotating shaft by holding the rod.

[0014] Optionally, the adjustment structure includes two fixing plates and bolts, each of the two fixing plates is provided with a first through-groove and a second through-groove, anti-slip pads are fixedly connected in the two first through-groove and the two second through-groove, and each of the two fixing plates is provided with a threaded hole, the two fixing plates cooperate with each other so that the two first through-groove and the two second through-groove cooperate with each other to form two hole bodies, and the bolt is threadedly connected in the two threaded holes.

[0015] By adopting the above technical solution, the two fixing plates are connected by bolts, so that the two first penetration grooves and the two second penetration grooves are in contact and matched to form a hole body, and the installation is achieved by passing the falling rope through the two hole bodies in sequence. During use, the two fixing plates are slid on the falling rope to store different parts of the falling rope, thereby achieving the length adjustment of the falling rope.

[0016] Optionally, two partitions are fixedly connected to the bottom end of the installation box.

[0017] By adopting the above technical solution, the pendant rope is isolated from the external environment as much as possible through the partition, thereby reducing the influence of the external environment on the pendant rope.

[0018] (III) Beneficial effects

[0019] Compared with the prior art, the utility model provides a plumb line for construction engineering, which has the following beneficial effects:

[0020] The plumb bob for construction engineering fixes two rotating shafts respectively through four rotating holes opened on the installation box, installs and winds two plumb ropes through the two rotating shafts respectively, and pulls the plumb ropes vertically downward through the counterweight block, thereby realizing the verticality measurement of the construction engineering. During use, the corresponding rotating shaft is rotated by rotating the holding rod, and the two rotating shafts are rotated together through the mutual cooperation between the two meshing gears, so that the two plumb ropes keep the storage box extending at the same rate, and at the same time, the two fixing plates are slid on the corresponding plumb ropes to realize the storage of plumb ropes of different lengths, so as to adjust the plumb ropes and measure the height easily. The device is convenient for storing and extending the plumb ropes, thereby improving the work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the three-dimensional structure of the main view of the utility model;

[0022] Figure 2 It is a schematic diagram of the three-dimensional structure of the utility model when viewed from above;

[0023] Figure 3 It is a three-dimensional structural schematic diagram of the utility model from the rear;

[0024] Figure 4 For this utility model Figure 1 A schematic diagram of the three-dimensional structure enlarged at the A mark in the middle;

[0025] In the figure: 1. Installation box; 2. Scale; 3. Falling rope; 4. Rotating shaft; 5. Meshing gear; 6. Counterweight; 7. Limit block; 8. Holding rod; 9. Fixing plate; 10. Bolt; 11. Anti-slip pad; 12. Partition. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Example

[0028] See also Figures 1 to 4A plumb line for construction engineering comprises: an installation box 1; a scale 2: the scale 2 is fixedly connected to the bottom end of the installation box 1; a measuring structure: the measuring structure is installed in the installation box 1, the measuring structure comprises two pendant ropes 3, and the measuring structure is used to perform vertical detection of the construction engineering; an adjustment structure: there are two adjustment structures, the two adjustment structures are respectively installed on the two pendant ropes 3, the measuring height is conveniently adjusted through the two adjustment structures, the measuring structure is installed through the installation box 1, the verticality measurement of the construction engineering is performed through the measuring structure, and the two adjustment structures are conveniently folded through the two pendant ropes 3, so as to adjust the length of the pendant ropes 3 and reduce the code of storing or stretching the pendant ropes 3 The measuring structure further comprises two rotating shafts 4 and two meshing gears 5. Four rotating holes are passed through the mounting box 1. The two rotating shafts 4 are rotatably connected in the corresponding two rotating holes. The two meshing gears 5 are respectively sleeved on the two rotating shafts 4. The two meshing gears 5 mesh with each other. The two pendant ropes 3 are respectively fixed and wound around the two rotating shafts 4. Two extension ports are provided at the bottom end of the mounting box 1. Counterweights 6 are installed on the two pendant ropes 3. Limit blocks 7 are installed at the ends of the two pendant ropes 3 away from the rotating shafts 4. The rotating shafts 4 are rotated to drive the corresponding meshing gears 5 to rotate. The two meshing gears 5 are matched with each other. The two rotating shafts 4 are combined to keep the two rotating shafts 4 rotating at the same speed, so that the two rotating shafts 4 can store and extend the two pendant ropes 3 at the same time, and the pendant ropes 3 are pulled vertically downward by the counterweight block 6 to realize the verticality measurement of the construction project. The limiting block 7 is used to limit the counterweight block 6 to prevent the counterweight block 6 from falling off the pendant rope 3. The two rotating shafts 4 are fixedly connected with a holding rod 8, which is convenient for the staff to rotate the rotating shaft 4. The adjustment structure includes two fixing plates 9 and bolts 10. The two fixing plates 9 are provided with a first penetration groove and a second penetration groove. The two first penetration grooves and the two second penetration grooves are fixedly connected with anti-slip pads 11, and the two fixing plates 9 are provided with threaded holes. The fixing plates 9 cooperate with each other so that the two first penetration grooves and the two second penetration grooves cooperate with each other to form two hole bodies. The bolts 10 are threadedly connected in the two threaded holes. The two fixing plates 9 are connected by the bolts 10, so that the two first penetration grooves and the two second penetration grooves contact and cooperate to form a hole body. The installation is achieved by passing the pendant rope 3 through the two hole bodies in sequence. During use, different parts of the pendant rope 3 are stored by sliding the two fixing plates 9 on the pendant rope 3, thereby achieving the length adjustment of the pendant rope 3. Two partitions 12 are fixedly connected to the bottom end of the installation box 1, and the partitions 12 are used to isolate the pendant rope 3 from the external environment as much as possible, thereby reducing the impact of the external environment on the pendant rope 3.

[0029] To sum up, the working principle and working process of the plumb line for construction projects are as follows: when in use, the device is moved to a suitable position, and the two rotating shafts 4 are fixed respectively through the four rotating holes opened on the installation box 1, and the two pendant ropes 3 are installed and wound respectively through the two rotating shafts 4, and the pendant ropes 3 are pulled vertically downward by the counterweight block 6, so as to realize the verticality measurement of the construction project. During use, the corresponding rotating shaft 4 is rotated by rotating the holding rod 8, and the two rotating shafts 4 are rotated together through the mutual cooperation between the two meshing gears 5, so that the two pendant ropes 3 keep the storage box extending at the same rate, and at the same time, the two fixing plates 9 are slid on the corresponding pendant ropes 3 to realize the storage of pendant ropes 3 of different lengths, so as to adjust the pendant ropes 3 and measure the height.

[0030] The above embodiments only express the specific implementation methods of the utility model, and the description is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the utility model, which all belong to the protection scope of the utility model.

Claims

1. A plumb bob for construction engineering, characterized in that: include: Installation box (1); Scale (2): the scale (2) is fixedly connected to the bottom end of the installation box (1); Measuring structure: the measuring structure is installed in the installation box (1), the measuring structure comprises two pendant ropes (3), and vertical detection of the construction project is carried out through the measuring structure; Adjustment structure: There are two adjustment structures, which are respectively installed on two pendant ropes (3). The measurement height can be adjusted conveniently through the two adjustment structures.

2. A plumb bob for construction engineering according to claim 1, characterized in that: The measuring structure also includes two rotating shafts (4) and two meshing gears (5). The installation box (1) is penetrated with four rotating holes. The two rotating shafts (4) are both rotatably connected in the corresponding two rotating holes. The two meshing gears (5) are respectively sleeved on the two rotating shafts (4). The two meshing gears (5) are meshed with each other. The two pendant ropes (3) are respectively fixed and wound on the two rotating shafts (4). The bottom end of the installation box (1) is provided with two extension openings. The two pendant ropes (3) are both installed with counterweights (6). The ends of the two pendant ropes (3) away from the rotating shafts (4) are both installed with limit blocks (7).

3. A plumb bob for construction engineering according to claim 2, characterized in that: The two rotating shafts (4) are both fixedly connected with a holding rod (8).

4. A plumb bob for construction engineering according to claim 1, characterized in that: The adjustment structure comprises two fixing plates (9) and a bolt (10), the two fixing plates (9) are each provided with a first through-groove and a second through-groove, the two first through-groove and the two second through-groove are each fixedly connected with an anti-slip pad (11), and the two fixing plates (9) are each provided with a threaded hole, the two fixing plates (9) cooperate with each other so that the two first through-groove and the two second through-groove cooperate with each other to form two hole bodies, and the bolt (10) is threadedly connected in the two threaded holes.

5. A plumb bob for construction engineering according to claim 1, characterized in that: Two partitions (12) are fixedly connected to the bottom end of the installation box (1).