New and old highway pavement splicing structure

By arranging specific structural layers and reinforcements at the joint between the old and new highways, the problem of pavement cracks caused by the difference in settlement between the old and new roads is solved, vehicle traffic safety is improved, maintenance costs are reduced, and sustainable development of the highway is achieved.

CN221837370UActive Publication Date: 2024-10-15QINGDAO HUALU HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420863741.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-10-15
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

After the expansion construction of the old and new highway pavements, longitudinal cracks appeared on the pavement due to settlement differences, which affected vehicle traffic safety and increased maintenance costs.

Method used

A new and old highway pavement splicing structure is adopted. A gravel layer, gravel layer, water stabilizing layer, geogrid, concrete layer, reinforcement and asphalt layer are installed in the splicing groove, and reinforced anti-cracking cloth is laid at the splicing joint. Reinforcement with connectors prevents settlement differences between old and new pavement.

Benefits of technology

It can effectively prevent the difference in settlement between old and new road surfaces, ensure road surface smoothness, improve vehicle traffic safety, reduce highway maintenance costs, and provide guarantee for the sustainable development of highways.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837370U_ABST
    Figure CN221837370U_ABST
Patent Text Reader

Abstract

The utility model discloses a new and old highway pavement splicing structure which comprises a splicing groove, a rock ballast layer is arranged at the bottom of an inner cavity of the splicing groove, a rubble layer is arranged at the top of the rock ballast layer, a water stable layer is arranged at the top of the rubble layer, and two symmetrical geogrids are arranged at the top of the water stable layer. And a concrete layer is arranged at the top of the cement stable layer. The grout geogrid is laid on the top of the cement stable layer, the first reinforcing pieces are arranged on the two sides of the concrete layer and fixed to the inner walls of the splicing grooves through bolts, the second reinforcing pieces are placed on the top of the concrete layer, and the second reinforcing pieces, the first reinforcing pieces and the concrete layer are fixed through bolts. And finally, the reinforced anti-cracking cloth is laid on the top of the asphalt layer II, so that the purposes of reinforcing the spliced part through the connecting piece, avoiding large settlement between the new pavement and the old pavement and ensuring safe passage of vehicles on the pavement can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of new and old highway pavement splicing, in particular to a new and old highway pavement splicing structure. Background Art

[0002] With the continuous growth of car ownership and the continuous expansion of passenger and freight volume, the existing road network is facing huge bearing pressure. Many roads built earlier can no longer cope with the growing traffic demand, so widening and reconstruction of the original roads has become a direct and effective solution. During the highway expansion construction process, the splicing of the various structural layers of the new and old pavement is particularly important.

[0003] However, after the new and old pavement were spliced ​​together, there was a significant difference in settlement between the expanded and old pavement due to the different construction periods. The old roadbed had a relatively small settlement after long-term use, while the expanded roadbed had a larger settlement in the later period due to a shorter construction period. This uneven settlement can easily lead to longitudinal cracks on the road surface after the highway is opened to traffic, which not only affects the safety of vehicle traffic, but also increases the maintenance cost of the highway.

[0004] Therefore, we need a new and old road pavement splicing structure, which can reinforce the splicing points through connectors, so as to effectively prevent excessive settlement differences between the new and old road surfaces, ensure the flatness of the road surface, improve the safety of vehicle traffic, and reduce the maintenance cost of the road, providing strong guarantees for the sustainable development of the road. Utility Model Content

[0005] The utility model aims to provide a new and old road pavement splicing structure, which can reinforce the splicing part through connecting pieces to avoid large settlement between the new and old road surfaces, thereby ensuring the safe passage of road vehicles and solving the above-mentioned background technical problems.

[0006] The utility model solves the above-mentioned technical problem with the following technical solutions: a new and old highway pavement splicing structure, comprising a splicing groove, a slag layer is arranged at the bottom of the inner cavity of the splicing groove, a crushed stone layer is arranged at the top of the slag layer, a water-stabilizing layer is arranged at the top of the crushed stone layer, two symmetrical geogrids are arranged at the top of the water-stabilizing layer, a concrete layer is arranged at the top of the water-stabilizing layer, reinforcement members 1 are arranged on both sides of the concrete layer, two symmetrical connecting plates are arranged on the top of the concrete layer, and clamps are welded on the opposite sides of the two connecting plates, and the clamps are matched with the top of the reinforcement member 1, and two identical bolts are penetrated on the surfaces of the reinforcement member 1 and the reinforcement member 2, and the reinforcement member 1 is fixedly connected to the new and old pavements on both sides of the splicing groove by bolts, and the reinforcement member 2 is fixedly connected to the concrete layer and the reinforcement member 1 by bolts, an asphalt layer 1 is arranged on the top of the concrete layer, an asphalt layer 2 is arranged on the top of the asphalt layer 1, and two symmetrical reinforced anti-cracking cloths are arranged on the top of the asphalt layer 2, and the reinforced anti-cracking cloths are fitted with the new and old pavements on both sides of the splicing groove, and an asphalt pavement is arranged on the top of the asphalt layer 2.

[0007] Preferably, both sides of the asphalt layer 1 and the asphalt layer 2 are provided with vertical waterproof stickers, and the vertical waterproof stickers are in contact with the new and old road surfaces on both sides of the splicing groove.

[0008] Preferably, the reinforcement member 1 is T-shaped, the bolts on the left side of the reinforcement member 1 pass through the right side of the reinforcement member 1 and are threadedly connected to the new and old pavements on both sides of the splicing groove, and the bolts on the top of the reinforcement member 1 pass through the bottom of the reinforcement member 1 and are threadedly connected to the new and old pavements on both sides of the splicing groove.

[0009] Preferably, the clamp is N-type, the bottom of the clamp is matched with the top of the reinforcement piece, the bolt on the top of the connecting plate passes through the connecting plate and is threadedly connected to the concrete layer, and the bolt on the left side of the clamp passes through the clamp and reinforcement piece and is threadedly connected with a nut.

[0010] Preferably, the splicing groove is opened between the new road surface and the old road surface, both sides of the inner cavity of the splicing groove are stepped, and the contact surface between the concrete layer and the new and old road surfaces is sprayed with cement slurry.

[0011] Preferably, the contact surfaces of the asphalt layer 1 and the asphalt layer 2 with the new and old road surfaces are sprayed with hot asphalt, and the bottom of the reinforcement member 2 is in contact with the top of the concrete layer.

[0012] The beneficial effects of the utility model are:

[0013] 1. The utility model lays the slurry geogrid on the top of the water-stable layer, sets the reinforcement member 1 on both sides of the concrete layer, fixes the reinforcement member 1 on the inner wall of the splicing groove by bolts, places the reinforcement member 2 on the top of the concrete layer, fixes the reinforcement member 2 with the reinforcement member 1 and the concrete layer by bolts, and finally lays the reinforced anti-cracking cloth on the top of the asphalt layer 2, so as to achieve the purpose of reinforcing the splicing part through the connecting piece, avoiding large settlement between the new and old pavements, and ensuring the safe passage of vehicles on the pavement;

[0014] 2. The utility model sets the facade waterproof sticker. Before setting the asphalt layer 1 and the asphalt layer 2, the facade waterproof sticker is fixed on the contact surface between the asphalt layer 1, the asphalt layer 2 and the inner wall of the splicing groove, so as to avoid leakage at the connection between the asphalt layer 1, the asphalt layer 2 and the inner wall of the splicing groove, thereby ensuring the anti-seepage effect at the connection between the asphalt layer 1, the asphalt layer 2 and the inner wall of the splicing groove. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] in:

[0016] Figure 1 It is a front view schematic diagram of an embodiment of the utility model;

[0017] Figure 2 This is a structural diagram of a front view cross section of an embodiment of the utility model;

[0018] Figure 3 This is an embodiment of the utility model Figure 2 A partial enlarged view of point A;

[0019] Figure 4 This is a schematic diagram of the disassembly of the reinforcement structure of an embodiment of the utility model.

[0020] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0021] 1. Splicing groove, 2. Slag layer, 3. Gravel layer, 4. Water-stabilizing layer, 5. Geogrid, 6. Concrete layer, 7. Reinforcement part one, 8. Reinforcement part two, 81. Connecting plate, 82. Clips, 9. Bolts, 10. Asphalt layer one, 11. Asphalt layer two, 12. Reinforced anti-cracking cloth, 13. Asphalt pavement, 14. Facade waterproofing sticker. DETAILED DESCRIPTION

[0022] Hereinafter, embodiments of the new and old highway pavement splicing structure of the present invention will be described with reference to the accompanying drawings. Example 1

[0023] Figure 1-4The utility model shows a new and old road pavement splicing structure of an embodiment of the utility model, which comprises: a splicing groove 1, the splicing groove 1 is opened between the new road surface and the old road surface, the two sides of the inner cavity of the splicing groove 1 are stepped, the contact surface of the concrete layer 6 and the new and old road surfaces is sprayed with cement slurry, the bottom of the inner cavity of the splicing groove 1 is provided with a slag layer 2, the top of the slag layer 2 is provided with a crushed stone layer 3, the top of the crushed stone layer 3 is provided with a water-stable layer 4, the top of the water-stable layer 4 is provided with two symmetrical geogrids 5, the top of the water-stable layer 4 is provided with a concrete layer 6, and the two sides of the concrete layer 6 are provided with a symmetrical geogrid 5. A reinforcing member 7 is provided on both sides, and the reinforcing member 7 is T-shaped. The bolt 9 on the left side of the reinforcing member 7 penetrates to the right side of the reinforcing member 7 and is threadedly connected to the new and old pavements on both sides of the splicing groove 1. The bolt 9 on the top of the reinforcing member 7 penetrates to the bottom of the reinforcing member 7 and is threadedly connected to the new and old pavements on both sides of the splicing groove 1. Two symmetrical connecting plates 81 are provided on the top of the concrete layer 6. A clamp 82 is welded on the opposite side of the two connecting plates 81. The clamp 82 is adapted to the top of the reinforcing member 7. The surfaces of the reinforcing member 7 and the reinforcing member 8 are Two identical bolts 9 are passed through each of the two reinforcing members 17, and the reinforcing member 17 is fixedly connected to the new and old pavements on both sides of the splicing groove 1 by the bolts 9. The reinforcing member 28 is fixedly connected to the concrete layer 6 and the reinforcing member 17 by the bolts 9. An asphalt layer 10 is arranged on the top of the concrete layer 6, and both sides of the asphalt layer 10 and the asphalt layer 2 11 are provided with a facade waterproofing sticker 14, and the facade waterproofing sticker 14 is fitted with the new and old pavements on both sides of the splicing groove 1. By setting the facade waterproofing sticker 14, before setting the asphalt layer 10 and the asphalt layer 2 11, the facade waterproofing sticker 14 is fixedly fixed to the concrete layer 6 and the new and old pavements on both sides of the splicing groove 1. It is fixed on the contact surface between asphalt layer 10, asphalt layer 2 11 and the inner wall of the splicing groove 1 to avoid leakage at the connection between asphalt layer 10, asphalt layer 2 11 and the inner wall of the splicing groove 1, ensuring the anti-seepage effect at the connection between asphalt layer 10, asphalt layer 2 11 and the inner wall of the splicing groove 1. An asphalt layer 2 11 is arranged on the top of the asphalt layer 10, and two symmetrical reinforced anti-cracking cloths 12 are arranged on the top of the asphalt layer 2 11. The reinforced anti-cracking cloths 12 are in contact with the new and old road surfaces on both sides of the splicing groove 1, and an asphalt pavement 13 is arranged on the top of the asphalt layer 2 11. Example 2

[0024] Figure 1-4The utility model shows a new and old road pavement splicing structure of an embodiment of the utility model, which comprises: a splicing groove 1, a slag layer 2 is arranged at the bottom of the inner cavity of the splicing groove 1, a crushed stone layer 3 is arranged on the top of the slag layer 2, a water-stable layer 4 is arranged on the top of the crushed stone layer 3, two symmetrical geogrids 5 are arranged on the top of the water-stable layer 4, a concrete layer 6 is arranged on the top of the water-stable layer 4, and a reinforcement member 7 is arranged on both sides of the concrete layer 6. Two symmetrical connecting plates 81 are arranged on the top of the concrete layer 6, and clamps 82 are welded on the opposite sides of the two connecting plates 81. The clamps 82 are n-shaped, and the bottom of the clamps 82 is adapted to the top of the reinforcement member 7. The bolts 9 on the top of the connecting plate 81 penetrate the connecting plate 81 and are threadedly connected to the concrete layer 6. The bolts 9 on the left side of the clamps 82 penetrate the clamps 82 and the reinforcement member 7. A nut is threadedly connected, and the clamp 82 is matched with the top of the reinforcement member 1 7. Two identical bolts 9 are penetrated on the surfaces of the reinforcement member 1 7 and the reinforcement member 2 8. The reinforcement member 1 7 is fixedly connected to the new and old road surfaces on both sides of the splicing groove 1 by the bolts 9. The reinforcement member 2 8 is fixedly connected to the concrete layer 6 and the reinforcement member 1 7 by the bolts 9. An asphalt layer 10 is provided on the top of the concrete layer 6. The contact surfaces of the asphalt layer 10 and the asphalt layer 2 11 with the new and old road surfaces are sprayed with hot asphalt. The bottom of the reinforcement member 2 8 is fitted with the top of the concrete layer 6. An asphalt layer 2 11 is provided on the top of the asphalt layer 10. Two symmetrical reinforced anti-cracking cloths 12 are provided on the top of the asphalt layer 2 11. The reinforced anti-cracking cloths 12 are fitted with the new and old road surfaces on both sides of the splicing groove 1, and an asphalt pavement 13 is provided on the top of the asphalt layer 2 11.

[0025] Working principle: When the utility model is used, the user sets a slag layer 2 at the bottom of the inner cavity of the splicing groove 1, sets a crushed stone layer 3 on the top of the slag layer 2, sets a water-stable layer 4 on the top of the crushed stone layer 3, sets a geogrid 5 on the top of the water-stable layer 4, fixes the reinforcement member 7 on the contact surface between the reinforcement member 7 and the inner wall of the splicing groove 1 through bolts 9, sprays cement slurry on the contact surface between the concrete layer 6 and the inner wall of the splicing groove 1, sets a concrete layer 6 on the top of the water-stable layer 4, clamps the clamp 82 on the reinforcement member 7, and fastens the clamp 82 and the reinforcement member 7 through bolts 9. The connecting plate 81 is fixed on the top of the concrete layer 6 by bolts 9, and a vertical waterproof sticker 14 is arranged on the contact surface between the asphalt layer 10, the asphalt layer 2 11 and the inner wall of the splicing groove 1, and hot asphalt is sprayed there. Finally, the asphalt layer 10 and the asphalt layer 2 11 are arranged on the top of the concrete layer 6 in sequence, and the reinforced anti-cracking cloth 12 is laid on the top of the asphalt layer 2 11. It is best to arrange an asphalt pavement 13 on the top of the asphalt layer 2 11, so as to reinforce the joint between the new and old pavements, avoid large settlement of the new and old pavements, and ensure the safe passage of vehicles on the road.

[0026] To sum up: the new and old highway pavement splicing structure is laid on the top of the water-stabilizing layer 4 through the slurry geogrid 5, the reinforcement member 7 is set on both sides of the concrete layer 6, the reinforcement member 7 is fixed to the inner wall of the splicing groove 1 through bolts 9, the reinforcement member 2 8 is placed on the top of the concrete layer 6, and the reinforcement member 2 8 is fixed to the reinforcement member 1 7 and the concrete layer 6 through bolts 9. Finally, the reinforced anti-cracking cloth 12 is laid on the top of the asphalt layer 2 11, so that the splicing can be reinforced by the connecting parts, avoiding large settlement between the new and old pavements, and ensuring the safe passage of vehicles on the road.

Claims

1. A new and old road pavement splicing structure, characterized in that: The invention comprises a splicing groove (1): a slag layer (2) is arranged at the bottom of the inner cavity of the splicing groove (1), a crushed stone layer (3) is arranged on the top of the slag layer (2), a water-stable layer (4) is arranged on the top of the crushed stone layer (3), two symmetrical geogrids (5) are arranged on the top of the water-stable layer (4), a concrete layer (6) is arranged on the top of the water-stable layer (4), a reinforcement member (7) is arranged on both sides of the concrete layer (6), two symmetrical connecting plates (81) are arranged on the top of the concrete layer (6), and clamps (82) are welded on the opposite sides of the two connecting plates (81), the clamps (82) are adapted to the top of the reinforcement member (7), and the reinforcement member (7) is arranged on the top of the reinforcement member (7). The surfaces of the reinforcement member 7 and the reinforcement member 2 (8) are penetrated by two identical bolts (9); the reinforcement member 1 (7) is fixedly connected to the new and old road surfaces on both sides of the splicing groove (1) by the bolts (9); the reinforcement member 2 (8) is fixedly connected to the concrete layer (6) and the reinforcement member 1 (7) by the bolts (9); an asphalt layer 1 (10) is arranged on the top of the concrete layer (6); an asphalt layer 2 (11) is arranged on the top of the asphalt layer 1 (10); two symmetrical reinforced anti-cracking cloths (12) are arranged on the top of the asphalt layer 2 (11); the reinforced anti-cracking cloths (12) are in contact with the new and old road surfaces on both sides of the splicing groove (1); and an asphalt pavement (13) is arranged on the top of the asphalt layer 2 (11).

2. A new and old road pavement splicing structure according to claim 1, characterized in that: Both sides of the asphalt layer 1 (10) and the asphalt layer 2 (11) are provided with facade waterproof stickers (14), and the facade waterproof stickers (14) are in contact with the new and old road surfaces on both sides of the splicing groove (1).

3. A new and old road pavement splicing structure according to claim 2, characterized in that: The reinforcing member 1 (7) is T-shaped, the bolt (9) on the left side of the reinforcing member 1 (7) passes through the right side of the reinforcing member 1 (7) and is threadedly connected to the new and old road surfaces on both sides of the splicing groove (1), and the bolt (9) on the top of the reinforcing member 1 (7) passes through the bottom of the reinforcing member 1 (7) and is threadedly connected to the new and old road surfaces on both sides of the splicing groove (1).

4. A new and old road pavement splicing structure according to claim 3, characterized in that: The clamp (82) is n-shaped, the bottom of the clamp (82) is matched with the top of the reinforcement member 1 (7), the bolt (9) on the top of the connecting plate (81) passes through the connecting plate (81) and is threadedly connected to the concrete layer (6), and the bolt (9) on the left side of the clamp (82) passes through the clamp (82) and the reinforcement member 1 (7) and is threadedly connected to a nut.

5. The new and old road pavement splicing structure according to claim 4 is characterized in that: The splicing groove (1) is provided between the new road surface and the old road surface, and both sides of the inner cavity of the splicing groove (1) are step-shaped. The contact surface between the concrete layer (6) and the new and old road surfaces is sprayed with cement slurry.

6. A new and old road pavement splicing structure according to claim 5, characterized in that: The contact surfaces of the asphalt layer 1 (10) and the asphalt layer 2 (11) with the new and old road surfaces are sprayed with hot asphalt, and the bottom of the reinforcement member 2 (8) is in contact with the top of the concrete layer (6).