Concrete mixing station three-stage sedimentation tank convenient for sediment treatment
By transforming the third-level sedimentation tank of the concrete mixing station, changing the first-level tank to a movable type and discharging slag in an open space, the problem of reduced filtration function and potential safety hazards caused by the accumulation of particulate matter during the sedimentation process has been solved, and a safe and efficient Sediment treatment is suitable for engineering projects with high production pressure and small sites.
Patent Information
- Application Number
- CN202420021453.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-04
AI Technical Summary
During the sedimentation process of the existing third-level sedimentation tank of the concrete mixing plant, the accumulation of particulate matter at the bottom of the first-level tank leads to a decline in filtering function, and workers need to enter the tank during the cleaning process, which poses safety hazards and risks of exposure to harmful gases, affecting work efficiency. and safety.
Change the primary pool to a movable type, designed to be lifted out for slag discharge, and set up in the secondary pool, equipped with a sewage pump and a switchable slag discharge port to ensure that sediment is processed in an open space, reducing harm to workers, and Maintain the normal operation of the three-stage sedimentation tank through rotation.
It can effectively prevent harmful gases from harming workers, shorten the slag discharge time, reduce the slag cleaning pressure on the second and third-level pools, and ensure the normal daily operation of the third-level sedimentation pool. It is suitable for small sites and high production pressure projects.
Smart Images

Figure CN221846197U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to a sewage treatment device, in particular to a three-level sedimentation tank of a concrete mixing station. Background Art
[0002] The sedimentation tank used in the sewage discharge system of a concrete mixing plant generally has no less than three levels. This is because the sewage generated during the production process of the concrete mixing plant, such as mud, sand and gravel, and other impurities, need to be treated to meet the discharge requirements. In order to ensure that the external drainage body meets environmental protection standards and effectively purifies these wastes, multi-stage sedimentation and filtration are usually used for treatment. Figure 1-3 As shown, the existing three-stage sedimentation tank consists of an upstream water inlet 1, a downstream water outlet 2, and a primary pool 31, a secondary pool 32 and a tertiary pool 33 which are connected in sequence and are composed of a brick partition wall 3, a brick side wall 4 and a waterproof concrete bottom plate 6. The liquid flows from the primary pool 31 to the secondary pool 32 through a connecting hole, and the secondary pool 32 and the tertiary pool 33 are connected through a siphon 5.
[0003] The upstream water inlet 1 is connected to the primary pool 31. The larger particulate matter is firstly separated and precipitated from the water through the coarse filtration of the primary pool. The water from which most of the solid impurities are removed by the preliminary separation flows into the secondary pool 32. Since the concrete mixing station adopts fully mechanized production, a large amount of oily wastewater will inevitably be generated during the daily maintenance of the machinery. The density of oil is smaller than that of water. Therefore, a siphon 5 is set in the secondary pool to separate oil and water and then discharge the water into the tertiary pool 33. During the hydrolysis reaction process in the tertiary pool, proprietary chemical agents are added to aggregate the suspended matter and turbid matter in the sewage through chemical reactions such as adsorption, neutralization, and complexation, so that it becomes easy to precipitate, ensuring that the water discharged from the downstream outlet 2 of the tertiary pool and flowing into the downstream ditch meets the discharge requirements.
[0004] In actual operation, it was found that: with the increase of larger particulate matter that sinks to the bottom of the primary pool during coarse filtration, the water storage space is reduced, resulting in insufficient time for the larger particulate matter in the sewage that subsequently flows into the primary pool to be initially separated from the water body and precipitated, and is discharged into the secondary pool together, resulting in a reduction in the filtration function of the primary pool. Due to the limited space of the sedimentation tank and the fact that most of the existing structures are brick, the use of machinery to remove waste from the bottom of the primary pool can easily damage the structure of the sedimentation tank and cause leakage. Workers are often required to go down to the bottom of the pool to manually remove the waste. The pool contains serious harmful gases that can easily affect the physical and mental health of the workers in the pool, and the filter pool needs to stop working during the pool cleaning process. Summary of the invention
[0005] The utility model aims to solve the problems existing in the above three-stage sedimentation tank and provide a three-stage sedimentation tank for a concrete mixing station which is convenient for sediment treatment.
[0006] In order to solve the above problems, the technical solution adopted by the utility model is a three-stage sedimentation tank of a concrete mixing station which is convenient for sludge treatment. The three-stage sedimentation tank is composed of a primary tank, a secondary tank and a tertiary tank. The secondary tank and the tertiary tank are connected by a siphon. The key point is that the primary tank is movably placed in the secondary tank, a lifting lug is designed on the primary tank, the water inlet pipe is fixed to the upstream water inlet, and its outlet is located above the primary tank.
[0007] The utility model is an improvement on the basis of the existing three-stage sedimentation tank of the concrete mixing station. The original fixed first-stage tank is changed into a movable first-stage tank which can be hoisted to discharge slag. The slag is discharged in an open space, which can effectively prevent harmful gases from harming the operators and eliminate safety hazards. At the same time, two first-stage tanks can be set for rotation, so that when the first-stage tank is cleaned, the filter tank as a whole does not stop working.
[0008] The first-stage pool is made of metal or engineering plastic. The one-piece first-stage pool made of metal or engineering plastic is easy to hoist and has a long service life.
[0009] The first-level pool is designed with a water outlet at the top and a switchable slag discharge port at the bottom. By discharging through the slag discharge port, operators do not need to enter the pool, further eliminating safety hazards.
[0010] The distance between the top and bottom of the slag discharge port is 1 / 5-1 / 3 of the overall height.
[0011] The water outlet is provided with a hole area of 0.5-4cm 2 Filter. Concentrate the main sedimentation in the primary pool and reduce the sedimentation in other pools.
[0012] It is equipped with a sewage pump, and the inlet and outlet pipes of the sewage pump can extend into the primary pool and the secondary pool. The sewage pump can be placed outside the secondary pool. Before lifting out the primary pool, the sewage pump is used to discharge the water in the primary pool to another primary pool or secondary pool, reducing the weight of the primary pool and the sewage discharge. When the primary pool is placed in the secondary pool, the water in the secondary pool can be pumped into the primary pool as a counterweight to allow the primary pool to be placed smoothly.
[0013] The secondary pool is provided with a base that can accommodate the primary pool, the base is open, the inner wall has a groove that matches the primary pool, and the inner height is 15-50 cm. The primary pool is limited by a fixed base.
[0014] The shape of the base is similar to that of the first-level pool, with the length and width being 40mm-100mm larger than that of the first-level pool. A circle of brick side walls 300mm-500mm higher than the bottom surface is set around the bottom.
[0015] The water inlet pipe consists of a long pipe fixed to the upstream water inlet and a short pipe with a wrench handle fixed to the long pipe.
[0016] The advantage of this utility model is that slag is discharged in an open space, which can effectively prevent harmful gases from harming the operators and eliminate potential safety hazards; it is conducive to rapid slag discharge operations and convenient for overall planning. The slag discharge frequency can be flexibly adjusted according to the trough and peak periods of the construction progress, reducing the slag removal pressure of the second and third-level tanks at the rear end, and does not affect the daily normal operation of the overall three-level sedimentation tank. It is particularly suitable for engineering projects with small sites, valuable production facility land, high daily output requirements, and high production pressure. The "two-tank rotation method" can be used to further shorten the single slag discharge operation time, and the three-level sedimentation tank can continue to operate normally even during the slag discharge. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 3D diagram of the existing three-stage sedimentation tank of the concrete mixing station
[0018] Figure 2 for Figure 1 Cross-sectional view
[0019] Figure 3 for Figure 1 Top view
[0020] Figure 4 The three-dimensional diagram of the utility model
[0021] Figure 5 This is a three-dimensional diagram of the first-level pool of the utility model
[0022] Figure 6 This is a cross-sectional view of the utility model
[0023] Figure 7 A top view of the utility model
[0024] Figure 8 Schematic diagram of the water inlet pipe
[0025] Among them: 1. Upstream water inlet, 2. Downstream water outlet, 3. Brick partition wall, 31 first-level pool, 311. Water outlet, 312. Slag outlet, 313. Lifting lug, 32 second-level pool, 33 third-level pool, 4. Brick side wall, 5. Siphon, 6. Waterproof concrete bottom plate, 7. Water inlet pipe, 9. Base. Implementation
[0026] The present invention is described in detail below in conjunction with the drawings. The enumerated embodiments may enable technicians in this field to better understand the present invention, but do not limit the present invention in any form.
[0027] like Figure 4-8As shown, a three-stage sedimentation tank of a concrete mixing station for convenient sediment treatment is improved on the basis of the existing three-stage sedimentation tank of a concrete mixing station, and is also composed of a primary tank 31, a secondary tank 32, and a tertiary tank 33. The secondary tank 32 and the tertiary tank 33 are connected through a siphon 5. The difference is that the primary tank 31 is made of metal or engineering plastic and is movably placed in the secondary tank 32. The primary tank 31 is rectangular, and ears 313 are designed on the four corner points. An outlet 311 is designed on the upper part of the primary tank 31. Generally, there is no outlet except on the side close to the water inlet, and there are outlets in the other three directions. The outlet is provided with a filter screen with a filter hole area of 0.5-4cm2. The water flows into the secondary pool through the outlet, leaving most of the particles in the primary pool. A switchable slag discharge port 312 is designed at the lower part of the primary pool, and a sewage pump (not shown in the figure) is configured and placed on the side of the secondary pool. The inlet and outlet pipes of the sewage pump can extend into the primary pool 31 and the secondary pool 32, so as to facilitate the pumping and release of water in the primary pool 31 and the secondary pool 32.
[0028] First, build a secondary pool 32 with a brick structure in a 2:1 space, with a length × width × height of 30 × 20 × 1.8, in meters. Customize a primary pool with a length × width × height of 20 × 16 × 1.7 meters using iron sheets, with a capacity of about half that of the secondary pool. The thickness of the iron sheets is controlled to be 1.0mm-1.2mm. Make a tertiary pool 33 on the side of the secondary pool 32, with a length × width × height of 15 × 20 × 1.8 meters, which is half that of the secondary pool. The outlet 311 of the primary pool is arranged in the center except for one side of the water inlet, with a distance of 10cm from the upper end to the upper top surface. The length × width of the outlets on both sides is (19-10) meters × 10cm, and the length × width of the outlet on the side far from the water inlet is (15-10) meters × 10cm. The filter hole area of the filter set at the outlet is 1cm 2 The slag discharge port 312 at the bottom may be provided on all four sides for convenient external slag discharge, or may be provided on only one side. The distance between the top of the slag discharge port and the bottom is 35-50 cm, and the distance between the top and the two sides is 0.5-5 meters.
[0029] The primary pool 31 can be directly placed in the secondary pool 32, or a base 9 that can accommodate the primary pool 31 can be set in the secondary pool 32. The base 9 is open, and the inner wall matches the groove of the primary pool 31. The inner height is 15-50 cm. The shape of the base 9 is similar to that of the primary pool 31. A base 9 with a thickness of 12 mm is built in the secondary pool 32. The inner length and width of the base are respectively 40 mm-100 mm larger than the length and width of the outer wall of the primary pool made of an iron water tank. The brick side wall is convenient for placing the primary pool, and the height is 30 cm-50 cm. The water inlet pipe 7 is fixed to the upstream water inlet, and its outlet is located above the primary pool. The water inlet pipe 7 consists of a long pipe 71 fixed to the upstream water inlet and a short pipe 72 with a lever handle fixed to the long pipe. The long water inlet pipe 71 can be quickly connected or disconnected with the short water inlet pipe 72 with a lever-type quick connector as needed. Since the diameter of the water inlet pipe and the cross-sectional area of the upstream water inlet are quite different, the water inlet volume can be increased by increasing the number of water inlet pipes, such as Figure 6 The water inlet pipe 7 shown is a double row triple assembly. The projection length of the long pipe 71 is outside the outer wall of the primary pool. After adding the short pipe 72, the projection length of the entire water inlet pipe is inside the primary pool, ensuring that the water in the water inlet pipe flows into the primary pool. When the primary pool is to be hoisted out, the short pipe 72 is first removed to prevent the water inlet pipe from interfering with the disassembly and assembly of the primary pool. After the primary pool is assembled, the short pipe 72 and the long pipe 71 are assembled.
[0030] Since the first-level pool of the utility model is relatively easy to discharge slag, the first-level pool can be used for drug addition and precipitation. While the larger particulate matter is initially separated and precipitated from the water body, the suspended matter and turbid matter in the sewage are aggregated and precipitated by the proprietary chemical agent. The first-level pool has the functions of the first-level pool and the third-level pool of the existing three-level sedimentation tank, and the third-level pool becomes a clear water pool. The third-level pool (clear water pool) can play the role of buffering the energy dissipation pool to prevent excessive water flow from impacting the downstream drainage facilities, and can also be pumped back to the concrete mixing station reservoir for use as production water.
[0031] The utility model is equipped with two primary pools, and the slag is removed regularly, generally during non-working hours; or when there is a lot of sediment in the primary pool, first disassemble the short pipe 72, lift the primary pool so that the outlet 311 is higher than the water surface of the secondary pool, and use a sewage pump to pump the water accumulated on the upper part of the sediment in the primary pool to the secondary pool or another primary pool. After the water accumulated on the upper part of the sediment is basically pumped out, the primary pool is lifted out, and the switchable slag discharge port 312 at the lower part is opened. The operator can open the slag discharge port to carry out sediment treatment operations in a well-ventilated environment. After the sediment in the primary pool (the bottom of the iron water tank) is cleaned, it is lifted back to the secondary pool, and the water in the secondary pool is pumped into the primary pool by the sewage pump, so that the primary pool gradually sinks (or the water in the secondary pool enters the primary pool from the slag discharge port. When the upper surface of the slag discharge port of the first pool is flush with the water surface of the secondary pool, the slag discharge port is closed, and the sewage pump then pumps the water in the secondary pool into the primary pool).
[0032] The utility model can flexibly adjust the slag discharge frequency according to the low and high periods of the construction progress, and minimize the floor space of the tertiary sedimentation tank without affecting the normal daily operation of the tertiary sedimentation tank. It is particularly suitable for engineering projects with small sites, valuable production facility land, high daily output requirements, and high production pressure.
[0033] At the same time, in order to ensure the normal operation time of the tertiary sedimentation tank as much as possible during the peak construction period, the "two-tank rotation method" can be used to further shorten the single slag discharge operation time without affecting the normal operation of the sedimentation tank.
[0034] The remaining parts not described are the same as the prior art.
[0035] The above is only a preferred embodiment of the present invention. It should be noted that for ordinary technicians in this field, several changes and improvements can be made without departing from the principle of the present invention, and they should also be considered to belong to the protection scope of the present invention.
Claims
1. A three-stage sedimentation tank for a concrete mixing station that is convenient for sediment treatment, which consists of a primary tank, a secondary tank, and a tertiary tank. The secondary tank and the tertiary tank are connected by a siphon. It is characterized in that The first-level pool is placed in the second-level pool. A lifting lug is designed on the first-level pool. The water inlet pipe is fixed to the upstream water inlet, and its outlet is located above the first-level pool.
2. A three-stage sedimentation tank for a concrete mixing station that facilitates sediment treatment according to claim 1, It is characterized in that The primary pool is made of metal or engineering plastics.
3. A three-stage sedimentation tank for a concrete mixing station that facilitates sediment treatment according to claim 1, It is characterized in that The upper part of the first-level pool is designed with a water outlet, and the lower part is designed with a switchable slag discharge port.
4. A three-stage sedimentation tank for a concrete mixing station that facilitates sediment treatment according to claim 3, It is characterized in that The distance between the top and bottom of the slag discharge port is 1 / 5-1 / 3 of the overall height.
5. A three-stage sedimentation tank for a concrete mixing station that facilitates sediment treatment according to claim 3, It is characterized in that The water outlet is provided with a filter hole area of 0.5-4cm 2 Filter.
6. A three-stage sedimentation tank for a concrete mixing station that facilitates sediment treatment according to claim 1, It is characterized in that A sewage pump is configured, and the inlet and outlet pipes of the sewage pump can extend into the primary pool and the secondary pool.
7. A three-stage sedimentation tank for a concrete mixing station for convenient sediment treatment according to claim 1, It is characterized in that The secondary pool is provided with a base that can accommodate the primary pool. The base is open, and the inner wall has a groove that matches the primary pool, and the inner height is 15-50 cm.
8. A three-stage sedimentation tank for a concrete mixing station for convenient sediment treatment according to claim 1, It is characterized in that The shape of the base is similar to that of the first-level pool, with the length and width being 40mm-100mm larger than that of the first-level pool. A circle of brick side walls 300mm-500mm higher than the bottom surface is set around the bottom.
9. A three-stage sedimentation tank for a concrete mixing station for convenient sediment treatment according to claim 1, It is characterized in that The water inlet pipe consists of a long pipe fixed to the upstream water inlet and a short pipe with a wrench handle fixed to the long pipe.