Waste gas treatment device for ferronickel smelting

CN221846683UActive Publication Date: 2024-10-18LINYI IRON & STEEL INVESTMENT GRP STAINLESS STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420401934.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-04
Publication Date
2024-10-18
Estimated Expiration
2034-03-04

AI Technical Summary

Technical Problem

In the existing ferronickel smelting waste gas treatment device, the spray plate is prone to blockage, causing inconvenience in clearing and affecting the efficiency of denitrification treatment.

Method used

An exhaust gas treatment device is designed that includes a tower body, a spray structure, a cleaning structure and a backflow structure. The spray structure drives the driving gear through a servo motor to mesh with the driven gear to realize the automatic flushing and dredging of the spray plate. The backflow structure The secondary spray treatment of gas is achieved through an exhaust fan.

Benefits of technology

It effectively avoids clogging of the spray plate, improves the efficiency and convenience of exhaust gas denitration treatment, and ensures the continuous operation of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221846683U_ABST
    Figure CN221846683U_ABST
Patent Text Reader

Abstract

The utility model discloses a waste gas treatment device for ferronickel smelting, which comprises a tower body, a waste gas inlet pipe is communicated with the tower body, a gas outlet pipe is communicated with the tower body, a waste liquid outlet pipe is communicated with the tower body, a spraying structure is arranged on the tower body, the spraying structure comprises a circular groove, a sealing bearing, a pipeline, a hose and a spraying disc, and the circular groove is communicated with the sealing bearing. Waste gas generated by ferronickel smelting enters the tower body through the waste gas inlet pipe, at the moment, a denitration agent in the hose enters the spraying disc through the pipeline and is sprayed out, the rising waste gas is subjected to denitration treatment, the treated gas is discharged through the gas outlet pipe, and when it is observed that spraying of the spraying disc is abnormal, spraying and waste gas stopping are stopped, and the waste gas is discharged through the gas outlet pipe. The output shaft of the servo motor drives the driving gear to rotate, through meshing force between the driving gear and the driven gear, the pipeline is made to rotate on the tower body through the sealing bearing, the spraying disc is made to flush upwards, and at the moment, the output end of the electric push rod drives the dredging needle on the disc to be inserted into the spraying hole in the spraying disc to conduct dredging.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This patent relates to the field of nickel-iron smelting, and specifically to a waste gas treatment device used in nickel-iron smelting. Background Art

[0002] Nickel, as an important strategic metal, is widely used in key materials and high-tech fields such as stainless steel, high-temperature alloys, catalysis, secondary batteries, and fuel cells. The most commonly used method for smelting nickel is dehydration in a rotary kiln followed by electric kiln roasting. Waste gas is produced during the smelting process of nickel iron, so it is necessary to denitrate the waste gas to remove nitrogen oxides in the waste gas. However, the current waste gas treatment devices for nickel iron smelting mostly use spray denitrification, and the spray plate will become clogged after long-term use, making it difficult to clear the spray plate, affecting the subsequent spray denitrification treatment. Utility Model Content

[0003] In view of the shortcomings of the prior art, the purpose of this patent is to provide a waste gas treatment device for nickel-iron smelting.

[0004] The technical solution adopted by this patent to solve its technical problem is: an exhaust gas treatment device for nickel-iron smelting, comprising a tower body, the tower body is connected to an exhaust gas inlet pipe, the tower body is connected to a gas outlet pipe, the tower body is connected to a waste liquid outlet pipe, and a spray structure is installed on the tower body, the spray structure includes a circular groove, a sealing bearing, a pipeline, a hose and a spray plate;

[0005] The circular groove is provided on the tower body, the sealing bearing is installed in the circular groove, the pipeline is installed in the sealing bearing, the hose is connected to one end of the pipeline, and the spray plate is connected to the other end of the pipeline;

[0006] The spray structure includes a mounting slot, a servo motor, a driving gear and a driven gear;

[0007] The installation groove is provided on the tower body, the servo motor is installed in the installation groove, the driving gear is installed on the output shaft of the servo motor, the driven gear is installed on the pipeline, and the driving gear is meshed and connected with the driven gear;

[0008] A cleaning structure is installed in the tower body, and the cleaning structure includes a horizontal plate, an electric push rod, a disc and a dredging needle;

[0009] The horizontal plate is installed in the tower body, the electric push rod is installed on the horizontal plate, the disc is installed on the output end of the electric push rod, the dredging needle is installed on the disc, and the dredging needle is arranged corresponding to the spray hole on the spray disc.

[0010] Furthermore, a reflux structure is installed outside the tower body, and the reflux structure includes a first connecting pipe, a second connecting pipe and an exhaust fan;

[0011] The first connecting pipe is connected to the tower body, the second connecting pipe is connected to the tower body, the air inlet of the exhaust fan is connected to the first connecting pipe, and the air outlet of the exhaust fan is connected to the second connecting pipe.

[0012] Furthermore, an annular plate is installed in the tower body, and a filter plate is placed on the annular plate.

[0013] Furthermore, the filter plate is limited on the annular plate by a limiting structure, the number of the limiting structures is not less than six, and the limiting structures are distributed in an annular shape and equidistantly between the filter plate and the annular plate;

[0014] The limiting structure comprises a limiting block and a limiting groove, wherein the limiting block is mounted on the filter plate, the limiting groove is arranged on the annular plate, and the limiting block is clamped in the limiting groove.

[0015] Furthermore, partitions are installed in the tower body, the number of the partitions is four, and the partitions are distributed at intervals on both sides.

[0016] Furthermore, a base is installed below the tower body, an inspection port is opened on the tower body, a sealed door is installed in the inspection port through hinge rotation, and a glass plate is installed in the observation port on the sealed door.

[0017] The beneficial effects of this patent are:

[0018] 1. The waste gas generated by nickel-iron smelting enters the tower body through the waste gas inlet pipe. At this time, the denitrification agent in the hose enters the spray plate through the pipeline and sprays out to denitrify the rising waste gas. The treated gas is discharged through the gas outlet pipe. When the spray plate is observed to have spraying abnormalities, the spraying stops, the waste gas stops, and the output shaft of the servo motor drives the driving gear to rotate. Through the meshing force between the driving gear and the driven gear, the pipeline rotates on the tower body through the sealed bearing, so that the spray plate rushes up. At this time, the output end of the electric push rod drives the dredging needle on the disc to insert into the spray hole on the spray plate for dredging;

[0019] 2. When reflux is required, the gas outlet pipe is closed. At this time, the exhaust fan will return the sprayed gas to the bottom of the tower through the first connecting pipe and the second connecting pipe. As the gas rises, secondary spraying treatment can be carried out to improve the effect of exhaust gas denitrification treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the patent structure.

[0021] Figure 2 It is a structural schematic diagram of the cross-sectional view of this patent.

[0022] Figure 3 It is a schematic diagram of the structure at A of this patent.

[0023] Figure 4 It is a schematic diagram of the structure at B of this patent.

[0024] Explanation of the reference numerals: 1 tower body, 2 base, 3 exhaust gas inlet pipe, 4 cleaning structure, 401 horizontal plate, 402 electric push rod, 403 disc, 404 unclogging needle, 5 gas outlet pipe, 6 inspection port, 7 sealing door, 8 glass plate, 9 spray structure, 10 circular groove, 11 sealing bearing, 12 pipeline, 13 hose, 14 spray disc, 15 mounting groove, 16 servo motor, 17 driving gear, 18 driven gear, 19 annular plate, 20 filter plate, 21 limiting structure, 22 limiting block, 23 limiting groove, 24 partition, 25 waste liquid outlet pipe, 26 reflux structure, 27 first connecting pipe, 28 second connecting pipe, 29 exhaust fan. DETAILED DESCRIPTION

[0025] The present invention is further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In addition, it should be understood that after reading the contents of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the claims attached to the application.

[0026] See also Figure 1-4 This is a schematic diagram of the structure of the patent, a waste gas treatment device for nickel-iron smelting, including a tower body 1, a waste gas inlet pipe 3 is connected to the tower body 1, the waste gas inlet pipe 3 is connected to an external electric valve, a gas outlet pipe 5 is connected to the tower body 1, the gas outlet pipe 5 is connected to an external electric valve, a waste liquid outlet pipe 25 is connected to the tower body 1, a spray structure 9 is installed on the tower body 1, and the spray structure 9 includes a circular groove 10, a sealing bearing 11, a pipeline 12, a hose 13 and a spray plate 14;

[0027] A circular groove 10 is provided on the tower body 1, a sealed bearing 11 is installed in the circular groove 10, a pipe 12 is installed in the sealed bearing 11, a hose 13 is connected to one end of the pipe 12, the hose 13 is relatively long and disc-shaped, and is connected to an external high-pressure denitrification agent pump, a spray plate 14 is connected to the other end of the pipe 12, and the waste gas generated by nickel-iron smelting enters the tower body 1 through the waste gas inlet pipe 3, at this time, the denitrification agent in the hose 13 enters the spray plate 14 through the pipe 12, and is sprayed out, and the rising waste gas is denitrated, and the treated gas is discharged through the gas outlet pipe 5;

[0028] The spray structure 9 includes a mounting slot 15, a servo motor 16, a driving gear 17 and a driven gear 18;

[0029] The mounting groove 15 is provided on the tower body 1, and the servo motor 16 is installed in the mounting groove 15. The servo motor 16 is powered on for operation. The output shaft of the servo motor 16 has a self-locking function. The driving gear 17 is installed on the output shaft of the servo motor 16, and the driven gear 18 is installed on the pipeline 12. The driving gear 17 is meshed and connected with the driven gear 18. When the spraying disc 14 is observed to have spraying abnormality, the spraying stops, and the output shaft of the servo motor 16 drives the driving gear 17 to rotate. Through the meshing force between the driving gear 17 and the driven gear 18, the pipeline 12 is rotated upward by 180 degrees on the tower body 1 through the sealed bearing 11, so that the spraying disc 14 rushes up;

[0030] A cleaning structure 4 is installed in the tower body 1, and the cleaning structure 4 includes a horizontal plate 401, an electric push rod 402, a disc 403 and a dredging needle 404;

[0031] The horizontal plate 401 is installed in the tower body 1, the electric push rod 402 is installed on the horizontal plate 401, the electric push rod 402 is powered on to work, the disc 403 is installed on the output end of the electric push rod 402, the unblocking needle 404 is installed on the disc 403, and the unblocking needle 404 is set corresponding to the spray hole on the spray plate 14. When the spray plate 14 rushes up, the output end of the electric push rod 402 drives the unblocking needle 404 on the disc 403 to insert into the spray hole on the spray plate 14 for unblocking. After unblocking, the spray plate 14 returns to its position and can continue the spraying work.

[0032] A reflux structure 26 is installed outside the tower body 1, and the reflux structure 26 includes a first connecting pipe 27, a second connecting pipe 28 and an exhaust fan 29;

[0033] The first connecting pipe 27 is connected to the tower body 1, the second connecting pipe 28 is connected to the tower body 1, the air inlet of the exhaust fan 29 is connected to the first connecting pipe 27, the exhaust fan 29 is powered on and works, and the air outlet of the exhaust fan 29 is connected to the second connecting pipe 28. When reflux is required, the gas outlet pipe 5 is closed. At this time, the exhaust fan 19 refluxes the sprayed gas through the first connecting pipe 27 and the second connecting pipe 28 to the bottom of the tower body 1. As the gas rises, secondary spraying treatment can be carried out to improve the effect of exhaust gas denitrification treatment.

[0034] An annular plate 19 is installed in the tower body 1, and a filter plate 20 is placed on the annular plate 19. The filter plate 20 is made of a stainless steel material with through holes on the surface. The filter plate 20 is limited on the annular plate 19 by a limiting structure 21. The number of the limiting structures 21 is not less than six, and the limiting structures 21 are distributed in an annular shape and equidistantly between the filter plate 20 and the annular plate 19.

[0035] The limiting structure 21 includes a limiting block 22 and a limiting groove 23. The limiting block 22 is installed on the filter plate 20. The limiting groove 23 is provided on the annular plate 19. The limiting block 22 is clamped in the limiting groove 23. When the filter plate 20 is placed on the annular plate 19, the limiting block 22 is inserted into the limiting groove 23 to fix the filter plate 20. As the exhaust gas rises, the filter plate 20 can filter impurities in the exhaust gas.

[0036] The tower body 1 is provided with four partitions 24 , which are spaced apart on both sides. During the rising process of the exhaust gas, the rising speed can be slowed down by the partitions 24 .

[0037] A base 2 is installed below the tower body 1, and the base 2 supports the tower body 1. An inspection port 6 is opened on the tower body 1, and a sealed door 7 is installed in the inspection port 6 by rotating through a hinge. The contact position between the sealed door 7 and the inspection port 6 is sealed by a rubber strip. A glass plate 8 is installed in the observation port on the sealed door 7. The glass plate 8 is made of transparent glass, and the internal situation of the tower body 1 can be observed through the glass plate 8.

[0038] When the present invention is working, the filter plate 20 can be put into the tower body 1 through the inspection port 6, and the filter plate 20 can be placed on the annular plate 19, then the limit block 22 is inserted into the limit groove 23 to fix the filter plate 20, and the sealing door 7 is closed, and the waste gas generated by nickel-iron smelting enters the tower body 1 through the waste gas inlet pipe 3. At this time, the denitrification agent in the hose 13 enters the spray plate 14 through the pipeline 12 and is sprayed out to denitrify the rising waste gas. The treated gas is discharged through the gas outlet pipe 5, and the waste liquid is discharged through the waste liquid outlet pipe 25. As the waste gas rises, the filter plate 20 can filter impurities in the waste gas, and the partition plate 24 can slow down the rising speed. When reflux is required, the gas outlet pipe 5 is closed, and the exhaust fan 19 will spray the treated gas through the first connection The pipe 27 and the second connecting pipe 28 flow back to the bottom of the tower body 1. As the gas rises, secondary spraying treatment can be carried out to improve the effect of exhaust gas denitration treatment. The internal situation of the tower body 1 can be observed through the glass plate 8. When the spray disc 14 is observed to have spraying abnormalities, the spraying stops, the exhaust gas stops, and the output shaft of the servo motor 16 drives the driving gear 17 to rotate. Through the meshing force between the driving gear 17 and the driven gear 18, the pipe 12 is rotated 180 degrees upward on the tower body 1 through the sealed bearing 11, so that the spray disc 14 rushes up. At this time, the output end of the electric push rod 402 drives the dredging needle 404 on the disc 403 to be inserted into the spray hole on the spray disc 14 for dredging. After dredging, the spray disc 14 returns to its position and the spraying work can continue.

[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A waste gas treatment device for ferronickel smelting, comprising a tower body (1), characterized in that: The tower body (1) is connected to a waste gas inlet pipe (3), the tower body (1) is connected to a gas outlet pipe (5), the tower body (1) is connected to a waste liquid outlet pipe (25), and a spray structure (9) is installed on the tower body (1). The spray structure (9) comprises a circular groove (10), a sealing bearing (11), a pipeline (12), a hose (13) and a spray plate (14); The circular groove (10) is formed on the tower body (1), the sealing bearing (11) is installed in the circular groove (10), the pipeline (12) is installed in the sealing bearing (11), the hose (13) is connected to one end of the pipeline (12), and the spray plate (14) is connected to the other end of the pipeline (12); The spray structure (9) comprises a mounting groove (15), a servo motor (16), a driving gear (17) and a driven gear (18); The mounting groove (15) is formed on the tower body (1), the servo motor (16) is mounted in the mounting groove (15), the driving gear (17) is mounted on the output shaft of the servo motor (16), the driven gear (18) is mounted on the pipe (12), and the driving gear (17) is meshingly connected with the driven gear (18); A cleaning structure (4) is installed in the tower body (1), and the cleaning structure (4) comprises a horizontal plate (401), an electric push rod (402), a disc (403) and a clearing needle (404); The horizontal plate (401) is installed in the tower body (1), the electric push rod (402) is installed on the horizontal plate (401), the disc (403) is installed on the output end of the electric push rod (402), the dredging needle (404) is installed on the disc (403), and the dredging needle (404) is arranged corresponding to the spray hole on the spray disc (14).

2. The exhaust gas treatment device for ferronickel smelting according to claim 1, characterized in that: A reflux structure (26) is installed outside the tower body (1), and the reflux structure (26) comprises a first connecting pipe (27), a second connecting pipe (28) and an exhaust fan (29); The first connecting pipe (27) is connected to the tower body (1), the second connecting pipe (28) is connected to the tower body (1), the air inlet of the exhaust fan (29) is connected to the first connecting pipe (27), and the air outlet of the exhaust fan (29) is connected to the second connecting pipe (28).

3. The waste gas treatment device for ferronickel smelting according to claim 1, characterized in that: An annular plate (19) is installed in the tower body (1), and a filter plate (20) is placed on the annular plate (19).

4. The waste gas treatment device for ferronickel smelting according to claim 3, characterized in that: The filter plate (20) is limited on the annular plate (19) by means of a limiting structure (21), the number of the limiting structures (21) is not less than six, and the limiting structures (21) are distributed in an annular shape and at equal intervals between the filter plate (20) and the annular plate (19); The limiting structure (21) comprises a limiting block (22) and a limiting groove (23); the limiting block (22) is mounted on the filter plate (20); the limiting groove (23) is formed on the annular plate (19); and the limiting block (22) is clamped in the limiting groove (23).

5. The waste gas treatment device for ferronickel smelting according to claim 1, characterized in that: Partition plates (24) are installed in the tower body (1), the number of the partition plates (24) is four, and the partition plates (24) are distributed at intervals on both sides.

6. The exhaust gas treatment device for ferronickel smelting according to claim 1, characterized in that: A base (2) is installed below the tower body (1), an inspection opening (6) is provided on the tower body (1), a sealed door (7) is rotatably installed in the inspection opening (6) via a hinge, and a glass plate (8) is installed in the observation opening on the sealed door (7).