Movable type gluing device for wind power blade formed based on large mold
By designing a mobile gluing device based on large mold molding and utilizing the automated control of screw elevators and heavy-duty navigation vehicles, the problems of low gluing efficiency and high curing risk for wind turbine blades have been solved, and fast and precise gluing of wind turbine blades has been achieved. , improving production efficiency and quality.
Patent Information
- Application Number
- CN202420124530.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-18
AI Technical Summary
When dealing with oversized blades, the existing glue coating device for wind turbine blades has low glue coating efficiency and high curing risk, resulting in unstable production efficiency and product quality. It is also costly and not suitable for various types of molds.
A mobile gluing device based on large mold molding is designed, including a screw elevator, a heavy-duty navigation vehicle, a large-tonnage glue machine and an avoidance device. Through the automated control of the screw elevator and heavy-duty navigation vehicle, the large-tonnage glue machine is realized Fast movement and precise gluing, the avoidance device supports the rapid turnover of the mold to ensure that the gluing process is not affected.
It achieves fast and precise gluing of oversized wind turbine blades, reduces the risk of solidification, improves production efficiency and quality, is suitable for different types of molds, and optimizes the gluing path to avoid structural interference and omissions.
Smart Images

Figure CN221847669U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of wind turbine blades, in particular to a mobile glue coating device for forming wind turbine blades based on a large mold. Background Art
[0002] A series of new energy industries represented by wind power are facing the industry challenge of speeding up and increasing efficiency, especially in the production of wind turbine blades. The length of wind turbine blades manufactured in the market is large, and the blade length has reached more than 100 meters. The amount of glue used for gluing is also increasing, resulting in longer gluing time and reduced production efficiency. In addition, due to the time process, there is a risk of curing during use, which affects the quality of the product.
[0003] In the prior art, the traditional wind turbine blade gluing and bonding adopts a fixed-point method. The equipment transports the mixed adhesive into a cardboard or basin according to the required weight, and the workers manually transport the glue to the designated location. This transportation process consumes a lot of manpower. At the same time, the mixed adhesive will solidify and produce a large amount of solid waste, which has an adverse impact on the environment. Therefore, the material loss caused is also very large. In many cases, the gluing process of some parts of the wind turbine blade has not been completed, and the glued parts have solidified, resulting in reduced production efficiency and extremely unstable product quality. At the same time, since the glue machine is separated from the glue head on both sides, the incoordination between the glue machine and the glue head during the gluing process leads to poor gluing efficiency.
[0004] For example, CN 114289269 B discloses an automatically positioned wind turbine blade gluing device and method, comprising a positioning guide rail, a self-propelled platform, and a gluing tooling installed on the self-propelled platform and moving synchronously with the self-propelled platform. The positioning guide rail is installed on both sides of the front and rear edges of the blade main mold, and its installation position is determined based on the front and rear edge parting lines of the blade main mold as the positioning reference and combined with the positioning data of the web in the blade, so that the shape of the positioning guide rail on each side is the same as the streamline on the corresponding side of the blade; by integrating the gluing tooling, the self-propelled platform, and the positioning guide rail with a specific shape into an automatically positioned wind turbine blade gluing device, accurate positioning and gluing can be achieved, the problems of uneven manual gluing effect and large position deviation can be solved, the bonding defects caused by positioning deviation can be eliminated, and the product quality can be improved. At the same time, the device can realize the simultaneous automatic coating of adhesives in the bonding areas of the front and rear edge webs, thereby improving work efficiency. However, in actual operation, due to the large size of the wind turbine blades and the large amount of glue applied, the glue filling process is cumbersome. After some of the glued parts on the wind turbine blades have been cured, some parts have not been glued. In addition, the cost of this structure is high and it is not suitable for various types of molds.
[0005] Another example is a device and method for automatically positioning the gluing position during the gluing process of wind turbine blades disclosed in Chinese patent CN 115646764 A, which belongs to the technical field of gluing of wind turbine blades. The device includes a wall-mounted track, a crossbeam, a gluing device and a follow-up transport trolley. The wall-mounted track is installed on the column I-beam of the factory production workshop and is divided into an upper track and a lower track. The upper track and the lower track are respectively equipped with an upper tube and a lower tube, which together support the crossbeam walking parts; the crossbeam includes a crossbeam body and a crossbeam walking part, and the crossbeam walking part is connected to the crossbeam body through a rotating shaft; the crossbeam provides support and guidance for the gluing device; the gluing device includes a walking servo hoist, a balancer, and a rubber boot, which are suspended on the crossbeam body; the follow-up transport trolley is used to carry the gluing system and control system hardware. The present invention can meet the gluing process requirements of different gluing areas of the blade and improve the efficiency and quality of the gluing operation. The gluing device of this structure has a high cost and is not suitable for various types of molds. It also has the problem of slow gluing speed, which leads to cumbersome gluing process. After some glued parts on the wind turbine blade have been cured, some parts have not been glued, resulting in poor work efficiency. Utility Model Content
[0006] Purpose of the utility model: In order to solve the shortcomings of the existing technology, the utility model provides a mobile gluing device for wind turbine blades based on large molds, which can realize rapid gluing of super-large wind turbine blades. The gluing process is accurate, which greatly improves the work quality and efficiency.
[0007] Technical solution: In order to achieve the above purpose, the utility model is a mobile gluing device based on large mold forming wind turbine blades, which includes: a spiral elevator, an oversized wind turbine blade mold, a heavy-load navigation vehicle, a large-tonnage glue machine, a large-tonnage glue machine walking channel and an avoidance device;
[0008] Extra-large wind turbine blade molds are respectively provided on both sides of the large-tonnage glue machine walking channel, and a avoidance device for avoiding the flip arm is provided in the middle of two adjacent large-tonnage glue machine walking channels located on the same straight line. When preparing wind turbine blades, the extra-large wind turbine blade molds need to be closed and separated by the flip arm. Therefore, by reserving the required width for flipping the flip mechanism on the large-tonnage glue machine walking channel, the extra-large wind turbine blade mold does not need to consider the influence of the gluing process when closing and separating the molds. The avoidance device can be opened in real time to realize the rapid flipping of the flip mechanism, thereby improving production efficiency.
[0009] The screw lift is installed on the large-tonnage glue machine walking channel at the end of the super-large wind turbine blade mold. The heavy-load navigation vehicle equipped with the large-tonnage glue machine is lifted and sent into the large-tonnage glue machine walking channel by the screw lift. When multiple large-tonnage glue machines are needed, the multiple large-tonnage glue machines are sent to the defined positions on the large-tonnage glue machine walking channel in sequence by the screw lift.
[0010] As a further preferred embodiment of the present invention, the spiral elevator comprises: a navigation vehicle bearing platform, a self-locking screw, a frame mechanism, a drive motor, a reducer, a linear guide column and a bottom plate;
[0011] The two frame mechanisms arranged opposite to each other are respectively vertically mounted on the base plate, the self-locking screw is fastened to the frame mechanism, the linear guide pillars located on both sides of the self-locking screw and arranged parallel to the self-locking screw are respectively fastened to the frame mechanism, the two sides of the navigation vehicle carrying platform installed horizontally above the base plate are respectively clamped on the two opposite frame mechanisms, the output end of the reducer fixed on the base plate is connected to the self-locking screw; the internal thread on the navigation vehicle carrying platform is matched with the external thread on the self-locking screw, and the linear guide pillars arranged opposite to each other are respectively clamped on the sides of the navigation vehicle carrying platform; the navigation vehicle carrying platform moves up and down in the two frame mechanisms under the rotation of the self-locking screw.
[0012] Since the two linear guide pillars and the self-locking screws are located on the same plane of the frame mechanism, and the two frame mechanisms are arranged opposite to each other, when the two drive motors rotate at the same time after receiving the PLC circuit signal, the rotation of the drive motor drives the two self-locking screws to rotate, and the two sides of the navigation vehicle carrying platform are respectively stuck on the linear guide pillars on the frame mechanism. At this time, the internal threads on both sides of the navigation vehicle carrying platform that are connected to the self-locking screws are driven by the rotation of the two self-locking screws, thereby realizing the horizontal height movement of the navigation vehicle carrying platform.
[0013] As a further preferred embodiment of the present invention, two self-locking screws arranged opposite to each other are respectively fastened to the frame mechanism, and at least one linear guide column is respectively provided on both sides of the self-locking screw.
[0014] As a further preference of the present invention, the heavy-load navigation vehicle comprises: a vehicle drive motor, a follower wheel, a limiting wheel and a driving wheel installed under the vehicle body, the vehicle drive motor is connected to the driving wheel, and the limiting wheel fastened under the vehicle body is stuck in a groove on the side of the large-tonnage glue machine walking channel, thereby realizing the position limitation of the heavy-load navigation vehicle relative to the large-tonnage glue machine walking channel in the horizontal direction and the width direction.
[0015] The side of the large-tonnage glue machine walking channel is an I-beam, and the follower wheel, the limiting wheel and the driving wheel are arranged in pairs. By clamping the limiting wheel in the groove of the I-beam, the stability of the heavy-loaded navigation vehicle in the horizontal and vertical directions can be ensured. The heavy-loaded navigation vehicle is a trackless flat car purchased from the supplier Dongteng Intelligent. Since the control method and working principle of the heavy-loaded navigation vehicle are existing technologies and have been widely used in the existing technologies, the specific structure of the heavy-loaded navigation vehicle will not be repeated here.
[0016] As a further preferred embodiment of the utility model, the avoidance device is hinged in the middle of the walking channels of two adjacent large-tonnage glue machines, and the avoidance device includes: a left avoidance plate and a right avoidance plate respectively hinged to the walking channels of the large-tonnage glue machines through avoidance hinges, and a left cylinder and a right cylinder for controlling the connection and disconnection of the left avoidance plate and the right avoidance plate, and the left cylinder and the right cylinder are respectively connected to the air pump.
[0017] As a further preferred embodiment of the present invention, one end of the left cylinder and the right cylinder are respectively hinged on a support seat for supporting the walking channel of the large-tonnage glue machine, and the other end of the left cylinder and the right cylinder are respectively hinged to the left avoidance plate and the right avoidance plate;
[0018] When the air pump inputs gas to the left cylinder and the right cylinder, the piston rods on the left cylinder and the right cylinder are pushed out, so that the left avoidance plate and the right avoidance plate are pushed upward respectively to achieve the connection between the left avoidance plate and the right avoidance plate and the adjacent two large-tonnage glue machine walking channels, so as to facilitate the heavy-loaded navigation vehicle carrying the large-tonnage glue machine to enter the left avoidance plate and the right avoidance plate from the large-tonnage glue machine walking channel and then enter the next large-tonnage glue machine walking channel;
[0019] When the air pump stops inputting gas to the left cylinder and the right cylinder, the piston rods on the left cylinder and the right cylinder are reset, so that the left avoidance plate and the right avoidance plate are disconnected under the action of the left cylinder and the right cylinder. The disconnection distance between the left avoidance plate and the right avoidance plate is the width required for the flip arm to flip.
[0020] As a further preferred embodiment of the present invention, the sum of the lengths of the left avoidance plate and the right avoidance plate is the same as the distance between two adjacent walking passages supporting the large-tonnage glue machine.
[0021] When it is necessary to close and separate the mold of an extra-large wind turbine blade through a flipping arm, by reserving the required width for flipping the flipping mechanism on the walking channel of the large-tonnage glue machine, the extra-large wind turbine blade mold can be closed and separated without considering the influence of the gluing process. The avoidance device can be opened in real time to achieve rapid flipping of the flipping mechanism.
[0022] The large-tonnage glue machine installed on the heavy-load navigation vehicle moves back and forth on the walking channel of the large-tonnage glue machine under the drive of the heavy-load navigation vehicle. The glue outlet of the large-tonnage glue machine evenly coats the colloid on the super-large wind turbine blade mold. The coating density of the colloid is set according to the requirements of different wind turbine blades. The large-tonnage glue machine in this technical solution is purchased from the supplier DOPAG, model gelcomlx. Since the control method and working principle of the large-tonnage glue machine are existing technologies and have been widely used in the existing technologies, the specific structure of the large-tonnage glue machine will not be repeated here.
[0023] As a further preferred embodiment of the present invention, the drive motor, vehicle drive motor and air pump are respectively connected to the PLC circuit.
[0024] Beneficial effects: Compared with the prior art, the mobile gluing device for forming wind turbine blades based on a large mold described in the utility model has the following advantages:
[0025] (1) The heavy-loaded navigation vehicle moving at a constant speed drives the large-tonnage glue machine to move at a constant speed, so that the glue coating of the super-large wind turbine blade mold is consistent, the position deviation is small, and it is not easy to cause the blade bonding defects;
[0026] (2) Through the cooperation of multiple large-tonnage glue machines and avoidance devices, the glue application of super-large wind turbine blades can be completed within 30 minutes, preventing the situation where some glue-coated areas have been solidified and some areas are not coated with glue due to the over-large mold of the super-large wind turbine blade;
[0027] (3) When two adjacent heavy-load navigation vehicles move, they have overlapping positions, which can prevent the situation where part of the structure is left out and not glued;
[0028] (4) Multiple large-tonnage glue machines move left or right at the same time to ensure that there is no interference or collision between the large-tonnage glue machines during the gluing process, so that the gluing path is optimized, the gluing process is fast and accurate, and the operation quality and efficiency are greatly improved;
[0029] (5) Through the automatic control of the screw lift, heavy-load navigation vehicle, large-tonnage glue machine and avoidance device by PLC circuit, the glue application work can be completed quickly and efficiently, realizing the automated batch glue application production of wind turbine blades. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a structural schematic diagram of the utility model in the state of preparing for gluing;
[0031] Figure 2 A schematic diagram of the structure for realizing lifting of the utility model
[0032] Figure 3 This is a schematic diagram of the structure of the utility model in the glue-spraying state.
[0033] Figure 4 It is a structural schematic diagram of a heavy-load navigation vehicle;
[0034] Figure 5 It is a structural schematic diagram of the overturning mechanism avoidance device;
[0035] Figure 6 The schematic diagram of the structure of the screw lift. DETAILED DESCRIPTION
[0036] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0037] like Figure 1 , Figure 2 , Figure 3 As shown, the utility model describes a mobile gluing device for forming wind turbine blades based on large molds, a spiral elevator 1, an oversized wind turbine blade mold 2, a heavy-loaded navigation vehicle 3, a large-tonnage glue machine 4, a large-tonnage glue machine walking channel 5 and an avoidance device 6. The oversized wind turbine blade mold 2 is located on both sides of the large-tonnage glue machine walking channel 5, and the spiral elevator 1 is installed at the end of the large-tonnage glue machine walking channel 5. The heavy-loaded navigation vehicle 3 equipped with the large-tonnage glue machine 4 is sequentially lifted and sent into the large-tonnage glue machine walking channel 5 by the spiral elevator 1, and an avoidance device 6 for avoiding the flip arm is provided on the large-tonnage glue machine walking channel 5.
[0038] The vehicle driving motor 34, the follower wheel 31, the limiting wheel 32 and the driving wheel 33 are installed under the vehicle body 35. The vehicle driving motor 34 is connected to the driving wheel 33. The limiting wheel 32 fastened under the vehicle body 35 is stuck in the groove on the side of the large-tonnage glue machine walking channel 5, so as to realize the horizontal and width direction position limitation of the heavy-load navigation vehicle 3 relative to the large-tonnage glue machine walking channel 5. Figure 4 shown.
[0039] The left cylinder 602 and the right cylinder 605 are connected to the air pump respectively. The left avoidance plate 603 and the right avoidance plate 604 are respectively hinged to the large-tonnage glue machine walking channel 5 through the avoidance hinge 601. The left cylinder 602 and the right cylinder 605 are used to control the connection and disconnection of the left avoidance plate 603 and the right avoidance plate 604. The disconnection size of the left avoidance plate 603 and the right avoidance plate 604 is the space size required for the flip arm to flip the super-large wind turbine blade mold 2, such as Figure 5 shown.
[0040] Two oppositely arranged frame mechanisms 103 are respectively vertically mounted on the base plate 107, the self-locking screw 102 is fastened to the frame mechanism 103, and the linear guide pillars 106 located on both sides of the self-locking screw 102 and arranged parallel to the self-locking screw 102 are respectively fastened to the frame mechanism 103, and the two sides of the navigation vehicle carrying platform 101 horizontally installed above the base plate 107 are respectively clamped on the two opposite frame mechanisms 103, and the output end of the reducer 105 fixed on the base plate 107 is connected to the self-locking screw 102. The navigation vehicle carrying platform 101 moves up and down in the two frame mechanisms 103 under the rotation of the self-locking screw 102, so that the navigation vehicle carrying platform 101 can sequentially send multiple heavy-loaded navigation vehicles 3 equipped with large-tonnage glue machines 4 into the large-tonnage glue machine walking channel 5 by lifting. Figure 6 shown.
[0041] Example 1
[0042] Step 1: Place multiple large-tonnage glue machine walking channels 5 in the middle of two super-sized wind turbine blade molds 2, install the spiral elevator 1 at the end of the large-tonnage glue machine walking channel 5, and then install the avoidance device 6 in the middle of two adjacent large-tonnage glue machine walking channels 5. Determine the number of large-tonnage glue machines 4 to be placed on the large-tonnage glue machine walking channels 5 according to the glue application amount of the wind turbine blades;
[0043] Step 2: transport the heavy-loaded navigation vehicle 3 equipped with the large-tonnage glue machine 4 to the navigation vehicle carrying platform 101, and then start the central console switch power supply. After receiving the signal, the weight sensor on the navigation vehicle carrying platform 101 feeds back the data to the PLC circuit. The PLC circuit determines whether the glue amount in the large-tonnage glue machine 4 meets the limit value according to the weight sensor feedback data. If the weight sensor data meets the limit value, the PLC circuit sends a start signal to the central console. If the weight sensor data does not meet the limit value, the PLC circuit sends a warning signal to the central console.
[0044] Step 3, after the central console receives the start signal from the PLC circuit, the operator presses the start button of the central console, and the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates clockwise to drive the self-locking screw 102 connected thereto to rotate counterclockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally upward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves upward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, and the PLC circuit sends a signal to the vehicle drive motor 34 to drive the heavy-loaded navigation vehicle 3 equipped with a large-tonnage glue machine 4 to move to a limited position on the large-tonnage glue machine walking channel 5;
[0045] Step 4, repeat step 3, transport multiple heavy-load navigation vehicles 3 equipped with large-tonnage glue machines 4 to the limited positions on the large-tonnage glue machine walking channel 5 in sequence, the PLC circuit sends a signal to the large-tonnage glue machine 4, and rotates and adjusts the glue outlet position of the large-tonnage glue machine 4 to correspond to the position of the super-large wind turbine blade mold 2 to prepare for glue application, wherein the number of large-tonnage glue machines 4 distributed at the root of the super-large wind turbine blade mold 2 accounts for 70% of the total number of large-tonnage glue machines 4, and the root of the super-large wind turbine blade mold 2 is 30% of the total length of the super-large wind turbine blade mold 2;
[0046] Step 5: The PLC circuit sends a signal to the vehicle drive motor 34 and the large-tonnage glue machine 4, and the heavy-load navigation vehicle 3 drives the large-tonnage glue machine 4 to move back and forth at a uniform speed on the large-tonnage glue machine walking channel 5. The large-tonnage glue machine 4 evenly applies glue to the super-large wind turbine blade mold 2 to obtain a uniformly distributed glue application path 7. The repeated position of two adjacent heavy-load navigation vehicles 3 when moving is 10 cm, and the glue output of the large-tonnage glue machine 4 is 10L / min.
[0047] Step 6, when the flip arm needs to close the mold of the oversized wind turbine blade 2, the PLC circuit sends a signal to the heavy-load navigation vehicle 3 to make the heavy-load navigation vehicle 3 move to the initial limited position, and then the PLC circuit sends a signal to the air pump, and the air pump stops inputting gas to the left cylinder 602 and the right cylinder 605, and the piston rods on the left cylinder 602 and the right cylinder 605 are reset back into the piston, so that the left avoidance plate 603 and the right avoidance plate 604 are disconnected under the action of the left cylinder 602 and the right cylinder 605, and the disconnection distance of the left avoidance plate 603 and the right avoidance plate 604 is the required width for the flip arm to flip;
[0048] When the flip arm completes the mold closing of the super-large wind turbine blade mold 2, the PLC circuit sends a signal to the air pump, and the piston rods on the left cylinder 602 and the right cylinder 605 are pushed out, so that the left avoidance plate 603 and the right avoidance plate 604 are respectively pushed upward to achieve the connection between the left avoidance plate 603 and the right avoidance plate 604 and the two adjacent large-tonnage glue machine walking channels 5, so as to facilitate the heavy-loaded navigation vehicle 3 carrying the large-tonnage glue machine 4 to enter the left avoidance plate 603 and the right avoidance plate 604 from the large-tonnage glue machine walking channel 5 and then enter the next large-tonnage glue machine walking channel 5, and finally arrive at the navigation vehicle carrying platform 101 at the end of the large-tonnage glue machine walking channel 5 in the front;
[0049] Step 7, the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates counterclockwise to drive the self-locking screw 102 connected thereto to rotate clockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally downward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves downward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, so that the heavy-loaded navigation vehicle 3 is placed on the ground, and the above actions are repeated until all heavy-loaded navigation vehicles 3 are placed on the ground;
[0050] Step 8: Repeat steps 2 to 6 to complete the gluing work of the next blade, so as to realize the mass gluing production of wind turbine blades.
[0051] Example 2
[0052] Step 1: Place multiple large-tonnage glue machine walking channels 5 in the middle of two super-sized wind turbine blade molds 2, install the spiral elevator 1 at the end of the large-tonnage glue machine walking channel 5, and then install the avoidance device 6 in the middle of two adjacent large-tonnage glue machine walking channels 5. Determine the number of large-tonnage glue machines 4 to be placed on the large-tonnage glue machine walking channels 5 according to the glue application amount of the wind turbine blades;
[0053] Step 2: transport the heavy-loaded navigation vehicle 3 equipped with the large-tonnage glue machine 4 to the navigation vehicle carrying platform 101, and then start the central console switch power supply. After receiving the signal, the weight sensor on the navigation vehicle carrying platform 101 feeds back the data to the PLC circuit. The PLC circuit determines whether the glue amount in the large-tonnage glue machine 4 meets the limit value according to the weight sensor feedback data. If the weight sensor data meets the limit value, the PLC circuit sends a start signal to the central console. If the weight sensor data does not meet the limit value, the PLC circuit sends a warning signal to the central console.
[0054] Step 3, after the central console receives the start signal from the PLC circuit, the operator presses the start button of the central console, and the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates clockwise to drive the self-locking screw 102 connected thereto to rotate counterclockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally upward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves upward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, and the PLC circuit sends a signal to the vehicle drive motor 34 to drive the heavy-loaded navigation vehicle 3 equipped with a large-tonnage glue machine 4 to move to a limited position on the large-tonnage glue machine walking channel 5;
[0055] Step 4, repeat step 3, transport multiple heavy-load navigation vehicles 3 equipped with large-tonnage glue machines 4 to the limited positions on the large-tonnage glue machine walking channel 5 in sequence, the PLC circuit sends a signal to the large-tonnage glue machine 4, and rotates and adjusts the glue outlet position of the large-tonnage glue machine 4 to correspond to the position of the super-large wind turbine blade mold 2 to prepare for glue application, wherein the number of large-tonnage glue machines 4 distributed at the root of the super-large wind turbine blade mold 2 accounts for 72% of the total number of large-tonnage glue machines 4, and the root of the super-large wind turbine blade mold 2 is 35% of the total length of the super-large wind turbine blade mold 2;
[0056] Step 5: The PLC circuit sends a signal to the vehicle drive motor 34 and the large-tonnage glue machine 4, and the heavy-load navigation vehicle 3 drives the large-tonnage glue machine 4 to move back and forth at a uniform speed on the large-tonnage glue machine walking channel 5. The large-tonnage glue machine 4 evenly applies glue to the super-large wind turbine blade mold 2 to obtain a uniformly distributed glue application path 7. The repeated position of two adjacent heavy-load navigation vehicles 3 when moving is 13 cm, and the glue output of the large-tonnage glue machine 4 is 16 L / min.
[0057] Step 6, when the flip arm needs to close the mold of the oversized wind turbine blade 2, the PLC circuit sends a signal to the heavy-load navigation vehicle 3 to make the heavy-load navigation vehicle 3 move to the initial limited position, and then the PLC circuit sends a signal to the air pump, and the air pump stops inputting gas to the left cylinder 602 and the right cylinder 605, and the piston rods on the left cylinder 602 and the right cylinder 605 are reset back into the piston, so that the left avoidance plate 603 and the right avoidance plate 604 are disconnected under the action of the left cylinder 602 and the right cylinder 605, and the disconnection distance of the left avoidance plate 603 and the right avoidance plate 604 is the required width for the flip arm to flip;
[0058] When the flip arm completes the mold closing of the super-large wind turbine blade mold 2, the PLC circuit sends a signal to the air pump, and the piston rods on the left cylinder 602 and the right cylinder 605 are pushed out, so that the left avoidance plate 603 and the right avoidance plate 604 are respectively pushed upward to achieve the connection between the left avoidance plate 603 and the right avoidance plate 604 and the two adjacent large-tonnage glue machine walking channels 5, so as to facilitate the heavy-loaded navigation vehicle 3 carrying the large-tonnage glue machine 4 to enter the left avoidance plate 603 and the right avoidance plate 604 from the large-tonnage glue machine walking channel 5 and then enter the next large-tonnage glue machine walking channel 5, and finally arrive at the navigation vehicle carrying platform 101 at the end of the large-tonnage glue machine walking channel 5 in the front;
[0059] Step 7, the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates counterclockwise to drive the self-locking screw 102 connected thereto to rotate clockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally downward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves downward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, so that the heavy-loaded navigation vehicle 3 is placed on the ground, and the above actions are repeated until all heavy-loaded navigation vehicles 3 are placed on the ground;
[0060] Step 8: Repeat steps 2 to 6 to complete the gluing work of the next blade, so as to realize the mass gluing production of wind turbine blades.
[0061] Example 3
[0062] Step 1: Place multiple large-tonnage glue machine walking channels 5 in the middle of two super-sized wind turbine blade molds 2, install the spiral elevator 1 at the end of the large-tonnage glue machine walking channel 5, and then install the avoidance device 6 in the middle of two adjacent large-tonnage glue machine walking channels 5. Determine the number of large-tonnage glue machines 4 to be placed on the large-tonnage glue machine walking channels 5 according to the glue application amount of the wind turbine blades;
[0063] Step 2: transport the heavy-loaded navigation vehicle 3 equipped with the large-tonnage glue machine 4 to the navigation vehicle carrying platform 101, and then start the central console switch power supply. After receiving the signal, the weight sensor on the navigation vehicle carrying platform 101 feeds back the data to the PLC circuit. The PLC circuit determines whether the glue amount in the large-tonnage glue machine 4 meets the limit value according to the weight sensor feedback data. If the weight sensor data meets the limit value, the PLC circuit sends a start signal to the central console. If the weight sensor data does not meet the limit value, the PLC circuit sends a warning signal to the central console.
[0064] Step 3, after the central console receives the start signal from the PLC circuit, the operator presses the start button of the central console, and the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates clockwise to drive the self-locking screw 102 connected thereto to rotate counterclockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally upward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves upward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, and the PLC circuit sends a signal to the vehicle drive motor 34 to drive the heavy-loaded navigation vehicle 3 equipped with a large-tonnage glue machine 4 to move to a limited position on the large-tonnage glue machine walking channel 5;
[0065] Step 4, repeat step 3, transport multiple heavy-load navigation vehicles 3 equipped with large-tonnage glue machines 4 to the limited positions on the large-tonnage glue machine walking channel 5 in sequence, the PLC circuit sends a signal to the large-tonnage glue machine 4, and rotates and adjusts the glue outlet position of the large-tonnage glue machine 4 to correspond to the position of the super-large wind turbine blade mold 2 to prepare for glue application, wherein the number of large-tonnage glue machines 4 distributed at the root of the super-large wind turbine blade mold 2 accounts for 75% of the total number of large-tonnage glue machines 4, and the root of the super-large wind turbine blade mold 2 is 40% of the total length of the super-large wind turbine blade mold 2;
[0066] Step 5: The PLC circuit sends a signal to the vehicle drive motor 34 and the large-tonnage glue machine 4, and the heavy-load navigation vehicle 3 drives the large-tonnage glue machine 4 to move back and forth at a uniform speed on the large-tonnage glue machine walking channel 5. The large-tonnage glue machine 4 evenly applies glue to the super-large wind turbine blade mold 2 to obtain a uniformly distributed glue application path 7. The repeated position of two adjacent heavy-load navigation vehicles 3 when moving is 15 cm, and the glue output of the large-tonnage glue machine 4 is 20L / min.
[0067] Step 6, when the flip arm needs to close the mold of the oversized wind turbine blade 2, the PLC circuit sends a signal to the heavy-load navigation vehicle 3 to make the heavy-load navigation vehicle 3 move to the initial limited position, and then the PLC circuit sends a signal to the air pump, and the air pump stops inputting gas to the left cylinder 602 and the right cylinder 605, and the piston rods on the left cylinder 602 and the right cylinder 605 are reset back into the piston, so that the left avoidance plate 603 and the right avoidance plate 604 are disconnected under the action of the left cylinder 602 and the right cylinder 605, and the disconnection distance of the left avoidance plate 603 and the right avoidance plate 604 is the required width for the flip arm to flip;
[0068] When the flip arm completes the mold closing of the super-large wind turbine blade mold 2, the PLC circuit sends a signal to the air pump, and the piston rods on the left cylinder 602 and the right cylinder 605 are pushed out, so that the left avoidance plate 603 and the right avoidance plate 604 are respectively pushed upward to achieve the connection between the left avoidance plate 603 and the right avoidance plate 604 and the two adjacent large-tonnage glue machine walking channels 5, so as to facilitate the heavy-loaded navigation vehicle 3 carrying the large-tonnage glue machine 4 to enter the left avoidance plate 603 and the right avoidance plate 604 from the large-tonnage glue machine walking channel 5 and then enter the next large-tonnage glue machine walking channel 5, and finally arrive at the navigation vehicle carrying platform 101 at the end of the large-tonnage glue machine walking channel 5 in the front;
[0069] Step 7, the PLC circuit sends a signal to the drive motor 104, and the drive motor 104 rotates counterclockwise to drive the self-locking screw 102 connected thereto to rotate clockwise, so that the navigation vehicle carrying platform 101 gradually moves horizontally downward to a limited position, and the position sensor located on the frame mechanism 103 sends a signal to the PLC circuit. When the navigation vehicle carrying platform 101 moves downward to the limited position, the PLC circuit sends a stop rotation signal to the drive motor 104, so that the heavy-loaded navigation vehicle 3 is placed on the ground, and the above actions are repeated until all heavy-loaded navigation vehicles 3 are placed on the ground;
[0070] Step 8: Repeat steps 2 to 6 to complete the gluing of the next blade, and realize mass gluing production of wind turbine blades. The above implementation is only to illustrate the technical concept and features of the utility model, and its purpose is to enable technicians familiar with the technical field to understand the content of the utility model and implement it accordingly, and it cannot be used to limit the protection scope of the utility model. Any equivalent changes or modifications made according to the spirit of the utility model should be included in the protection scope of the utility model.
Claims
1. A mobile gluing device for forming wind turbine blades based on a large mold, characterized by: It includes: Screw lift (1), super-large wind turbine blade mold (2), heavy-load navigation vehicle (3), large-tonnage glue machine (4), large-tonnage glue machine walking channel (5) and avoidance device (6); Super-sized wind turbine blade molds (2) are respectively arranged on both sides of the large-tonnage glue machine walking channel (5), and an avoidance device (6) for avoiding the flip arm is arranged in the middle of two adjacent large-tonnage glue machine walking channels (5); The spiral lift (1) is installed on a large-tonnage glue machine walking channel (5) located at the end of an oversized wind turbine blade mold (2), and a heavy-loaded navigation vehicle (3) equipped with a large-tonnage glue machine (4) is lifted and sent into the large-tonnage glue machine walking channel (5) by the spiral lift (1).
2. According to claim 1, a mobile glue coating device for forming wind turbine blades based on a large mold is characterized by: The spiral elevator (1) comprises: a navigation vehicle bearing platform (101), a self-locking screw (102), a frame mechanism (103), a driving motor (104), a reducer (105), a linear guide column (106) and a base plate (107); Two frame mechanisms (103) arranged opposite to each other are respectively vertically mounted on a bottom plate (107); a self-locking screw (102) is fastened to the frame mechanism (103); linear guide pillars (106) located on both sides of the self-locking screw (102) and arranged parallel to the self-locking screw (102) are respectively fastened to the frame mechanism (103); both sides of a navigation vehicle carrying platform (101) horizontally mounted above the bottom plate (107) are respectively clamped on the two opposite frame mechanisms (103); and an output end of a reducer (105) fixed on the bottom plate (107) is connected to the self-locking screw (102); The internal thread on the navigation vehicle carrying platform (101) is matched with the external thread on the self-locking screw (102), and the linear guide pillars (106) arranged opposite to each other are respectively clamped on the side of the navigation vehicle carrying platform (101); The navigation vehicle carrying platform (101) moves up and down in two frame mechanisms (103) under the rotation of the self-locking screw (102).
3. According to claim 2, a mobile glue coating device for forming wind turbine blades based on a large mold is characterized by: Two self-locking screws (102) arranged opposite to each other are respectively fastened to the frame mechanism (103).
4. According to claim 1, a mobile glue coating device for forming wind turbine blades based on a large mold is characterized by: The heavy-load navigation vehicle (3) comprises: a vehicle driving motor (34), a follower wheel (31), a limiting wheel (32) and a driving wheel (33) installed below a vehicle body (35); the vehicle driving motor (34) is connected to the driving wheel (33); the limiting wheel (32) fastened below the vehicle body (35) is stuck in a groove on the side of a large-tonnage glue machine walking channel (5), so as to realize the position limitation of the heavy-load navigation vehicle (3) relative to the large-tonnage glue machine walking channel (5) in the horizontal direction and the width direction.
5. The mobile glue coating device for forming wind turbine blades based on a large mold according to claim 4 is characterized by: The follower wheel (31), the limiting wheel (32) and the driving wheel (33) are arranged in pairs.
6. The mobile glue coating device for forming wind turbine blades based on a large mold according to claim 1 is characterized by: The avoidance device (6) is hinged in the middle of two adjacent large-tonnage glue machine walking channels (5).
7. The mobile gluing device for forming wind turbine blades based on a large mold according to claim 6 is characterized by: The avoidance device (6) comprises: a left avoidance plate (603) and a right avoidance plate (604) respectively hinged to the large-tonnage glue machine walking channel (5) through avoidance hinges (601), and a left cylinder (602) and a right cylinder (605) for controlling the connection and disconnection of the left avoidance plate (603) and the right avoidance plate (604), and the left cylinder (602) and the right cylinder (605) are respectively connected to air pumps.
8. The mobile glue coating device for forming wind turbine blades based on a large mold according to claim 7 is characterized by: One end of the left cylinder (602) and the right cylinder (605) are respectively hinged on a support seat (51) for supporting the large-tonnage glue machine walking channel (5), and the other end of the left cylinder (602) and the right cylinder (605) are respectively hinged to the left avoidance plate (603) and the right avoidance plate (604).
9. The mobile glue coating device for forming wind turbine blades based on a large mold according to claim 7 is characterized by: The sum of the lengths of the left avoidance plate (603) and the right avoidance plate (604) is the same as the distance between two adjacent walking passages (5) supporting large-tonnage glue machines.
10. A mobile glue coating device for forming wind turbine blades based on a large mold according to claim 1, 2, 4 or 7, characterized in that: The large-tonnage glue machine (4), the drive motor (104), the vehicle drive motor (34) and the air pump are respectively connected to the PLC circuit.
Citation Information
Cited By
Movable type rapid gluing method for wind power blade formed by large mold
CN117884323A
Movable fast coating method for large-mold forming wind power blade
CN117884323B
