Desulfurization wastewater zero discharge treatment system

By using components such as filtration, freezing, melting, reverse osmosis membrane and non-boiling evaporation in the desulfurization wastewater treatment system, combined with freezing method and reverse osmosis membrane treatment, the problems of high energy consumption of evaporation and concentration and difficulty in utilizing salt are solved, and desulfurization is achieved. Zero discharge of waste water and full utilization of resources.

CN221854388UActive Publication Date: 2024-10-18SICHUAN WEIXIN GREEN ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322339512.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-08-29
Publication Date
2024-10-18
Estimated Expiration
2033-08-29

AI Technical Summary

Technical Problem

The existing desulfurization wastewater treatment system has high energy consumption of evaporation and concentration, and the difficulty in reusing and processing the salt finally produced by evaporation and crystallization, and has not achieved true zero emissions.

Method used

Using filter components, freezing components, melting components, reverse osmosis membrane components, non-boiling evaporation components and freezing crystallization devices, through freezing method and reverse osmosis membrane treatment, the concentration of desulfurization wastewater and pure water recovery are achieved, and the concentrated salt is analyzed Used as a snow melting agent to achieve zero emissions.

Benefits of technology

It reduces the energy consumption and investment cost of the system, realizes the recycling of all resources of desulfurization wastewater, truly achieves zero emissions, and uses low-temperature environments to reduce costs in the severe cold areas of the north, and uses snow melting agents to process the melting of ice and snow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221854388U_ABST
    Figure CN221854388U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of desulfurization wastewater recovery, in particular to a zero-discharge treatment system for desulfurization wastewater, which overcomes the defects that the energy consumption of evaporation and concentration is higher, the salt finally generated by evaporation and crystallization is difficult to recycle and treat, and the real zero discharge is not realized in the conventional desulfurization wastewater treatment system. The system comprises a filtering assembly, a freezing assembly, a melting assembly, a first reverse osmosis membrane assembly, a non-boiling evaporation assembly, a freezing crystallization device and a snow melting agent collecting device which are sequentially communicated, an air dehumidification device is arranged in the non-boiling evaporation assembly, and the air dehumidification device heats air through low-temperature hot water and then takes away moisture in waste water; and the wastewater is concentrated. Through arrangement and connection of all the components, recycling of desulfurization wastewater is completed, and zero-emission recovery is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of desulfurization wastewater recovery, in particular to a desulfurization wastewater zero-discharge treatment system. Background Art

[0002] At present, the main idea of ​​zero-emission process for desulfurization wastewater is pretreatment + membrane concentration + evaporation crystallization.

[0003] The evaporation and crystallization system is the final treatment unit of the "zero discharge of desulfurization wastewater" technology. It realizes zero discharge of liquid by evaporating and crystallizing highly concentrated high-salt water. For the evaporation and crystallization system of the zero discharge process of desulfurization wastewater, the multi-effect evaporation process or the MVR evaporation process is generally adopted. The two evaporation and crystallization processes have their own advantages and disadvantages. The multi-effect evaporation process has low requirements for pretreatment, and the water production rate and water quality reuse rate can meet the water standards for steam injection boilers. The MVR evaporation process has stable performance. After the system is started, it only consumes electricity, has no dependence on heat sources, and has strong independence, but the pretreatment requirements are higher than those of the multi-effect evaporation process.

[0004] The evaporation process can achieve zero discharge of desulfurization wastewater, and there are successful engineering cases in China. However, this method also has many shortcomings: 1. Due to the use of membrane concentration and evaporation crystallization process, the entire system occupies a large area; 2. This process has high investment and operating costs, and requires a large amount of heat energy to provide steam; 3. The salt produced by evaporation and crystallization is generally mixed salt, which is difficult to reuse and difficult to handle, and has not achieved true "zero discharge"; 4. The investment and operating costs are high, and this technology has not been widely promoted and applied. Utility Model Content

[0005] The utility model aims to solve the problems that the existing desulfurization wastewater treatment system has high evaporation and concentration energy consumption, and the salt finally produced by evaporation and crystallization is difficult to reuse and difficult to treat, and the real "zero emission" problem is not achieved. The utility model provides a desulfurization wastewater zero emission treatment system, which completes the recycling of desulfurization wastewater through the arrangement and connection of various components, and realizes zero emission recycling.

[0006] The specific technical solution of the utility model is as follows:

[0007] A zero-discharge treatment system for desulfurization wastewater comprises: a filtering component, a freezing component, a melting component, a first reverse osmosis membrane component, a non-boiling evaporation component, a freezing crystallization device and a snowmelt collection device which are connected in sequence. An air dehumidification device is arranged in the non-boiling evaporation component. The air dehumidification device heats the air with low-temperature hot water and removes the moisture in the wastewater, so that the wastewater is concentrated.

[0008] Working and use process: When using this system to recycle desulfurized wastewater, connect the inlet of the filter component to the inflow end of the desulfurized wastewater, and the desulfurized wastewater flows into the filter component. The filter component physically removes impurities from the desulfurized wastewater. The filter component removes some larger suspended solids and other impurities in the desulfurized wastewater, thus achieving the first step of impurity removal and filtration of the desulfurized wastewater. The wastewater flows into the freezing component to freeze the wastewater, and then the solid matter is melted by the melting component to remove some impurities. The melted wastewater flows to the first reverse osmosis membrane component, which further separates the wastewater. Part of pure water and part of concentrated wastewater are obtained, and then the concentrated wastewater enters the non-boiling evaporation component, the air dehumidification device in the non-boiling evaporation component, the air dehumidification device heats the air by low-temperature hot water, improves the water carrying capacity of the heated air, and the heated air is fully in contact with the wastewater to be concentrated, takes away the water in the concentrated wastewater, and further concentrates the concentrated wastewater. The concentrated wastewater enters the freezing crystallization device, and various salts in the concentrated wastewater such as sodium chloride, magnesium sulfate and magnesium chloride are precipitated in the freezing crystallization device to obtain a deicing agent, and the deicing agent enters the deicing agent collection device to be collected. The utility model provides a zero-discharge treatment system for desulfurization wastewater, which uses a freezing method to treat desulfurization wastewater to achieve the recycling of its water resources, and through reverse osmosis membrane treatment, pure water is obtained for recycling. The concentrated liquid obtained by reverse osmosis membrane treatment is further concentrated by an air dehumidification device, and then a solid phase is obtained, which is used as a deicing agent, realizing the recycling of all resources of desulfurization wastewater, and truly achieving zero discharge.

[0009] At the same time, when this system is used in the extremely cold regions of the north, the refrigeration component can directly utilize the low temperature of the environment to freeze the wastewater, thereby reducing costs, and ultimately achieving wastewater treatment and utilizing the impurities in the wastewater to make a snow-melting agent, which can be used to melt ice and snow in the extremely cold regions of the north, thus realizing full utilization of resources.

[0010] Furthermore, the system also includes a sedimentation component connected between the freezing component and the non-boiling evaporation component, and the sedimentation component is used to settle the wastewater that is not frozen by the freezing component.

[0011] Furthermore, the sedimentation component is also connected to a second reverse osmosis membrane component, and the outlet end of the second reverse osmosis membrane component is also connected to the non-boiling evaporation component.

[0012] Furthermore, the outlet end of the second reverse osmosis membrane assembly is also provided with a pure water outlet.

[0013] Furthermore, a heat pump system is provided between the freezing component and the melting component. A fan is provided in the heat pump system. The fan is used to blow cold air to the freezing component. The heat pump system is also used to absorb the residual heat of other components and transfer it to the melting component to provide temperature for it.

[0014] Furthermore, the heat pump system is also used to absorb the residual heat of other components and transfer it to the air dehumidification device to provide heat therefor.

[0015] Furthermore, an impurity collecting device is provided in the filter assembly.

[0016] Furthermore, the outlet end of the reverse osmosis membrane assembly is also provided with a pure water outlet.

[0017] Compared with the prior art, the utility model completes the recycling of desulfurization wastewater by setting a filter component, a freezing component, a melting component, a reverse osmosis membrane component, a non-boiling evaporation component, a freezing crystallization device and a snowmelt collection device that are connected in sequence, realizes zero-discharge recycling of wastewater, and solves the problems of high energy consumption of evaporation and concentration in the existing desulfurization wastewater treatment system, and the salt finally produced by evaporation and crystallization is difficult to be reused, difficult to treat, and does not achieve true "zero discharge". At the same time, when the system is used in the northern cold regions, the freezing component can directly use the low temperature of the environment to freeze the wastewater, reducing the cost, and finally can realize the treatment of wastewater and treat and utilize the impurities in the wastewater to make a snowmelt, which can be used in the melting of ice and snow in the northern cold regions, realizing the full utilization of resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of a zero-discharge treatment system for desulfurization wastewater provided by the utility model. Figure 1 .

[0019] Figure 2 This is a schematic diagram of a zero-discharge treatment system for desulfurization wastewater provided by the utility model. Figure 2 .

[0020] Figure 3 This is a schematic diagram of a zero-discharge treatment system for desulfurization wastewater provided by the utility model. Figure 3 .

[0021] Description of the accompanying drawings:

[0022] 1. Filtration component; 2. Freezing component; 3. Melting component; 4. First reverse osmosis membrane component; 5. Non-boiling evaporation component; 6. Freezing crystallization device; 7. Snow melting agent collection device; 8. Sedimentation component; 9. Heat pump system; 10. Second reverse osmosis membrane component. DETAILED DESCRIPTION

[0023] Please combine Figure 1The embodiment of the utility model provides a zero-discharge treatment system for desulfurization wastewater, comprising: a filter component 1, a freezing component 2, a melting component 3, a first reverse osmosis membrane component 4, a non-boiling evaporation component 5, a freezing crystallization device 6 and a snowmelt collection device 7 connected in sequence, wherein the non-boiling evaporation component 5 is provided with an air dehumidification device, and the air dehumidification device heats the air with low-temperature hot water and removes the moisture in the wastewater, so that the wastewater is concentrated.

[0024] It can be understood that when using this system to recycle desulfurized wastewater, the inlet of the filter component 1 is connected to the inflow end of the desulfurized wastewater, the desulfurized wastewater flows into the filter component 1, and the filter component 1 physically removes impurities from the desulfurized wastewater. The filter component 1 removes some larger suspended matter and other impurities in the desulfurized wastewater, thereby achieving the first step of impurity removal and filtration of the desulfurized wastewater; the wastewater flows into the freezing component 2, the wastewater is frozen, and then the solid matter is melted by the melting component 3, and some impurities are removed. The melted wastewater flows to the first reverse osmosis membrane component 4, and the first reverse osmosis membrane component 4 further separates the wastewater. Part of pure water and part of concentrated wastewater are obtained, and then the concentrated wastewater enters the non-boiling evaporation component 5, in which an air dehumidification device is provided. The air dehumidification device heats the air by low-temperature hot water to improve the water carrying capacity of the heated air. The heated air is in full contact with the wastewater to be concentrated, and the moisture in the concentrated wastewater is taken away, so that the concentrated wastewater is further concentrated. The concentrated wastewater enters the freezing crystallization device 6, and various salts in the concentrated wastewater, such as sodium chloride, magnesium sulfate and magnesium chloride, are precipitated in the freezing crystallization device 6 to obtain a deicing agent, which enters the deicing agent collection device 7 to be collected.

[0025] The utility model provides a zero-discharge treatment system for desulfurization wastewater, which utilizes a freezing method to treat desulfurization wastewater, realizes the recycling of its water resources, and obtains pure water for recycling through reverse osmosis membrane treatment. The concentrated liquid obtained by reverse osmosis membrane treatment is further concentrated by an air dehumidification device, and then a solid phase is obtained, which is used as a snow-melting agent, thereby realizing the recycling of all resources of desulfurization wastewater and truly achieving zero discharge. At the same time, when the system is used in the severely cold areas of the north, the freezing component 2 can directly utilize the low temperature of the environment to freeze the wastewater, thereby reducing the cost, and finally realizing the treatment of the wastewater and processing and utilizing the impurities in the wastewater to make a snow-melting agent, which can be used in the melting of ice and snow in the severely cold areas of the north, thereby realizing the full utilization of resources.

[0026] Among them, the filtering component 1 is preferably a wastewater filter, the freezing component 2 is preferably a freezer, the melting component 3 is preferably a heater, the first reverse osmosis membrane component 4 is preferably a reverse osmosis RO membrane purifier, the non-boiling evaporation component 5 is preferably an evaporator or an evaporation device, the freezing crystallization device 6 is preferably a freezing crystallizer, the snow melting agent collection device 7 is preferably a solid collector, and the air dehumidification device is preferably an air dehumidifier, that is, dry dehumidification using wet energy technology.

[0027] Please combine Figure 2 In some embodiments of the present invention, the system further comprises a sedimentation component 8 connected between the freezing component 2 and the non-boiling evaporation component 5, and the sedimentation component 8 is used to sediment the unfrozen wastewater of the freezing component 2. The sedimentation component 8 is preferably a sedimentation centrifuge.

[0028] The sedimentation assembly 8 is also connected to a second reverse osmosis membrane assembly 10, and the outlet of the second reverse osmosis membrane assembly 10 is also connected to the non-boiling evaporation assembly 5. A pure water outlet is also provided at the outlet of the second reverse osmosis membrane assembly 10. The second reverse osmosis membrane assembly 10 is preferably a reverse osmosis RO membrane purifier.

[0029] It can be understood that, in this embodiment, after the freezing component 2 freezes the wastewater, a portion of the wastewater is not frozen. This portion of the wastewater that is not frozen enters the sedimentation component 8 for sedimentation, and the solid-liquid mixture after sedimentation enters the non-boiling evaporation component 5 to take away the water in the solid-liquid mixture, so that the salts in the wastewater are further concentrated, and the subsequent snow-melting agent is also prepared.

[0030] By connecting the second reverse osmosis membrane component 10 to the sedimentation component 8, the unsettled part of the wastewater (supernatant) is further separated to obtain part of the pure water and filtered wastewater liquid (concentrated wastewater with pure water removed). The pure water is discharged from the pure water outlet and enters other process flows, while the concentrated wastewater treated by the second reverse osmosis membrane component 10 also enters the non-boiling evaporation component 5 to be used for subsequent de-icing agent preparation.

[0031] It can be seen that in this embodiment, by adding a sedimentation component 8 and a second reverse osmosis membrane component 10 on the basis of the above embodiment, if the freezing efficiency of the freezing component 2 is low, for example, when the ambient low temperature is used for freezing but not all the wastewater is frozen, the unfrozen wastewater enters the sedimentation component 8 for sedimentation, and the solid-liquid mixture at the bottom after sedimentation enters the non-boiling evaporation component 5 to prepare the snow-melting agent, and the upper clear liquid obtained by sedimentation enters the second reverse osmosis membrane component 10 for separation, and the pure water is discharged after separation, and the concentrated wastewater also enters the non-boiling evaporation component 5 to prepare the snow-melting agent. Such a setting allows most of the wastewater to be processed and utilized, improves the processing efficiency, and increases the amount of snow-melting agent prepared.

[0032] See also Figure 3In some embodiments of the present invention, a heat pump system 9 is provided between the freezing component 2 and the melting component 3. A fan is provided in the heat pump system 9. The fan is used to blow cold air from the outside to the freezing component 2. Therefore, the freezing component 2 can use cold air from the outside to freeze the wastewater. The heat pump system 9 is also used to absorb the residual heat of other components and transfer it to the melting component 3 to provide a temperature for melting the frozen wastewater.

[0033] In some embodiments of the present invention, the heat pump system 9 is also used to absorb the residual heat of other components and transfer it to the air dehumidification device to provide heat for it. The heat pump system 9 is preferably a heat pump device.

[0034] It can be understood that arranging a fan inside the heat pump system 9 or connecting a fan outside the heat pump system 9 makes it possible to directly use natural cold air to freeze the wastewater, saving costs. The heat pump system 9 also absorbs the residual heat of other components to provide heat for subsequent components, which can reduce the external energy supply to the heat pump system 9 and further save costs.

[0035] In some embodiments of the present invention, an impurity collecting device is provided in the filter assembly 1. The impurity collecting device is preferably an existing solid collector.

[0036] It can be understood that by setting up an impurity collecting device to collect impurities after wastewater filtration, the discharge of impurities is achieved.

[0037] In certain embodiments of the present invention, the outlet end of the first reverse osmosis membrane assembly 4 is further provided with a pure water outlet.

[0038] It can be understood that by setting a pure water outlet to discharge and collect the pure water separated by the first reverse osmosis membrane assembly 4, water resource recovery is achieved.

[0039] In this embodiment, a zero-discharge treatment system for desulfurization wastewater is provided, and its specific application is recorded. The wastewater is first filtered through a filter assembly 1, and a simple pretreatment is performed on the desulfurization wastewater to remove its suspended matter, etc., and then enters a freezing assembly 2 for a freezing process. The cold air in the freezing process is natural cold air in winter. When the ambient temperature is high, the cold air is provided by a heat pump system 9. The freezing assembly 2 at the freezing point is connected to a fan, and the fan blows the cold air into the freezing assembly 2. This process can separate water and other substances in the desulfurization wastewater, and the frozen ice enters a melting assembly 3, where the melting assembly 3 needs to absorb heat. The heat can be provided by waste heat from large factories such as surrounding power plants in winter (such as low-temperature hot water, etc.), and can be provided by a heat pump system 9 when the temperature is high.

[0040] Here, the two ends of the heat pump system 9 respectively provide heat for the melting device of the melting component 3 and provide low temperature for the cold air end of the freezing component 2. After that, the melted water is further separated by the first reverse osmosis membrane component 4. Taking the treatment capacity of 50kg / h of desulfurization wastewater as an example, 45kg / h of pure water and 5kg / h of concentrated wastewater can be obtained through the first reverse osmosis membrane component 4. After that, the concentrated wastewater enters the non-boiling evaporation component 5 such as the non-boiling evaporation device. In this device, the concentrated wastewater is further concentrated by the air dehumidification device, taking away 3.225kg / h of water, and then enters the cooling crystallization device 6. Finally, 1.55kg / h of solid can be obtained. This part of solid is the main solid phase in the desulfurization wastewater, which can be used as a deicing agent and used to treat snow in areas with heavy snowfall in the north. The air dehumidification device in this embodiment mainly heats the air through low-temperature hot water (about 50°C) to improve the water carrying capacity of the heated air, and the heated air is fully in contact with the wastewater to be concentrated, taking away the water in the concentrated wastewater, so that the concentrated wastewater is further concentrated. The low-temperature hot water required for this part is provided by the heat pump system 9. Finally, it enters the cooling process, where salts (sodium chloride, magnesium sulfate, magnesium chloride, etc.) are precipitated to obtain 1.55kg / h of snow melting agent.

[0041] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A zero-discharge treatment system for desulfurization wastewater, characterized in that: include: A filtering component, a freezing component, a melting component, a first reverse osmosis membrane component, a non-boiling evaporation component, a freezing crystallization device and a snowmelt collecting device are sequentially connected. The non-boiling evaporation component is provided with an air dehumidification device. The air dehumidification device heats the air with low-temperature hot water and then removes moisture from the wastewater, so that the wastewater is concentrated.

2. A desulfurization wastewater zero discharge treatment system according to claim 1, characterized in that: The system further includes a sedimentation component connected between the freezing component and the non-boiling evaporation component, and the sedimentation component is used to settle the wastewater that is not frozen by the freezing component.

3. A zero-discharge treatment system for desulfurization wastewater according to claim 2, characterized in that: The sedimentation component is also connected to a second reverse osmosis membrane component, and the outlet end of the second reverse osmosis membrane component is also connected to the non-boiling evaporation component.

4. A zero-discharge treatment system for desulfurization wastewater according to claim 3, characterized in that: The outlet end of the second reverse osmosis membrane assembly is also provided with a pure water outlet.

5. A zero-discharge treatment system for desulfurization wastewater according to claim 1, characterized in that: A heat pump system is provided between the freezing component and the melting component. A fan is provided in the heat pump system. The fan is used to blow cold air to the freezing component. The heat pump system is also used to absorb the residual heat of other components and transfer it to the melting component to provide temperature for it.

6. A zero-discharge treatment system for desulfurization wastewater according to claim 5, characterized in that: The heat pump system is also used to absorb the residual heat of other components and transfer it to the air dehumidification device to provide heat therefor.

7. A zero-discharge treatment system for desulfurization wastewater according to claim 1, characterized in that: An impurity collecting device is arranged in the filter assembly.

8. A zero-discharge treatment system for desulfurization wastewater according to claim 1, characterized in that: The outlet end of the first reverse osmosis membrane assembly is also provided with a pure water outlet.