Defective soil foundation reinforcing device
Through the design of precast concrete piles and slabs, the problems of difficult pile driving and long construction time in foundation reinforcement on poor soil are solved, and fast and stable foundation reinforcement is achieved, which is suitable for tight construction schedules and winter construction.
Patent Information
- Application Number
- CN202420445459.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The existing foundation reinforcement technology in poor soil has problems such as difficulty in pile driving, long construction time, and unfixed piles and slabs. It is especially unsuitable for tight construction schedules and winter construction in the north.
Prefabricated concrete piles and concrete slabs are used. The lower end of the concrete pile is tapered, and the top surface is flush with the foundation. There are vertical jacks on the piles. The bottom of the slab is fixed on the pile through bolts. Adjacent slabs are connected by arc-shaped plug-ins. Bolts and bent rod bolts are used for fixation, and rubber water-stop strips are provided on the edge of the board to prevent gaps.
It greatly reduces the construction waiting time, simplifies the piling process, enhances the fixation of the pile plate, makes full use of the in-situ soil characteristics, and is suitable for tight construction schedules and winter construction.
Smart Images

Figure CN221855481U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bad soil foundation construction, in particular to a bad soil foundation reinforcement device. Background Art
[0002] Collapsible loess, soft soil, expansive soil and frozen soil are the most common types of poor foundation soils on construction sites. Since the above-mentioned poor soils have the characteristics of low strength, high compression and high water content, when the foundation is affected by groundwater, it is very easy to experience foundation settlement, which in turn affects the quality of the superstructure. Traditional construction operations mostly use heavy pressure, strong tamping or drainage consolidation to reinforce the foundation. Although this method avoids the problems of material transportation, waste soil coordination and high cost during large-scale replacement and filling, it takes a long time to drain and consolidate the foundation, which is not suitable for rapid rush work under tight construction conditions. In addition, due to the influence of soil foundation water content and low temperature, traditional reinforcement methods are not suitable for winter construction in the north.
[0003] The invention patent with the patent number CN201810830317.6, the application date July 25, 2018, and the patent name "Prefabricated GFRP tube concrete pile and reinforced concrete slab top-mounted roadbed pile-slab structure" discloses a new foundation reinforcement method, which adds tube piles to the foundation to compact the foundation, and after driving the concrete piles, lays the concrete slab mold on the piles to cast the concrete slab. Although the above patent can reinforce the poor soil foundation to a certain extent, it still has the following defects:
[0004] The bottom surface of the pipe pile is flat, so it is difficult to drive the pile into the soil foundation;
[0005] After the piles are driven, a concrete slab is poured on top of it. It takes a long time to wait for the concrete slab to solidify, which affects the construction progress;
[0006] A crushed soil layer is laid between the concrete piles and the concrete, so that the concrete piles and the concrete slabs are divided into two independent parts. When the concrete piles are deformed under the influence of the foundation, they cannot provide good support for the concrete slabs, which will affect the stability of the superstructure in the long run. Utility Model Content
[0007] In order to solve the technical problems existing in the prior art such as difficulty in piling, long construction time and unfixed connection between piles and plates, the utility model provides a poor soil foundation reinforcement device.
[0008] To achieve this technical purpose, the utility model adopts the following scheme:
[0009] A poor soil foundation reinforcement device includes a plurality of prefabricated concrete piles and a plurality of concrete slabs.
[0010] A number of concrete piles are inserted into the foundation at equal intervals, the lower ends of the concrete piles are tapered, the top surfaces of the concrete piles are flush with the surface of the foundation, and vertically penetrating insertion holes are opened on the concrete piles;
[0011] Several concrete slabs are assembled to cover the foundation range. The bottom of the concrete slabs is supported by concrete piles. Threaded holes are opened at positions corresponding to the insertion holes on the concrete slabs. Bolts are fixed in the insertion holes and the threaded holes. Adjacent concrete slabs are fixed by arc-shaped plug-ins.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The concrete piles and concrete slabs of this device are prefabricated in the factory. When in use, you can directly drive the piles and cover the slabs, which can greatly reduce the waiting time;
[0014] 2. The lower end of the concrete pile is set in a cone shape, which can reduce the resistance when the concrete pile is driven into the foundation, and the concrete pile can be driven into the foundation with less force;
[0015] 3. The concrete piles and concrete slabs are fixed by bolts and support each other. The concrete piles, soil between the piles and concrete slabs form a composite foundation, which jointly bears the upper load and makes full use of the characteristics of the original soil.
[0016] The preferred embodiment of the present utility model is:
[0017] The edge of the concrete slab is provided with an arc-shaped hole extending from the top surface of the concrete slab to the outer side surface of the concrete slab, and the arc-shaped holes of two adjacent concrete slabs are plugged and fixed by arc-shaped plug-ins.
[0018] An annular buffer pad is fixed at the lower end of the threaded hole, the inner diameter of the annular buffer pad is greater than or equal to the aperture of the threaded hole, and the area of the annular buffer pad is greater than the top surface area of the concrete column; when installing the concrete slab, the buffer pad can prevent crushing damage caused by direct contact between the concrete pile and the concrete slab during the installation process.
[0019] The side of the concrete slab is fixed with a rubber water stop strip to prevent gaps between the spliced concrete slabs and prevent groundwater from flowing onto the ground. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the reinforcement method of the utility model;
[0021] Figure 2 It is a top view of the splicing of multiple concrete slabs of the utility model;
[0022] Figure 3 It is a side view of the concrete slab of the utility model;
[0023] Figure 4This is a schematic diagram of the concrete pile of the utility model;
[0024] The markings in the figure are: 1. concrete slab; 11. arc hole; 12. threaded hole; 13. nut hole; 14. annular buffer pad hole; 15. rubber water stop; 2. concrete pile; 21. socket; 3. foundation. DETAILED DESCRIPTION
[0025] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0026] Reference Figure 1-4 The utility model provides a poor soil foundation reinforcement device, which pre-plans the number of concrete piles 2 that need to be inserted into the foundation 3 according to the area of the foundation 3 and the tightness of the soil of the foundation 3, and then prefabricates the corresponding number of concrete piles 2 and concrete slabs 1;
[0027] A plurality of concrete piles 2 are inserted into the foundation 3 at equal intervals, the lower end of the concrete pile 2 is conical, the top surface of the concrete pile 2 is flush with the surface of the foundation 3, and a vertical insertion hole 21 is opened on the concrete pile 2;
[0028] Several concrete slabs 1 are assembled to cover the foundation range. The bottom of the concrete slabs is supported by concrete piles 2. Threaded holes 12 are opened at positions corresponding to the sockets 21 on the concrete slabs 1. Bolts are fixed in the sockets 21 and the threaded holes 12. Adjacent concrete slabs 1 are fixed by arc-shaped plugs.
[0029] In this embodiment, the bolts arranged in the socket 21 and the threaded hole 12 are straight-rod bolts. The opening depth of the socket 21 is greater than the length of the bolt, so that the bolt can be inserted into the concrete pile 2 through the socket 21. A coaxial nut hole 13 with a diameter greater than the threaded hole 12 is opened at the upper end of the threaded hole 12. After the bolt is screwed into the threaded hole 12 and the socket 21 from top to bottom, the nut of the bolt is limited in the nut hole 13. This arrangement facilitates rotating the nut to drive the bolt to be fixed in the socket 21 and the threaded hole 12, and can also prevent the nut from continuing to rotate downward into the socket 21, resulting in poor fixing effect of the concrete pile 2 and the concrete slab 1. At the same time, the nut is limited in the nut hole 13 to prevent the nut from protruding from the surface of the concrete slab 1 and affecting the construction of other structures on the upper side of the concrete slab 1. The concrete slab 1 and the concrete pile 2 are fixed by bolts.
[0030] In this embodiment, an arc-shaped hole 11 extending from the top surface of the concrete slab 1 to the outer side surface of the concrete slab 1 is provided at the edge of the concrete slab 1. The upper end diameter of the arc-shaped hole 11 is larger than the lower end diameter, and the upper end is used for limiting the nut. After the concrete slab 1 is cast, the arc-shaped hole 11 can be opened by using a bent rod drill bit, or the concrete slab 1 with the arc-shaped hole 11 can be cast by a mold when casting the concrete slab 1; the diameter of the arc-shaped hole 11 is smaller than the thickness of the concrete slab 1, and the positions of the arc-shaped holes 11 of each concrete slab 1 are the same. When splicing, the positions of the arc-shaped holes 11 of two adjacent concrete slabs 1 correspond, and the arc-shaped plug-in is inserted into the two butted arc-shaped holes 11. Preferably, the arc-shaped plug-in is a bent rod bolt, and the two adjacent concrete slabs 1 are fixedly connected by the bent rod bolt, and nuts are set at both ends of the bent rod bolt for fixing.
[0031] In this embodiment, an annular buffer pad hole 14 coaxial with the threaded hole 12 is also opened at the lower end of the threaded hole 12. The diameter of the annular buffer pad hole 14 is the same as the diameter of the annular buffer pad and is used to accommodate the annular buffer pad. The inner diameter of the annular buffer pad is greater than or equal to the aperture of the threaded hole 12 to prevent the annular buffer pad from affecting the bolt passing through the insertion hole 21; the area of the annular buffer pad is greater than the top surface area of the concrete column. When installing the concrete slab 1, the annular buffer pad can prevent crushing damage caused by direct contact between the concrete pile 2 and the concrete slab 1 during the installation process.
[0032] In this embodiment, a rubber waterstop strip 15 is fixed to the side of the concrete slab 1. The width of the rubber waterstop strip 15 is equal to the thickness of the concrete slab 1, so that the rubber waterstop strip 15 can completely wrap the side of the concrete slab 1, thereby avoiding gaps between the spliced concrete slabs 1 and groundwater returning through the gaps; the rubber waterstop strip 15 adopts the waterstop strip that expands when exposed to water commonly used on the market, and its hardness is relatively low. When the two concrete slabs 1 are butt-jointed, the rubber waterstop strip 15 will be squeezed, and when fixed by means of bent rod bolts, continuously tightening the bent rod bolts will also continuously reduce the gap until it is infinitely close to no gap.
[0033] In this embodiment, the concrete pile 2 and the concrete slab 1 of the device are both prefabricated in the factory. When in use, the concrete pile 2 is directly driven into the foundation 3, and then the concrete slab 1 is placed on the upper end of the concrete pile 2. The concrete pile 2 and the concrete slab 1 are assembled into a whole by bolts and bent rod bolts. This construction method can greatly reduce the time for waiting for the concrete to solidify.
[0034] In this embodiment, preferably, the concrete pile 2 is prefabricated into a cylindrical pile body, which is convenient for setting the lower end of the cylindrical pile body to a cone. The concrete slab 1 is a rectangular slab with a certain thickness. One concrete slab 1 is fixed to multiple concrete piles 2. It is not necessary for one concrete slab 1 to correspond to one concrete pile 2. It is only necessary to calculate the position of the threaded hole 12 on the concrete. Before implementing this device, it is necessary to first determine the characteristics of the soil of the foundation 3 based on geological survey data, and determine the configuration and specific size of the prefabricated concrete slab 11 and the pile type, piling method and pile diameter of the prefabricated concrete pile 24 based on the soil characteristics.
[0035] In this embodiment, the lower end of the concrete pile 2 is set to be tapered to facilitate the concrete pile 2 to be driven into the foundation 3; the concrete pile 2 and the concrete slab 1 are fixed by bolts to support each other, and the concrete pile 2, the soil between the piles and the concrete slab 1 together form a composite foundation 3, which jointly bears the upper end load and fully utilizes the inherent characteristics of the in-situ soil.
[0036] The construction method of using the device to reinforce the foundation 3 is:
[0037] Step 1: prefabricate a plurality of concrete piles 2 and a plurality of concrete slabs 1. When pouring the concrete piles 2, an axial insertion hole 21 is reserved at the upper end of the concrete piles 2, and the lower end of the concrete piles 2 is poured into a cone;
[0038] Step 2: drive a number of concrete piles 2 into the foundation 3 at equal intervals, so that the top surface of the concrete piles 2 is flush with the surface of the foundation 3;
[0039] Step 3: A plurality of threaded holes 12 are formed on the concrete slab 1, an annular buffer pad is fixed to the bottom of the threaded holes 12, and an arc-shaped hole 11 is formed on the edge of the concrete slab 1 to penetrate the top and the side;
[0040] Step 4: Splice several concrete slabs 1 and place them on top of the concrete pile 2, with the positions of the sockets 21 corresponding to the threaded holes 12, and use bolts to pass through the threaded holes 12 and the sockets 21 to fix the concrete slabs 1 and the concrete pile 2;
[0041] Step 5: Insert the two ends of the bent rod bolt into the arc-shaped holes 11 of two adjacent concrete slabs 1 respectively, and fix the two ends of the bent rod bolt with nuts.
[0042] Finally, it should be noted that the above-listed examples are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and modifications fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A device for reinforcing a poor soil foundation, comprising a plurality of prefabricated concrete piles (2) and a plurality of concrete slabs (1), characterized in that: A plurality of concrete piles (2) are inserted into the foundation (3) at equal intervals, the lower end of the concrete pile (2) is conical, the top surface of the concrete pile (2) is flush with the surface of the foundation (3), and a vertical insertion hole (21) is opened at the upper end of the concrete pile (2); A plurality of concrete slabs (1) are assembled to cover the foundation range, the bottom of the concrete slabs are supported by concrete piles (2), threaded holes (12) are provided at positions corresponding to the insertion holes (21) on the concrete slabs (1), and bolts are fixed in the insertion holes (21) and the threaded holes (12); Adjacent concrete slabs (1) are fixed via arc-shaped plug-ins.
2. The poor soil foundation reinforcement device according to claim 1 is characterized in that: The edge of the concrete slab (1) is provided with an arc-shaped hole (11) extending from the top surface of the concrete slab (1) to the outer side surface of the concrete slab (1), and the arc-shaped holes (11) of two adjacent concrete slabs (1) are connected and fixed by an arc-shaped plug-in.
3. The poor soil foundation reinforcement device according to claim 1 is characterized in that: An annular buffer pad is fixed at the lower end of the threaded hole (12); the inner diameter of the annular buffer pad is greater than or equal to the hole diameter of the threaded hole (12); and the area of the annular buffer pad is greater than the top surface area of the concrete column.
4. The poor soil foundation reinforcement device according to claim 1 is characterized in that: A rubber water stop strip (15) is fixed to the side of the concrete slab (1).