Steel pipe pile positioning system suitable for bare rock riverbed

By using a steel pipe pile system connected with small-diameter positioning piles and cast-in-place concrete on the bare rock river bed, the construction problem of steel pipe piles on the bare rock river bed is solved, an efficient, safe and economical construction method is achieved, and large-scale drilling is avoided. Use of machinery.

CN221855502UActive Publication Date: 2024-10-18THE FOURTH ENG CO LTD OF CHINA ZHONGTIEMAJOR BRIDGE ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420151622.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-10-18
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

When constructing steel pipe piles on bare rock riverbeds, it is difficult to effectively position and sink piles with existing technology. Large drilling rigs and complex processes are often required, resulting in construction uncertainty and safety risks.

Method used

Small-diameter positioning piles are embedded in the bare rock river bed. The bottom of the steel pipe pile is inserted outside the positioning pile and connected through the sealing layer and cast-in-situ concrete. A small geological drilling rig is used for pilot hole construction, which simplifies the process and improves the efficiency. Positioning accuracy.

Benefits of technology

There is no need for large-scale drilling equipment, construction is more convenient and efficient, steel pipe pile positioning is reliable, structural stability and safety are high, and it is highly economical and environmentally friendly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855502U_ABST
    Figure CN221855502U_ABST
Patent Text Reader

Abstract

The utility model provides a steel pipe pile positioning system suitable for a bare rock riverbed, which comprises a plurality of positioning piles, the plurality of positioning piles are embedded and fixed in the bare rock riverbed, the bottom of a steel pipe pile is sleeved and inserted on the outer side of the plurality of positioning piles, and a plugging layer is arranged on the periphery of the bottom of the steel pipe pile. The plugging layer is used for plugging a gap between the bottom of the steel pipe pile and the bare rock riverbed; and a connecting part is arranged at the inner bottom of the steel pipe pile and is used for connecting the steel pipe pile with the positioning piles. The utility model has the advantages of higher engineering economy, safety and reliability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel pipe pile positioning, in particular to a steel pipe pile positioning system suitable for a bare rock riverbed. Background Art

[0002] For some large bridge projects across rivers, the construction technology of setting up construction platforms or trestles on water is widely used, especially for steel pipe pile foundation construction. However, for some riverbeds with exposed rocks, steel pipe pile construction is particularly difficult. Ordinary vibration pile driving equipment is difficult to achieve pile driving. Large drilling rigs are often required to guide holes for construction before conventional steel pipe pile driving, or other drilling equipment is used to drill holes or carve threads before installing steel pipe piles. Such construction methods require the use of large drilling machinery, especially for some large-diameter steel pipe piles, which require the use of large drilling equipment, and the construction process is complicated. After the holes are guided and drilled, the construction method of natural backflow and filling after pile insertion is often used. The reliability has a high degree of uncertainty, and most of them are single-point single-pile construction, which has uncertain safety risks and inherent stability.

[0003] In response to the theme of "safety, applicability, economy and environmental protection", it is urgent to invent a new steel pipe pile construction method to improve the construction economy and safety and reliability while ensuring the construction quality. Summary of the invention

[0004] In view of the above-mentioned prior art, the utility model proposes a steel pipe pile positioning system suitable for bare rock riverbed.

[0005] The utility model provides a steel pipe pile positioning system suitable for a bare rock riverbed, comprising a plurality of positioning piles, wherein the plurality of positioning piles are all embedded in the bare rock riverbed, the bottom of the steel pipe pile is inserted into the outside of the plurality of positioning piles, and a blocking layer is arranged on the outer periphery of the bottom of the steel pipe pile, and the blocking layer is used to block the gap between the bottom of the steel pipe pile and the bare rock riverbed; and a connecting part is arranged on the inner bottom of the steel pipe pile, and the connecting part is used to connect the steel pipe pile with the plurality of positioning piles.

[0006] Preferably, the positioning piles are embedded in positioning holes in the bare rock riverbed.

[0007] Preferably, the positioning piles are made of steel pipes with a diameter smaller than that of the steel pipe piles.

[0008] Preferably, the plurality of positioning piles are arranged in a matrix.

[0009] Preferably, the sealing layer is made of sandbags or backfill soil.

[0010] Preferably, the connecting portion is a cast-in-place concrete layer.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. The utility model provides a steel pipe pile positioning system suitable for bare rock riverbeds. It does not require large-scale hole-guiding equipment, such as large drilling rigs, large pile diameter drill bits, pile driving equipment, etc. Only small drilling equipment such as small geological drilling rigs is needed to complete the hole-guiding construction, and small-scale drilling construction is more convenient and more efficient.

[0013] 2. The utility model does not require high positioning accuracy for the guide hole drilling, and the drilling deviation can be adjusted during the construction of the connection between the steel pipe pile and the positioning pile, and only the positioning of the steel pipe pile needs to be controlled.

[0014] 3. The utility model is convenient for adjusting the steel pipe pile during positioning, thus avoiding the problem of steel pipe pile positioning deviation caused by the deviation of the guide hole.

[0015] 4. In the utility model, the steel pipe piles and the positioning piles are connected by cast-in-place concrete, the connection is reliable, the structural stability, safety and reliability are high, and the construction technology is mature.

[0016] 5. In the utility model, a floating platform can be used in conjunction with a small geological drill to carry out the lead hole construction, which is convenient for construction. All the drilling construction of the positioning piles required for a single steel pipe pile can be completed by positioning the platform once.

[0017] 6. The utility model can fully utilize the high bearing capacity of the bare rock riverbed, reduce the length of the steel pipe piles driven into the riverbed, and has high economy.

[0018] 7. The dismantling of the steel pipe piles in the utility model can make full use of the existing underwater cutting new technology, the steel pipe piles are recyclable, and the dismantling process is simple, efficient, safe and environmentally friendly.

[0019] 8. The utility model adopts multiple small-diameter steel pipes to embed steel pipe piles. After forming, the steel pipe piles have strong integrity and stability, and are more stable than single-pile boring piles. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of an embodiment of the utility model;

[0021] Figure 2 , 3 It is a construction schematic diagram of an embodiment of the utility model;

[0022] In the figure, 1. positioning piles; 2. steel pipe piles; 3. bare rock riverbed; 4. sand bags; 5. cast-in-place concrete layer; 6. construction platform; 7. geological drilling rig; 8. positioning holes. DETAILED DESCRIPTION

[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.

[0024] Embodiment: A steel pipe pile positioning system suitable for bare rock riverbed, such as Figure 1 As shown, it includes a plurality of positioning piles 1 arranged in a matrix, the positioning piles 1 use steel pipes with a diameter smaller than that of the steel pipe piles 2, the plurality of positioning piles 1 are embedded in positioning holes in a bare rock riverbed 3, the bottoms of the steel pipe piles 2 are inserted into the outsides of the plurality of positioning piles 1, and sand bags 4 are provided on the outer periphery of the bottoms of the steel pipe piles 2, the sand bags 4 are used to block the gaps between the bottoms of the steel pipe piles 2 and the bare rock riverbed 3; and a cast-in-place concrete layer 5 is provided on the inner bottoms of the steel pipe piles 2, the cast-in-place concrete layer 5 is used to connect the steel pipe piles 2 with the plurality of positioning piles 1 together.

[0025] like Figure 2 , 3 As shown, the construction method of the steel pipe pile positioning system is as follows:

[0026] S1: A temporary floating construction platform 6 is arranged above the designed pile position, and a geological drilling rig 7 is used on the construction platform 6 to construct a positioning hole 8.

[0027] S2: After the corresponding positioning pile 1 is inserted into the positioning hole 8, the steel pipe pile 2 is positioned and inserted.

[0028] S3: The gap between the pile bottom and the riverbed is sealed by throwing sand bags 4 around the steel pipe pile 2.

[0029] S4: pouring pile bottom concrete into the steel pipe pile 2 to connect the steel pipe pile 2 with the plurality of positioning piles 1.

[0030] S5: After the construction of the steel pipe pile 2 at the pile position is completed, the construction platform 6 is moved to carry out the construction of the next pile position.

[0031] In the case where it is difficult to experiment with sinking steel pipe piles 2 on an exposed rock riverbed, the present embodiment adopts a construction method that cooperates with a floating construction platform 6 and a geological drill rig 7. First, multiple positioning holes 8 are drilled at the designed pile positions and positioning piles 1 are installed. After the multiple positioning piles 1 are installed, the steel pipe piles 2 are inserted into the pile positions. The positioning piles 1 and the steel pipe piles 2 are connected by pouring concrete at the bottom of the piles to form a reliable steel pipe pile foundation, so that the steel pipe piles 1 have good stability and are reliably connected to the riverbed. In addition, the method can avoid the use of large-scale drilling machinery during construction, and the project economy, safety and reliability are high.

[0032] It should be noted that in some implementation cases, other forms of small drilling equipment can also be used for drilling, including but not limited to small drilling rigs, homemade drilling equipment, etc. The steel pipe pile 2 can be a steel pipe, or a pipe pile structure made of other materials. The embedding form can be an insertion type, or a threaded installation type, or other effective connection forms. The connection between the bottom of the steel pipe pile 2 and the positioning pile 1 can be made by filling the bottom of the pile with concrete, or by mechanical connection, or other forms of effective connection. The construction platform 6 can also be a fixed or mobile construction platform of other styles.

[0033] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent replacement made using the specification and drawings of the present utility model, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present utility model.

Claims

1. A steel pipe pile positioning system suitable for bare rock riverbed, characterized in that: It comprises a plurality of positioning piles, which are all embedded in a bare rock riverbed, the bottom of a steel pipe pile is inserted into the outside of the plurality of positioning piles, and a sealing layer is arranged on the outer periphery of the bottom of the steel pipe pile, and the sealing layer is used to seal the gap between the bottom of the steel pipe pile and the bare rock riverbed; and a connecting part is arranged on the inner bottom of the steel pipe pile, and the connecting part is used to connect the steel pipe pile with the plurality of positioning piles.

2. The steel pipe pile positioning system according to claim 1, characterized in that: The positioning piles are embedded in positioning holes in the bare rock riverbed.

3. The steel pipe pile positioning system according to claim 1 or 2, characterized in that: The positioning piles are made of steel pipes with a diameter smaller than that of the steel pipe piles.

4. The steel pipe pile positioning system according to claim 1 or 2, characterized in that: The plurality of positioning piles are arranged in a matrix.

5. The steel pipe pile positioning system according to claim 1 or 2, characterized in that: The sealing layer is made of sand bags or backfill soil.

6. The steel pipe pile positioning system according to claim 1 or 2, characterized in that: The connecting part is a cast-in-place concrete layer.