Drilling pile foundation fender pile and drilling pile foundation fender pile suite
Through the combined structure of anchor tubes, anchor rods and clamping parts, the problems of pile position deviation and material waste in bored pile foundation construction are solved, safe storage of wire ropes and flexible review of pile positions are realized, and construction safety is improved. and civilization.
Patent Information
- Application Number
- CN202420218246.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-29
AI Technical Summary
During the construction of bored pile foundations, pile position deviations occur due to geological changes and too long drill pipes. The existing review methods have problems such as material waste, safety hazards, and civilized construction impacts.
It adopts the structure of anchor barrel and anchor rod. The wire rope is wrapped around the anchor rod and put into the anchor barrel. The limit and storage are realized through the clamping parts and slots. It is combined with the main body of the puller and the support to facilitate height adjustment and safe lifting. pull.
It effectively avoids corrosion of wire ropes mixed with mud and water, reduces material waste, improves construction safety and civility, and simplifies the pile position review process.
Smart Images

Figure CN221855506U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pile foundation construction, in particular to a bored pile foundation guard pile and a bored pile foundation guard pile kit. Background Art
[0002] During the drilling process, the drill operator may experience geological changes, excessively long drill rods, and other situations that may cause the drill bit to swing, causing the pile position deviation of the pile foundation to be unable to be controlled within the specified value, resulting in errors in the connection between the pile foundation steel cage and the column steel cage, affecting the stress of the bridge substructure and the quality of the column steel protection layer. Therefore, when forming the pile foundation, it is necessary to constantly review the drilling position of the pile foundation; currently, the most commonly used positioning review method is the "4-point cross method", which is to hammer in four steel bars around the pile foundation position, and pull the wire rope when waiting for the positioning review. The intersection of the cross is compared with the pile foundation position to determine whether the pile foundation position is offset during the drilling process. Specifically, before burying the steel cage, the surveyor needs to first lay out the position of the pile foundation point, and the construction team drives steel bars into the soil around the pile foundation, and then pulls the wire rope between the two opposite steel bars to finally form a cross intersection. Next, the surveyor needs to re-measure to determine whether the intersection corresponds accurately to the pile guard position.
[0003] At present, the length of the re-checked steel bars needs to be selected according to the height of the pile foundation on site. If the terrain is uneven, the length of the steel bars will increase, which will cause material waste for steel bars that will not be used later. If the steel bars are too long, the exposed length on site will be longer after being driven in, and the movement of workers on site will also be affected. Or if the depth is too long, it will be more difficult for workers on site to remove the steel bars. Moreover, after the cross-check, workers on site often put the ropes aside at will, and the mud and ropes are mixed together. After a long time, the ropes will be corroded and have a certain impact on the safe and civilized construction on site. Utility Model Content
[0004] One of the purposes of the utility model is to provide a bored pile foundation guard pile to solve the problems that the existing double-checked steel bars are exposed on the ground and easily damaged, have poor versatility, and are not conducive to safe and civilized construction on site; the second purpose is to provide a bored pile foundation guard pile kit to facilitate the extraction of the bored pile foundation guard pile.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0006] A bored pile foundation guard pile comprises an anchoring tube, wherein the anchoring tube is a hollow structure with one end open, the bottom of the anchoring tube is a conical structure, and a clamping groove is provided at the top of the anchoring tube;
[0007] An anchor rod and a wire rope, wherein the wire rope can be wound around the anchor rod, and the wire rope and the anchor rod can be extended into the anchor barrel together;
[0008] A clamping piece is provided at one end of the anchor rod, and the clamping piece can be engaged with the clamping groove to limit the position of the anchor rod.
[0009] According to the above technical scheme, by setting an anchor tube and an anchor rod, the rope can be wound around the anchor rod, and both the rope and the anchor rod can be placed in the anchor tube, which plays a role of storing the rope and prevents the rope from being mixed with mud and water after use, causing corrosion to the rope; at the same time, by setting a clip and a slot, the clip can be inserted into the slot to connect the clip to the top of the anchor rod. When the clip is inserted into the slot, it can limit the anchor rod, which is convenient for use.
[0010] Furthermore, the number of the slots is more than two, and each of the slots extends along the length direction of the anchor tube.
[0011] According to the above technical solution, by providing a plurality of card slots, it is convenient for the card connector to be inserted into the card slots, thereby increasing the use effect.
[0012] Furthermore, a card block is formed around the clamping member, the number of the card blocks corresponds to the number of the card slots, and each of the card blocks extends in a vertical direction, and each of the card blocks can be inserted into one of the card slots.
[0013] According to the above technical solution, by arranging a clamping block around the clamping piece, when the clamping block is clamped into the clamping slot, the clamping piece is buried in the anchoring tube, and when the clamping block is clamped into the clamping slot, the anchoring rod is limited.
[0014] Furthermore, a protrusion is provided at one end of the clamping member away from the anchor rod.
[0015] According to the above technical solution, a protrusion is provided at the end of the clamping piece to prevent the clamping piece from being damaged or deformed when hammered.
[0016] Furthermore, a first latch opening is provided at the top of the anchoring tube.
[0017] According to the above technical solution, by setting the first latch hole, when in use, the bored pile foundation guard pile kit can pass through the first latch hole through the connecting piece, which is convenient for the subsequent use of the bored pile foundation guard pile kit to pull out the anchor tube for subsequent extraction.
[0018] Furthermore, when the anchor rod is located in the anchor tube, the anchor rod and the inner wall of the anchor tube are gap-matched.
[0019] According to the above technical solution, when the anchor rod is located in the anchor tube, there is a gap between the anchor rod and the inner wall of the anchor tube. When the rope is wrapped around the anchor rod, the rope fits against the inner wall of the anchor tube, which is used to prevent soil from entering the anchor rod during construction.
[0020] In addition, the utility model also provides a bored pile foundation guard pile kit, comprising the bored pile foundation guard pile as described above;
[0021] It also includes an extractor body and a support, wherein the support is movably connected to the extractor body;
[0022] The end of the puller body may be connected to the anchoring tube.
[0023] Furthermore, the extractor body comprises a pressure rod, a first connecting block and a second connecting block, the first connecting block is fixed to the pressure rod, and the second connecting block is hinged to the end of the pressure rod.
[0024] According to the above technical solution, a first connecting block is provided, the first connecting block is used to be connected to the support rod, and the second connecting block is used to be connected to the anchoring tube.
[0025] Furthermore, the support includes a support rod and a base, one end of the support rod is fixed to the base, and the other end of the support rod is hinged to the first connecting block.
[0026] According to the above technical solution, the base is located at the bottom of the support rod, and the two are fixed to each other. The top of the support rod is hinged to the first connecting block, and the bottom of the base is a disc structure. By setting it as a disc structure, the force on the lower part can be prevented to prevent sinking.
[0027] Furthermore, a connecting piece is included, and the second connecting block is connected to the anchoring tube through the connecting piece.
[0028] According to the above technical solution, the connecting piece is used to connect the second connecting block to the anchoring tube.
[0029] Beneficial effects of the utility model:
[0030] The utility model provides an anchoring tube and an anchoring rod, so that the wire rope can be wound around the anchoring rod, and both the wire rope and the anchoring rod can be placed in the anchoring tube, which can store the wire rope and prevent the wire rope from being mixed with muddy water after use, which may cause corrosion to the wire rope; at the same time, by providing a clamping piece and a slot, the clamping piece can be inserted into the slot, and the clamping piece is connected to the top of the anchoring rod. When the clamping piece is inserted into the slot, the anchoring rod can be limited, which is convenient for use. The utility model adopts the form of an anchoring tube and an anchoring rod. When checking, it is only necessary to extend the anchoring rod from the anchoring tube, and the height can be flexibly adjusted, which avoids the trouble of the anchoring rod being driven in too deep and affecting the subsequent extraction. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the anchor tube structure of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model;
[0032] Figure 2 It is a schematic diagram of the anchor rod structure of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model;
[0033] Figure 3 It is a cross-sectional view of the structure of the clamping member of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model;
[0034] Figure 4 It is a structural schematic diagram of the bored pile foundation protection pile kit of the utility model;
[0035] Figure 5 It is a schematic diagram of the structure of the connecting parts of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model;
[0036] Figure 6 It is a schematic diagram of the general state of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model;
[0037] Figure 7 It is a schematic diagram of the drilled pile foundation guard pile and the drilled pile foundation guard pile kit of the utility model in the review state;
[0038] Figure 8 It is a top view of the bored pile foundation guard pile and the bored pile foundation guard pile kit of the utility model in the review state.
[0039] Among them, there are an anchor tube 1, a slot 11, a first pin hole 12, an anchor rod 2, a wire rope 3, a clamping part 4, a clamping block 41, a protrusion 42, a puller body 5, a pressure rod 51, a first connecting block 52, a second connecting block 53, a support 6, a support rod 61, a base 62, and a connecting part 8. DETAILED DESCRIPTION
[0040] The following will describe the implementation of the present invention with reference to the accompanying drawings and preferred embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be understood that the preferred embodiments are only for illustrating the present invention, not for limiting the scope of protection of the present invention.
[0041] It should be noted that the illustrations provided in the following embodiments are only schematic illustrations of the basic concept of the present invention, and thus the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed at will, and the component layout may also be more complicated.
[0042] This embodiment proposes a bored pile foundation guard pile, such as Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, it includes an anchor tube 1, an anchor rod 2 and a wire rope 3. The anchor tube 1 is a hollow structure with an opening at the top. The bottom of the anchor tube 1 is a conical structure with a sharp bottom, which is convenient for reducing resistance when inserted into the ground and can be hammered down more effortlessly to facilitate insertion into the ground. A card slot 11 is provided on the top of the anchor tube 1. The wire rope 3 can be installed on the anchor rod 2 by winding, and the wire rope 3 and the anchor rod 2 can be inserted into the anchor tube 1 together.
[0043] like Figure 2 As shown, one end of the anchor rod 2 (i.e. Figure 2 In the utility model, a clamping member 4 is provided at the top of the anchor rod 2, and the clamping member 4 can be engaged with the slot 11 to limit the anchor rod 2. In the utility model, the clamping member 4 is fixed to the end of the anchor rod 2 by welding.
[0044] According to the above technical scheme, by setting the anchor tube 1 and the anchor rod 2, the rope 3 can be wound around the anchor rod 2, and both the rope 3 and the anchor rod 2 can be placed in the anchor tube 1, which plays a role of storing the rope 3 and prevents the rope 3 from being mixed with mud and water after use, causing corrosion to the rope 3; at the same time, by setting the clip 4 and the slot 11, the clip 4 is connected to the top of the anchor rod 2, and the clip 4 can be inserted into the slot 11. When the clip 4 is inserted into the slot 11, it can limit the anchor rod 2, which is convenient for use.
[0045] As a preferred embodiment, the number of the card slots 11 is more than two, and each card slot 11 extends along the length direction of the anchor tube 1. Specifically, in the present utility model, the extension length of the card slot 11 is preferably twice the diameter of the anchor rod 2, and the width of the card slot 11 is one eighth of the diameter of the anchor rod 2. The present utility model adopts the form of setting a plurality of card slots 11, which facilitates the card connector 4 to be inserted into the card slot 11, and is easy to use.
[0046] Furthermore, a card block 41 is formed around the clamping member 4, the number of the card blocks 41 corresponds to the number of the card slots 11, and each card block 41 extends in the vertical direction. The number of the card blocks 41 is four, which are distributed around the clamping member 4 to form a cross-vertical cross structure. The size and height of the card block 41 correspond to the card slot 11 reserved for the anchor tube 1; the extension length of the card block 41 is also twice the diameter of the anchor rod 2, and each card block 41 can be inserted into one of the card slots 11. In the utility model, after the card block 41 is inserted into the card slot 11, the card block 41 can also protrude a part of the card slot 11, so that the card block 41 is convenient to be removed from the card slot 11.
[0047] Furthermore, if Figure 2 and Figure 3 As shown, the end of the clamping member 4 facing away from the anchor rod 2 (i.e. Figure 2 The top of the middle clamping member 4 is provided with a protrusion 42. By providing the protrusion 42 on the top of the clamping member 4, when the clamping member 4 is hammered, the protrusion 42 contacts the impact hammer, and the protrusion 42 serves to prevent the clamping member 4 from being damaged or deformed during the hammering.
[0048] As a preferred embodiment, there is a gap between the anchor rod 2 and the inner wall of the anchor tube 1. When the anchor rod 2 is located in the anchor tube 1, the gap between the anchor rod 2 and the inner wall of the anchor tube 1 is matched. When the wire rope 3 is wrapped around the anchor rod 2, the wire rope 3 fits the inner wall of the anchor tube 1, which is used to prevent soil from entering the anchor rod 2 during construction. Specifically, the diameter of the anchor rod 2 is preferably ten millimeters smaller than the inner diameter of the anchor tube 1, so that the width of the wire rope 3 around the anchor rod 2 and the diameter of the anchor rod 2 can fit the inner wall of the anchor tube 1. When verification is required, the integral body welded by the clamp 4 and the anchor rod 2 can be pulled out of the anchor tube 1, and the wire rope 3 can be taken out to verify the pile position. For details, see Figure 7 and Figure 8 Further, if Figure 1 As shown, a first latch hole 12 is provided at the top of the anchor tube 1. By providing the first latch hole 12, the bored pile foundation protection pile kit can pass through the first latch hole 12 through the connector 8, so that the bored pile foundation protection pile kit can be used to pull out the anchor tube 1 for subsequent pulling out.
[0049] On the other hand, Figure 4 As shown, the utility model also provides a bored pile foundation pile protection kit, comprising:
[0050] The puller body 5 and the support 6 are movably connected to the puller body 5 ; the puller body 5 also includes the aforementioned bored pile foundation guard pile, and the end of the puller body 5 can be connected to the anchor tube 1 .
[0051] like Figure 4As shown, the extractor body 5 includes a pressure rod 51, a first connection block 52 and a second connection block 53. The first connection block 52 is located at one-third of the pressure rod 51 and is fixed to the pressure rod 51, serving as a prying fulcrum for the pressure rod 51. The second connection block 53 is hinged to the end of the pressure rod 51. Further, the support 6 includes a support rod 61 and a base 62. The base 62 is located at the bottom of the support rod 61, and the two are fixed to each other. The top of the support rod 61 is hinged to the first connection block 52, and the bottom of the base 62 is a disc structure. By setting it as a disc structure, the force on the lower part can be prevented from sinking.
[0052] Furthermore, if Figure 5 As shown, the utility model further includes a connecting member 8, and the second connecting block 53 is connected to the anchor tube 1 through the connecting member 8. Specifically, the utility model preferably uses a bolt as the connecting member 8. When in use, the anchor tube 1 is connected to the second connecting block 53 by passing the bolt through the first latch hole 12. Both ends of the second connecting block 53 are connected by the connecting member 8 and can be movable, so that when one end of the pressure rod 51 applies force downward, the other end of the pressure rod 51 tilts upward. The two movable connecting members 8 can change the angle between the pressure rod 51 and the second connecting block 53, so as to ensure that the anchor rod 2 is subjected to a vertical upward pulling force, so as to facilitate the extraction of the anchor tube 1, and save time and effort.
[0053] It should be noted that during the drilling process, the drill rig operator may experience swinging of the drill bit due to geological changes, excessively long drill rods, etc., which may result in the pile position deviation of the pile foundation not being controlled within the specified value, thus causing an error in the connection between the pile foundation steel cage and the column steel cage, affecting the stress of the bridge substructure and the quality of the column steel protection layer. Therefore, when forming the pile foundation, it is necessary to constantly review the drilling position of the pile foundation. Therefore, during the implementation of the utility model, first determine the specific position of the pile foundation according to the engineering requirements and design drawings; if Figure 6 , Figure 7 and Figure 8 As shown, control points are set and four anchor cylinders 1 are driven into the ground, that is, four control points are formed in the four directions of the pile foundation. These control points are used to monitor and locate the pile position. The control points should be selected in a stable position so that the movement of the pile foundation can be clearly observed. Ensure that the cross intersection between the anchor cylinders 1 driven into the ground is located at the center of the pile foundation; that is, after the rope 3 wrapped around the anchor rod 2 is straightened, two cross-corresponding ropes 3 are formed, which coincide with the center of the pile foundation, and these lines form a cross-intersection line. The drilling rig compares the cross intersection formed by the rope 3 with the pile foundation position every time it works for a period of time to determine whether the pile foundation position is offset during the drilling process.
[0054] During the piling process, the displacement of the pile foundation can be monitored by observing the position changes of the cross lines. If the displacement is found to exceed the allowable range, the position of the piling equipment should be adjusted in time or other measures should be taken to ensure the accuracy and stability of the pile foundation. During the construction process, the displacement data of each control point should be recorded, analyzed and processed. These data can help construction personnel understand the movement law of the pile foundation, optimize the construction plan, and improve the construction quality. After the pile foundation construction is completed, acceptance work should be carried out. The optimization of the construction plan includes measures such as repositioning, strengthening the soil around the pile, and adding support structures to ensure the stability of the pile foundation and meet the engineering requirements.
[0055] Compared with the prior art, the utility model provides an anchor tube 1 and an anchor rod 2, and the wire rope 3 can be wound around the anchor rod 2. Both the wire rope 3 and the anchor rod 2 can be put into the anchor tube 1, which plays a role of storing the wire rope 3, and prevents the wire rope 3 from being mixed with mud and water after use, resulting in corrosion of the wire rope 3; at the same time, by providing a clamping piece 4 and a clamping groove 11, the clamping piece 4 can be clamped into the inside of the clamping groove 11, and the clamping piece 4 is connected to the top of the anchor rod 2. When the clamping piece 4 is clamped into the clamping groove 11, the anchor rod 2 can be limited. It is easy to use, has strong versatility, and is conducive to safe and civilized construction on site.
[0056] The above embodiments are only preferred embodiments for fully illustrating the present invention, and the protection scope of the present invention is not limited thereto. Any equivalent substitution or modification made by a person skilled in the art based on the present invention is within the protection scope of the present invention.
Claims
1. A bored pile foundation guard pile, characterized in that: include: An anchoring tube (1), the anchoring tube (1) is a hollow structure with one end open, the bottom of the anchoring tube (1) is a conical structure, and a clamping groove (11) is provided at the top of the anchoring tube (1); An anchor rod (2) and a wire rope (3), wherein the wire rope (3) can be wound around the anchor rod (2), and the wire rope (3) and the anchor rod (2) can be extended into the anchor tube (1) together; One end of the anchor rod (2) is provided with a clamping piece (4), and the clamping piece (4) can be engaged with the clamping groove (11) to limit the position of the anchor rod (2).
2. The bored pile foundation guard pile according to claim 1, characterized in that: The number of the clamping grooves (11) is more than two, and each of the clamping grooves (11) extends along the length direction of the anchoring tube (1).
3. The bored pile foundation guard pile according to claim 2, characterized in that: A clamping block (41) is formed around the clamping member (4), the number of the clamping blocks (41) corresponds to the number of the clamping slots (11), and each of the clamping blocks (41) extends in a vertical direction, and each of the clamping blocks (41) can be clamped into one of the clamping slots (11).
4. The bored pile foundation guard pile according to claim 1, characterized in that: A protrusion (42) is provided at one end of the clamping member (4) facing away from the anchor rod (2).
5. The bored pile foundation guard pile according to claim 1, characterized in that: The top of the anchoring tube (1) is provided with a first pin opening (12).
6. The bored pile foundation guard pile according to claim 5, characterized in that: When the anchor rod (2) is located in the anchor cylinder (1), the anchor rod (2) and the inner wall of the anchor cylinder (1) are loosely matched.
7. A bored pile foundation pile protection kit, characterized in that: comprising a bored pile foundation guard pile as claimed in any one of claims 1 to 6; It also includes an extractor body (5) and a support (6), wherein the support (6) is movably connected to the extractor body (5); The end of the puller body (5) can be connected to the anchoring tube (1).
8. The bored pile foundation protection pile kit according to claim 7, characterized in that: The extractor body (5) comprises a pressure rod (51), a first connecting block (52) and a second connecting block (53); the first connecting block (52) is fixed to the pressure rod (51), and the second connecting block (53) is hinged to the end of the pressure rod (51).
9. The bored pile foundation protection pile kit according to claim 8, characterized in that: The support (6) comprises a support rod (61) and a base (62), one end of the support rod (61) is fixed to the base (62), and the other end of the support rod (61) is hinged to the first connecting block (52).
10. The bored pile foundation protection pile kit according to claim 8, characterized in that: It also comprises a connecting piece (8), and the second connecting block (53) is connected to the anchoring tube (1) via the connecting piece (8).