Node structure for preventing water leakage at joint of post-cast strip

By using brick retaining walls, drainage boards and geotextiles at the joints of the post-pouring belts, the leakage problem at the joints between the post-pouring belts and the base plate was solved, the construction quality and project reliability were improved, and the construction time was shortened.

CN221855603UActive Publication Date: 2024-10-18SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323417983.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-10-18
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

Water leakage often occurs at the joint between the post-cast belt and the base plate, resulting in a decrease in concrete quality, affecting project safety and durability, and increasing construction time.

Method used

Brick retaining walls and drainage slabs are used in combination, and geotextiles and fine stone concrete are laid on them to divert groundwater and prevent slurry from leaking into the drainage slab to ensure effective drainage.

Benefits of technology

It effectively prevents water leakage at the joint of the post-cast belt, improves construction quality and project reliability, shortens construction time, and avoids the negative impact of water leakage on the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855603U_ABST
    Figure CN221855603U_ABST
Patent Text Reader

Abstract

The utility model relates to a joint structure for preventing water leakage at the joint of a post-cast strip, which comprises the post-cast strip and bottom plates on two sides, brick retaining walls are built on the bottom plates on two sides at equal length from two sides of the post-cast strip, and surface layers built on the bottom plates are arranged on the outer sides of the brick retaining walls. A drainage plate is fully laid between the brick retaining walls on the two sides, convex points of the drainage plate are arranged downwards, geotechnical cloth is laid on the drainage plate, and fine aggregate concrete is poured on the geotechnical cloth. According to the utility model, the problem of water leakage of the basement post-cast strip caused by uneven settlement of two sides of the basement post-cast strip or improper treatment before pouring of the post-cast strip or higher underground confined water head is effectively solved. The construction quality is ensured, and the construction time is shortened. And meanwhile, the quality and reliability of the project are improved, and the adverse effect of the water leakage position of the post-cast strip on the project is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a node structure for preventing water leakage at a joint of a post-casting belt, and belongs to the technical field of building construction. Background Art

[0002] With the development of cities, new projects basically have basements. However, due to the high local groundwater level, the post-casting strip and the surrounding bottom plate are cast twice in succession. The post-casting strip often leaks in the later use stage. The main reasons include: 1. Improper construction organization leads to a large difference in concrete settlement on both sides of the post-casting strip; 2. The post-casting strip is exposed for a long time at the bottom plate position, which makes the surface of the joint stained with mud and fails to be treated seriously, seriously affecting the combination of new and old concrete; 3. The concrete construction of the post-casting strip is too early, and the shrinkage and deformation of the structural concrete on both sides of the post-casting strip has not been completed. Leakage of the post-casting strip at the joint will lead to a decrease in the quality of the poured concrete, affect the safety and durability of the project, affect the construction quality, and increase the construction time. Utility Model Content

[0003] The utility model aims to overcome the deficiencies of the prior art and provide a node structure for preventing water leakage at the joint of the post-cast strip, and solves the water leakage problem at the joint of the post-cast strip and the surrounding bottom plate by combining the retaining wall, the drainage board and the geotextile.

[0004] The utility model can be realized by the following technical solutions:

[0005] A node structure for preventing water leakage at the joint of a post-cast strip, comprising a post-cast strip and bottom plates on both sides, brick retaining walls are built on the bottom plates on both sides at equal lengths from the two sides of the post-cast strip, the outer side of the brick retaining wall is a surface layer built on the bottom plate, a drainage board is fully laid between the brick retaining walls on both sides, the convex points of the drainage board are arranged downward, a geotextile is laid on the drainage board, and fine stone concrete is poured on the geotextile.

[0006] Furthermore, the distance between the brick retaining wall and the post-cast strip is 1m.

[0007] Furthermore, the height of the brick retaining wall is the same as the thickness of the surface layer.

[0008] The working principle of the utility model is to drain the seepage water to the basement water collection well through the drainage board to prevent the groundwater from seeping out at the junction of the post-casting belt and the bottom plate; the setting of the geotextile can prevent the slurry water from leaking into the drainage board during the pouring of fine stone concrete, resulting in the blockage of the drainage board in the later stage.

[0009] Compared with the prior art, the beneficial effects of the utility model are:

[0010] The utility model effectively solves the problem of water leakage in the post-casting belt of the basement caused by uneven settlement on both sides or improper treatment before pouring the post-casting belt or high underground pressure head. It ensures the construction quality and shortens the construction time. At the same time, it improves the quality and reliability of the project and avoids the adverse effects of water leakage in the post-casting belt on the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of a preferred embodiment of the utility model.

[0012] In the figure: 1. Post-cast joint; 2. Base plate; 3. Brick retaining wall; 4. Drainage board; 5. Geotextile; 6. Fine stone concrete; 7. Surface layer. DETAILED DESCRIPTION

[0013] The utility model is further described in detail below in conjunction with the accompanying drawings and specific embodiments. According to the following description, the purpose, technical solution and advantages of the utility model will become clearer. It should be noted that the described embodiments are preferred embodiments of the utility model, but not all embodiments.

[0014] Combination Figure 1 As shown, a node structure for preventing water leakage at the joint of the post-cast strip includes a post-cast strip 1 and a bottom plate 2 on both sides. A brick retaining wall 3 is built on the bottom plate 2 on both sides 1m away from both sides of the post-cast strip 1. The height of the brick retaining wall 3 is the same as the thickness of the surface layer 7. The outer side of the brick retaining wall 3 is a surface layer 7 built on the bottom plate. A drainage board 4 is fully laid between the brick retaining walls 3 on both sides. The convex point of the drainage board is set downward. A geotextile 5 is laid on the drainage board, and fine stone concrete 6 is poured on the geotextile 5.

[0015] The utility model effectively solves the problem of water leakage in the post-casting belt of the basement caused by uneven settlement on both sides or improper treatment before pouring the post-casting belt or high underground pressure head. It ensures the construction quality and shortens the construction time. At the same time, it improves the quality and reliability of the project and avoids the adverse effects of water leakage in the post-casting belt on the project.

[0016] The above is only a description of the preferred embodiment of the utility model, and is not a limitation of the protection scope of the utility model. Obviously, any technician familiar with the field can easily think of replacement or change to obtain other embodiments based on the above embodiments, which should all be included in the protection scope of the utility model.

Claims

1. A node structure for preventing water leakage at the joint of a post-cast strip, comprising a post-cast strip (1) and bottom plates (2) located on both sides, Features: Brick retaining walls (3) are built on the bottom plate (2) on both sides at equal lengths from the post-cast strip (1), the outer side of the brick retaining wall (3) is a surface layer (7) built on the bottom plate, and a drainage board (4) is fully laid between the brick retaining walls (3) on both sides, the convex point of the drainage board is set downward, a geotextile (5) is laid flat on the drainage board, and fine stone concrete (6) is poured on the geotextile (5).

2. The node structure for preventing water leakage at the joint of the post-casting belt according to claim 1, Features: The distance between the brick retaining wall (3) and the post-cast strip (1) is 1 m.

3. The node structure for preventing water leakage at the joint of the post-casting belt according to claim 1, Features: The height of the brick retaining wall (3) is the same as the thickness of the surface layer (7).