Prefabricated column and beam-column connecting joint
By embedding connectors in prefabricated columns and prefabricated beams, efficient connections between beams and columns are achieved, which solves the problems of high mold costs and complicated processes in the manufacturing and installation of prefabricated components in the existing technology, and improves project quality and construction efficiency. Reduced construction costs.
Patent Information
- Application Number
- CN202320524657.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-17
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-03-17
AI Technical Summary
In the existing technology, the cost of manufacturing molds for prefabricated components is high, the production process is complex, and the protection of prefabricated components during transportation and installation is difficult, resulting in high requirements for hoisting equipment, high installation costs, and difficulty in ensuring the connectivity of the concrete sections between beams and columns.
A prefabricated column and beam-column connection node is designed. By pre-embedding connectors in prefabricated columns and prefabricated beams, and using column longitudinal reinforcement holes, column through holes, stirrup placement holes and bolt holes, prefabricated columns and prefabricated beams are realized. Efficient connection ensures the tightness of concrete pouring, and grouting sleeves are used to connect multi-layer precast columns to simplify the construction process.
It improves the project quality and construction efficiency, reduces the construction cost, simplifies the construction process, reduces the erection of on-site formwork and support frames, shortens the construction period, and improves the economy of the mold.
Smart Images

Figure CN221855778U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of construction, and in particular relates to a prefabricated column and beam-column connection node. Background Art
[0002] Currently, the installation of elevator corridors in existing residential buildings is mainly based on steel structures or cast-in-place construction. The fire resistance and corrosion resistance of steel structures are poor, while cast-in-place construction is complicated due to the complex construction processes such as formwork support, steel bar binding, pouring, and formwork removal, as well as the influence of seasons, which makes it very difficult to control the construction progress.
[0003] Chinese utility model patent CN214834407U discloses a corridor structure of an assembled elevator shaft, which includes a square frame beam and several columns arranged on the bottom surface of the frame beam; a platform floor is installed on the frame beam to connect the elevator shaft with the existing building, and the top of the frame beam is also provided with several embedded steel plates corresponding to the columns, and each embedded steel plate is fastened with embedded steel bars, and a reserved grouting sleeve is provided on the bottom surface of the column for fitting the embedded steel bars; it adopts an assembled corridor structure with frame beams and columns, thereby overcoming the defects of the cast-in-place construction method, and can realize factory prefabrication and layer-by-layer assembly on the construction site, with simple construction, short cycle, high assembly efficiency, low construction cost, green environmental protection, safety and reliability, and solves the problem of steel structure corridors being fastened with expansion bolts and buildings. However, the mold manufacturing cost of the corridor structure of the assembled elevator shaft is high, the production process is relatively complicated, and the finished product protection during the transportation of prefabricated components is relatively difficult. In addition, the prefabricated components are heavy, have high requirements for lifting equipment, are difficult to lift, and have high installation costs. Utility Model Content
[0004] The utility model aims to provide a prefabricated column and beam-column connection node to solve the technical problem that the connectivity of the concrete cross section between the beams and columns is difficult to ensure.
[0005] To achieve the above purpose, the specific technical solution of the utility model is as follows:
[0006] A prefabricated column comprises a prefabricated column body and a first embedded part; both upper and lower end surfaces of the first embedded part are provided with column longitudinal reinforcement holes and column through holes, and at least two connecting plates are arranged on the side of the first embedded part; the body of the first embedded part is embedded in the prefabricated column body, and the connecting plate extends out relative to the prefabricated column body to form a connecting end.
[0007] Therefore, in the first embedded part provided by the utility model, the column longitudinal reinforcement hole is used to pass the prefabricated column longitudinal reinforcement, and the column through hole is set to ensure that the upper and lower layers of concrete are poured densely and continuously. In this way, by pre-embedded connecting parts in the prefabricated column body, the prefabricated column and the prefabricated beam are connected during the installation process through the connecting parts pre-embedded in the prefabricated column.
[0008] Furthermore, stirrup placement holes are provided between the upper and lower end surfaces of the first embedded part, and the stirrup placement holes are used to place several layers of stirrups.
[0009] Furthermore, the connecting plate is provided with bolt holes, and the bolt holes are used for connecting with the prefabricated beams.
[0010] Furthermore, a plurality of the first embedded parts are embedded in the prefabricated column body, a grouting sleeve is further provided at the bottom of the prefabricated column body, and multiple layers of the prefabricated column bodies are connected by the grouting sleeve.
[0011] In addition, the connecting plate of the first embedded part is configured to be I-shaped, L-shaped or T-shaped.
[0012] Based on the same design concept, the utility model also provides a beam-column connection node, which includes a prefabricated beam and the prefabricated column as described above, a second embedded part is embedded in the end of the prefabricated beam, and the protruding end of the second embedded part is fixedly connected to the connecting end of the first embedded part.
[0013] Furthermore, the prefabricated beam is prefabricated by bundling the beam surface reinforcement, beam waist reinforcement and beam bottom reinforcement through stirrups, and the ends of the beam surface reinforcement, beam waist reinforcement and beam bottom reinforcement all pass through the plug welding holes set at the end of the prefabricated beam to connect the second embedded part to the prefabricated beam.
[0014] The utility model has the following advantages:
[0015] 1) All components are prefabricated in the factory in advance. Through scientific quality management methods, the quality of prefabricated components is more guaranteed, thus improving the quality of the project.
[0016] 2) The connection nodes between various components are set scientifically and reasonably, which is conducive to improving construction efficiency.
[0017] 3) The mold can be reused to improve economy.
[0018] 4) Reduce on-site formwork, support frames and external scaffolding, greatly shorten the construction period and reduce construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a three-dimensional diagram of the connection between the prefabricated column and the prefabricated beam of the utility model;
[0020] Figure 2This is a plan view of the connection between the prefabricated column and the prefabricated beam of the utility model;
[0021] Figure 3 This is a schematic diagram of the prefabricated beam structure of the utility model;
[0022] Figure 4 This is a structural schematic diagram of a first embodiment of the first embedded part of the utility model;
[0023] Figure 5 This is a structural schematic diagram of a second embodiment of the first embedded part of the utility model;
[0024] Figure 6 This is a schematic structural diagram of a third embodiment of the first embedded part of the utility model;
[0025] Figure 7 This is a schematic diagram of the prefabricated fully assembled concrete frame corridor structure of the utility model;
[0026] Figure 8 for Figure 7 A magnified view at point A;
[0027] Fig. 9 This is the connection diagram of the prefabricated floor slab of the utility model;
[0028] Fig.10 This is a connection diagram between the corridor body and the prefabricated elevator shaft of the utility model.
[0029] Explanation of markings in the figure: 1. Corridor body; 2. Precast column body; 3. Precast beam; 31. Beam surface reinforcement; 32. Beam waist reinforcement; 33. Beam bottom reinforcement; 34. Plug welding hole; 4. Precast floor slab; 41. Insert reinforcement hole; 51. First embedded part; 52. Second embedded part; 53. Column longitudinal reinforcement hole; 54. Through hole in column; 55. Connecting plate; 56. Bolt hole; 57. Hoop reinforcement placement hole; 6. Precast elevator shaft; 7. Precast cup-shaped foundation; 8. Anchor. DETAILED DESCRIPTION
[0030] In order to better understand the purpose, structure and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings.
[0031] like Figure 1 and Figure 2 As shown, the beam-column connection node of this embodiment includes a prefabricated column body 2 and a prefabricated beam 3, wherein the prefabricated column body 2 is connected to the prefabricated beam 3, and the prefabricated column body 2 includes a first embedded part 51 embedded in the prefabricated column body 2. Figures 4 to 6As shown, both upper and lower end surfaces of the first embedded part 51 are provided with column longitudinal reinforcement holes 53 and column through holes 54. At least two connecting plates 55 for connecting with the second embedded part 52 are provided on the side of the first embedded part 51. The connecting plates 55 extend relative to the prefabricated column body 2 to form a connecting end. The connecting plates 55 are provided with bolt holes 56 on the connecting ends. A stirrup placement hole 57 is also provided between the upper and lower end surfaces of the first embedded part 51. Specifically, the column longitudinal reinforcement hole 53 is used to pass the column longitudinal reinforcement, the column through hole 54 ensures that the upper and lower columns of concrete are poured densely and continuously, and the stirrup placement hole 57 is used to place several layers of stirrups; the bolt holes 56 on the connecting plate 55 are used to connect with the second embedded part 52 of the prefabricated beam 3. Preferably, in order to better connect with the corresponding second embedded part 52, the connecting plate 55 of the first embedded part 51 can be set to be a type, an L-type or a T-type as needed.
[0032] like Figure 1 and Figure 7 As shown, preferably, a plurality of the first embedded parts 51 are embedded in the prefabricated column body 2, and a grouting sleeve is also provided at the bottom of the prefabricated column body 2. A second embedded part 52 is embedded in the end of the prefabricated beam 3, and the extended end of the second embedded part 52 is fixedly connected to the connecting end of the first embedded part 51. Figure 3 As shown, the precast beam 3 is precast by binding the beam face reinforcement 31, the beam waist reinforcement 32 and the beam bottom reinforcement 33 by stirrups, and the ends of the beam face reinforcement 31, the beam waist reinforcement 32 and the beam bottom reinforcement 33 all pass through the plug welding hole 34 set at the end of the precast beam 3, so as to connect the second embedded part 52 with the precast beam 3. Specifically, as Figure 1 As shown, the prefabricated column body 2 is provided with a first embedded part 51, and the prefabricated beam 3 is provided with a second embedded part 52. The first embedded part 51 is connected to the second embedded part 52. The connection between the first embedded part 51 and the second embedded part 52 can be achieved by bolts, bolt clamps, welding, etc. Figure 7 As shown, a plurality of prefabricated column bodies 2 and a plurality of prefabricated beams 3 are connected to form the frame of the corridor body 1. Figure 1 , Figure 2 and Figure 7 As shown, a plurality of first embedded parts 51 are provided in the length direction of the prefabricated column body 2, and each first embedded part 51 is connected to a corresponding second embedded part 52. Preferably, three first embedded parts 51 are provided in the length direction of the prefabricated column body 2.
[0033] The prefabricated column body and prefabricated beams of this embodiment can be installed into a prefabricated fully assembled concrete frame corridor. Figure 7 and Figure 8As shown, the prefabricated fully assembled concrete frame corridor includes a corridor body 1, and the corridor body 1 includes a prefabricated column body 2, a prefabricated beam 3, a prefabricated floor slab 4 and a prefabricated cup-shaped foundation 7. The prefabricated cup-shaped foundation 7 is arranged at the bottom of the corridor body 1, and the lower end of the prefabricated column body 2 is installed on the prefabricated cup-shaped foundation 7. The connection method of the steel bars between the upper and lower prefabricated column bodies 2 is steel sleeve grouting connection. Figure 7 and Fig. 9 As shown, the prefabricated floor slab 4 is installed on the upper end surface of the prefabricated beam 3, and the prefabricated beam 3 and the prefabricated floor slab 4 are both provided with rebar insertion holes, and the rebar insertion holes are passed through between the prefabricated beam 3 and the prefabricated floor slab 4 and sealed with slurry. The prefabricated floor slabs 4 are staggered and overlapped, and rebar insertion holes 41 are reserved at the overlap of the prefabricated floor slab 4, and rebars are reserved at the overlap of the prefabricated beam 3, and the rebars pass through the rebar insertion holes 41 reserved at the overlap, and are sealed with mortar. Specifically, the connection between the prefabricated floor slabs 4 adopts the form of staggered overlapping of steps, and rebars are reserved on the prefabricated beam 3, which pass through the rebar insertion holes 41 reserved on the prefabricated floor slab 4 and are sealed with mortar.
[0034] like Figure 7 and Fig.10 As shown, one side of the corridor body 1 is a prefabricated elevator shaft 6, and the prefabricated elevator shaft 6 is connected to the corridor body 1. An internal threaded sleeve is reserved on the side of the prefabricated elevator shaft 6 close to the corridor body 1, and the corridor body 1 and the internal threaded sleeve are anchored by an anchor 8, and the connection between the prefabricated elevator shaft 6 and the corridor body 1 is completed by integral formwork casting. Specifically, the internal threaded sleeve is reserved on the side of the prefabricated elevator shaft, and the surface and bottom bars of the beam are installed later, and anchored at the post-casting section of the main frame beam, and integral formwork casting is performed later, so that the elevator shaft is connected to the main body.
[0035] A method for installing a prefabricated fully assembled concrete frame corridor in this embodiment is as follows:
[0036] Step 1: Before installing the prefabricated column, first level the prefabricated cup-mouth foundation and determine the axis. After the prefabricated column slowly falls into the bottom of the cup, check and fine-tune the axis of the prefabricated column. After the lower axis is adjusted, use a jack to perform double-sided correction of the verticality of the prefabricated column. After the correction is completed, use a triangular wedge to support and fix the prefabricated column around the cup mouth to ensure the stability of the column. When pouring concrete in the remaining space of the prefabricated cup-mouth foundation, pour it once to the upper plane of the cup mouth and vibrate it with a vibrating rod to make it dense.
[0037] Step 2: After the strength of the post-poured concrete at the bottom of the precast column meets the requirements of the specification, the precast beam is hoisted. After the installation is completed, check the leveling and size positioning of each component to ensure that the requirements of the specification are met; the precast column and the fully precast beam are connected by precast composite concrete beam ends and column steel plates, which can be connected by bolts, bolt clamps, welding, etc., and then the nodes are post-poured.
[0038] Step 3: After the beams are installed, carry out the hoisting operation of the prefabricated floor slabs, check the leveling and size positioning of each component, and seal the rebar holes with mortar.
[0039] Step 4: After the 4th floor beams and slabs are hoisted, the prefabricated columns are hoisted on the 4th floor. The prefabricated columns are connected by steel sleeve grouting, and the prefabricated column joints are connected by grouting sleeves.
[0040] Step 5. After the grouting operation is completed and the strength of the grouting material reaches the specification requirements, the subsequent hoisting operations of prefabricated beams and slabs are carried out.
[0041] In order to reduce the joints of floor slabs and achieve better waterproofing effect, the roof floor slabs can be prefabricated as a whole.
[0042] It is understood that the present invention is described by some embodiments, and those skilled in the art are aware that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. A prefabricated column, comprising a prefabricated column body (2), characterized in that: The invention also comprises a first embedded part (51); the upper and lower end surfaces of the first embedded part (51) are both provided with column longitudinal reinforcement holes (53) and column through holes (54); at least two connecting plates (55) are provided on the side of the first embedded part (51); the body of the first embedded part (51) is embedded in the prefabricated column body (2), and the connecting plates (55) extend relative to the prefabricated column body (2) to form connecting ends.
2. The prefabricated column according to claim 1, characterized in that: A stirrup placement hole (57) is also provided between the upper and lower end surfaces of the first embedded part (51).
3. The prefabricated column according to claim 1, characterized in that: The connecting plate (55) is provided with bolt holes (56).
4. The prefabricated column according to claim 1, characterized in that: A plurality of the first embedded parts (51) are embedded in the prefabricated column body (2), and a grouting sleeve is also provided at the bottom of the prefabricated column body (2).
5. The prefabricated column according to claim 1, characterized in that: The connecting plate (55) of the first embedded part (51) is configured to be I-shaped, L-shaped or T-shaped.
6. A beam-column connection node, characterized in that: It comprises a prefabricated beam (3) and a prefabricated column according to any one of claims 1 to 5, wherein a second embedded part (52) is embedded in the end of the prefabricated beam (3), and the protruding end of the second embedded part (52) is fixedly connected to the connecting end of the first embedded part (51).
7. The beam-column connection node according to claim 6, characterized in that: The prefabricated beam (3) is prefabricated by binding beam surface reinforcement (31), beam waist reinforcement (32) and beam bottom reinforcement (33) via stirrups, and the ends of the beam surface reinforcement (31), beam waist reinforcement (32) and beam bottom reinforcement (33) all pass through plug welding holes (34) provided at the ends of the prefabricated beam (3), so as to connect the second embedded part (52) to the prefabricated beam (3).