Overhanging type climbing frame hanging seat hanging device

By designing a cantilevered climbing frame hanging device and utilizing the synergistic effect of the installation beam, cable-stayed mechanism, diagonal brace reinforcement and top support rod, the safety hazards and unstable support of the climbing frame installation under the concave structure of the building's outer frame are solved. problem, achieving higher structural strength and construction safety.

CN221856160UActive Publication Date: 2024-10-18XINJIANG CONSTR ENG GRP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323414959.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-10-18
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

During construction, when a local concave structure appears in the outer frame of the building, the existing installation method of the climbing frame hanger has potential safety hazards and unstable support problems, especially during the climbing process, it is easy to cause the frame to tilt outward.

Method used

A cantilevered climbing frame hanging device is designed, including a mounting beam, a cable-stayed mechanism, a diagonal brace reinforcement and a top brace. Through the synergy of these components, the overhang length of the mounting beam and the applied tension are adjusted to ensure that the structure Strength and stability, and provide multiple guarantees through the joint action of multiple components.

Benefits of technology

It improves the structural strength and support capacity of the hanging device, enhances construction safety and the stability of the climbing frame, ensures the support effect of the climbing frame in different structural areas, and improves the flexibility and applicability of the device through the adjustment mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856160U_ABST
    Figure CN221856160U_ABST
Patent Text Reader

Abstract

The utility model discloses an overhanging type climbing frame hanging seat hanging device which comprises an installation beam with the inner end fixedly installed on a floor slab and the outer end extending out of the outer edge of the floor slab, a hanging piece arranged at the end of the installation beam and used for installing a climbing frame hanging seat, and a cable-stayed mechanism arranged between the outer end of the installation beam and an upper floor slab. The inclined strut reinforcing piece is arranged at the outer end of the mounting beam, the top supporting rod is arranged at the inner end of the mounting beam, and the two ends of the top supporting rod abut against the mounting beam and an upper floor slab respectively. The hanging length of the mounting beam can be adjusted according to the change of the outer vertical face of a building structure so as to support climbing frames in different structural areas, the upper floor slab, the lower floor slab and the mounting beam jointly bear outer end loads through the combined action of the cable-stayed mechanism, the inclined strut reinforcing piece and the top supporting rod, and then the structural strength of the hanging device is fully guaranteed; the device has high bearing capacity and supporting capacity, the safety of the device during use is improved, and the overall stability of the climbing frame and the continuity during climbing are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cantilever climbing frames, and specifically to a cantilever climbing frame hanging seat hanging device. Background Art

[0002] With the rapid development of urbanization, the number of urban population has increased dramatically, and urban construction land resources have become increasingly scarce. Therefore, high-rise buildings have become the focus of the current development of the construction industry. Climbing technology can convert high-altitude operations into low-altitude operations, and convert suspended operations into operations inside the frame, which greatly improves the safety of construction and ensures the speed and safety of construction. During the construction process, the use conditions of the climbing frame are relatively harsh. It must meet the requirements of no large changes in the concave and convex structure of the overall exterior of the building, and the height standards of the construction floors must be kept as consistent as possible. If the local floor structure is concave and convex, it will affect the climbing and hanging of the climbing frame.

[0003] When the outer frame of a building presents a partially concave structure, the climbing frame bracket cannot be installed in the area of ​​the outer frame structure beam. The on-site usually adopts the steel pipe oblique-stayed method to protect the frame in the local area of ​​the climbing frame, but this method still has certain disadvantages in actual use: 1. When there are many concave structural areas in the outer frame of the building, the use of steel pipe oblique-stayed method will result in poor force reinforcement of the climbing frame and high safety hazards; 2. When the climbing frame is climbing, the oblique-stayed reinforced part needs to be loosened, which may easily lead to the cantilever end of the top of the climbing frame being too long and the frame tilting outward. Summary of the invention

[0004] The purpose of the utility model is to provide a cantilever climbing frame hanging seat hanging device to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0006] A cantilever climbing frame mount hanging device includes a mounting beam whose inner end is fixedly mounted on a floor slab and whose outer end extends out of the outer edge of the floor slab, a hanging member arranged at the end of the mounting beam and used to install the climbing frame mount, a diagonal stay mechanism arranged between the outer end of the mounting beam and the upper floor slab, a diagonal brace reinforcement member arranged at the outer end of the mounting beam, and a top brace rod arranged at the inner end of the mounting beam and with both ends respectively tightened against the mounting beam and the upper floor slab.

[0007] Preferably, the mounting beam comprises: two parallel, spaced and back-symmetrical channel steels, a plurality of connecting steel plates connected between the two channel steels, and an end plate connected to the inner ends of the two channel steels, a plurality of first screws passing through the middle of the two channel steels, the other end of the first screw passing through the floor slab, and a first gasket and a nut are installed at both ends of the first screw.

[0008] Preferably, the inclined-stayed mechanism includes: a mounting base fixed to the upper floor slab, a first pull rod hinged to the mounting base at one end, a basket bolt threadedly connected to the other end of the first pull rod, a second pull rod threadedly connected to the basket bolt at one end and hinged to the outer end of the mounting beam at the other end, a second screw rod is passed through the mounting base and the upper floor slab, and second gaskets and nuts are installed at both ends of the second screw rod.

[0009] Preferably, the hanging member includes: a hanging plate fixedly connected to the outer end of the mounting beam, a reinforcement frame connected to the side wall of the hanging plate away from the mounting beam, and a first reinforcing angle steel respectively located at an angle on both sides of the mounting beam, one end of which is connected to the upper part of the hanging plate and the other end is connected to the mounting beam, and the hanging plate is penetrated by a mounting hole for installing a climbing frame bracket.

[0010] Preferably, the reinforcement frame includes: two parallel reinforcement channel steels with openings facing one side of the hanging plate, a second reinforcement angle steel located at both ends of the two reinforcement channel steels and connected between the two reinforcement channel steels, the reinforcement channel steel is a 6# channel steel, and the first reinforcement angle steel and the second reinforcement angle steel are 5# angle steels.

[0011] Preferably, the diagonal brace reinforcement comprises: a horizontal plate located at the lower end of the mounting beam, a vertical plate whose upper end is connected to the inner side of the horizontal plate, a diagonal brace rod with adjustable length, one end hinged to the lower end of the vertical plate and the other end hinged to the outer end of the mounting beam, a connecting plate arranged at the upper end of the mounting beam, and a third screw rod with two ends movably passing through the horizontal plate and the connecting plate and threadedly connected to a nut.

[0012] Preferably, the diagonal struts include: a first strut that is hollow inside and has an open end, which passes through a first through-hole arranged on the side wall of the first strut, a second strut that is slidably arranged in the first strut at one end and is hinged to the mounting beam at the other end, a plurality of second through-holes that pass through the second strut along the length direction of the second strut, and a reinforcement bolt that passes through the first through-hole and the second through-hole and is threadedly connected to a nut, and the first strut is hinged to the vertical plate.

[0013] Preferably, the top support rod includes: a connecting piece connected to the mounting beam, a first top support tube whose bottom end is connected to the upper end of the connecting piece, a threaded support rod threadedly connected to the first top support tube at the lower end, a second top support tube threadedly connected to the upper end of the threaded support rod, and a top support plate arranged at the top end of the second top support tube, a rubber pad being arranged at the upper end of the top support plate.

[0014] Preferably, the connecting member includes: a connecting frame slidably arranged on the mounting beam and in the shape of "П", two adjusting rods respectively threadedly connected to the side walls on both sides of the connecting frame, locking plates respectively arranged on the opposite ends of the two adjusting rods, and rotating knobs respectively arranged on the ends away from each other of the two adjusting rods.

[0015] Compared with the prior art, the advantages of the utility model are:

[0016] 1. The utility model can adjust the overhang length of the installation beam according to the changes in the facade of the building structure to meet the support of the climbing frame in different structural areas. Through the joint action of the inclined-stayed mechanism, the inclined-bracing reinforcement and the top-bracing rod, the upper and lower floor slabs and the installation beam jointly bear the external end load, thereby fully ensuring the structural strength of the hanging device, so that the device has a higher load-bearing capacity and support capacity, improving the safety of the device when in use, and ensuring the overall stability of the climbing frame and the continuity during climbing;

[0017] 2. The utility model applies tension to the cantilevered end of the installation beam by setting an inclined stay mechanism, balances the load on the outer end of the installation beam, and thus increases the load-bearing capacity of the device. By setting an inclined brace reinforcement member abutting against the outer edge of the floor slab at the outer end of the installation beam, an upward support force is provided to the outer end of the installation beam and part of the load is shared, thereby effectively improving the overall rigidity and stability of the installation beam, and effectively improving the supporting capacity of the device. By setting a top support rod at the inner end of the installation beam to fix the installation beam for a second time, the stability of the device structure is further improved. The joint action of multiple components provides multiple guarantees for the device, which can not only stably fix the climbing frame, but also enable the climbing frame to have an adhesion force point when climbing, effectively improving the construction safety.

[0018] 3. The utility model is provided by threading the first tie rod and the second tie rod at both ends of the turnbuckle bolt, and threading the first top support tube and the second top support tube at both ends of the threaded support rod, so that the device can adjust the length of the inclined stay mechanism and the top support rod according to the height between floors, thereby effectively improving the flexibility and applicability of the device when in use;

[0019] 4. The utility model increases the contact area between the top support rod and the floor by arranging a top support plate at the top of the second top support tube. By arranging a rubber pad at the upper end of the top support plate, not only the friction between the top support plate and the floor can be increased, but also the vibration between the floor can be buffered, thereby further improving the stability of the device;

[0020] 5. The utility model improves the connection strength and stability between the hanging plate and the mounting beam by connecting the first reinforcing angle steel between the hanging plate and the mounting beam, and effectively improves the structural strength of the hanging plate by arranging a reinforcing frame on the hanging plate, thereby improving the bearing capacity of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 It is a structural schematic diagram of a cantilever climbing frame hanging seat hanging device;

[0023] Figure 2 It is a schematic diagram of the installation beam structure of a cantilever climbing frame hanging seat hanging device;

[0024] Figure 3 It is a schematic diagram of the structure of a hanging component of a cantilever climbing frame hanging seat hanging device;

[0025] Figure 4 It is a schematic diagram of the structure of a diagonal brace reinforcement member of a cantilever climbing frame hanging device;

[0026] Figure 5 It is a schematic diagram of the top support rod structure of a cantilever climbing frame hanging seat hanging device;

[0027] Figure numerals: 1-mounting beam, 2-hanging member, 3-slant-stayed mechanism, 4-slant bracing reinforcement member, 5-top bracing rod, 6-channel steel, 7-connecting steel plate, 8-end plate, 9-first screw rod, 10-first gasket, 11-mounting seat, 12-first tie rod, 13-basket bolt, 14-second tie rod, 15-second screw rod, 16-second gasket, 17-hanging plate, 18-reinforcement frame, 19-first reinforcement angle steel, 20-mounting hole, 21-reinforcement groove Steel, 22-second reinforcing angle steel, 23-horizontal plate, 24-vertical plate, 25-diagonal support rod, 26-connecting plate, 27-third screw rod, 28-first support rod, 29-first through hole, 30-second support rod, 31-second through hole, 32-reinforcement bolt, 33-first top support tube, 34-threaded support rod, 35-second top support tube, 36-top support plate, 37-rubber pad, 38-connecting frame, 39-adjusting rod, 40-locking plate, 41-rotating button. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the embodiments of the present utility model clearer, the technical solution in the embodiments of the present utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the present utility model.

[0029] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0030] In the description of the present utility model, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the utility model product is usually placed when used. It is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model.

[0031] In addition, the terms "first", "second", "third", etc., if used, are only used to distinguish descriptions and cannot be understood as indicating or implying relative importance. The terms "horizontal", "vertical", "overhanging", etc., if used, do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0032] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connection", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0034] Example 1

[0035] like Figure 1-Figure 2 As shown, a cantilever climbing frame hanging seat hanging device includes a mounting beam 1 whose inner end is fixedly mounted on the floor slab and whose outer end extends out of the outer edge of the floor slab, a hanging member 2 arranged at the end of the mounting beam 1 and used to install the climbing frame hanging seat, a diagonal stay mechanism 3 arranged between the outer end of the mounting beam 1 and the upper floor slab, a diagonal brace reinforcement member 4 arranged at the outer end of the mounting beam 1, and a top brace rod 5 arranged at the inner end of the mounting beam 1 and tightened against the mounting beam 1 and the upper floor slab at both ends respectively.

[0036] Among them, the mounting beam 1 includes: two parallel, spaced and back-symmetrical channel steels 6, a plurality of connecting steel plates 7 connected between the two channel steels 6, and an end plate 8 connected to the inner ends of the two channel steels 6, a plurality of first screw rods 9 are passed through the middle of the two channel steels 6, the other end of the first screw rod 9 passes through the floor slab, and a first gasket 10 and a nut are installed at both ends of the first screw rod 9.

[0037] In this embodiment, the device can adjust the overhang length of the installation beam 11 according to the changes in the facade of the building structure to meet the support of the climbing frame in different structural areas. The first screw rod 9 is passed through the middle of the two channel steels 6 and the floor slab in turn, and then the first gasket 10 and the nut are respectively installed at both ends of the first screw rod 9 for tension locking and fixing, so as to complete the fixing of the installation beam 1. It should be noted that the floor slab should be pre-buried with a hole for the first screw rod 9 to pass through;

[0038] During use of the device, the inclined stay mechanism 3 can apply tension to the cantilevered end of the mounting beam 1, balance the load on the outer end of the mounting beam 1 and thereby increase the load-bearing capacity of the device; a diagonal brace reinforcement member 4 is provided at the outer end of the mounting beam 1 to abut against the outer edge of the floor slab, which can provide an upward support force to the outer end of the mounting beam 1 and share part of the load, thereby effectively improving the overall stiffness and stability of the mounting beam 1, and effectively improving the supporting capacity of the device; a top support rod 5 is provided at the inner end of the mounting beam 1 to perform secondary fixation of the mounting beam 1, further improving the stability of the device structure; multiple components work together to enable the upper and lower floor slabs and the mounting beam 1 to jointly bear the outer end load, thereby fully ensuring the structural strength of the hanging device, so that the device has a high load-bearing capacity and support capacity, thereby improving the safety of the device during use, and ensuring the overall stability of the climbing frame and the continuity during climbing.

[0039] Example 2

[0040] On the basis of Example 1, the diagonal mechanism 3 includes: a mounting base 11 fixed to the upper floor, a first pull rod 12 hinged to the mounting base 11 at one end, a basket bolt 13 threadedly connected to the other end of the first pull rod 12, a second pull rod 14 threadedly connected to the basket bolt 13 at one end and hinged to the outer end of the mounting beam 1 at the other end, a second screw 15 is inserted into the mounting base 11 and the upper floor, and second gaskets 16 and nuts are installed at both ends of the second screw 15.

[0041] It should be noted that: in practice, a hole for the second screw rod 15 to pass through should be pre-buried on the upper floor slab, and a hinge bolt should be provided at the outer end of the mounting beam 1 to facilitate the hinge connection of the second pull rod 14 therewith;

[0042] In this embodiment, the second screw rod 15 passes through the holes reserved on the mounting seat 11 and the upper floor slab in turn, and then the second gasket 16 and the nut are respectively installed on the two ends of the second screw rod 15 for tensioning and locking, so that the mounting seat 11 can be fixed on the lower end surface of the upper floor slab, and then the basket bolt 13 is adjusted according to the distance between the outer end of the mounting beam 1 and the mounting seat 11, so that the first pull rod 12 and the second pull rod 14 are respectively hinged and tightened with the mounting seat 11 and the outer end of the mounting beam 1, and by applying tension to the cantilevered end of the mounting beam 1, the load on the outer end of the mounting beam 1 is balanced, thereby increasing the bearing capacity of the device. The structure is simple and practical, and the length of the inclined-stayed mechanism 3 can be adjusted according to the distance between the outer end of the mounting beam 1 and the mounting seat 11, which effectively improves the flexibility and applicability of the device when used.

[0043] Example 3

[0044] On the basis of Example 1, Figure 3 As shown, the hanging member 2 includes: a hanging plate 17 fixedly connected to the outer end of the mounting beam 1, a reinforcement frame 18 connected to the side wall of the hanging plate 17 away from the mounting beam 1, and a first reinforcing angle steel 19 which is respectively located obliquely on both sides of the mounting beam 1, one end of which is connected to the upper part of the hanging plate 17 and the other end is connected to the mounting beam 1, and the hanging plate 17 is penetrated by a mounting hole 20 for installing a climbing frame bracket.

[0045] Among them, the reinforcement frame 18 includes: two parallel reinforcement channel steels 21 with openings facing one side of the hanging plate 17, and a second reinforcement angle steel 22 respectively located at the two ends of the two reinforcement channel steels 21 and connected between the two reinforcement channel steels 21. The reinforcement channel steel 21 is a 6# channel steel, and the first reinforcement angle steel 19 and the second reinforcement angle steel 22 are 5# angle steels.

[0046] In this embodiment, the climbing frame bracket can be connected to the mounting hole 20 of the hanging plate 17 by bolts, and two reinforcing channel steels 216 and two second reinforcing angle steels 22 are used to form a fixed frame, which can effectively improve the structural strength of the hanging plate 17 and thus improve the bearing capacity of the device. The first reinforcing angle steel 19 is obliquely connected between the hanging plate 17 and the mounting beam 1, which can improve the connection strength and stability between the hanging plate 17 and the mounting beam 1.

[0047] Example 4

[0048] On the basis of Example 1, Figure 4As shown, the diagonal brace reinforcement 4 includes: a horizontal plate 23 located at the lower end of the mounting beam 1, a vertical plate 24 whose upper end is connected to the inner side of the horizontal plate 23, a diagonal brace rod 25 with adjustable length, one end of which is hinged to the lower end of the vertical plate 24 and the other end is hinged to the outer end of the mounting beam 1, a connecting plate 26 arranged at the upper end of the mounting beam 1, and a third screw rod 27 with two ends respectively movably passing through the horizontal plate 23 and the connecting plate 26 and threadedly connected to a nut.

[0049] Among them, the diagonal support rod 25 includes: a first support rod 28 which is hollow inside and has an open end, a first through hole 29 which passes through the side wall of the first support rod 28, a second support rod 30 which is slidably set in the first support rod 28 at one end and is hinged to the mounting beam 1 at the other end, a plurality of second through holes 31 which pass through the second support rod 30 along the length direction of the second support rod 30, and a reinforcing bolt 32 which passes through the first through hole 29 and the second through hole 31 and is threadedly connected to a nut, and the first support rod 28 is hinged to the vertical plate 24.

[0050] In this embodiment, the length of the diagonal brace 25 is adjusted according to the overhang length of the mounting beam 1, and then the diagonal brace 25 is hinged to the outer end of the mounting beam 1 by a hinge bolt, and the third screw 27 is passed through the mounting beam 1, and the two ends are respectively passed through the horizontal plate 23 and the connecting plate 26 to thread the nuts, so that the vertical plate 24 abuts against the outer edge of the floor slab, and thus a stable triangular support structure can be formed at the bottom of the mounting beam 1, providing an upward support force to the outer end of the mounting beam 1 and sharing part of the load, effectively improving the overall stiffness and stability of the mounting beam 1, and thus improving the supporting capacity of the device; the specific method for adjusting the length of the diagonal brace 25 is as follows: adjust the length of the second brace 30 extending out of the first brace 28 according to the required length, and then pass the reinforcing bolt 32 through the first through-hole 29 and the second through-hole 31, and finally thread the nut on the end of the reinforcing bolt 32 to achieve fixation between the second brace 30 and the first brace 28, and complete the adjustment of the length of the diagonal brace 25.

[0051] Example 5

[0052] On the basis of Example 1, the top support rod 5 includes: a connecting piece connected to the mounting beam 1, a first top support tube 33 whose bottom end is connected to the upper end of the connecting piece, a threaded support rod 34 threadedly connected at the lower end in the first top support tube, a second top support tube 35 threadedly connected to the upper end of the threaded support rod 34, and a top support plate 36 arranged at the top end of the second top support tube 35, and a rubber pad 37 is arranged at the upper end of the top support plate 36.

[0053] Among them, the connecting member includes: a connecting frame 38 in the shape of "П" slidably set on the mounting beam 1, two adjusting rods 39 respectively threadedly connected to the side walls on both sides of the connecting frame 38, locking plates 40 respectively set on the opposite ends of the two adjusting rods 39, and rotating buttons 41 respectively set on the ends away from each other of the two adjusting rods 39.

[0054] In this embodiment, the connecting frame 38 is first set on the inner end of the mounting beam 1, and then the rotating button 41 is rotated to make the adjusting rod 39 move on the side wall of the adjusting rod 39 connecting frame 38, so that the locking plate 40 is abutted against the side wall of the mounting beam 1, completing the fixation of the connecting piece on the mounting beam 1, and then according to the height between the floors, the threaded support rod 34 or the second top support tube 35 is rotated to adjust the length of the top support rod 5 so that the top support plate 36 at the top of the top support rod 5 is tightly abutted against the lower end surface of the upper floor slab, thereby realizing secondary fixation of the mounting beam 1 and further improving the stability of the device structure; the setting of the top support plate 36 increases the contact area between the top support rod 5 and the floor slab, and a rubber pad 37 is provided at the upper end of the top support plate 36, which can not only increase the friction between the top support plate 36 and the floor slab, but also can play a buffering role in the vibration between the floor slabs, thereby further improving the stability of the device.

[0055] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described by referring to the preferred embodiments of the utility model, those skilled in the art should understand that various changes can be made in form and details without departing from the spirit and scope of the utility model as defined in the appended claims.

Claims

1. A cantilever climbing frame hanging seat hanging device, characterized in that: It comprises a mounting beam (1) whose inner end is fixedly mounted on a floor slab and whose outer end extends outward from the outer edge of the floor slab, a hanging member (2) arranged at the end of the mounting beam (1) and used for mounting a climbing frame hanging seat, a diagonal stay mechanism (3) arranged between the outer end of the mounting beam (1) and the upper floor slab, a diagonal brace reinforcement member (4) arranged at the outer end of the mounting beam (1), and a top brace rod (5) arranged at the inner end of the mounting beam (1) and at both ends thereof, respectively tightened against the mounting beam (1) and the upper floor slab.

2. A cantilever climbing frame hanging bracket hanging device according to claim 1, characterized in that: The mounting beam (1) comprises: two parallel, spaced and back-symmetrical channel steels (6), a plurality of connecting steel plates (7) connected between the two channel steels (6), and an end plate (8) connected to the inner ends of the two channel steels (6); a plurality of first screw rods (9) are passed through the middle of the two channel steels (6); the other end of the first screw rod (9) passes through the floor slab; and first washers (10) and nuts are installed at both ends of the first screw rod (9).

3. The cantilever climbing frame hanging bracket hanging device according to claim 1 is characterized in that: The inclined-stayed mechanism (3) comprises: a mounting seat (11) fixed to the upper floor, a first tie rod (12) one end of which is hinged to the mounting seat (11), a basket bolt (13) threadedly connected to the other end of the first tie rod (12), a second tie rod (14) one end of which is threadedly connected to the basket bolt (13) and the other end of which is hinged to the outer end of the mounting beam (1), a second screw rod (15) is inserted into the mounting seat (11) and the upper floor, and second washers (16) and nuts are installed at both ends of the second screw rod (15).

4. The cantilever climbing frame hanging bracket hanging device according to claim 1 is characterized in that: The hanging member (2) comprises: a hanging plate (17) fixedly connected to the outer end of the mounting beam (1), a reinforcing frame (18) connected to the side wall of the hanging plate (17) away from the mounting beam (1), and a first reinforcing angle steel (19) respectively located obliquely on both sides of the mounting beam (1), one end of which is connected to the upper part of the hanging plate (17) and the other end of which is connected to the mounting beam (1); and a mounting hole (20) for mounting a climbing frame bracket is provided through the hanging plate (17).

5. A cantilever climbing frame hanging bracket hanging device according to claim 4, characterized in that: The reinforcement frame (18) comprises: two parallel reinforcement channel steels (21) with their openings facing one side of the hanging plate (17), and a second reinforcement angle steel (22) respectively connected at both ends of the two reinforcement channel steels (21) and connected between the two reinforcement channel steels (21); the reinforcement channel steel (21) is a 6# channel steel, and the first reinforcement angle steel (19) and the second reinforcement angle steel (22) are 5# angle steels.

6. The cantilever climbing frame hanging bracket hanging device according to claim 1 is characterized in that: The diagonal bracing reinforcement member (4) comprises: a horizontal plate (23) located at the lower end of the mounting beam (1), a vertical plate (24) whose upper end is connected to the inner side of the horizontal plate (23), a diagonal bracing rod (25) whose one end is hinged to the lower end of the vertical plate (24) and the other end is hinged to the outer end of the mounting beam (1) and whose length is adjustable, a connecting plate (26) arranged at the upper end of the mounting beam (1), and a third screw rod (27) whose two ends respectively movably penetrate the horizontal plate (23) and the connecting plate (26) and are threadedly connected to a nut.

7. The cantilever climbing frame hanging bracket hanging device according to claim 6 is characterized in that: The diagonal support rod (25) comprises: a first support rod (28) which is hollow inside and has an open end, a first through hole (29) which passes through a side wall of the first support rod (28), a second support rod (30) which is slidably arranged in the first support rod (28) at one end and is hinged to the mounting beam (1) at the other end, a plurality of second through holes (31) which pass through the second support rod (30) along the length direction of the second support rod (30), and a reinforcing bolt (32) which passes through the first through hole (29) and the second through hole (31) and is threadedly connected to a nut, wherein the first support rod (28) is hinged to the vertical plate (24).

8. The cantilever climbing frame hanging bracket hanging device according to claim 1 is characterized in that: The top support rod (5) comprises: a connecting piece connected to the mounting beam (1), a first top support tube (33) whose bottom end is connected to the upper end of the connecting piece, a threaded support rod (34) whose lower end is threadedly connected to the inside of the first top support tube (33), a second top support tube (35) threadedly connected to the upper end of the threaded support rod (34), and a top support plate (36) arranged at the top end of the second top support tube (35), wherein a rubber pad (37) is arranged at the upper end of the top support plate (36).

9. A cantilever climbing frame hanging bracket hanging device according to claim 8, characterized in that: The connecting member comprises: a connection frame (38) slidably arranged on the mounting beam (1) and in the shape of a "P", two adjustment rods (39) respectively threadedly connected to the side walls on both sides of the connection frame (38), locking plates (40) respectively arranged on the opposite ends of the two adjustment rods (39), and rotating knobs (41) respectively arranged on the ends away from each other of the two adjustment rods (39).

Citation Information

Cited By

  • Overhanging type climbing frame hanging seat hanging device

    CN117513720A