Supporting module

By combining the pipe shed, composite horizontal jet grouting pile layer, dewatering module and tunnel face monitoring module in the advance support module, the deficiencies of the support structure during tunnel construction in water-rich and weak strata are solved, and tunnel stability and stability are achieved. Improvement of construction safety.

CN221856735UActive Publication Date: 2024-10-18THE FIFTH ENG CO LTD OF CHINA TIESIJU CIVIL ENG GRP +6
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420017823.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-10-18
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

In the existing technology, faced with water-rich and weak strata, conventional advanced support structures are difficult to apply and have insufficient safety. They cannot effectively stabilize the tunnel face, and they lack effective measures to reduce groundwater and monitor surrounding rock deformation in real time.

Method used

A support module including a pipe shed, a composite horizontal jet grouting pile layer, a dewatering module and a tunnel face monitoring module is used. The pipe shed and composite horizontal jet grouting pile layer are used for support and water isolation. The dewatering module reduces groundwater through dewatering wells. , the tunnel face monitoring module monitors tunnel deformation in real time through multi-point displacement meters and inclinometer tubes.

Benefits of technology

It effectively improves the stability of the tunnel face, stabilizes the tunnel arch with water isolation function, reduces the damage of groundwater from deteriorating the surrounding rock, and enables real-time monitoring and early warning of deformation during tunnel construction, improving construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856735U_ABST
    Figure CN221856735U_ABST
Patent Text Reader

Abstract

The utility model provides a support module which comprises a forepoling module, the forepoling module comprises a pipe shed and a composite horizontal jet grouting pile layer, the pipe shed and the composite horizontal jet grouting pile layer are both arranged on the outer side of a vault of a tunnel, precipitation modules are arranged on the two sides of the tunnel, and each precipitation module comprises a plurality of precipitation wells which are evenly distributed at intervals. The dewatering well extends from the ground into the stratum below, a tunnel face monitoring module is arranged in surrounding rock on the outer side of the tunnel face of the tunnel, the tunnel face monitoring module comprises a plurality of monitoring units which are evenly arranged at intervals, each monitoring unit comprises a multi-point displacement meter and an inclinometer pipe, and the multi-point displacement meters and the inclinometer pipes are located on the axis of the tunnel. By arranging the advance support module, the stability of the tunnel face is effectively enhanced, by arranging the precipitation module and the tunnel face monitoring module, the surrounding rock degradation hazard caused by underground water in a water-rich stratum to tunnel construction can be effectively solved, and the deformation condition of the tunnel face is always monitored in the tunnel construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a supporting module. Background Art

[0002] With the rapid development of economy and the continuous expansion of urban scale, people have an unprecedented strong demand for traffic volume. After a long period of research and practice in tunnel and underground engineering, super-large cross-section traffic tunnels have repeatedly come into sight.

[0003] For ultra-large cross-section tunnels, the construction method is usually to alternate excavation and support. The surrounding rock of the tunnel will undergo a process of multiple disturbances, so the progressive destruction process of the surrounding rock is one of the key points of attention. During the construction process, the surrounding rock is constantly in the process of adjusting its own stress state, and the deterioration of the surrounding rock is a long-term process. The manifestations of deterioration include adverse geological phenomena such as mud inclusions and water seepage on the face. These changes need to be continuously paid attention to during the construction process.

[0004] For the construction of ultra-large-section tunnels in soft strata, the stability of the face is crucial, so advance support is often used in existing technologies, which is an important means to ensure the stability of the face. Different soft strata should be treated differently. For example, for water-rich fully weathered granite, the effect of conventional advance support such as small advance guide tubes and pipe sheds may not be ideal. In order to ensure safe and efficient construction, more comprehensive support-related systems are needed in construction, which should include measures to reduce groundwater and monitor surrounding rock deformation in real time. Utility Model Content

[0005] In view of the deficiencies of the prior art, the purpose of the present invention is to provide a support module, aiming to solve the problem in the prior art that conventional advance support structures are difficult to apply and lack safety when facing water-rich soft strata.

[0006] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:

[0007] A support module comprises an advance support module, wherein the advance support module comprises a pipe shed and a composite horizontal rotary jet grouting pile layer, wherein the pipe shed and the composite horizontal rotary jet grouting pile layer are both used to support a tunnel, wherein the tunnel is located in a stratum below the ground, wherein the stratum comprises surrounding rock surrounding the tunnel, wherein the pipe shed and the composite horizontal rotary jet grouting pile layer are both arranged in the surrounding rock, wherein the pipe shed and the composite horizontal rotary jet grouting pile layer are both located outside the vault of the tunnel, wherein the composite horizontal rotary jet grouting pile layer is also used for water isolation, wherein dewatering modules are arranged on opposite sides of the tunnel, wherein the dewatering modules comprise a plurality of evenly spaced dewatering wells, wherein the dewatering wells extend from the ground to the stratum below, wherein a face monitoring module is arranged in the surrounding rock outside the face of the tunnel, wherein the face monitoring module comprises a plurality of evenly spaced monitoring units, wherein the monitoring units comprise a multi-point displacement meter and an inclinometer tube, wherein the multi-point displacement meter and the inclinometer tube are both located on the axis of the tunnel.

[0008] Compared with the prior art, the beneficial effect of the utility model lies in that: by setting the advance support module including the composite horizontal rotary jet pile layer, the stability of the tunnel face is effectively enhanced, and the composite horizontal rotary jet pile layer also has a certain water-isolating function, which helps to stabilize the arch of the tunnel; by setting the dewatering module and the face monitoring module, the surrounding rock degradation hazard caused by groundwater in the water-rich strata to the tunnel construction can be effectively solved, and the deformation of the face is always monitored during the tunnel construction process, so as to timely warn of risks and adjust the plan.

[0009] Furthermore, the pipe rack includes a plurality of steel flower pipes, and a plurality of grouting holes are arranged on the side walls of the steel flower pipes, and the grouting holes penetrate the side walls of the steel flower pipes.

[0010] Furthermore, the composite horizontal rotary jet pile layer includes a first horizontal rotary jet pile layer, a second horizontal rotary jet pile layer and a third horizontal rotary jet pile layer, the first horizontal rotary jet pile layer, the second horizontal rotary jet pile layer and the third horizontal rotary jet pile layer all include a number of mutually interlocking horizontal rotary jet piles, the first horizontal rotary jet pile layer surrounds the outer side of the arch of the tunnel, the first horizontal rotary jet pile layer is interlocked with the second horizontal rotary jet pile layer on the side facing away from the tunnel, the steel flower pipe is located at the interlocking position of the first horizontal rotary jet pile layer and the second horizontal rotary jet pile layer, both ends of the first horizontal rotary jet pile layer and the second horizontal rotary jet pile layer are interlocked with the third horizontal rotary jet pile layer, and the third horizontal rotary jet pile layer extends from the tunnel to the surrounding rock of the tunnel.

[0011] Furthermore, the precipitation well includes a solid pipe, a filter pipe and a sedimentation pipe. The top of the solid pipe is located on the ground, a clay ball is arranged on the outside of the side wall of the solid pipe, the bottom end of the solid pipe is connected to the filter pipe, and the end of the filter pipe facing away from the solid pipe is connected to the sedimentation pipe.

[0012] Furthermore, the length of the sedimentation tube is 3m.

[0013] Furthermore, a plurality of filter holes are arranged on the side wall of the filter tube, and the filter holes penetrate the side wall of the filter tube.

[0014] Furthermore, the multi-point displacement meter includes a plurality of measuring points, and the measuring points are evenly spaced from the tunnel vault to the ground, and the distance between adjacent measuring points is 1.5m.

[0015] Furthermore, the inclinometer casing extends from the ground into the stratum and is perpendicular to the axial direction of the tunnel.

[0016] Furthermore, a waterproof layer is provided on the ground, and the position of the waterproof layer corresponds to the position of the advanced support module. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the structure of the support module in the embodiment of the utility model;

[0018] Figure 2 This is a structural schematic diagram of an advanced support module in a support module in an embodiment of the utility model;

[0019] Figure 3 This is a structural schematic diagram of a precipitation module in a support module in an embodiment of the utility model;

[0020] Figure 4 This is a structural schematic diagram of a tunnel face monitoring module in a support module in an embodiment of the utility model;

[0021] Figure 5 It is a structural schematic diagram of another viewing angle of the tunnel face monitoring module in the support module in the embodiment of the utility model;

[0022] Description of main component symbols:

[0023] Advanced support module 100 The first horizontal jet grouting pile layer 110 The second horizontal jet grouting pile layer 120 The third horizontal jet grouting pile layer 130 Pipe Shed 140 Precipitation well 200 Sedimentation tube 210 Filter tube 220 Tunnel face monitoring module 300 Multi-point displacement meter 310 Inclinometer 320 Waterproof layer 400 tunnel 500 Tunnel vault 510 Tunnel arch bottom 520

[0024] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0025] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0026] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0028] See also Figures 1 to 5The support module in the embodiment of the utility model includes an advance support module 100, and the advance support module 100 includes a pipe shed 140 and a composite horizontal rotary jet pile layer. The pipe shed 140 and the composite horizontal rotary jet pile layer are both used to support a tunnel 500. The tunnel 500 is located in a stratum below the ground, and the stratum includes surrounding rocks surrounding the tunnel 500. The pipe shed 140 and the composite horizontal rotary jet pile layer are both arranged in the surrounding rocks. The pipe shed 140 and the composite horizontal rotary jet pile layer are both located outside the vault of the tunnel 500. The composite horizontal rotary jet pile layer is also used for water isolation. The pipe shed 140 includes a plurality of steel flower pipes arranged around the outside of the tunnel vault 510. The side wall of the steel flower pipe is provided with a plurality of grouting holes, and the grouting holes penetrate the side wall of the steel flower pipe. The composite horizontal rotary jet pile layer includes a first horizontal rotary The sprayed pile layer 110, the second horizontal rotary jet pile layer 120 and the third horizontal rotary jet pile layer 130, the first horizontal rotary jet pile layer 110, the second horizontal rotary jet pile layer 120 and the third horizontal rotary jet pile layer 130 all include a plurality of mutually interlocking horizontal rotary jet piles, the first horizontal rotary jet pile layer 110 surrounds the outer side of the tunnel vault 510, the side of the first horizontal rotary jet pile layer 110 facing away from the tunnel vault 510 is interlocked with the second horizontal rotary jet pile layer 120, the steel flower pipe is located at the interlocking position of the first horizontal rotary jet pile layer 110 and the second horizontal rotary jet pile layer 120, both ends of the first horizontal rotary jet pile layer 110 and the second horizontal rotary jet pile layer 120 are interlocked with the third horizontal rotary jet pile layer 130, and the third horizontal rotary jet pile layer 130 extends from the tunnel 500 to the surrounding rock of the tunnel 500. Preferably, the advanced support module 100 is constructed before the excavation of the tunnel blind hole, the diameter of the sprayed solid of the horizontal jet grouting pile is 500mm, the pile circumferential center spacing is 400mm, the adjacent horizontal jet grouting piles are engaged by 100mm, the horizontal jet grouting piles and the pipe shed 140 longitudinally penetrate the fully weathered stratum, and during the construction process, in order to form the horizontal jet grouting piles, high-pressure jet engagement piles use cement single slurry, and the two ends of the composite horizontal jet grouting pile layer are widened, that is, the number of horizontal water-jetted piles is increased, the diameter of the steel flower pipe is 180mm, the thickness of the steel flower pipe is 10mm, and each cross section of the steel flower pipe is provided with 4 grouting holes, and the grouting holes are arranged in a plum blossom shape, and the slurry used for grouting is cement slurry.It can be understood that the advance support module 100 can enhance the stability of the face of the tunnel 500, and the horizontal jet grouting piles are interlocked with each other, which has structural strength and water-isolating effect. The widened ends of the composite horizontal jet grouting piles can further prevent water from leaking downward from the top of the tunnel 500 to the arch foot of the tunnel 500, thereby protecting the stability of the arch of the tunnel 500. By grouting into the steel flower pipe, the cement slurry flows outward from the inside of the steel flower pipe through the grouting hole and solidifies, so that the horizontal jet grouting piles are interlocked with the steel flower pipe, making the connection between the first horizontal jet grouting pile layer 110, the second horizontal jet grouting pile layer 120 and the pipe shed 140 more stable.

[0029] A dewatering module is arranged on both sides of the tunnel 500, and the dewatering module includes a plurality of dewatering wells 200 evenly spaced, and the dewatering wells 200 extend from the ground into the stratum, and the dewatering wells 200 include a solid pipe, a sedimentation pipe 210 and a filter pipe 220, the top of the solid pipe is located on the ground, and a clay ball is arranged on the outside of the side wall of the solid pipe, and the bottom of the solid pipe is located inside the stratum and connected to the filter pipe 220, the length of the sedimentation pipe 210 is 3m, and a plurality of filter holes are arranged on the side wall of the filter pipe 220, and the filter holes penetrate the side wall of the filter pipe 220, and a waterproof layer 400 is arranged on the ground, and the position of the waterproof layer 400 corresponds to the position of the advanced support module 100. Preferably, the solid pipe and the sedimentation pipe 210 are both made of steel pipes, the effective working length of the filter tube 220 of the precipitation well 200 is 4.8 mm, the filter tube 220 is made of a steel pipe with an outer diameter of 500 mm, and the distribution of the filter holes is staggered in a plum blossom shape to improve the filtering effect. When draining water, the operator extends a drainage pipe to the effective working section of the filter tube 220 to drain the water, and drains the water to the open drainage ditch on the ground, and finally guides it to the tunnel surface drainage system. The precipitation module can be opened in sections according to the excavation conditions of the tunnel 500. The precipitation module should reduce the groundwater to the designed water level before excavation. The bottom of the precipitation well 200 is located at the same height, specifically, it should be located below the height of the tunnel arch bottom 520. The waterproof layer 400 is made of clay with a thickness of 500 mm. It can be understood that the dewatering module is used to reduce the groundwater in the water-rich stratum to the designed water level, and the waterproofing operation is carried out through the waterproof layer 400 in cooperation with the composite horizontal rotary jet pile layer, which is beneficial to improving the stability of the tunnel and ensuring construction safety.

[0030] A face monitoring module 300 is set in the surrounding rock outside the face of the tunnel 500. The face monitoring module 300 includes a plurality of monitoring units evenly spaced apart. The monitoring units include a multi-point displacement meter 310 and an inclinometer tube 320. The multi-point displacement meter 310 and the inclinometer tube 320 are both located on the axis of the tunnel 500. The multi-point displacement meter 310 includes a plurality of measuring points. The measuring points are evenly spaced apart from the tunnel vault 510 to the ground. The distance between adjacent measuring points is 1.5 m. The inclinometer tube 320 extends from the ground into the stratum and is perpendicular to the axial direction of the tunnel 500. Preferably, the face monitoring module 300 is set up in advance, the multi-point displacement meter 310 is set with five measuring points, the deepest point reaches the tunnel vault 510, and the inclinometer tube 320 is set with five measuring points, with the deepest point being 1m deeper than the tunnel vault 520, and a measuring point is set every 2m vertically to the ground, and the monitoring unit is located on the central axis of the tunnel 500 and extends along the axis of the tunnel 500 in the direction away from the face of the tunnel 500. It can be understood that the method of directly measuring by setting the multi-point displacement meter 310 from the face forward is very easy to be damaged during construction, so this embodiment adopts the setting method of driving from the surface, so that the multi-point displacement meter 310 only reaches the tunnel vault 310, to prevent the multi-point displacement meter 310 from being damaged, and at the same time, in conjunction with the inclinometer tube 320, the displacement of the face is indirectly reflected through the slope, which has an important role in improving the deformation monitoring of the face during the construction of the tunnel 500.

[0031] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0032] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. A support module, characterized in that: It comprises an advance support module, the advance support module comprises a pipe shed and a composite horizontal rotary jet pile layer, the pipe shed and the composite horizontal rotary jet pile layer are both used to support the tunnel, the tunnel is located in a stratum below the ground, the stratum comprises surrounding rock surrounding the tunnel, the pipe shed and the composite horizontal rotary jet pile layer are both arranged in the surrounding rock, the pipe shed and the composite horizontal rotary jet pile layer are both located outside the vault of the tunnel, the composite horizontal rotary jet pile layer is also used for water isolation, dewatering modules are arranged on opposite sides of the tunnel, the dewatering module comprises a plurality of evenly spaced dewatering wells, the dewatering wells extend from the ground to the stratum below, a face monitoring module is arranged in the surrounding rock outside the face of the tunnel, the face monitoring module comprises a plurality of evenly spaced monitoring units, the monitoring unit comprises a multi-point displacement meter and an inclinometer tube, the multi-point displacement meter and the inclinometer tube are both located on the axis of the tunnel.

2. The support module according to claim 1, characterized in that: The pipe rack comprises a plurality of steel flower pipes, the side walls of the steel flower pipes are provided with a plurality of grouting holes, and the grouting holes penetrate through the side walls of the steel flower pipes.

3. The support module according to claim 2, characterized in that: The composite horizontal rotary jet pile layer includes a first horizontal rotary jet pile layer, a second horizontal rotary jet pile layer and a third horizontal rotary jet pile layer. The first horizontal rotary jet pile layer, the second horizontal rotary jet pile layer and the third horizontal rotary jet pile layer all include a plurality of mutually interlocking horizontal rotary jet piles. The first horizontal rotary jet pile layer surrounds the outer side of the arch of the tunnel. The first horizontal rotary jet pile layer is interlocked with the second horizontal rotary jet pile layer on the side facing away from the tunnel. The steel flower pipe is located at the interlocking position of the first horizontal rotary jet pile layer and the second horizontal rotary jet pile layer. Both ends of the first horizontal rotary jet pile layer and the second horizontal rotary jet pile layer are interlocked with the third horizontal rotary jet pile layer. The third horizontal rotary jet pile layer extends from the tunnel to the surrounding rock of the tunnel.

4. The support module according to claim 1, characterized in that: The precipitation well includes a solid pipe, a filter pipe and a sedimentation pipe. The top of the solid pipe is located on the ground, a clay ball is arranged outside the side wall of the solid pipe, the bottom end of the solid pipe is connected to the filter pipe, and the end of the filter pipe facing away from the solid pipe is connected to the sedimentation pipe.

5. The support module according to claim 4, characterized in that: The length of the sedimentation tube is 3 m.

6. The support module according to claim 4, characterized in that: A plurality of filter holes are arranged on the side wall of the filter tube, and the filter holes penetrate through the side wall of the filter tube.

7. The support module according to claim 1, characterized in that: The multi-point displacement meter includes a plurality of measuring points, and the measuring points are evenly spaced from the tunnel vault to the ground, and the distance between adjacent measuring points is 1.5m.

8. The support module according to claim 1, characterized in that: The inclinometer casing extends from the ground into the stratum and is perpendicular to the axial direction of the tunnel.

9. The support module according to claim 1, characterized in that: A waterproof layer is arranged on the ground, and the position of the waterproof layer corresponds to the position of the advanced support module.